Coal Diver Everything you wanted to know about coal, but were afraid to ask.

This is a text-only version of the document "West Hay Creek - Final Environmental Impact Statement - June 2004". To see the original version of the document click here.
U.S. Department of the Interior
Bureau of Land Management Wyoming State Office Casper Field Office
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT

June 2004

FINAL ENVIRONMENTAL IMPACT STATEMENT for the West Hay Creek Coal Lease Application
(Federal Coal Lease Application WYW151634)

MISSION STATEMENT It is the mission of the Bureau of Land Management to sustain the health, diversity, and productivity of the public lands for the use and enjoyment of present and future generations.

BLM/WY/PL-04/022+1320

EXECUTIVE SUMMARY
On August 31, 2000, Triton Coal Company, LLC (Triton) filed an application with the Bureau of Land Management (BLM) for federal coal reserves in a tract located to the north and west of, and adjacent to, Triton’s Buckskin Mine in Campbell County, Wyoming (figures ES-1 and ES-2). This coal lease application was assigned case number WYW151634, and is referred to as the West Hay Creek lease by application (LBA) tract. As applied for, the West Hay Creek LBA tract includes approximately 840 acres and an estimated 145 million tons of in-place federal coal reserves. The lands applied for in this application are located in northern Campbell County, Wyoming, approximately 12 miles north of the city of Gillette, Wyoming. This lease application was reviewed by the BLM, Wyoming State Office, Division of Mineral and Lands Authorization, and it was determined that the application and the lands involved met the requirements of the regulations governing coal leasing on application at Title 43 of the Code of Federal Regulations Part 3425.1 (43 CFR 3425.1). The PRRCT reviewed this lease application at a public meeting held on October 25, 2000, in Cheyenne, Wyoming. At that meeting, the PRRCT recommended that the BLM continue to process the lease application. In order to process an LBA, the BLM must evaluate the quantity, quality, maximum economic recovery, and fair market value of the federal coal and fulfill the requirements of the National Environmental Policy Act (NEPA) by evaluating the environmental consequences of leasing the federal coal. To evaluate the environmental impacts of leasing and mining the coal, the BLM must prepare an environmental assessment (EA) or an environmental impact statement (EIS) to evaluate the site-specific and cumulative environmental and socioeconomic impacts of leasing and developing the federal coal in the application area. The BLM made a decision to prepare an EIS for this lease application. The Draft EIS for the West Hay Creek LBA Tract was mailed to the public in March 2003. The US Environmental Protection Agency (EPA) published a notice announcing the availability of the DEIS in the Federal Register on March 28, 2003. BLM published a Notice of Availability and Notice of Public Hearing in the Federal Register, also on March 21, 2003. A 60-day comment period on the DEIS commenced with publication of the EPA’s Notice of Availability and ended on May 30, 2003. The BLM’s Federal Register notice announced the date and time of a public hearing, as required under 43 CFR 3425.4 (a) (1). The public hearing was held at the Clarion Western Plaza in Gillette, Wyoming, at 7:00 p.m., on April 16, 2003. The purpose of the public hearing was to solicit public comments on the DEIS and on the fair market value, the maximum economic recovery, and the proposed competitive sale of federal coal from the LBA tract. One comment was recorded at the public hearing, and eight written comment letters were received on the Draft EIS. The comment letters and responses are

ES-1


LEGEND

EXISTING LEASES

West Hay Creek LBA
Buckskin Mine

LBAs ISSUED Belco I-90 Exchange Lease LBAs PENDING WEST HAY CREEK LBA TRACT AS APPLIED FOR (THIS EIS)

Rawhide Mine Eagle Butte Mine West Extension LBA Eagle Butte LBA Fort Union Mine Dry Fork Mine Wyodak Mine

GILLETTE

West Rocky Butte LBA Belle Ayr LBA Belle Ayr Mine

North Caballo Mine

Caballo Mine Cordero-Rojo Mine (Cordero-Rojo Complex) Cordero Mine (Cordero-Rojo Complex)

Maysdorf LBA

Coal Creek Mine

North Jacobs Ranch LBA Thundercloud LBA Jacobs Ranch LBA WRIGHT Jacobs Ranch Mine Little Thunder LBA West Black Thunder LBA West Roundup LBA North Rochelle LBA	 NARO North LBA NARO South LBA Horse Creek LBA Black Thunder Mine North Rochelle Mine Powder River LBA North Antelope/ Rochelle Complex North Antelope/ Rochelle LBA West Antelope LBA	 Antelope LBA Antelope Mine

Figure ES-1. General Location Map with Federal Coal Leases and LBAs.

ES-2


12

R. 73 W.

R.
 72 W.


7


8


9

10

11 


13

18

17

16

15

14


24


19


20


21

22

23


25

30

29


28


27

26


36

31

32


33

34

35


T. 52 N. T. 51 N.

T. 52 N. T. 51 N.

1

6

5

4

3

2


12

R. 73 W.

R. 72
 W.

7

8

9

10

11


LEGEND

BUCKSKIN MINE PERMIT BOUNDARY
 WEST HAY CREEK LBA TRACT AS APPLIED FOR
 AREA ADDED UNDER BLM'S PREFERRED ALTERNATIVE
 W-0325878
 WYW-129205
 WYW-78634
 WYW-150152


Figure ES-2. Existing Federal Leases and LBA Preferred Alternative Tract Configuration.

ES-3


included as appendix H of the FEIS. A transcript of the hearing can be viewed at the BLM offices in Casper and Cheyenne. BLM will use the analysis in this EIS to decide whether or not to hold a public, competitive, sealed-bid coal lease sale for the federal coal tract and issue a federal coal lease. The LBA sale process is, by law and regulation, an open, public, competitive, sealed-bid process. Bidding at a potential sale would be open to any qualified bidder; it would not be limited to the applicant. If a lease sale is held, a federal coal lease would be issued to the highest bidder at the sale if a federal sale panel determines that the high bid at that sale meets or exceeds the fair market value of the coal as determined by BLM's economic evaluation, and if the US Department of Justice determines that there are no antitrust violations if a lease is issued to the high bidder at the sale. The applicant (Triton) may not be the successful high bidder. Other agencies, including the Office of Surface Mining and Reclamation (OSM), a cooperating agency on this EIS, will also use this analysis to make decisions related to leasing and mining the federal coal in this tract. The US Forest Service (FS) is not a cooperating agency on this EIS because there are no federal surface lands managed by the FS included in the West Hay Creek LBA tract. A decision to lease the federal coal lands in this application would be in conformance with the current Resource Management Plan for the BLM Buffalo Field Office. The West Hay Creek LBA tract is contiguous with the Buckskin Mine. The analysis in this EIS assumes that Triton would be the successful bidder on the West Hay Creek LBA tract if a sale were held, and that it would be mined as a maintenance tract for the Buckskin Mine. The Proposed Action and three alternatives are analyzed in this FEIS. Proposed Action The Proposed Action is to hold a competitive coal lease sale and issue a maintenance lease to the successful bidder for the West Hay Creek LBA tract as applied for (figure ES-2). Under the Proposed Action, Triton currently estimates that average annual production would be 25 million tons per year, the life of the existing mine would be extended by approximately 5 years, and employment would be about 225 persons. The proposed action includes 838.13 acres. Alternative 1 Under alternative 1, the No Action alternative, the LBA tract would not be leased and the Buckskin Mine would mine its remaining leased coal reserves in approximately 12 years at an average annual production rate of 25 million tons per year. Average employment would be 225 persons. Portions of the surface of the LBA tract adjacent to the existing Buckskin leases will be disturbed when those leases are developed in accordance with the existing approved mining plans. Selection of this alternative would

ES-4


not preclude leasing and mining of this tract in the future, either as a maintenance tract for an existing operation or as part of a new start mine. Alternative 2 (Preferred Alternative) Under alternative 2, BLM would hold a competitive lease sale and issue a maintenance lease for a tract that is larger than the applied for configuration. In evaluating the West Hay Creek LBA, BLM identified a study area, shown as “West Hay Creek LBA Tract Alternative 2” in figure ES-2, which includes unleased federal coal adjacent to the tract as applied for that BLM could add to the tract to potentially maximize recovery and/or avoid bypassing potentially recoverable coal. The study area includes approximately 176.2 acres and 25 million tons of unleased mineable federal coal north of and southeast of the tract as applied for. BLM is considering adding the federal coal north of the tract to provide for more efficient recovery of the federal coal and/or increase competitive interest in the West Hay Creek LBA tract and the remaining unleased federal coal in this area. The area of unleased federal coal adjacent to the southeast corner of the West Hay Creek tract as applied for would be isolated and might be bypassed if it is not included in the tract. The mine did not incorporate this area into their application because their current geologic model does not indicate that any mineable coal is present. BLM is considering including it in the tract because additional drilling may indicate there is some recoverable coal in this area. The BLM’s Preferred Alternative is to add the area to the southeast and a portion of the Alternative 2 study area north of the tract as applied for, as illustrated in figure ES-3. Under the Preferred Alternative, BLM would add approximately 83.06 acres and 15 million tons of mineable coal to the tract as applied for. Under the preferred alternative, production and employment would be similar to the Proposed Action. Alternative 3 This alternative also considers holding a competitive coal lease sale and issuing a maintenance lease to the successful bidder for a tract that is larger than the applied for tract (figure ES-3). Under this alternative, the unleased federal coal southeast of the tract as applied for (discussed under alternative 2, above) would be added to the tract, which would increase the size of the tract by 31.13 acres. Production and employment would be similar to the Proposed Action. Table ES-1 summarizes coal production, surface disturbance, and mine life for the Buckskin Mine under each alternative. The environmental impacts of mining the LBA tract would be similar under the proposed action, the preferred alternative and alternative 3. Other alternatives that were considered but not analyzed in detail include: x	 holding a competitive coal lease sale and issuing a lease to the successful bidder (not the applicant) for the purpose of developing a new stand-alone mine. This alternative was considered and eliminated from detailed study because the

ES-5


R. 73 W.

R. 72 W.

7

8

9

R. 73 W.

R. 72 W.

7

8

9

18

17

16

18

17

16

19

20

21

19

20

21

T. 52 N.

T. 52 N.

WEST HAY CREEK LBA TRACT AS APPLIED FOR (Proposed Action)
R. 73 W. R. 72 W. R. 73 W. R. 72 W.

WEST HAY CREEK LBA TRACT ALTERNATIVE 2

7

8

9

7

8

9

18

17

16

18

17

16

19

20

21

19

20

21

T. 52 N.

T. 52 N.

WEST HAY CREEK LBA TRACT ALTERNATIVE 3

WEST HAY CREEK LBA TRACT PREFERRED ALTERNATIVE

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT AS APPLIED FOR AREA ADDED UNDER BLM'S PREFERRED ALTERNATIVE AREA ADDED BY BLM UNDER ALTERNATIVE 2 AREA ADDED BY BLM UNDER ALTERNATIVE 3

Figure ES-3. West Hay Creek LBA Tract Configurations.

ES-6


TABLE ES-1
 COMPARISON OF COAL PRODUCTION, SURFACE DISTURBANCE, 
 AND MINE LIFE 


Item In-place1 federal coal (as of 1/1/02) Recoverable coal2 (as of 1/1/02) Coal mined3, 12/31/01 Lease acres4 Total area to be disturbed4 Permit area4 Average annual post-2001 coal production Remaining life of mine (post-2001) Average no. of employees Total projected state revenues (post-2001)5 Total projected federal revenues (post-2001)6
1

No Action Alternative (existing Buckskin Mine) 512 mmt 434 mmt 189.9 mmt 4,949 ac 5,099 ac 7,602 ac 25 mmt 12.4 yrs 225 $477 million $165 million

Added by Proposed Action 145 mmt 130 mmt --838.1975 ac 830 ac 0 ac 0 mmt 5.2 yrs 0 $143 million $49 million

Added by Alternative 2 (Preferred Alternative) 160 mmt 140 mmt — 921.1575 ac 897 ac 0 ac 0 mmt 5.6 yrs 0 $154 million $53 million

Added by Alternative 3 150 mmt 130 mmt --869.26 ac 830 ac 0 ac 0 mmt 5.2 yrs 0 $143 million $49 million

In-place coal includes all Canyon and Anderson coal within the lease area.

2

Buckskin Mine defines recoverable coal as an estimate of the extractable coal that can be recovered. Excludes all mining losses that occur during normal mining operations, including wedge losses, coal left in pillars and fenders, and top and bottom coal cleaning. Assumes 90% to 92% recovery of extractable coal.

3

4

Lease area includes Federal coal leases only and does not include state and private coal within the permit boundary. The permit area is larger than leased or disturbed areas to assure that all disturbed lands are within the permit boundary and to allow an easily defined legal land description. The permit area would not need to be changed for any of the action alternatives.

Projected revenue to the state of Wyoming is $1.10 per ton of coal sold and includes income from severance tax, property and production taxes, sales and use taxes, and Wyoming's share of federal royalty payments (University of Wyoming 1994). Federal revenues based on $4.00 per ton price x federal royalty of 12.5% x amount of recoverable coal plus bonus payment on LBA coal of $0.26 per ton based on average of last 11 LBAs (table 1-1) x amount of recoverable coal less state's 50% share.
6

5

ES-7


current economics of mining in the Powder River Federal Coal Region appear to make construction of a new mine economically unfeasible on a tract of federal coal of this size.

x	 delaying the sale of the West Hay Creek LBA tract as applied for to increase the benefit to the public afforded by higher coal prices and/or to allow more complete recovery of the potential CBM resources in the tract prior to mining. This alternative was not analyzed in detail because it would not produce significantly different impacts than other alternatives analyzed in detail. Royalty and tax payments increase as coal prices increase because they are collected at the time the coal is sold. Recovery of a substantial portion of the CBNG resources on the tract would be feasible after lease issuance. Critical elements of the human environment (BLM 1988) that could be affected by the proposed project include air quality, cultural resources, Native American religious concerns, threatened, endangered (T&E), and candidate plant and animal species, hazardous or solid wastes, water quality, wetlands/riparian zones, environmental justice, and invasive nonnative species. Five critical elements (areas of critical environmental concern, prime and unique farmland, wild and scenic rivers, floodplains, and wilderness) are not present in the project area and are not addressed further. In addition to the critical elements that are potentially present in the project area, the EIS discusses the status and potential effects of the project on topography and physiography, geology and mineral resources, soils, water availability and quality, alluvial valley floors, vegetation, wildlife, land use and recreation, paleontological resources, visual resources, noise, transportation resources, and socioeconomics. The analysis area, which is shown in Figure ES-2, is located in the Powder River Basin (PRB), a part of the Northern Great Plains that includes most of northeastern Wyoming. The Buckskin Mine, which is located on the gently dipping eastern limb of the structural basin, is the northernmost operating mine within the Wyoming PRB. The West Hay Creek LBA tract is in an area consisting primarily of elevated ridges broken by minor drainages with an elevation ranging from 4,100 to 4,340 feet. In the LBA tract, there are two mineable coal seams, referred to as the Anderson and the Canyon coal seams. The Anderson coal seam averages 40 feet thick and the underlying Canyon seam averages 66 feet. The parting thickness between the Anderson and Canyon coal seams averages about 15 feet in the tract. The average overburden thickness is about 204 ft. The existing topography on the LBA tract would be substantially changed during mining. A highwall with a vertical height equal to overburden plus coal thickness would exist in the active pits. Following reclamation, the average surface elevation would be lower due to removal of the coal. The reclaimed land surface would approximate premining contours and the basic drainage network would be retained, but the reclaimed surface would contain fewer, gentler topographic features. This could contribute to reduced habitat diversity and wildlife carrying capacity on the LBA tract.

ES-8


These topographic changes would not conflict with regional land use, and the postmining topography would adequately support anticipated post-mining land use. The geology from the base of the coal to the land surface would be subject to considerable long-term change on the LBA tract under any alternative. An average of 204 feet of overburden, 18 feet of interburden and 106 feet of coal would be removed from the LBA tract. The replaced overburden would be a relatively homogeneous mixture compared to the premining layered overburden. Development of other minerals potentially present on the LBA tract could not occur during mining but could occur after mining. There are no conventional oil and gas wells within the LBA tract at this time, but if any are drilled, they would have to be plugged and abandoned prior to mining but could be recompleted after mining if the remaining reserves justify the expense of the recompletion. There were six active CBM wells, three shut-in CBM wells, and three CBM wells that were permitted or had started drilling within the LBA tract itself as of April 9, 2004. CBM resources that are not recovered prior to mining would be vented to the atmosphere and irretrievably lost when the coal is removed. CBM could be produced from the existing wells, and other wells could be drilled during the time it takes to lease and permit the LBA tract and, on a case by case basis, until mining activity approaches each well. BLM’s policy is to optimize recovery of both resources, ensure the public receives a reasonable return, and encourage agreements between lessees or use BLM authority to minimize loss of publicly owned resources. Consequences to soil resources from mining the LBA tract would include changes in the physical, biological, and chemical properties. Following reclamation, the soils would be unlike premining soils in texture, structure, color, accumulation of clays, organic matter, and microbial populations. Soil chemistry and soil nutrient distribution would be more uniform. The replaced topsoil would also be more uniform in type, thickness, and texture. It would be adequate in quantity and quality to support planned postmining land uses (wildlife habitat and rangeland). If the West Hay Creek LBA tract is leased and mined as proposed under the Proposed Action or any of the alternatives, there would be a continuation of the impacts to air quality that are occurring as a result of the currently permitted mining operations. Dust would be visible to the public when mining occurs near Wyoming 14-16, Collins Road, or McGee Road. Overburden thickness, coal thickness, and interburden thickness in the LBA tract under the Proposed Action and action alternatives are similar to the existing mine. Concentrations of particulate matter would be elevated in the vicinity of mining operations on the LBA tract. From 1995 through 2003, the mine produced an average of 15.9 million tons of coal per year. During that time, there was one exceedance of the PM10 24-hour standard at one of the Buckskin Mine’s air quality monitoring sites; it has been flagged by the Wyoming Department of Environmental Quality/Air Quality Division (WDEQ/AQD) in the Aerometric Information and Retrieval System (AIRS) database as having been impacted by winds in excess of 40 mph during the collection period. If Triton acquires a lease for the West Hay Creek LBA tract, they would be required to modify the WDEQ/AQD air quality permit for the Buckskin Mine to include the tract before it could be mined.

ES-9

There is public concern in the Wyoming PRB over releases of nitrogen oxides (NOx) that sometimes occur during blasting operations conducted prior to coal removal. Lowlying, gaseous orange clouds containing NOx that can be transported by wind have sometimes formed after overburden blasting. Exposure to NOx can cause adverse health effects. EPA has expressed concerns that NOx levels in some blasting clouds may be sufficiently high at times to cause human health effects. As a result of these incidents, the mines have been evaluating new blasting techniques, which have been able to reduce, but not eliminate, the production of NOx during blasting. The WDEQ/Land Quality Division (LQD) has directed some mines to take steps designed to mitigate the effects of NO2 emissions occurring from overburden blasting. To date, there have been no complaints to the Buckskin Mine or the WDEQ/LQD about blasting clouds at the Buckskin Mine. Based on the size and nature of their blasting, the WDEQ/LQD has not directed the Buckskin Mine to take any of the required steps to mitigate or prevent blasting clouds. Changes in runoff characteristics and sediment discharges would occur during mining of the LBA tract, and erosion rates could reach high values on the disturbed areas because of vegetation removal. However, state and federal regulations require that surface runoff from mined lands be treated to meet effluent standards, so sediment would be deposited in ponds or other sediment-control devices before the surface runoff water is allowed to leave the permit area. After mining and reclamation are complete, surface water flow, quality, and sediment discharge would approximate premining conditions. Mining the LBA tract would increase both the areal extent of drawdown in water levels in the coal and overburden aquifers and the size of the area where the existing coal and overburden aquifers would be replaced by mine backfill. Drawdown in the coal aquifer, which is a considered to be a regional aquifer, would be expected to increase roughly in proportion to the increase in area affected by mining and would extend farther than drawdown in the overburden aquifers, which are typically limited in areal extent. The data available indicate that hydraulic properties of the backfill would be comparable to the premining overburden and coal aquifers. Total dissolved solids concentrations in the backfill could initially be expected to be higher than in the premining overburden and coal aquifers, but would be expected to meet Wyoming Class III standards for use as stock water. The West Hay Creek LBA tract has been evaluated for the presence of AVFs, and there are none. Jurisdictional wetlands that are disturbed by mining must be replaced during the reclamation process. A total of 17.51 acres of jurisdictional wetlands have been identified within the analysis area. Existing wetlands in the LBA tract would be impacted by mining operations. The Army Corps of Engineers (COE) requires replacement of all impacted jurisdictional wetlands in accordance with section 404 of the Clean Water Act and determines the number of acres to be restored. WDEQ/LQD allows and sometimes requires mitigation

ES-10


of nonjurisdictional wetlands affected by mining, depending on the values associated with the wetland features. Mining would progressively remove the native vegetation on the LBA tract. Reclamation and revegetation of disturbed land would occur contemporaneously with mining. Reestablished vegetation would be dominated by species mandated in the reclamation seed mixtures, which are approved by the WDEQ. The majority of these species would be native to the LBA tract. Initially, the reclaimed land would be dominated by grassland vegetation, which would be less diverse than the premining vegetation. Estimates for the time it would take to restore sagebrush to premining density levels range from 20 to 100 years. An indirect impact associated with this vegetative change would potentially be a decreased big game habitat carrying capacity. However, a diverse, productive, and permanent vegetative cover would be established on the LBA tract within about 10 years following reclamation, prior to release of the final reclamation bond. The decrease in plant diversity would not seriously affect the potential productivity of the reclaimed areas, and the proposed postmining land uses (wildlife habitat and rangeland) should be achieved even with the changes in vegetation composition and diversity. The reclamation plans for the LBA tract would also include steps to control invasion by weedy (invasive, nonnative) plant species. In the short term, wildlife would be displaced from the LBA tract in areas of active mining and the acreage of habitat available for wildlife populations would be reduced. Habitat would be disturbed in parcels, with reclamation progressing as new disturbance occurs. The LBA tract does not contain any unique or crucial big game habitat. Sage grouse have been found on lands within and adjacent to the LBA tract and are yearlong residents in this area. No leks have been recorded on the LBA tract during baseline surveys or annual mine surveys and there are currently no active leks in the area of the tract. No broods were recorded during formal brood surveys but breeding and brood-rearing habitat is present in the analysis area. There are no intact raptor nest sites on the West Hay Creek LBA Tract, but five raptor species (the burrowing owl, great horned owl, ferruginous hawk, red-tailed hawk and golden eagle) have been identified nesting within 2 miles of the LBA tract. In the long term, following reclamation, carrying capacity and habitat diversity may be reduced due to flatter topography, less diverse vegetative cover, and reduction in sagebrush density. T&E plant and wildlife surveys specific to the proposed lease tract were conducted in 1999. No suitable roosting habitat, known nest sites, or concentrated prey or carrion sources for bald eagles have been identified during baseline or annual wildlife surveys in the West Hay Creek analysis area. Historically, this species has infrequently been seen foraging in the general vicinity of Buckskin Mine. No prairie dog colonies are currently located on or within ½-half mile of the West Hay Creek LBA tract. No evidence of black-footed ferrets has ever been recorded by qualified biologists during general or specific surveys in the Buckskin Mine area. Potential habitat for Ute ladiestresses orchid was surveyed within the West Hay Creek LBA tract. No Ute ladies’­

ES-11


tresses were observed during this survey, and none have been identified during surveys for other mines in this area. Active mining would preclude other land uses, including livestock and wildlife grazing use and recreational use of the LBA tract. There is no public surface included in the tract, the surface of the tract is owned entirely by Triton. Within 10 years after initiation of each reclamation phase, rangeland and wildlife use would return to near premining levels. The cumulative impacts of energy development (coal mining, oil, and gas) in the PRB are and will continue to contribute to a reduction in hunting opportunities for some animals (pronghorn, mule deer, and sage grouse). Mining would impact oil and gas development on the leased lands during active mining. The federal oil and gas rights are leased. As discussed above, there are active CBM wells on the tract under the Proposed Action and Alternatives 2 and 3. CBM that is not recovered prior to mining would be vented and irretrievably lost as the coal is removed. Cultural resources surveys have been conducted on the West Hay Creek tract LBA area. A data recovery plan has been developed for the one site found on the LBA tract which meets the eligibility criteria for the NRHP. This data recovery plan will be carried forward in the mining and reclamation plan and implemented before the site is disturbed. No sites of Native American religious or cultural importance have been identified on the LBA tract. The OSM completed Native American consultation on the lands within the analysis area in 2000. No comments were received. If such sites or localities are identified at a later date, appropriate action must be taken to address concerns related to those sites. No unique or significant paleontological resources have been identified on the West Hay Creek LBA Tract, and the likelihood of encountering significant paleontological resources is small. Mining activities at the existing Buckskin Mine are currently visible from Collins Road and McGee Road and Wyoming 14-16, and mining activities on the West Hay Creek LBA tract would also be visible from these roads. Mining would affect landscapes classified by BLM as VRM Class IV, and the landscape character would not be significantly changed following reclamation. No unique visual resources have been identified on or near the LBA tract. Noise levels on the LBA tract would be increased considerably by mining activities (blasting, loading, hauling, and possibly in-pit crushing). The nearest occupied dwelling is just over ½ mile from the LBA tract, which is about the same distance as the nearest occupied dwelling to the existing Buckskin Mine permit boundary. No new or reconstructed coal transportation facilities would be required under the Proposed Action or Alternatives 2 or 3, but leasing the LBA tract would extend the

ES-12


length of time that coal is shipped from the existing facilities for the permitted Buckskin Mine. Active pipelines and utility lines would have to be relocated in accordance with previous agreements, or agreements would have to be negotiated for their removal or relocation. Royalty and bonus payments for the coal in the LBA tract would be collected by the federal government and split with the state. A 1994 University of Wyoming study estimated that the total direct fiscal benefit to the State of Wyoming from coal mining taxes and royalties is $1.10/ton of coal mined. Using that estimate, mining the coal in the West Hay Creek LBA Tract under the action alternatives would provide a tax and royalty benefit to the State of Wyoming of $143 to $154 million, expressed in current dollars. Triton anticipates that employment levels would be the same with or without the West Hay Creek LBA tract. Mine life and employment, would be extended up to about 6 years at the Buckskin Mine, and Triton projects that employment at the mine would remain at 225 persons. With regard to environmental justice issues, it was determined that potentially adverse impacts would not disproportionately affect minorities, low-income groups, or Native American tribes or groups. No tribal lands or Native American communities are included in this area, and no Native American treaty rights or Native American trust resources are known to exist for this area. As stated previously, the impacts of mining the coal, which are described in the paragraphs above, would be similar under the proposed action and the action alternatives (preferred alternative and alternative 3). Under the No Action Alternative, the coal lease application would be rejected; the area contained in the application would not be offered for lease at this time. The tract could be nominated for lease again in the future. Under the No Action Alternative, the impacts described in the preceding paragraphs to topography and physiology, geology and minerals, soils, air quality, water resources, alluvial valley floors, wetlands, vegetation, wildlife, threatened, endangered and candidate species, land use and recreation, cultural resources, Native American concerns, paleontological resources, visual resources, noise, transportation, and socioeconomics would occur on the existing Buckskin coal leases. These impacts would not be extended onto the LBA tract. Portions of the West Hay Creek LBA tract adjacent to the existing Buckskin Mine would be disturbed to recover the coal in the existing leases. If impacts are identified during the leasing process that are not mitigated by existing required mitigation measures, BLM can include additional mitigation measures, in the form of stipulations on the new lease, within the limits of its regulatory authority. BLM has not identified additional special stipulations that should be added to the BLM lease or areas where additional or increased monitoring measures are recommended. Cumulative impacts result from the incremental impacts of an action added to other past, present, and reasonably foreseeable future actions, regardless of who is

ES-13


responsible for such actions. Cumulative impacts can result from individually minor, but collectively significant, actions occurring over time. Since decertification of the Powder River Federal Coal Region in 1990, the BLM Wyoming State Office has issued 11 new federal coal leases containing approximately 3.178 billion tons of coal using the LBA process. This leasing process has undergone the scrutiny of two appeals to the Interior Board of Land Appeals and one audit by the General Accounting Office. None of the leases issued since decertification have been adjacent to the Buckskin Mine, but Triton acquired federal coal lease WYW150152, which is adjacent to the Buckskin Mine, from EOG Resources in 2000. This lease was issued to EOG Resources in exchange for federal coal lease WYW0322794, the Belco I-90 lease. This exchange was authorized by the I-90 Exchange Act of 1978. Eight additional coal lease applications, including the West Hay Creek application, are currently pending. The pending LBA applications contain approximately 2.2 billion tons of coal. Three regional EISs evaluating surface coal development in the PRB in Wyoming were previously prepared. They are: x	 Final Environmental Impact Statement, Eastern Powder River Coal Basin of Wyoming, BLM, October 1974; x	 Final Environmental Impact Statement, Eastern Powder River Coal, BLM, March 1979; and x	 Final Environmental Impact Statement, Powder River Coal Region, BLM, 
 December 1981. 
 A draft document for a fourth regional EIS, the Draft Environmental Impact Statement for Round II Coal Lease Sale in the Powder River Region, was prepared by BLM and released in January 1984, but a final document was not prepared and the actions considered in that EIS were not implemented. Since 1989, coal production in the Powder River Basin has increased by approximately 6.8% per year. The increasing state production is primarily due to increasing sales of low-sulfur, low-cost PRB coal to electric utilities that must comply with Phase I requirements of Title III of the 1990 Clean Air Act Amendments. Electric utilities account for 97% of Wyoming's coal sales. Oil production has decreased in the Wyoming PRB since 1990, but natural gas production has been increasing, particularly in Campbell County. This is due to the development of shallow CBM resources in the basin. CBM exploration and production are currently ongoing throughout the Wyoming PRB. Since the early 1990s, BLM has

ES-14


completed numerous environmental assessments (EAs) and EISs analyzing CBM projects. The latest of these is the Final Environmental Impact Statement and Draft Planning Amendment for the Powder River Basin Oil and Gas Project, which was completed in January 2003. The project area for this EIS includes almost eight million acres of mixed federal, state, and private lands within the Wyoming portion of the PRB. The EIS evaluates the impacts of drilling, completing, operating, and reclaiming almost 39,400 new federal, state, and private CBM wells in addition to the roughly 12,100 federal, state, and private CBM wells that were already drilled or permitted within the project area when the EIS analysis was prepared. The EIS also analyzes the impacts of developing 3,200 new conventional oil and gas wells, as well as constructing, operating, and reclaiming various ancillary facilities needed to support the new CBM and conventional wells, including roads, pipelines for gathering gas and produced water, electrical utilities, and compressors. Under the current process for approving CBM drilling, CBM wells can be drilled on private and state oil and gas leases after approval by the Wyoming Oil and Gas Conservation Commission (WOGCC) and the Wyoming State Engineer’s Office (SEO). On federal oil and gas leases, BLM must analyze the individual and cumulative environmental impacts of all drilling, as required by NEPA, before CBM drilling can be authorized. CBM wells have been drilled in or around the West Hay Creek LBA tract. CBM drilling and production are expected to continue in the Wyoming PRB. Due to the proximity of surface coal mining to some of the CBM production operations, cumulative impacts to groundwater, surface water, air quality, and wildlife have occurred and are likely to continue as more CBM resources are developed adjacent to existing surface coal mines. Other mineral development levels in the Wyoming PRB are currently lower than predicted in the regional coal EISs. In the 1970s, significant uranium development was anticipated in southwest Campbell County and northwest Converse County. This development did not materialize because the price of uranium dropped in the early 1980s. There are currently two in situ uranium operations in Converse and Johnson counties, but no mines and no mills. Wyoming uranium production is expected to decrease this year. In addition to the ongoing coal mining and leasing and the CBM development, other projects planned in the vicinity of the northern mine group include the construction of the Wygen II coal-fired power plant which has been proposed at the Black Hills Corporation energy complex near the Wyodak Mine site. The power plant could be expected to have some overlapping impacts with the impacts of mining the West Hay Creek LBA tract. Most of the other projects proposed in the PRB are located some distance south of the LBA tract near the middle and southern portion of the basin. These include the construction and operation of the North American Power Group’s Two Elk and Two Elk Unit 2 power plants east of the Black Thunder Mine; construction and operation by North American Power Group of a 500-megawatt coal fired power plant at the Cordero

ES-15


Rojo Complex; and construction and operation of the proposed DM&E rail line. The impacts of mining the West Hay Creek LBA tract would not be expected to overlap with the impacts of building and operating these projects. The existing and proposed development in the PRB has and will continue to result in the introduction of additional roads, railroads, power lines, fences, oil and gas production equipment and mine structures. This area has already undergone change from a semi-agriculturally based economy to a coal mining and oil and gas economy. Environmentally, the open, basically treeless landscape in the Wyoming PRB has been visibly altered by construction, equipment, and human activities. Leasing the LBA tract to an existing mining operation would increase the total area that would be affected by mining by up to about 921 acres. Mining disturbance is progressive with reclamation proceeding contemporaneously. Cumulative impacts vary by resource and range from being almost undetectable to being substantial. Cumulative impacts on air quality, groundwater quantity and wildlife habitat have created the greatest concern. An air quality impact assessment predicting potential far-field cumulative air quality impacts, using the EPA CALMET/CALPUFF dispersion modeling system, has been prepared to predict maximum potential air quality impacts at mandatory federal PSD Class I areas downwind of proposed oil and gas development in the PRB in northeast Wyoming and southeast Montana. The assessment considered potential air pollutant emission sources from proposed CBM development in Wyoming and Montana combined with other reasonably foreseeable development (RFD) emission sources to predict the total potential cumulative impact to air quality. Surface coal mining operations in Montana and Wyoming were included as other RFD emission sources in this assessment. The cumulative far-field impacts predicted in the air quality impact assessment would not increase or decrease under the proposed action and all of the alternatives for leasing or not leasing federal coal considered in the West Hay Creek LBA tract because it is a maintenance tract which would be leased to extend operations at the existing Buckskin mine. Selection of the proposed action, the preferred alternative or Alternative 3 would not introduce new sources of impacts to air quality, but would change the location of the sources of those impacts to the newly leased tracts and would extend the period of time that those existing sources would be in operation. Selection of the no action alternative (alternative 1) would not affect the currently approved mining operations at Buckskin Mine existing leases. Table ES-2 presents the maximum predicted air pollutant concentrations at specified PSD Class I areas. The Northern Cheyenne Reservation is located approximately 70 miles northwest of the LBA Tract and the Absaroka-Beartooth Wilderness Area is located approximately 170 miles northwest of the LBA Tract. Table ES-3 summarizes the range of projected visibility impacts as the annual average number of days over the 11-year periods predicted to equal or exceed a 1.0 deciview

ES-16


“just noticeable change.” The Class I areas shown in Table ES-3 range from 70 miles (Northern Cheyenne Reservation) to 350 miles (Gates of the Mountains Wilderness Area) from the West Hay Creek LBA Tract. Most of the areas are more than 200 miles from the LBA tract. TABLE ES-2 
 MAXIMUM PREDICTED PSD CLASS I AREA
 CUMULATIVE FAR-FIELD IMPACTS (in Pg/m3) UNDER WYOMING PRB OIL AND
 GAS PROJECT EIS ALTERNATIVE 1 (PROPOSED ACTION) AND ALL WEST HAY 
 CREEK LEASE APPLICATION EIS ALTERNATIVES

Maximum Modeled PSD Concentration Class I (cumulative) Increment 4.2 12.8 2.5 8

Pollutant

Averaging Period

Class I Area Northern Cheyenne Reservation Northern Cheyenne Reservation

Nitrogen dioxide Annual PM10 24-hour

Annual

Northern Cheyenne Reservation Northern Cheyenne Reservation Absaroka-Beartooth Wilderness Northern Cheyenne Reservation

1.7

4

Sulfur dioxide

3-hour

5.1

25

24-hour

2.4

5

Annual Source: Argonne 2002

0.3

2

Coal mines develop predictive models to assess the potential air quality impacts of their mining operations. The predictive modeling conducted for PRB mines indicates that mining operations do not have significant offsite particulate pollution impacts, even when production and pollution from neighboring mines are considered. This modeling is based on the assumption that mining activities are sufficiently removed from the permit boundaries and that neighboring mines are not actively mining in the immediate vicinity (within 0.6 to 2.5 miles). Figure ES-5 shows modeled and extrapolated worst-case coal aquifer drawdown as a result of mining at the northern group of mines. Monitoring of backfill areas indicates that reclaimed areas are being recharged with water generally suitable for livestock use, which is the main premining use.

ES-17

TABLE ES-3 
 PREDICTED VISIBILITY IMPACTS IN CLASS I AREAS – 
 DAILY FLAG-REFINED METHOD 

(average number of days per year predicted to equal or exceed a 1.0 dv “just noticeable change”) Nonproject Cumulative Sources Sources 13 to 17 7 to 9 6 to 9 3 to 4 3 to 5 9 to 13 0 to 1 2 to 2 6 to 9 1 to 1 1 to 3 4 to 5 10 to 14 17 to 21 8 to 11 27 to 82 18 to 28 8 to 12 8 to 12 3 to 4 4 to 8 11 to 15 0 to 3 2 to 3 7 to 11 1 to 3 2 to 7 5 to 8 12 to 18 22 to 28 9 to 13 33 to 92

Class I Area Badlands Wilderness Area1 Bridger Wilderness Area Fitzpatrick Wilderness Area Gates of the Mtns Wilderness Area Grand Teton National Park North Absaroka Wilderness Area Red Rock Lakes Wilderness Area Scapegoat Wilderness Area Teton Wilderness Area Theodore Roosevelt NMP2 (North Unit) Theodore Roosevelt NMP2 (South Unit) U.L. Bend Wilderness Area Washakie Wilderness Area Wind Cave National Park Yellowstone National Park Northern Cheyenne Reservation3

Alt 1

Alt 2A

Alt 2B

Alt 3

3 4 4 0 1 4 0 0 3 0 1 1 5 4 3 17

3 4 3 0 1 3 0 0 3 0 0 1 4 3 2 16

1 3 3 0 0 2 0 0 2 0 0 1 4 2 1 14

0 1 1 0 0 0 0 0 0 0 0 0 1 0 0 7

Note: Results shown are the predicted impacts under Wyoming PRB Oil and Gas Project Alternatives 1, 2A, 2B, and 3; impacts related to coal mining under all West Hay Creek lease application EIS (alternatives are included Under “Non-Project Sources”)
1

2 3

Congress designated the wilderness area portion of Badlands National Park as a mandatory federal PSD Class I area. The remainder of Badlands National Park is a PSD Class II area. NMP - National memorial park. Although the Northern Cheyenne Reservation is a tribal designated PSD Class I area, it is not a mandatory federal PSD Class I area subject to EPA’s regional haze regulations.

Nonproject Sources – The impact of all air pollutant emission sources not included in Wyoming PRB Oil and Gas Project EIS Alt 1, Alt 2A, Alt 2B or Alt 3, including existing surface coal mines in Wyoming and Montana and the Montana Statewide EIS sources. The range of potential annual average days above a 1.0 dv “just noticeable change” in visibility corresponds to including Montana Alternative A (low) to Montana Alternative B/C/E (high). Cumulative Sources – The impact of all cumulative air pollutant emission sources combined, including Wyoming PRB Oil and Gas Project EIS Alt 1, Alt 2A, Alt 2B, Alt 3, and nonproject sources (which include the West Hay Creek Lease Application EIS Proposed Action and alternatives and Montana Statewide EIS sources). The range of potential annual average days above a 1.0 dv “just noticeable change” in visibility corresponds to: including nonproject, Wyoming Alternative 3 and Montana Alternative A sources (low); up to including nonproject, Wyoming Alternative 1 and Montana Alternative B/C/E sources (high). Source: Argonne 2002

ES-18


LEGEND
WEST HAY CREEK LBA TRACT ANALYSIS AREA EXTENT OF WORST-CASE MODELED LIFE OF MINE CANYON COAL DRAWDOWN WITH WEST HAY CREEK LBA TRACT, AS APPLIED FOR EXTENT OF WORST-CASE EXTRAPOLATED LIFE OF MINE CANYON COAL DRAWDOWN WITH WEST HAY CREEK LBA TRACT, AS APPLIED FOR APPROXIMATE COAL OUTCROP LINE CLINKER (SCORIA) AREA OF GREATER THAN 5 ft. MEASURED DRAWDOWN IN COAL FROM 15 YEARS OF MINING 1980-1995 (GAGMO 10-1995) EXTENT OF DRAWDOWN DUE TO ALL ANTICIPATED MINING (USGS CHIA Study, Martin et al. 1998)

Figure ES-4. Modeled and Extrapolated Worst-Case Coal Aquifer Drawdown Scenarios Showing Extent of Actual 15-yr Drawdowns and USGS Predicted Cumulative Drawdowns.

ES-19


Mining the LBA tract would add to the habitat fragmentation that is contributing to a decline in wildlife habitat quality in the PRB. Although there are no intact raptor nest sites or sage grouse leks on the West Hay Creek LBA tract, there may be overlapping impacts to raptors and sage grouse and other wildlife species as a result of the development of both coal and CBM resources in the area of the West Hay Creek LBA tract. Wildlife monitoring indicates that wildlife are using reclaimed areas. This draft EIS presents the BLM's analysis of environmental impacts under authority of the NEPA and associated rules and guidelines. The BLM will use this analysis to make a leasing decision. The decision to lease these lands is a necessary requisite for mining but is not in itself the enabling action that will allow mining. The most detailed analysis prior to mine development would occur after the lease is issued, when the lessee files an application for a surface mining permit and mining plan approval, supported by extensive proposed mining and reclamation plans, to the WDEQ.

ES-20


TABLE OF CONTENTS
EXECUTIVE SUMMARY .......................................................................................... ES-1
 ABBREVIATIONS AND ACRONYMS ............................................................................ix
 CHAPTER 1: PURPOSE OF, AND NEED FOR, THE PROPOSED ACTION ............ 1-1
 Introduction........................................................................................................ 1-1
 Purpose and Need for the Proposed Action ...................................................... 1-7
 Regulatory Authority and Responsibility ............................................................ 1-8
 Relationship to BLM Policies, Plans, and Programs........................................ 1-10
 Conformance with Existing Land Use Plans .................................................... 1-10
 Consultation and Coordination ........................................................................ 1-12
 CHAPTER 2: PROPOSED ACTION AND ALTERNATIVES...................................... 2-1
 Introduction........................................................................................................ 2-1
 The Proposed Action ......................................................................................... 2-4
 Hazardous and Solid Waste ......................................................................... 2-6
 Alternative 1: No Action Alternative .................................................................. 2-8
 Alternative 2: The Preferred Alternative............................................................ 2-8
 Alternative 3..................................................................................................... 2-12
 Alternatives Considered But Not Analyzed in Detail ........................................ 2-13
 Alternative 4................................................................................................ 2-13
 Alternative 5................................................................................................ 2-14
 Comparison of Alternatives.............................................................................. 2-16
 CHAPTER 3: THE AFFECTED ENVIRONMENT ....................................................... 3-1
 Introduction........................................................................................................ 3-1
 General Setting.................................................................................................. 3-1
 Topography and Physiography.......................................................................... 3-3
 Geology ............................................................................................................. 3-4
 Mineral Resources............................................................................................. 3-8
 Coal .............................................................................................................. 3-8
 Oil and Gas................................................................................................... 3-8
 Coal Bed Methane........................................................................................ 3-8
 Bentonite .................................................................................................... 3-10
 Uranium ...................................................................................................... 3-10
 Scoria ......................................................................................................... 3-10
 Soils................................................................................................................. 3-11
 Air Quality and Climate.................................................................................... 3-13
 Topography ..................................................................................................... 3-14


i


TABLE OF CONTENTS (continued)

CHAPTER 3: THE AFFECTED ENVIRONMENT (continued) Climate and Meteorology................................................................................. 3-14
 Regulatory Framework .................................................................................... 3-14
 Existing Air Quality ..................................................................................................... 3-18
 Historical Ambient Air Quality: Particulates..................................................... 3-22
 Regional ..................................................................................................... 3-22
 Site Specific................................................................................................ 3-24
 Control Measures ....................................................................................... 3-26
 Historical Ambient Air Quality: NO2 ................................................................ 3-27
 Regional ..................................................................................................... 3-27
 Site Specific................................................................................................ 3-27
 Control Measures ....................................................................................... 3-28
 Air Quality Related Values - Visibility and Acidification of Lakes ..................... 3-29
 Visibility....................................................................................................... 3-29
 Acidification of Lakes.................................................................................. 3-30
 Water Resources............................................................................................. 3-32
 Groundwater............................................................................................... 3-32
 Recent Alluvium..................................................................................... 3-32
 Wasatch Formation ............................................................................... 3-32
 Wyodak Coal ......................................................................................... 3-34
 Subcoal Fort Union Formation............................................................... 3-35
 Lance and Fox Hills Formations ............................................................ 3-36
 Surface Water............................................................................................. 3-36
 Water Rights............................................................................................... 3-39
 Alluvial Valley Floors (AVFs) ...................................................................... 3-39
 Wetlands .................................................................................................... 3-40
 Vegetation ....................................................................................................... 3-41
 Vegetation Types........................................................................................ 3-43
 Threatened, Endangered, and Candidate Plant Species............................ 3-48
 Wildlife Resources........................................................................................... 3-48
 Big Game ................................................................................................... 3-49
 Other Mammals .......................................................................................... 3-50
 Raptors....................................................................................................... 3-50
 Game Birds................................................................................................. 3-51
 Migratory Birds of Management Concern ................................................... 3-53
 Other Species............................................................................................. 3-57
 Ownership and Use of Land ............................................................................ 3-57
 Cultural Resources .......................................................................................... 3-62
 Native American Concerns ......................................................................... 3-64


ii


TABLE OF CONTENTS (continued)

CHAPTER 3: THE AFFECTED ENVIRONMENT (continued) Paleontological Resources .............................................................................. 3-64
 Visual Resources............................................................................................. 3-65
 Noise ............................................................................................................... 3-65
 Transportation Facilities .................................................................................. 3-66
 Socioeconomics .............................................................................................. 3-66
 Population................................................................................................... 3-69
 Local Economy ........................................................................................... 3-69
 Employment................................................................................................ 3-70
 Housing ...................................................................................................... 3-71
 Local Government Facilities and Services.................................................. 3-71
 Social Conditions........................................................................................ 3-71
 Environmental Justice ................................................................................ 3-72
 Hazardous and Solid Waste ............................................................................ 3-73
 CHAPTER 4: ENVIRONMENTAL CONSEQUENCES ............................................... 4-1
 Introduction........................................................................................................ 4-1
 Direct and Indirect Impacts of the Proposed Action........................................... 4-2
 Topography and Physiography.......................................................................... 4-3
 Geology and Minerals........................................................................................ 4-4
 Soils................................................................................................................... 4-7
 Air Quality .......................................................................................................... 4-8
 Regulatory Background ................................................................................ 4-8
 Existing Air Quality Issues .......................................................................... 4-13
 Impacts of the Proposed Action and Action Alternatives ............................ 4-16
 Water Resources............................................................................................. 4-20
 Groundwater............................................................................................... 4-20
 Surface Water............................................................................................. 4-24
 Alluvial Valley Floors (AVFs) ...................................................................... 4-24
 Wetlands .................................................................................................... 4-25
 Vegetation ....................................................................................................... 4-25
 Threatened, Endangered, and Candidate Plant Species............................ 4-27
 Wildlife ............................................................................................................. 4-28
 Threatened, Endangered, and Proposed Wildlife Species ......................... 4-32
 Land Use and Recreation ................................................................................ 4-32
 Cultural Resources .......................................................................................... 4-33
 Native American Concerns ......................................................................... 4-34
 Paleontological Resources .............................................................................. 4-34
 Visual Resources............................................................................................. 4-34
 Noise ............................................................................................................... 4-35


iii


TABLE OF CONTENTS (continued) CHAPTER 4: ENVIRONMENTAL CONSEQUENCES (continued) Transportation Facilities .................................................................................. 4-35
 Socioeconomics .............................................................................................. 4-36
 Hazardous and Solid Waste ............................................................................ 4-37
 Direct and Indirect Impacts of the No Action Alternative.................................. 4-37
 Regulatory Compliance, Mitigation, and Monitoring ........................................ 4-38
 Residual Impacts ............................................................................................. 4-43
 Topography and Physiography .................................................................. 4-43
 Geology and Minerals ................................................................................ 4-43
 Soils ........................................................................................................... 4-43
 Air Quality................................................................................................... 4-44
 Water Resources ....................................................................................... 4-44
 Alluvial Valley Floors............................................................................. 4-44
 Wetlands............................................................................................... 4-44
 Vegetation .................................................................................................. 4-44
 Wildlife........................................................................................................ 4-44
 Threatened, Endangered, and Proposed Wildlife Species.................... 4-44
 Land Use and Recreation........................................................................... 4-45
 Cultural Resources..................................................................................... 4-45
 Native American Concerns ................................................................... 4-45
 Paleontological Resources......................................................................... 4-45
 Visual Resources ....................................................................................... 4-45
 Noise .......................................................................................................... 4-45
 Transportation Facilities ............................................................................. 4-45
 Socioeconomics ......................................................................................... 4-45
 Cumulative Impacts ......................................................................................... 4-45
 Topography and Physiography .................................................................. 4-53
 Geology and Minerals ................................................................................ 4-54
 Soils ........................................................................................................... 4-55
 Air Quality................................................................................................... 4-55
 Emission Sources ................................................................................. 4-58
 Predicted Air Quality Impacts................................................................ 4-59
 Wyoming PRB Oil and Gas EIS Alternatives 1, 2a, and 2b .................. 4-59
 Wyoming PRB Oil and Gas EIS Alternative 3 ....................................... 4-62
 Cumulative Impacts .............................................................................. 4-62
 Water Resources ....................................................................................... 4-70
 Groundwater ......................................................................................... 4-70
 Surface Water....................................................................................... 4-81
 Alluvial Valley Floors............................................................................. 4-82
 Wetlands............................................................................................... 4-82


iv


TABLE OF CONTENTS (continued) CHAPTER 4: ENVIRONMENTAL CONSEQUENCES (continued) Vegetation .................................................................................................. 4-83
 Wildlife........................................................................................................ 4-85
 Threatened, Endangered, and Proposed Wildlife Species.................... 4-89
 Land Use and Recreation........................................................................... 4-89
 Cultural Resources..................................................................................... 4-90
 Native American Concerns ................................................................... 4-91
 Paleontological Resources......................................................................... 4-91
 Visual Resources ....................................................................................... 4-91
 Noise .......................................................................................................... 4-92
 Transportation Facilities ............................................................................. 4-92
 Socioeconomics ......................................................................................... 4-92
 Short-term Use of the Environment vs. Long-term Productivity....................... 4-94
 Irreversible and Irretrievable Commitments of Resources............................... 4-96
 CHAPTER 5: CONSULTATION AND COORDINATION............................................ 5-1
 REFERENCES........................................................................................................ REF-1
 FIGURES Figure 1-1 Figure 1-2 General Location Map with Federal Coal Leases and LBAs..............................1-2
 Buckskin Mine Federal Coal Leases and the West Hay Creek LBA Tract 
 as Applied For .................................................................................................1-3
 West Hay Creek LBA Tract Configurations........................................................2-2
 West Hay Creek LBA Preferred Alternative Tract Configuration......................2-10
 General Analysis Area .......................................................................................3-2
 Stratigraphic Relationships and Hydrologic Characteristics of Upper 
 Cretaceous, Lower Tertiary, and Recent Geologic Units, Powder River Basin, Wyoming ..............................................................................................3-5
 North-South and East-West Geologic Cross Sections, West Hay Creek 
 LBA Tract ........................................................................................................3-6
 Soil Series Within the West Hay Creek LBA Tract Analysis Area ....................3-12
 Wind Rose, Air Quality, and Meteorological Stations at the Buckskin Mine.....3-15
 Active PM10 Monitoring Stations in Northeastern Wyoming .............................3-20
 Coal Production and Overburden Removal vs. Ambient Particulates for 
 Buckskin Mine ...............................................................................................3-25
 Visibility in the Badlands and Bridger Wilderness Areas..................................3-31


Figure 2-1 Figure 2-2 Figure 3-1 Figure 3-2

Figure 3-3 Figure 3-4 Figure 3-5 Figure 3-6 Figure 3-7 Figure 3-8

v


TABLE OF CONTENTS (continued) FIGURES (continued) Figure 3-9 Monitoring Well Locations Within and Near the West Hay Creek LBA Tract 
 and Fort Union Formation Water Supply Well Locations at the Buckskin 
 Mine ..............................................................................................................3-33
 Figure 3-10 Surface Water Features Within and Adjacent to the West Hay Creek LBA Tract..............................................................................................................3-38
 Figure 3-11 Wetlands Within the West Hay Creek LBA Tract Analysis Area ......................3-42
 Figure 3-12 Vegetation Communities Within the West Hay Creek LBA Tract Analysis 
 Area ..............................................................................................................3-44
 Figure 3-13 Raptor Nest Sites, Grouse Leks, and Prairie Dog Colonies Within and 
 Adjacent to the West Hay Creek Analysis Area ............................................3-52
 Figure 3-14 Surface Ownership on the West Hay Creek LBA Tract ...................................3-59
 Figure 3-15 Oil and Gas Ownership on the West Hay Creek LBA Analysis Area ...............3-60
 Figure 3-16 Relationship Between A-Scale Decibel Readings and Sounds of Daily Life ....3-67
 Figure 3-17 Transportation Facilities Within and Adjacent to the West Hay Creek LBA 
 Tract Analysis Area .......................................................................................3-68


Figure 4-1

Figure 4-2 Figure 4-3

Figure 4-4

Modeled Maximum PM10 and NOx Concentrations at Buckskin Mine NCM 
 Boundary, Year 2005 Worst-Case Scenario Resulting from 27.5 Million 
 Tons per Year of Coal Removal from Existing Leases..................................4-17
 Life of Mine Drawdown Map, Resulting from Proposed Action .......................4-22
 Modeled and Extrapolated Worst-Case Coal Aquifer Drawdown Scenarios 
 Showing Extent of Actual 15-Year Drawdowns and USGS Predicted 
 Cumulative Drawdowns.................................................................................4-74
 Life of Mine Drawdown Map with Maximum Modeled CBM Drawdown 
 Contours Superimposed ...............................................................................4-79


TABLES Table 1-1 Table 1-2 Table 2-1 Table 2-2 Table 2-3 Table 3-1 Leases Issued Since Decertification of the Powder River Basin, Wyoming .......1-5
 Pending LBAs, Powder River Basin, Wyoming..................................................1-6
 Comparison of Coal Production, Surface Disturbance, and Mine Life .............2-16
 Summary Comparison of Direct and Indirect Impacts......................................2-18
 Summary Comparison of Cumulative Impacts.................................................2-22
 Acres of Soil Available for Reclamation Within the West Hay Creek LBA 
 Tract Analysis Area .......................................................................................3-13


vi


TABLE OF CONTENTS (continued) TABLES (continued) 
 Table 3-2 Assumed Background Air Pollutant Concentrations, Applicable Ambient 
 Air Quality Standards, and PSD Increment Values .......................................3-17
 Table 3-3 Approximate Distances and Directions from the West Hay Creek Analysis 
 Area to PSD Class I and Class II Sensitive Areas.........................................3-19
 Table 3-4 Summary of Air Quality Monitoring in Wyoming’s Powder River Basin, 
 1980-2000 .....................................................................................................3-23
 Table 3-5 Annual Ambient NO2 Concentration Data ........................................................3-27
 Table 3-6 2001 Annual Ambient NO2 Concentration Data ...............................................3-28
 Table 3-7 Existing Acid Neutralizing Capacity in Sensitive Lakes....................................3-30
 Table 3-8 Vegetation Types Within the Analysis Area .....................................................3-43
 Table 3-9 Regional Status of Birds of Management Concern in Wyoming for Coal 
 Mines and Expected and Actual Occurrence on and Within ½ Mile of the West Hay Creek LBA Tract ...........................................................................3-54
 Table 3-10 Oil and Gas Ownership on the West Hay Creek LBA Tract .............................3-61
 Table 3-11 Results of the Class III Cultural Resource Inventory of the West Hay 
 Creek LBA Tract Analysis Area.....................................................................3-63
 Table 3-12 Campbell County Estimated 2003 Fiscal Revenues from 2002 Coal 
 Production ....................................................................................................3-70
 Table 4-1 Table 4-2 Table 4-3 Table 4-4 Table 4-5 Table 4-6 Table 4-7 Table 4-8 Table 4-9 Comparison of Existing and Proposed Disturbance...........................................4-2
 Comparison of Coal, Overburden, and Interburden Thicknesses ......................4-4
 Federal and State Ambient Air Quality Standards for Criteria Pollutants .........4-10
 Required Mitigation and Monitoring Measures Required for All Alternatives ...4-39
 Status of Wyoming Powder River Basin Coal Mines........................................4-48
 Coal Production and Development, Campbell and Converse Counties, 
 Wyoming .......................................................................................................4-49
 Range of Predicted Maximum Potential Near-field Impacts Under
 Alternatives 1, 2a, and 2b of the Wyoming PRB Oil and Gas Project EIS .......4-60
 Predicted Maximum Potential Near-field Impacts Under Alternative 3 
 of the Wyoming PRB Oil and Gas Project EIS................................................4-61
 Maximum Predicted PSD Class I Area Cumulative Far-field Impacts 
 Under Wyoming PRB Oil and Gas Project EIS Alternative 1 (Proposed 
 Action) and All West Hay Creek Lease Application EIS Alternatives ............4-63
 Predicted Total Cumulative Change in Acid Neutralizing Capacity at 
 Sensitive Area Lakes ....................................................................................4-65
 Predicted Visibility Impacts in the Mandatory Federal PSD Class I 
 Washakie Wilderness Area from Direct Wyoming PRB Oil and Gas 
 Project EIS Alternative Sources – Daily FLAG-refined Method .....................4-67
 Predicted Visibility Impacts in Class I Areas – Daily FLAG-refined Method .....4-68


Table 4-10 Table 4-11

Table 4-12

vii


TABLE OF CONTENTS (continued) 
 TABLES (continued) 
 Table 5-1 Other Federal, State, and Local Governmental Agencies Consulted in
 EIS Preparation ............................................................................................5-3
 Table 5-2 Contributors and Reviewers...............................................................................5-4
 Table 5-3 Preparers ...........................................................................................................5-5
 Table 5-4 BLM Distribution List for Coal Leasing ...............................................................5-7
 APPENDICES
 Appendix A Federal and State Agencies and Permitting Requirements .............................. A-1
 Appendix B Unsuitability Criteria for the West Hay Creek LBA Tract ................................... B-1
 Appendix C Coal Lease-by-Application Flow Chart.............................................................. C-1
 Appendix D BLM Special Coal Lease Stipulations and Form 3400-12 Coal Lease.............. D-1
 Appendix E Cumulative Air Quality Impact Technical Support Documentation.................... E-1
 Appendix F Surface and Groundwater Rights Within and Adjacent to the West Hay 
 Creek LBA Tract..............................................................................................F-1
 Appendix G Biological Assessment for the West Hay Creek LBA Tract and BLM 
 Sensitive Species Evaluation ......................................................................... G-1
 Appendix H Comment Letters on the Draft West Hay Creek EIS and Responses to 
 Those Letters ................................................................................................. H-1


viii


ABBREVIATIONS
AAQS ANC AQRV AREV AVF BACT bcy BLM B.P. Btu CAA CAAA CBM CASTNet CERCLA ambient air quality standards acidification neutralization capacity air quality related values State engineer’s office water rights database and program alluvial valley floor best available control technology bank cubic yards Bureau of Land Management before present British thermal units Clean Air Act of 1990 Clean Air Act Amendment coal bed methane Clean Air Status and Trends Network Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Code of Federal Regulations Cumulative Hydrologic Impact Assessment carbon monoxide Army Corps of Engineers cubic yards A-weighted decibels draft environmental impact statement Dakota, Minnesota & Eastern Railroad Corporation Department of Energy Department of the Interior Department of Justice deciview, a measure of view impairment

CFR CHIA CO COE cy dBA DEIS DM&E DOE DOI DOJ dv

ix

EA EC EIS EPA ESA F FS FCLAA FDM FEIS FLAG FLM FLPMA FWS GAGMO GNP gpm GSP HAP IBLA IMPROVE ISCLT IWAQM Km Kv LAC LBA lbs/mmBtu LFC LOP

environmental assessment elemental carbon particles (re: air quality) environmental impact statement Environmental Protection Agency Endangered Species Act of 1973 fahrenheit Forest Service Federal Coal Leasing Act Amendments of 1976 fugitive dust model final environmental impact statement Federal land managers’ air quality Federal land management Federal Land Policy Management Act of 1976 Fish and Wildlife Service Gillette Area Ground Water Monitoring Organization gross national product gallons per minute gross state product hazardous air pollutant Interior Board of Land Appeals Interagency Monitoring of Protected Visual Environments Industrial Source Complex Model-Long Term version 3 Interagency Workgroup on Air Quality Monitoring kilometers kilovolts level of acceptable change (re: air quality) lease by application pounds per million British thermal units liquids from coal life of project

x

LRMP	 LW	 Pg/m3	 Peq/L	 mi2	 mg/L	 MLA	 MLE	 MEI	 mmbcy	 mmtpy	 MSA	 MDEQ/AWM 	

land and resource management plan lower Wyodak coal seam micrograms per cubic meter microequivalents per liter square mile milligrams per liter Mineral Leasing Act of 1920 most likely exposure maximally exposed individual million bank cubic yards million tons per year Metropolitan statistical area Montana Department of Environmental Quality/Air and Waste Management Bureau megawatts National Ambient Air Quality Standards National Atmospheric Deposition Program North American Power Group National Environmental Policy Act of 1969 National Institute of Occupational Safety and Health national memorial park nitrogen dioxide nitrogen oxides National Park Service National Register of Historic Places National Source Performance Standards photochemical oxidants organic carbon particles Occupational Safety and Health Administration Office of Surface Mining Reclamation & Enforcement

mw NAAQS NADP NAPG NEPA NIOSH NMP NO2 NOx NPS NRHP NSPS O3 OC OSHA OSM

xi

PECS PM10 PMT PP&L PRB PRBRC PRCC PRES PRRCT PSD R2P2 RH RMG RMP ROD ROW scf SARA SEO SIP SHPO SHWD SLAMS SMCRA SO2 STB T&E TBCC TBNG TDS

passive enclosure control system particulates finer than 10 microns postmining topography Pacific Power and Light Company Powder River Basin Powder River Basin Resource Council Powder River Coal Company Powder River Eagle Studies Powder River Regional Coal Team prevention of significant deterioration Resource Recovery and Protection Plan relative humidity Reservoir Management Group (Wyoming State Office) resource management plan Record of Decision right-of-way standard cubic feet Superfund Amendment & Reauthorization Act of 1986 State Engineer’s Office State Implementation Plan State Historic Preservation Office Solid and Hazardous Waste Division (WDEQ) state and local air monitoring stations Surface Mining Control and Reclamation Act of 1977 sulfur dioxide Surface Transportation Board threatened and endangered Thunder Basin Coal Company Thunder Basin National Grassland total dissolved solids

xii

tpy TSP TWC USC USDI USDOC USGS UW VRM WAAQS WAQSR WARMS WCIC WDEQ WDEQ/AQD

tons per year total suspended particulates Thunderbird Wildlife Consulting, Inc. United States Code US Department of the Interior US Department of the Census US Geological Survey upper Wyodak coal seam visual resource management Wyoming ambient air quality standards Wyoming air quality standards and regulations Wyoming air resources monitoring system Wyoming Coal Information Committee Wyoming Department of Environmental Quality Wyoming Department of Environmental Quality/Air Quality Division Wyoming Department of Environmental Quality/Land Quality Division Wyoming Game and Fish Department Wyoming Mining Association Wyoming Outdoor Council Wyoming Oil and Gas Conservation Commission Wyoming State Geological Survey

WDEQ/LQD 	

WGFD WMA WOC WOGCC WGS

xiii

CHAPTER 1: PURPOSE OF, AND THE NEED FOR, THE PROPOSED ACTION
INTRODUCTION On August 31, 2000, Triton Coal Company, LLC (Triton) filed an application with the Bureau of Land Management (BLM) for federal coal reserves in a tract located to the north and west, and adjacent to the Buckskin Mine in Campbell County, Wyoming. On November 5, 2001, Triton filed an application to modify the tract configuration. The application area is located in Campbell County, Wyoming, approximately 12 miles north of Gillette, Wyoming (figure 1-1). The federal coal reserves were applied for as a maintenance tract for the Buckskin Mine under the regulations at 43 CFR (Code of Federal Regulations) 3425, Leasing on Application. At the time the application was filed, the Buckskin Mine was owned and operated by Triton, a subsidiary of Vulcan Intermediary, LLC. In May 2003, Arch Coal announced that it was purchasing Vulcan Coal Holdings, LLC, including the Buckskin Mine. In this environmental impact statement (EIS), the applicant for the tract will be referred to as Triton. The West Hay Creek LBA tract as applied for and the existing federal coal leases in the adjacent Buckskin Mine are shown in figure 1-2. As applied for, the West Hay Creek LBA tract includes approximately 840 acres and an estimated 145 million tons of inplace coal reserves. Triton estimates that approximately 130 million tons of coal would be produced if the tract as applied for is leased, assuming a recovery factor of 90%. Triton's coal lease application (case file WYW151634) was reviewed by the BLM’s Wyoming State Office, Division of Mineral and Lands. They determined that it met the regulatory requirements for a lease by application (LBA). The tract is referred to as the West Hay Creek LBA tract. The West Hay Creek LBA tract is located within the Powder River Federal Coal Region, which was decertified in January 1990. Although the Powder River Federal Coal Region is decertified, the Powder River Regional Coal Team (PRRCT), a federal/state advisory board established to develop recommendations concerning management of federal coal in the region, has continued to meet regularly and review all federal lease applications in the region. The PRRCT reviewed this lease application at a public meeting held on October 25, 2000, in Cheyenne, Wyoming. At that meeting, the PRRCT recommended that the BLM continue to process the lease application. In order to process an LBA, the BLM must evaluate the quantity, quality, maximum economic recovery, and fair market value of the federal coal and fulfill the requirements of the National Environmental Policy Act (NEPA) by evaluating the environmental consequences of leasing the federal coal. This EIS has been prepared to evaluate the site-specific and cumulative environmental impacts of leasing and developing the federal coal included in the application area. BLM does not authorize mining by issuing

1-1


LEGEND

EXISTING LEASES

West Hay Creek LBA
Buckskin Mine

LBAs ISSUED Belco I-90 Exchange Lease LBAs PENDING WEST HAY CREEK LBA TRACT AS APPLIED FOR (THIS EIS)

Rawhide Mine Eagle Butte Mine West Extension LBA Eagle Butte LBA Fort Union Mine Dry Fork Mine Wyodak Mine

GILLETTE

West Rocky Butte LBA Belle Ayr LBA Belle Ayr Mine

North Caballo Mine

Caballo Mine Cordero-Rojo Mine (Cordero-Rojo Complex) Cordero Mine (Cordero-Rojo Complex)

Maysdorf LBA

Coal Creek Mine

North Jacobs Ranch LBA Thundercloud LBA Jacobs Ranch LBA WRIGHT Jacobs Ranch Mine Little Thunder LBA West Black Thunder LBA West Roundup LBA North Rochelle LBA	 NARO North LBA NARO South LBA Horse Creek LBA Black Thunder Mine North Rochelle Mine Powder River LBA North Antelope/ Rochelle Complex North Antelope/ Rochelle LBA West Antelope LBA	 Antelope LBA Antelope Mine

Figure 1-1.

General Location Map with Federal Coal Leases and LBAs.

1-2


12

R. 73 W.

R. R.
 72 W.

7

8

9

10

11 11


13

18

17

16

15

14

24

19

20

21

22

23

25

30

29

28

27

26

36

31

32

33

34

35

T. 52 N. T. 51 N.

T. 52 N. T. 51 N.

1

6

5

4

3

2

12

R. 73 W.

R. 72 W.

7

8

9

10

11

LEGEND

BUCKSKIN MINE PERMIT BOUNDARY
 WEST HAY CREEK LBA TRACT AS APPLIED FOR
 W-0325878
 WYW-129205
 WYW-78634
 WYW-150152


Figure 1-2.

Buckskin Mine Federal Coal Leases and the West Hay Creek LBA Tract as Applied For.

1-3


a lease for federal coal, but the impacts of mining the coal are considered in this EIS because it is a logical consequence of issuing a lease. BLM will use the analysis in this EIS to decide whether to hold a competitive, sealed-bid lease sale for the tract as applied for, hold a competitive sealed-bid lease sale for a modified tract, or reject the current lease application and not offer the tract for sale at this time. If the sale is held, the bidding at the sale would be open to any qualified bidder; it would not be limited to the applicant. If a lease sale is held, a lease would be issued to the highest bidder at the sale if a federal sale panel determines that the high bid meets or exceeds the fair market value of the coal as determined by BLM's economic evaluation and if the US Department of Justice (DOJ) determines that there would be no antitrust violations if a lease is issued to the high bidder. In return for receiving a lease, a lessee must pay the federal government a bonus equal to the amount it bid at the time the lease sale was held (the bonus can be paid in five yearly installments), make annual rental payments to the federal government, and make royalty payments to the federal government when the coal is mined. Federal bonus, rental, and royalty payments are equally divided with the state in which the lease is located. Other agencies may use this analysis to make decisions related to leasing and mining the federal coal in this tract. The Office of Surface Mining Reclamation and Enforcement (OSM), the federal agency responsible for regulating surface coal mining operations, is a cooperating agency on this EIS. OSM will use this EIS to make decisions related to the approval of the Mineral Leasing Act (MLA) mining plan for this tract if a lease is issued. Since decertification of the Powder River Federal Coal Region, 11 federal coal leases have been sold at competitive sealed-bid sales (table 1-1). One federal coal lease (WYW150152) was issued to EOG Resources in exchange for federal coal lease WYW0322794, the Belco I-90 lease. This exchange was authorized by the I-90 Exchange Act of 1978. The lease acquired by EOG Resources as a result of this exchange is adjacent to the Buckskin Mine (figure 1-2). Triton acquired this lease from EOG Resources in 2000. Table 1-2 summarizes the eight applications for federal coal that are currently pending in the Wyoming portion of the Powder River Basin (PRB). A coal exchange proposal by the Pittsburg and Midway Coal Mining Company is also currently being evaluated. Pittsburg and Midway proposes to exchange lands and minerals it owns in Lincoln, Carbon, and Sheridan counties, Wyoming for federal coal in Sheridan County, Wyoming. The West Hay Creek LBA tract adjoins the Buckskin Mine (figure 1-2). The LBA tract lies within the current mine permit area for the Buckskin Mine. The area applied for is substantially similar to the area for which detailed site-specific environmental data have

1-4


TABLE 1-1 
 LEASES ISSUED SINCE DECERTIFICATION OF THE 
 POWDER RIVER BASIN, WYOMING 

LBA Name (lease #) Lessee/Effective Date
Jacobs Ranch LBA (WYW117924) Jacobs Ranch Mine/10/1/1992 West Black Thunder LBA (WYW118907) Black Thunder Mine/10/1/1992 N. Antelope/Rochelle LBA (WYW119554) North Antelope/Rochelle Mine/10/1/1992 West Rocky Butte LBA (WYW122586) No existing mine2/1/1/1993 Eagle Butte LBA (WYW124783) Eagle Butte Mine/8/1/1995 Antelope LBA (WYW128322) Antelope Mine/2/1/1997 North Rochelle LBA (WYW127221) North Rochelle Mine/1/1/1998 Powder River LBA (WYW136142) North Antelope/Rochelle Mine/9/1/1998 Thundercloud LBA (WYW136458) Black Thunder Mine/1/1/1999 Horse Creek LBA (WYW141435) Antelope Mine/12/1/2000 N. Jacobs Ranch LBA (WYW146744) Jacobs Ranch Mine/5/1/2002 TOTALS Exchange Name (Lease Number) Lessee/Effective Date EOG (Belco) I-90 Lease Exchange (WYW150152)
 EOG Resources (formerly Belco)3/4/1/2000

1 2

Acres1
1,708.620

Mineable Coal (tons)1
147,423,560

Successful Bid
$20,114,930.00

3,492.495

429,048,216

$71,909,282.69

3,064.040

403,500,000

$86,987,765.00

463.205

56,700,000

$16,500,000.00

1,059.175

166,400,000

$18,470,400.00

617.200

60,364,000

$9,054,600.00

1,481.930

157,610,000

$30,576,340.00

4,224.225

532,000,000

$109,596,500.00

3,545.503

412,000,000

$158,000,008.50

2,818.695

275,577,000

$91,220,120.70

4,982.24 27,457.328 Acres1 599.170	

537,500,000 3,178,122,776 Mineable Tons of Coal1 106,000,000

$379,504,652.00 $991,934,598.89 Action Exchanged for rights to Belco I-90 lease (WYW0322794)

Information from sale notice. The West Rocky Butte lease is now owned by the Caballo Mine. 
 3 The EOG Resources Belco Exchange lease is now owned by the Buckskin Mine


1-5


TABLE 1-2 
 PENDING LBAs, POWDER RIVER BASIN, WYOMING

LBA Name Lease # Applicant Mine
NARO North WYW150210 North Antelope/ Rochelle NARO South WYW154001 North Antelope/ Rochelle Little Thunder WYW150318 Black Thunder West Roundup WYW151134 North Rochelle

Application Date

Acres

Estimated Coal (tons)1

Status

3/10/00

2,369.38

323 mm

Hearing 3/4/03 FEIS 12/03

3/10/00

2,133.64

241 mm

Hearing 3/4/03 FEIS 12/03

3/23/00

3,449.32

479.3 mm

Hearing 3/4/03 FEIS 12/03

7/28/00

1,870.64

192.6 mm

Hearing 3/4/03 FEIS 12/03

West Hay Creek WYW151634 Buckskin West Antelope WYW151643 Antelope Maysdorf (formerly Mt. Logan) WYW154432 Cordero-Rojo West Extension WYW155132 Eagle Butte TOTAL PENDING
1

8/31/00

840.00

130 mm

Hearing 4/16/2003 FEIS in preparation

9/12/00

3,542.19

293.9 mm

Hearing 3/4/03 FEIS 12/03

9/20/01

2,809.48

296.3 mm

PRRCT reviewed 5/30/2002

12/28/01

1,397.61

243 mm

PRRCT reviewed 5/30/2002

18,412.26

2,199 mm

Estimated tons of in-place coal as reported in the lease application.

1-6


been collected and for which environmental analyses have previously been prepared to secure the existing leases and the necessary mining permits. Triton owns the surface of the West Hay Creek LBA tract. Current land uses of the tract include livestock grazing, wildlife habitat, cropland, pastureland, and oil and gas production. If Triton acquires a federal coal lease for these lands, the West Hay Creek LBA tract coal resources would be mined as a maintenance tract to extend mine life at the Buckskin Mine. The mining method would be truck and shovel, which is the mining method currently in use at the Buckskin Mine. The coal would be used primarily for electric power generation. After mining, the land would be reclaimed for livestock grazing, wildlife habitat, cropland and pastureland as is the current practice at the Buckskin Mine. PURPOSE AND NEED FOR THE PROPOSED ACTION BLM administers the federal coal leasing program under the Mineral Leasing Act of 1920. A federal coal lease grants the lessee the exclusive right to obtain a mining permit for, and to mine coal on, the leased tract subject to the terms of the lease, the mining permit, and applicable state and federal laws. This EIS was prepared in response to an application BLM received to lease a tract of federal coal received from an existing mine, the Buckskin Mine, in the Wyoming Powder River Basin. The purpose of this application is to allow the Buckskin Mine access to a continuing supply of low sulfur compliance coal, which it can continue to sell to power plants for the purpose of power generation. Continued leasing of PRB coal enables coal-fired power plants to meet Clean Air Act (CAA) of 1990 requirements without constructing new plants, revamping existing plants, or switching to existing alternative fuels, which would potentially significantly increase power costs for individuals and businesses. A primary goal of the National Energy Policy is to add energy supplies from diverse sources, including domestic oil, gas and coal as well as hydropower and nuclear power. BLM recognizes that the continued extraction of coal is essential to meet the nation’s future energy needs. As a result, private development of federal coal reserves is integral to the BLM coal leasing program under the authority of the Mineral Leasing Act of 1920 (MLA), as amended, as well as the Federal Land Policy Management Act of 1976 (FLPMA) and the Federal Coal Leasing Amendments Act of 1976 (FCLAA). The coal leasing program managed by BLM encourages the development of domestic oil, gas, and coal reserves and reduction of the US dependence on foreign sources of energy. As a result of the leasing and subsequent mining and sale of federal coal resources in the PRB, the public receives lease bonus payments, lease royalty payments, and a supply of low cost, low sulfur coal for power generation.

1-7

The Buckskin Mine, as currently permitted, includes 7,602.11 acres. As of January 1, 2002, Buckskin had an estimated 512 million tons of in-place federal coal reserves remaining at the mine, and the company estimates that approximately 434 million tons of those remaining reserves are recoverable. Triton’s currently approved [by Wyoming Department of Environmental Quality, Air Quality Division (WDEQ/AQD)] air quality permit allows the production of up to 27.5 million tons of coal per year (mmtpy). The mine produced approximately 17.5 million tons in 2003. The company has applied for the coal reserves in the West Hay Creek LBA tract to extend the life of the Buckskin Mine. According to the most recent information from Triton, they would plan to produce approximately 25 mmtpy from the West Hay Creek LBA tract, which would extend the life of the mine by about five years. If the LBA tract is leased to Triton as a maintenance tract, Triton would have to revise their mine permit to include coal recovery in the new lease area before the coal could be mined. This process takes several years to complete. Triton is applying for federal coal reserves now so that they can negotiate new contracts and then complete the permitting process in time to meet anticipated new contract requirements. This EIS analyzes the environmental impacts of issuing a federal coal lease and mining the federal coal in the West Hay Creek LBA tract as required by NEPA and associated rules and guidelines. A decision to hold a competitive sale and issue a lease for the lands in this application is a prerequisite for mining, but it is not the enabling action that would allow mining to begin. The BLM does not authorize mining operations by issuing a lease. After a lease has been issued but prior to mine development, the lessee must file a permit application package with the WDEQ, Land Quality Division (LQD) and OSM for a surface mining permit and approval of the MLA mining plan. An analysis of a sitespecific mining and reclamation plan occurs at that time. Authorities and responsibilities of the BLM and other concerned regulatory agencies are described in the following sections. REGULATORY AUTHORITY AND RESPONSIBILITY The Triton coal lease application was submitted and will be processed and evaluated under the following federal authorities: MLA, as amended; Multiple-Use Sustained Yield Act of 1960; NEPA; FCLAA; 
 FLPMA; and
 Surface Mining Control and Reclamation Act of 1977 (SMCRA). 


The BLM is the lead agency responsible for leasing federal coal lands under the MLA as amended by FCLAA and is also responsible for preparation of this EIS. The West Hay Creek LBA tract is included in the area covered by the BLM Approved Resource Management Plan (RMP) for Public Lands Administered by the Bureau of

1-8


Land Management Buffalo Field Office (BLM 2001). There are no US Forest Service (FS) lands included in the West Hay Creek LBA tract. Therefore, the FS is not a cooperating agency on this EIS, and FS consent will not be required if a lease sale is held. The OSM is a cooperating agency on this EIS. After a coal lease is issued, SMCRA gives OSM primary responsibility to administer programs that regulate surface coal mining operations and the surface effects of underground coal mining operations. Pursuant to section 503 of SMCRA, the WDEQ developed, and in November 1980 the Secretary of the Interior approved, a permanent program authorizing WDEQ to regulate surface coal mining operations and surface effects of underground mining on nonfederal lands within the state of Wyoming. In January 1987, pursuant to section 523(c) of SMCRA, WDEQ entered into a cooperative agreement with the Secretary of the Interior authorizing WDEQ to regulate surface coal mining operations and surface effects of underground mining on federal lands within the state. Pursuant to the cooperative agreement, a federal coal leaseholder in Wyoming must submit a permit application package to OSM and WDEQ/LQD for any proposed coal mining and reclamation operations in the state. WDEQ/LQD reviews the permit application package to ensure the permit application complies with the permitting requirements, and the coal mining operation will meet the performance standards of the approved Wyoming program. OSM, BLM, and other federal agencies review the permit application package to ensure it complies with the terms of the coal lease, the MLA, NEPA, and other federal laws and regulations. If the permit application package does comply, WDEQ issues the applicant a permit to conduct coal mining operations. OSM recommends approval, approval with conditions, or disapproval of the MLA mining plan to the Assistant Secretary of the Interior, Land and Minerals Management. Before the MLA mining plan can be approved, the BLM must concur with OSM’s recommendation. If a proposed LBA tract is leased to an existing mine, the lessee is required to revise its coal mining permit before mining the coal, following the processes outlined above. As a part of that process, a new mining and reclamation plan would be developed showing how the lands in the LBA tract would be mined and reclaimed. The revised permit area would be larger than the revised lease area in order to allow for disturbances outside the actual coal removal areas for such purposes as reclaiming to undisturbed topography, constructing flood control and sediment control facilities, and related activities. Specific impacts which would occur during the mining and reclamation of the LBA tract would be addressed in the mining and reclamation plans as well as specific mitigation measures. WDEQ enforces the performance standards and permit requirements for reclamation during a mine's operation. OSM retains oversight responsibility for this enforcement. BLM has authority in those emergency situations where WDEQ or OSM cannot act before environmental harm and damage occurs.

1-9


BLM also has a responsibility to consult with and obtain the comments of other state or federal agencies which have jurisdiction by law or special expertise with respect to potential environmental impacts. Appendix A presents other federal and state permitting requirements that must be satisfied to mine this LBA tract.

RELATIONSHIP TO BLM POLICIES, PLANS, AND PROGRAMS In addition to the federal acts previously listed, guidance and regulations for managing and administering public lands, including the federal coal lands in the Triton application, are set forth in 40 CFR 1500 (Protection of Environment), 43 CFR 1601 (Planning, Programming, Budgeting), and 43 CFR 3400 (Coal Management). Specific guidance for processing applications follow BLM Manual 3420 (Competitive Coal Leasing, BLM 1989) and the 1991 Powder River Regional Coal Team Operational Guidelines for Coal Lease-By-Applications (BLM 1991). The National Environmental Policy Act Handbook (BLM 1988) has been followed in developing this EIS.

CONFORMANCE WITH EXISTING LAND USE PLANS The FCLAA requires that lands considered for leasing be included in a comprehensive land use plan and that leasing decisions be compatible with that plan. The BLM Approved Resource Management Plan (RMP) for Public Lands Administered by the Bureau of Land Management Buffalo Field Office (BLM 2001) [an update of the Buffalo Resource Area RMP (BLM 1985a)] governs and addresses the leasing of federal coal in Campbell County. Coal land use planning involves four planning screens to determine whether the subject coal is acceptable for further lease consideration. The four coal screens are: development potential of the coal lands; unsuitability criteria application; multiple land use decisions that eliminate federal coal deposits; and surface owner consultation.

Only those federal coal lands that pass these screens are given further consideration for leasing. BLM applied these coal screens to federal coal lands in Campbell County in the early 1980s. The results were published in the Buffalo RMP. In 1993, BLM began the process of reapplying these screens to federal coal lands in Campbell, Converse, and Sheridan counties. This analysis was adopted in the BLM Buffalo Field Office RMP update, discussed above. The results of this analysis are included in appendix D of the Buffalo RMP (BLM 2001). A coal tract that is acceptable for further consideration for leasing must be located within areas that have been determined to have coal development potential. The BLM has

1-10


determined that the land in this coal lease application is within the area identified as having coal development potential. The coal mining unsuitability criteria listed in the federal coal management regulations (43 CFR 3461) have been applied to high to moderate coal development potential lands in the Wyoming Powder River Basin. Appendix B summarizes the unsuitability criteria, describes the general findings for the Buffalo RMP, and presents a validation of these findings for the West Hay Creek LBA tract. As indicated in appendix B, no lands in the West Hay Creek LBA tract have been found to be unsuitable for mining. Surface owner consultation was completed during the preparation of the coal screening analyses published in 1985 and 2001. The surface on the West Hay Creek LBA tract is owned entirely by Triton. As part of the coal planning for the 1985 Buffalo RMP, a multiple land use conflict analysis was completed to identify and eliminate additional coal deposits from further consideration for leasing to protect resource values of a locally important or unique nature not included in the unsuitability criteria, in accordance with 43 CFR 3420.1-4e(3). The 1985 multiple use conflict evaluation in the Buffalo RMP identified approximately 221,000 acres within Campbell, Sheridan, and Johnson counties that were potentially affected by multiple use conflicts in four categories (producing oil and gas fields, communities, recreation and public purpose facilities, and cultural resources). No lands within the West Hay Creek LBA tract were identified as potentially affected by multiple use conflicts. No additional lands were specifically identified as potentially affected by multiple use conflicts in the multiple use analysis referenced in the 2001 Buffalo RMP update. The 1985 Buffalo RMP addressed coal and oil and gas development conflicts in two planning decisions. Decision MM-4 recommended authorizing oil and gas drilling on coal leases only where drilling would not conflict with coal mining. Decision MM-5 recommended deferring coal leasing in producing oil and gas fields until coal development would not interfere with economic recovery of the oil and gas resource, as determined on a case by case basis. The multiple use analysis published in the 2001 Buffalo RMP update did not recommend changes to the existing 1985 RMP decisions. As previously mentioned, the PRRCT reviewed the West Hay Creek lease application at a public meeting on October 25, 2000, in Cheyenne, Wyoming. The PRRCT recommended that the BLM proceed with leasing this tract. Coal bed methane (CBM) wells have been drilled or are permitted to drill inside the West Hay Creek tract (see “Mineral Resources” section). BLM has approved applications to drill CBM wells on federal oil and gas leases inside the LBA tract so that the oil and gas lessees can start recovering the CBM resources. BLM has also

1-11


identified federal oil and gas leases and corresponding lessees within the Buckskin Mine’s existing coal leases. Those oil and gas lessees have been and are being contacted and encouraged to develop and recover the CBM resources prior to coal mining. This approach is consistent with BLM’s policy on conflicts between coal and CBM development, which is explained in BLM Instruction Memorandum No. 2003-253 (on file at the BLM’s Casper Field Office). BLM’s policy is to optimize the recovery of both resources and ensure that the public receives a reasonable return. In summary, the lands in the West Hay Creek LBA tract have been subjected to the coal planning screens and determined acceptable for further lease consideration. Thus, a decision to lease the federal coal lands in this application would be in conformance with the BLM Buffalo RMP. CONSULTATION AND COORDINATION Initial Involvement BLM received the West Hay Creek coal lease application on August 31, 2000. The application was initially reviewed by the BLM, Wyoming State Office, Division of Mineral and Lands. The BLM ruled that the application and lands involved met the requirements of regulations at 43 CFR 3425, Leasing on Application. Notice that this application had been received was published in the Federal Register September 12, 2000. The Governor of Wyoming was notified on October 3, 2000, that Triton had filed a lease application with BLM for the West Hay Creek LBA tract. Copies of the notice were sent to voting and nonvoting members of the PRRCT, including the governors of Wyoming and Montana, the Northern Cheyenne Tribe, the Crow Tribal Council, OSM, United States Fish and Wildlife Service (FWS), National Park Service, and United States Geological Survey (USGS). The PRRCT reviewed this lease application at a public meeting held on October 25, 2000 in Cheyenne, Wyoming. Triton presented information about their existing mine and pending lease application to the PRRCT at that meeting. The PRRCT recommended that the BLM process this application. The major steps in processing an LBA are shown in appendix C. The BLM filed a Notice of Intent to prepare an EIS and Notice of Scoping in the Federal Register on June 25, 2002 and requested public comment. A public scoping meeting was held on June 26, 2002 in Gillette, Wyoming. At the public meeting, Triton personnel presented information about their mine and their need for the coal. The presentation was followed by a question and answer period, during which one public comment was received. The scoping period extended from June 1 through July 31, 2002 during which time BLM received eight written comments.

1-12

Chapter 5 provides a list of other federal, state, and local governmental agencies that were consulted in preparation of this EIS (table 5-1) as well as the distribution list for this EIS (table 5-3). Issues and Concerns Issues and concerns expressed by the public and government agencies relating to the West Hay Creek coal lease application and previous coal lease applications included: ƒ	 potential conflicts with existing conventional oil and gas development and existing and proposed CBM development; ƒ	 cumulative impacts of mineral development to all other resources; ƒ	 validity and currency of resource data; ƒ	 public access; ƒ	 potential impacts to threatened and endangered species and other species of concern; ƒ	 potential air quality impacts (including cumulative impacts to visibility); ƒ	 potential surface and groundwater quality and quantity impacts; ƒ	 potential impacts of and possible mitigation for nitrogen oxide emissions resulting from blasting of coal and overburden; ƒ	 the need to address increasing coal production in the Powder River Basin in the cumulative analysis; ƒ	 potential impacts on cultural and paleontological resources; ƒ	 wetland impacts; ƒ	 short- and long-term impacts on fish and wildlife. Draft EIS (DEIS) Parties on the distribution list were sent copies of the DEIS, and copies were made available for review at the BLM offices in Casper and Cheyenne. The US Environmental Protection Agency (EPA) published a notice announcing the availability of the DEIS in the Federal Register on March 28, 2003. BLM published a Notice of Availability and Notice of Public Hearing in the Federal Register on March 21, 2003. A 60-day comment period on the DEIS commenced with publication of the EPA’s Notice of Availability and ended on May 30, 2003. The BLM’s Federal Register notice announced the date and time of a public hearing, as required under 43 CFR 3425.4 (a) (1). The public hearing was held at the Clarion Western Plaza in Gillette, Wyoming, at 7:00 p.m., on April 16, 2003. The purpose of the public hearing was to solicit public comments on the DEIS and on the fair market value, the maximum economic recovery, and the proposed competitive sale of federal coal from the LBA tract. One comment was recorded at the public hearing. A transcript of the hearing can be viewed at the BLM offices in Casper and Cheyenne.

1-13


Department of Justice Consultation After a competitive coal lease sale, but before a lease is issued, the BLM must solicit the opinion of the DOJ on whether the planned lease issuance creates a situation inconsistent with federal anti-trust laws. The DOJ is allowed 30 days to make this determination. If the DOJ has not responded in writing within the 30 days, the BLM can proceed with lease issuance.

1-14


CHAPTER 2: PROPOSED ACTION AND ALTERNATIVES
INTRODUCTION This chapter describes the Proposed Action and alternatives to this action. The Proposed Action is to hold a competitive coal lease sale and issue a lease for the federal coal lands in the West Hay Creek LBA tract as applied for by Triton. This alternative assumes that the tract would be developed as a maintenance tract for the Buckskin Mine. NEPA requires the consideration and evaluation of other reasonable ways to meet proposal objectives while minimizing or avoiding environmental impacts. Thus, NEPA requires the evaluation of a No Action Alternative and a practical range of other "reasonable" action alternatives that may avoid or minimize project impacts. Reasonable alternatives are defined by NEPA as those that are technically, economically, and environmentally practical and feasible. Reasonable alternatives are formulated to address issues and concerns raised by the public and agencies during scoping. These alternatives should represent another means of satisfying the stated purpose and need for the federal action. BLM Manual 3420-1 requires the BLM to evaluate the configuration of the tract based on providing for maximum economic recovery of the coal resource, maintaining or increasing the potential for competition, and avoiding future bypass or captive tract situations. If BLM identifies alternate tract configurations that meet these criteria, they are considered as alternatives to the Proposed Action. The No Action Alternative (Alternative 1) is to reject the West Hay Creek lease application. Under the No Action Alternative, the tract would not be offered for competitive sale; existing mining at the Buckskin Mine would continue as permitted. Selection of the No Action Alternative would not necessarily preclude mining in this area as the applicant or some other party could submit another application to lease this coal in the future. Alternatives 2 and 3 evaluate alternate tract configurations in which BLM considers adding coal to the tract as applied for. In evaluating this lease application, BLM identified a study area that includes adjacent unleased federal coal north and southeast of the West Hay Creek LBA tract as applied for. Alternative 2 evaluates adding all or part of the coal included in the entire study area to the tract as applied for. Alternative 3 evaluates adding only the coal included in the southeastern portion of the study area to the tract as applied for. Under alternatives 2 and 3, a competitive sale would be held and a lease issued for federal coal lands included in a tract modified by the BLM. The West Hay Creek LBA tract as applied for (Proposed Action) and the study area evaluated by BLM under alternatives 2 and 3 are shown in figure 2-1.

2-1

R. 73 W.

R. 72 W.

7

8

9

R. 73 W.

R. 72 W.

7

8

9

18

17

16

18

17

16

19

20

21

19

20

21

T. 52 N.

T. 52 N.

WEST HAY CREEK LBA TRACT AS APPLIED FOR (Proposed Action)
R. 73 W. R. 72 W. R. 73 W.

WEST HAY CREEK LBA TRACT ALTERNATIVE 2

7

8

9

R. 72 W.

7

8

9

18

17

16

18

17

16

19

20

21

19

20

21

T. 52 N.

T. 52 N.

WEST HAY CREEK LBA TRACT ALTERNATIVE 3

WEST HAY CREEK LBA TRACT ANALYSIS AREA

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY
 WEST HAY CREEK LBA TRACT ANALYSIS AREA
 WEST HAY CREEK LBA TRACT AS APPLIED FOR (Proposed Action)
 AREA ADDED BY BLM UNDER ALTERNATIVE 2
 AREA ADDED BY BLM UNDER ALTERNATIVE 3


Figure 2-1.

West Hay Creek LBA Tract Configurations.

2-2


Other alternatives considered but not analyzed in detail include: x	 holding a competitive lease sale and issuing a lease for federal coal lands included in the West Hay Creek tract (as applied for or as modified by BLM), with the assumption that the tract would be developed as a stand­ alone mine (Alternative 4); or x	 delaying the sale of the West Hay Creek LBA tract in order to take advantage of higher coal prices and/or to allow recovery of the potential CBM resources in the tract before mining (Alternative 5). Under this alternative, it is assumed that the tract could be developed as a maintenance tract or a new start mine, depending on how long the sale is delayed. LBA tracts are nominated for leasing by companies with an interest in acquiring them but, as discussed in chapter 1, the LBA process is, by law and regulation, an open, public, competitive sealed-bid process. If the decision reached after this EIS is completed is to hold a lease sale, the applicant (Triton) may or may not be the high bidder. The Proposed Action and alternatives 2 and 3 (the action alternatives) considered in this EIS assume that Triton would be the successful bidder if a competitive sale is held, and that the West Hay Creek LBA tract would be mined as a maintenance tract for the permitted Buckskin Mine. If a decision is made to hold a competitive lease sale and there is a successful bidder, a detailed mining and reclamation plan must be developed by the successful bidder and approved before mining can begin. As part of the approval process, the mining and reclamation plan would undergo detailed review by state and federal agencies. This plan could potentially differ from the plan used to analyze the impacts of the Proposed Action and alternatives 2 and 3 in this EIS, but the differences would not be expected to significantly change the impacts described here. These differences would typically be related to the details of mining and reclaiming the tract, but major factors (tons of coal mined, yards of overburden removed, acres disturbed, etc.) would not be notably different from the plan used in this analysis. The Proposed Action and action alternatives assume that an area larger than the tract would have to be disturbed in order to recover all of the coal in the tract. The disturbances outside the coal removal area would be due to activities like overstripping, matching undisturbed topography, and constructing flood control and sediment control structures.

2-3


THE PROPOSED ACTION Under the Proposed Action, the West Hay Creek LBA tract, as applied for by Triton, would be offered for lease at a competitive sale, subject to standard and special lease stipulations developed for the PRB (appendix D). The boundaries of the tract would be consistent with the tract configurations proposed in the West Hay Creek LBA tract lease application (figure 2-1). The Proposed Action assumes that Triton will be the successful bidder on the West Hay Creek LBA tract if it is offered for sale. The legal description of the proposed West Hay Creek LBA tract coal lease lands as applied for by Triton under the Proposed Action is as follows: T. 52 N., R. 72 W., 6th P.M., Campbell County, Wyoming
Section 17: Lot 5 (S2S2) 6 (S2S2) 7 (S2S2) 8 (S2S2) 9-14, inclusive; Lot 13 (E2) 20 (E2) Lot 5 (E2) 12 (E2) 13 (E2) 20 (E2) 10.265 acres 10.265 10.3475 10.3475 247.24 21.035 20.75 20.71 20.84 20.935 21.065 31.1175 165.38 31.1325 31.1475 165.52 838.0975 acres

Section 18:

Section 19:

Section 20:

Lot 2 (W2,W2E2) 3-6, inclusive; 7 (W2, W2 E2) 10 (W2, W2E2) 11-14, inclusive

Total Acres

Land descriptions and acreage are based on the BLM Status of Public Domain Land and Mineral Title approved coal plat as of March 2, 2002. As discussed in chapter 1 and appendix B, no lands in the West Hay Creek LBA tract were found to be unsuitable for mining. The tract as applied for includes approximately 838.0975 mineable acres. Triton estimates that it includes approximately 145 million tons of in-place coal, and that about 130 million tons of that coal would be recoverable. BLM will independently evaluate the volume and average quality of the coal resources included in the tract as part of the fair market value determination process. BLM's estimate of the mineable reserves and average quality of the coal included in the tract will be published in the sale notice if the tract is offered for sale. Some coal quality information in the area of the

2-4


West Hay Creek LBA tract is included in the “Geology” section in chapter 3. The approved Buckskin mine permit (Triton 2002) includes monitoring and mitigation measures that are required by SMCRA and Wyoming state law. If Triton acquires the West Hay Creek LBA tract, these monitoring and mitigation measures would be extended to cover operations on the LBA tract when the coal mining permit is revised to include mining the tract. This permit would have to be approved before coal removal could take place. These monitoring and mitigation measures are considered to be a part of the Proposed Action and action alternatives during the leasing process because they are regulatory requirements. The West Hay Creek LBA tract would be mined as an integral part of the Buckskin Mine under the Proposed Action. The Buckskin Mine is already operating under both an approved state mining permit and an MLA mining plan. As shown on figure 2-1, the LBA tract as applied for is entirely within the current Buckskin Mine permit boundary, and all environmental baseline studies have been conducted. Both the existing approved state mining permit and the MLA mining plan would require revision to include mining the LBA tract as applied for. Since the West Hay Creek LBA tract would be an extension of the existing Buckskin Mine, the facilities and infrastructure would be the same as those identified in the WDEQ/LQD Mine Permit 500 for the Buckskin Mine and the BLM’s resource recovery and protection plan (R2P2) for the Buckskin Mine. Triton’s currently approved air quality permit from the WDEQ/AQD allows up to 27.5 million tons of coal per year. In 2002, the Buckskin Mine produced 18.3 million tons. In 2003, the mine produced approximately 17.5 million tons. Under the No Action Alternative, the 434 million tons of in-place leased federal coal reserves remaining as of January 1, 2002 will be mined in approximately 17 years at an average annual production rate of 25 million tons per year. Under the Proposed Action, Triton currently estimates that average annual production would be 25 million tons per year, and the life of the existing mine would be extended by approximately 5 years. If Triton acquires the West Hay Creek LBA tract as applied for, they estimate that a total of 564 million tons of federal coal would be mined after January 1, 2002, with an estimated 130 million tons coming from the LBA tract. This estimate of recoverable reserves assumes that about 10% of the coal would be lost under normal mining practices, based on historical recovery factors at the Buckskin Mine. As of December 31, 2001, about 190 million tons of coal had been mined from within the current permitted area of the mine. Topsoil removal would be performed before the overburden is removed. Whenever possible, direct transport to a reclamation area would be done, but due to scheduling, some topsoil would be temporarily stockpiled. As required by the reclamation plan, heavy equipment would be used to haul and distribute the stockpiled topsoil.

2-5

The Buckskin Mine is one of several coal mines currently operating in the PRB where the coal seams are notably thick, and the overburden is relatively thin. The truck-shovel mining method and hydraulic excavator have to date been used for overburden stripping and coal mining at the mine. The overburden is excavated and loaded into trucks by electric-powered shovels. Overburden would be removed within the West Hay Creek LBA tract by truck-shovel operations. Most overburden and all coal would be drilled and blasted to facilitate efficient excavation. As overburden is removed, most would be directly placed into areas where coal has already been removed. Elevations consistent with an approved post-mining topography (PMT) plan would be established as quickly as possible. Under certain conditions, the PMT may not be immediately achievable. This would occur when there is an excess of material which may require temporary stockpiling; when there is insufficient material available from current overburden removal operations; or when future mining could redisturb an area already mined. Coal would be produced from two coal seams, which Triton refers to as the Anderson and Canyon, at several working faces to enable blending of the coal to meet customer quality requirements, to comply with BLM lease requirements for maximum economic recovery of the coal resource, and to optimize coal removal efficiency with available equipment. There are two existing crushing facilities within the Buckskin Mine permit area that provide the capacity to produce the permitted level. The two facilities employ one-stage crushing to size the coal to a nominal two-inch product. There are a total of 11 storage silos. While sufficient capacity exists, future facilities may be constructed to improve operating efficiency and air quality protection. Current employment at the Buckskin Mine is 199. Production plans for the Buckskin Mine call for an increase to 25 million tons per year in 2004, with employment estimated at 225. If the LBA tract is acquired, Triton anticipates that production would be 25 million tons per year, and employment would be 225 persons. Hazardous and Solid Waste Solid waste, which is produced at the existing Buckskin Mine, consists of floor sweepings, shop rags, lubricant containers, welding rod ends, metal shavings, worn tires, packing material, used filters, and office and food wastes. The mine disposes of its solid wastes within its permit boundary in accordance with the WDEQ-approved solid waste disposal plan. Sewage is handled by WDEQpermitted sewage systems at the existing mine facilities. Maintenance and lubrication of most of the equipment takes place at shop facilities at the mine. Major lubrication and oil changes of most equipment are performed inside the service building lube bays, where used oil is currently contained and deposited in storage tanks. Used oil is disposed of in accordance with WDEQ Solid and Hazardous Waste Division (SHWD) regulations.

2-6

Triton has reviewed the EPA’s Consolidated List of Chemicals Subject to Reporting Under Title III of the Superfund Amendments and Re-authorization Act (SARA) of 1986 (as amended) and EPA’s List of Extremely Hazardous Substances as defined in 40 CFR 355 (as amended) for hazardous substances used at the Buckskin Mine. Triton maintains files containing material safety data sheets for all chemicals, compounds, and/or substances which are or would be used during the course of mining. Triton is responsible for ensuring that all production, use, storage, transport, and disposal of hazardous and extremely hazardous materials as a result of mining are in accordance with all applicable existing or hereafter promulgated federal, state, and local government rules, regulations, and guidelines. All mining activities involving the production, use, and/or disposal of hazardous or extremely hazardous materials are and would continue to be conducted so as to minimize potential environmental impacts. Any release of hazardous or extremely hazardous substances in excess of the reportable quantity, as established in 40 CFR 117, is reported as required by the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended. The materials for which such notification must be given are the extremely hazardous substances listed in section 302 of the Emergency Planning and Community Right to Know Act and the hazardous substances designated under section 102 of CERCLA, as amended. If a reportable quantity of a hazardous or extremely hazardous substance is released, immediate notice must be given to the WDEQ Solid and Hazardous Waste Division and all other appropriate federal and state agencies. Each mining company is expected to prepare and implement several plans and/or policies to ensure environmental protection from hazardous and extremely hazardous materials. These plans/policies include: - spill prevention control and countermeasure plans; - spill response plans; - inventories of hazardous chemical categories pursuant to section 312 of
 SARA, as amended; and 
 - emergency response plans. All mining operations are also required to be in compliance with regulations promulgated under the Resource Conservation and Recovery Act, Federal Water Pollution Control Act (Clean Water Act), Safe Drinking Water Act, Toxic Substances Control Act, Mine Safety and Health Act, and the CAA. In addition, mining operations must comply with all attendant state rules and regulations relating to hazardous material reporting, transportation, management, and disposal. 2-7

Compliance with these rules is the current practice at Buckskin Mine. Acquisition of the West Hay Creek LBA tract by Triton would not change these current practices nor the amount or type of any wastes generated or disposed at the mine, although quantities of some wastes would increase in proportion to anticipated increases in coal production (fuel, lubricants, and shop and office wastes). ALTERNATIVE 1: NO ACTION ALTERNATIVE Under the No Action Alternative, Triton’s coal lease application would be rejected, the West Hay Creek LBA tract would not be offered for competitive sale, and the coal contained within the tract would not be mined. Rejection of the application would not affect permitted mining activities on existing leases at the adjacent Buckskin Mine. The mine currently leases approximately 4,949 acres of federal coal, about 160 acres of private coal, and about 640 acres of state coal (of which only 372 acres are within the permit boundary). Approximately 5,099 acres will eventually be affected. Under the No Action Alternative, Triton estimates that average annual production at the Buckskin Mine after 2002 will be 25 mmtpy, and average employment will be 225 persons. Portions of the surface of the LBA tract will be disturbed due to overstripping to allow coal to be removed from existing, contiguous leases. In order to compare the economic and environmental consequences of mining these lands versus not mining them, this EIS analysis was prepared under the assumption that the West Hay Creek tract would not be mined in the near future if the No Action Alternative were selected. However, selection of this alternative would not preclude leasing and mining of this tract in the future, either as a maintenance tract for an existing operation or as part of a new start mine. ALTERNATIVE 2: THE PREFERRED ALTERNATIVE Under Alternative 2, BLM would hold a competitive lease sale and issue a lease for a tract that is larger than the applied for configuration to the successful bidder. The modified tract would be subject to standard and special lease stipulations developed for the PRB and this tract (appendix D) In evaluating the West Hay Creek coal lease application, BLM identified a study area, shown in figure 2-1 as “West Hay Creek LBA Tract Alternative 2” that includes unleased federal coal to the north and adjacent to the southeast corner of the tract as applied for. The study area includes approximately 176.2 acres and 25 million tons of in-place coal. In identifying the northern study area, BLM wanted to evaluate the potential that another configuration of the tract would provide for more efficient recovery of the federal coal and/or increase competitive interest in the West Hay Creek LBA tract and the remaining unleased federal coal in this area.

2-8

In identifying the southeastern study area, BLM was concerned with the unleased lot of federal coal in Section 20 between the tract as applied for and the existing leases at the Buckskin Mine (See figure 1-2). If this lot is not leased with the adjacent federal coal, any mineable federal coal in the lot would potentially be bypassed when the surrounding coal is mined. (Note: Figure 1-2 also shows a gap between the LBA tract and the existing Buckskin leases in Section 17; the coal in that lot is private coal.) Before the Buckskin Mine applied for the West Hay Creek LBA, they evaluated the area adjacent to the southeast corner of the tract as applied for. The mine did not incorporate this area into their application because their current geologic model does not indicate that any mineable coal is present. As described in chapter 3, (Geology), modeling indicates the presence of a geologic anomaly along the southern portion of the tract. . The BLM’s Preferred Alternative would add all of the study area to the southeast (approximately 31.16 acres) and a portion of the study area to the north (approximately 51.90 acres), as illustrated in figure 2-2. BLM added the southeast part of the study area to the Preferred Alternative because, if it is leased with the surrounding coal, it could be mined if additional drilling does indicate that there is some recoverable coal in the area. BLM added a portion of the study area the north of the tract as applied for to the Preferred Alternative in order to eliminate the notch in the northwest corner of the tract as applied for, as shown in figure 2-1. This would facilitate more efficient recovery of the coal. The following lands would be added to the tract under the BLM’s Preferred Alternative:
Section 17 Lot 5 (N2S2) 6 (N2S2) 7 (N2S2) 8 (N2S2) 10.265 10.265 10.3475 10.3475 10.6725 31.1625 83.06 acres

Section 18: Section 20: Total acres:

Lot 12 (SE4) Lot 15 (W2, W2E2)

Triton estimates the 83.06 acres which BLM would be added under the Preferred Alternative includes approximately 15 million tons of in-place coal, and that about 10 million tons of that coal would be recoverable.

2-9


12


R. 73 W.

R.
 72
 W.

7


8


9

10 


11
 


13


18


17

16


15


14


24


19


20


21


22


23


25


30


29


28


27


26


36

31


32


33


34

35


T. 52 N. T. 51 N.

T. 52 N. T. 51 N.

1


6


5


4


3

2


12


R. 73 W.

R. 72
 W.

7


8


9


10

11


LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT AS APPLIED FOR AREA ADDED UNDER BLM'S PREFERRED ALTERNATIVE

Figure 2-2.

West Hay Creek LBA Preferred Alternative Tract Configuration.

2-10

The legal description of the West Hay Creek LBA Tract under the BLM’s Preferred Alternative is:
T. 52 N., R. 72 W., 6th P.M., Campbell County, Wyoming Section 17: Lot 5 (S2) 6 (S2) 7 (S2) 8 (S2) 9-14, inclusive; 20.53 20.53 20.695 20.695 247.24 10.6725 21.035 20.75 20.71 20.84 20.935 21.065 31.1175 165.38 31.1325 31.1475 165.52 31.1625 921.1575 acres

Section 18:

Lot 12 (SE4) 13 (E2) 20 (E2) 5 (E2) 12 (E2) 13 (E2) 20 (E2) 2 (W2, W2E2) 3-6, inclusive 7 (W/2, W2E2) 10 (W2, W2E2) 11-14, inclusive 15 (W2, W2E2)

Section 19: Lot

Section 20: Lot

Total acres:

Triton estimates that the reconfigured tract includes approximately 160 million tons of in-place coal, and that approximately 140 million tons of that coal would be recoverable. BLM will independently evaluate the volume and average quality of the coal resources included in the tract offered for sale as part of the fair market value determination process. As shown in figure 2-2, the Preferred Alternative is entirely within the Buckskin Mine permit boundary, and all environmental studies have been conducted. Both the existing approved state mining permit and MLA mining plan would require revision to include mining the tract under the Preferred Alternative. This alternative assumes that the tract would be developed as a maintenance tract for the Buckskin Mine. Production and employment would be similar to the Proposed Action. Other assumptions would also be the same as for the Proposed Action. Since the West Hay Creek LBA tract would be an extension of the existing Buckskin Mine, the facilities and infrastructure would be the same as those identified in the WDEQ/LQD Mine Permit 500 for the Buckskin Mine and the BLM R2P2 for the Buckskin Mine.

2-11


ALTERNATIVE 3 Under Alternative 3, BLM would hold a competitive lease sale and issue a lease for a tract that is larger than the applied for configuration, if a sale is held and there is a successful bidder. The modified tract would be subject to standard and special lease stipulations developed for the PRB and this tract (appendix D). BLM is considering this tract configuration for the West Hay Creek LBA tract in order to minimize the risk of bypassing federal coal that would potentially become economically unrecoverable if it is not included in this tract. As part of the preliminary geologic analysis of the federal coal resources in and around the West Hay Creek LBA tract, the BLM identified unleased federal coal southeast of the tract as applied for that would be isolated and might be bypassed if it is not included in the tract. Specifically, this alternative would add approximately 31.1625 acres of unleased federal coal in the W½ W½ E½ of lot 5 in section 20. As discussed above, the mine did not incorporate this area into their application because their current geologic model does not indicate that any mineable coal is present. BLM is considering adding this area to the lease because, as the model becomes further defined by additional drilling information, there may be portions of the area that include mineable coal. The Alternative 3 tract is described as follows: T. 52 N., R. 72 W., 6th P.M., Campbell County, Wyoming
Section 17: Lot 5 (S2S2) 6 (S2S2) 7 (S2S2) 8 (S2S2) 9 9-14, inclusive; 13 (E2) 20 (E2) 5 (E2) 12 (E2) 13 (E2) 20 (E2) 2 (W2, W2E2) 3-6, inclusive; 7 (W2, W2E2) 10 (W2, W2E2) 11-14, inclusive 15 (W2, W2E2) 10.265 acres 10.265 10.3475 10.3475 41.32 247.24 21.035 20.75 20.71 20.84 20.935 21.065 31.1175 165.38 31.1325 31.1475 165.52 31.1625 869.26 acres

Section 18:

Lot

Section 19:

Lot

Section 20:

Lot

Total acres:

2-12


Since Triton estimates that no additional coal would be recoverable if this area is added to the tract, they estimate that the tract would include approximately 130 million tons of recoverable coal. BLM will independently evaluate the volume and average quality of the coal resources included in the tract offered for sale as part of the fair market value determination process. As shown on figure 2-1, the tract in this alternative is entirely within the current Buckskin Mine permit boundary, and all environmental baseline studies have been conducted. Both the existing approved state mining permit and the MLA mining plan would require revision to include mining the Alternative 3 tract. This alternative assumes that the tract would be developed as a maintenance tract for the Buckskin Mine. Other assumptions would also be the same as for the Proposed Action. Since the West Hay Creek LBA tract would be an extension of the existing Buckskin Mine, the facilities and infrastructure would be the same as those identified in the WDEQ/LQD mine permit 500 for the Buckskin Mine and the BLM R2P2 for the Buckskin Mine. ALTERNATIVES CONSIDERED BUT NOT ANALYZED IN DETAIL Alternative 4 Under this alternative, as under the Proposed Action and alternatives 2 and 3, the BLM would hold a separate, competitive, sealed-bid sale for the lands included in the West Hay Creek LBA tract. Alternative 4 assumes that the successful qualified bidder would be someone other than the applicant, and that this bidder would acquire the tract in order to open a new mine to develop the coal resources in the tract. A company acquiring this coal for a new stand-alone mine would require considerable initial capital expenses, including the construction of new surface facilities (offices, shops, warehouses, coal processing facilities, coal loadout facilities, and rail spur), extensive baseline data collection, and development of new mining and reclamation plans. In addition, a company or companies acquiring this coal for a new start mine would have to compete for customers with established mines in a competitive market. BLM currently estimates that a tract would potentially need to include as much as 500 to 600 million tons of coal in order to attract a buyer interested in opening a new mine in the Wyoming PRB. This is based on the assumptions that an operator would construct facilities capable of producing 30 mmtpy to take advantage of the economies of scale offered by the coal deposits in the PRB, and 20 to 30 years of coal reserves would be needed to justify the expense of building the facilities described above. Given these assumptions, under the Proposed Action or alternatives 2 or 3, the tract does not include sufficient coal resources to consider opening a new mine. Therefore, it is unlikely that a company would lease the West Hay Creek LBA tract in order to open a new mine, and this alternative is not

2-13


analyzed in detail in this EIS. The environmental impacts of developing a new mine to recover the coal resources in the West Hay Creek LBA tract would be greater than under the Proposed Action, the No Action Alternative, or alternatives 2 or 3 because of the need for new facilities, new rail lines, new employment, and the creation of additional sources of particulates (dust). In the event that a lease sale is held and the applicant is not the successful bidder, the successful bidder would be required to submit a detailed mining and reclamation plan for approval before any the tract could be mined. This NEPA analysis would be reviewed and supplemented as necessary before that mining and reclamation plan is approved. Alternative 5 Under Alternative 5, the BLM would delay the sale of the West Hay Creek LBA tract as applied for to increase the benefit to the public afforded by higher coal prices and/or to allow more complete recovery of the potential CBM resources in the tract prior to mining. There are two major sources of revenue to state and federal governments from the leasing and mining of federal coal: 1) the competitive bonus bid paid at the time the coal is leased, and 2) a 12.5% royalty collected when the coal is sold. This alternative could potentially increase the fair market value of the coal resources in the LBA tract, thus increasing the bonus bid when the coal is leased. The price paid for coal from northeastern Wyoming decreased by more than $1.00 per ton from 1992 to 2000, while production of low sulfur PRB coal increased annually since 1992. Prices for PRB coal increased in 2001 and 2002, and are projected to remain stable or decrease slightly from 2004 through 2008 (WGS 2003). There is no assurance that delaying the sale would result in a higher coal price. The fair market value of the tract and the resulting bonus payment to the government could increase if the lease sale is postponed and if PRB coal prices do increase. The postponement would not necessarily lead to higher royalty income to the state or federal governments. Royalty payments are the larger of the two revenue sources. They increase automatically when coal prices increase because they are collected at the time the coal is sold, but they cannot be collected until the coal is leased and permitted which takes several years. If leasing is delayed until prices increase, then by the time the coal is mined the higher coal prices may or may not persist. If the higher coal prices do persist, they may enable the coal lessee to negotiate longer term contracts at higher prices, which would result in longer term, higher royalty payments. In contrast, if the existing mining operation runs out of coal reserves before prices rise, the operations may have to be shut down before additional coal can be leased and permitted for mining. In that case, the fair market value of the coal may actually drop because the added expense of reopening a mine or starting a new mine would have to be factored into the fair market value.

2-14

Other considerations include the value of leaving the mineable coal for future development versus the value of making low-sulfur coal available now, in anticipation of cleaner fuel sources being developed in the future. Continued leasing of PRB coal enables coal-fired power plants to meet Clean Air Act requirements without constructing new plants, revamping existing plants, or switching to existing alternative fuels, which may significantly increase power costs for individuals and businesses. If cleaner fuel sources are developed in the future, they could be phased in with less economic impact to the public. A range of the potential future economic benefits of delaying leasing until coal prices rise could be quantified in an economic analysis, but the benefits would have to be discounted to the present, which would make them similar to the Proposed Action and the action alternatives.

CBM resources are currently being recovered from oil and gas leases on the West Hay Creek LBA tract and there are several mechanisms in place that can be used to allow continuing recovery of the CBM resources prior to mining if the Federal coal in the tract is leased now: x	 BLM will attach a Multiple Mineral Development stipulation to the lease which states that BLM has the authority to withhold approval of coal mining operations that would interfere with the development mineral leases issued prior to the coal lease [see Attachment 2(c)]. x	 Mining of the West Hay Creek LBA Tract cannot occur until the coal lessee has a permit to mine the tract approved by the Wyoming Department of Environmental Quality and a MLA mining plan approved by the Secretary of the Interior. Before the MLA mining plan can be approved, BLM must approve the Resource Recovery and Protection Plan (R2P2) for mining the tract. Prior to approving the R2P2, BLM can review the status of CBM development on the tract and the mining sequence proposed by the coal lessee. The permit approval process generally takes the coal lessee several years, during which time CBM can be recovered. x	 BLM has a policy in place on CBM-coal conflicts (BLM Instruction Memorandum No. 2003-253), which directs BLM decision makers to optimize the recovery of both resources and ensure that the public receives a reasonable return. This alternative was not analyzed in detail because it would not produce substantially different impacts from other alternatives analyzed in detail. Rental and royalty provisions in the proposed lease provide for the United States to benefit if coal prices have increased by the time of mining. Moreover, recovery of a large portion of the

2-15

economically-recoverable CBM resources on the tract would be anticipated after lease issuance because of the mechanisms discussed above. The environmental impacts of mining the coal later as part of an existing mine would be expected to be similar and about equal to the Proposed Action and the action alternatives. If a new mine start is required to mine the coal, the environmental impacts would be expected to be greater than if it were mined as an extension of an existing mine. COMPARISON OF ALTERNATIVES Figure 2-1 shows the locations of the Proposed Action and alternatives 2 and 3 for the West Hay Creek LBA tract. Table 2-1 is a summary comparison of coal production, surface disturbance, mine life, and projected federal and state revenues for the Proposed Action and alternatives 2 and 3 for the West Hay Creek LBA tract. Table 2-2 presents a comparative summary of the direct and indirect environmental impacts of implementing each alternative as compared to the No Action Alternative. The No Action Alternative assumes completion of currently permitted mining at the Buckskin Mine for comparison to anticipated mining if the West Hay Creek LBA tract is leased. Table 2-3 presents a comparative summary of cumulative environmental impacts of implementing each alternative. The environmental consequences of the Proposed Action and alternatives are analyzed in chapter 4. These summary impact tables are derived from the following explanation of impacts and magnitude. As required by NEPA, all agencies of the federal government are required to provide a detailed statement by the responsible official on: x	 the environmental impact of the Proposed Action, x	 any adverse environmental effects which cannot be avoided should the proposal be implemented, x	 Alternatives to the Proposed Action, x	 the relationship between local short-term uses of man’s environment and the maintenance and enhancement of long-term productivity, and x	 any irreversible and irretrievable commitments of resources which would be involved in the Proposed Action should it be implemented (42 USC 4332[C]).

2-16


TABLE 2-1 
 COMPARISON OF COAL PRODUCTION, SURFACE DISTURBANCE, 
 AND MINE LIFE

No Action Alternative (existing Buckskin Mine) 512 mmt 434 mmt 189.9 mmt 4,949 ac 5,099 ac 7,602 ac 25 mmt 17.4 yrs 225 $477 million $165 million Added by Proposed Action 145 mmt 130 mmt --838.0975 ac 830 ac 0 ac 0 mmt 5.2 yrs 0 $143 million $49 million Added by Alternative 2 (Preferred Alternative) 160 mmt 140 mmt — 921.1575 ac 897 ac 0 ac 0 mmt 5.6 yrs 0 $154 million $53 million Added by Alternative 3 150 mmt 130 mmt --869.26 ac 830 ac 0 ac 0 mmt 0 yrs 0 $143 million $49 million

Item In-place1 federal coal (as of 1/1/02) Recoverable coal2 (as of 1/1/02) Coal mined3, 12/31/01 Lease acres4 Total area to be disturbed4 Permit area4 Average annual post-2001 coal production Remaining life of mine (post-2001) Average no. of employees Total projected state revenues (post-2001)5 Total projected federal revenues (post-2001)6
1

In-place coal includes all Canyon and Anderson coal within the lease area. Buckskin Mine defines recoverable coal as an estimate of the extractable coal that can be recovered. This figure excludes all mining losses that occur during normal mining operations, including wedge losses, coal left in pillars and fenders, and top and bottom coal cleaning. Assumes 90% to 92% recovery of extractable coal. Lease area includes federal coal leases only and does not include state and private coal within the permit boundary. The permit area is larger than leased or disturbed areas to assure that all disturbed lands are within the permit boundary and to allow an easily defined legal land description. The additional disturbance areas are less than the additional lease areas for the action alternatives because portions of the lease areas are included in the existing disturbance area for Buckskin Mine. The permit area would not need to be changed for Alternative 3 or the Preferred Alternative. Projected revenue to the state of Wyoming is $1.10 per ton of coal sold and includes income from severance tax, property and production taxes, sales and use taxes, and Wyoming's share of federal royalty payments (University of Wyoming 1994). Federal revenues based on $4.00 per ton price x federal royalty of 12.5% x amount of recoverable coal plus bonus payment on LBA coal of $0.26 per ton based on average of last 11 LBAs (table 1-1) x amount of recoverable coal less state's 50% share.

2

3

4

5

6

2-17


Impacts can be beneficial or adverse, and they can be a primary result of an action (direct) or a secondary result (indirect). They can be permanent, long-term (persisting beyond the end of mine life and reclamation) or short-term (persisting during mining and reclamation and through the time the reclamation bond is released). Impacts also vary in terms of significance. The basis for conclusions regarding significance are the criteria set forth by the Council on Environmental Quality (40 CFR 1508.27) and the professional judgment of the specialists doing the analyses. Impact significance may range from negligible to substantial; impacts can be significant during mining but be reduced to insignificance following completion of reclamation.

2-18


TABLE 2-2 
 SUMMARY COMPARISON OF DIRECT AND INDIRECT IMPACTS 

(Chapter 4 contains an additional description of the impacts.)
MAGNITUDE TYPE AND DURATION OF IMPACT (Impacts are assumed to be adverse unless otherwise indicated) PROPOSED ACTION AND NO ACTION ALTERNATIVE ALTERNATIVES

RESOURCE TOPOGRAPHY AND PHYSIOGRAPHY The topography following reclamation would be gentler and more uniform. This topographic moderation would be permanent and would potentially result in: - a potential reduction in microhabitats habitat diversity, and big game carrying capacity. - a reduction in water runoff and peak flows which would potentially help reduce erosion, enhance vegetative productivity, and accelerate groundwater recharge. GEOLOGY AND MINERALS Coal, overburden and topsoil would be removed, topsoil and overburden would be replaced. The physical characteristics of the overburden and topsoil would be permanently altered when it is replaced. Unsuitable overburden material would be placed in areas where it would not affect groundwater quality or revegetation success. Coal bed methane would be lost through venting and depletion of hydrostatic pressure. Subcoal conven­ tional oil and gas resources could not be developed during mining. SOILS Changes to physical properties would include increased near-surface bulk density and more uniformity in soil type, thickness, and texture. Soil material that is not suitable to support plant growth would not be salvaged for use in reclamation Changes in chemical properties would include more uniform soil nutrient distribution. Changes in biological properties would include a reduction in organic matter and microorganism populations. The existing plant habitat in stockpiled soils would be reduced. AIR QUALITY Overburden and coal blasting, coal hauling and dumping, and operation of mining equipment would cause elevated concentrations of particulate matter and gaseous emissions. Public would potentially be exposed to elevated particulate and gaseous emissions along publicly accessible roads and in occupied dwellings located near mining operations.

Impacts would be moderate but long term on the existing mine area. Some impacts would be beneficial.

Same as the No Action Alternative on expanded area of coal removal.

Impacts would be moderate and long term to permanent on existing mine area.

Same as the No Action Alternative on expanded area of coal removal.

Impacts would be moderate but longterm on the existing mine area. Some changes to the physical properties would be beneficial.

Same as the No Action Alternative on expanded area of coal removal.

Changes to the chemical properties would have a beneficial, long-term effect on existing mine area.

Same as the No Action Alternative on expanded area of coal removal.

Changes in biological properties would be moderate and short-term to longterm on the existing mine area.

Same as the No Action Alternative on expanded area of coal removal.

Impacts would be moderate and short term on the existing mine permit and surrounding area.

Same as the No Action Alternative on the expanded area of coal removal and surrounding area.

2-19


TABLE 2-2
(continued)
MAGNITUDE TYPE AND DURATION OF IMPACT (Impacts are assumed to be adverse unless otherwise indicated) PROPOSED ACTION AND NO ACTION ALTERNATIVE ALTERNATIVES

RESOURCE WATER RESOURCES Surface water: Changes in runoff characteristics and sediment discharge would be associated with disruption of surface drainage systems. Sediment control structures would moderate peak flows and help control sediment down­ stream. Vegetation removal during mining could result in increased erosion rates. Loss of soil structure after reclamation would act to increase runoff rates, but topographic moderation would help increase infiltration. Groundwater: Coal and overburden aquifers would be removed; the replaced overburden would have altered hydraulic properties; water levels in affected coal and overburden aquifers adjacent to the mine would be depressed. Groundwater quality in backfilled areas would be changed but would be expected to be similar to premining aquifers. ALLUVIAL VALLEY FLOORS (AVFs) AVF’s significant to agriculture can be disturbed but must be replaced; AVFs not significant to agriculture would be removed and restored. WETLANDS Wetlands would be removed by mining operations.

Impacts would be moderate and short term to long term on existing mine area.

Same as the No Action Alternative on expanded area of coal removal.

Impacts would be minor to moderate and long term on the existing mine area.

Same as the No Action Alternative on expanded area of coal removal.

No impact on existing mine area.

No AVFs on expanded area of coal removal.

Impacts would be moderate and long term on existing mine area. Juris­ dictional wetlands would be replaced in accordance with section 404 of the Clean Water Act; non-jurisdictional wetlands would be replaced as required by the surface land owner or WDEQ/ LQD.

Same as the No Action Alternative on expanded area of coal removal.

VEGETATION During mining, progressive removal of native vegetation would result in increased erosion, loss of wildlife and livestock habitat, and loss of wildlife habitat carrying capacity. After reclamation, vegetation patterns would be changed, vegetation diversity would be decreased, shrub density could be reduced and wildlife carrying capacity would potentially be reduced. Nonnative plant species would potentially invade. Impacts would be moderate and shortto long-term on existing mine area. Same as the No Action Alternative on expanded area of coal removal.

Impacts would be minor to moderate and long term on existing mine area. Steps to control invasion by nonnative plant species would be implemented.

Same as the No Action Alternative on expanded area of coal removal.

2-20


TABLE 2-2
(continued)
MAGNITUDE TYPE AND DURATION OF IMPACT (Impacts are assumed to be adverse unless otherwise indicated) PROPOSED ACTION AND NO ACTION ALTERNATIVE ALTERNATIVES

RESOURCE WILDLIFE During mining, wildlife would be displaced from and habitat would be lost in active mining areas. Wildlife movement through mine permit area would be restricted. Small mammal mortality would increase. Foraging and nesting habitat for raptors and migratory birds and breeding and brood-rearing habitat for sage grouse would be lost. Habitat for waterfowl and aquatic species would be disturbed. Minerelated traffic would be responsible for road kills. After reclamation, big game habitat carrying capacity and habitat diversity on reclaimed lands would potentially be decreased. Changes in sagebrush density on reclaimed lands may limit sage grouse repopulation until premining conditions are restored. Post mining aquatic habitat may not duplicate premining habitat. THREATENED, ENDANGERED, AND PROPOSED SPECIES Black-footed ferret Bald eagle habitat. Ute ladies’-tresses Black-tailed prairie dog LAND USE AND RECREATION Livestock grazing use and wildlife habitat in active mining areas would be reduced before reclamation. Oil and gas production and transportation facilities would be removed prior to mining. Subcoal oil and gas reservoirs would not be accessible for development during mining and before reclamation. CBM not recovered prior to mining would be permanently lost. Hunting access would be restricted during mining and reclamation. CULTURAL RESOURCES Historic and prehistoric sites and isolated artifacts would be disturbed. All sites that meet the eligibility requirements for the NRHP would be avoided or mitigated through data recovery. Potential for vandalism and unauthorized collection would increase.

Impacts would be minor to moderate and short term on existing mine area.

Same as the No Action Alternative on expanded area of coal removal.

Impacts would be moderate and long term on existing mine area.

Same as the No Action Alternative on expanded area of coal removal.

As determined by previous consultation with FWS for all species

No effect May affect, not likely to adversely affect May affect, not likely to adversely affect No effect

Impacts would be moderate and short term to long term on existing mine area.

Same as No Action Alternative on expanded area of coal mining.

Eligible or unevaluated sites on existing mine area must be avoided or mitigated through data recovery; ineligible sites may be destroyed without further work.

Same as No Action Alternative on expanded area of coal mining.

2-21


TABLE 2-2
(continued)
MAGNITUDE TYPE AND DURATION OF IMPACT (Impacts are assumed to be adverse unless otherwise indicated) PROPOSED ACTION AND NO ACTION ALTERNATIVE ALTERNATIVES No impact identified on existing mine area. Native American consultation completed for existing mine permit area. Same as the No Action Alternative on expanded area of coal removal. OSM completed Native American consultation on the lands within the analysis area in 2000.

RESOURCE NATIVE AMERICAN CONCERNS

PALEONTOLOGICAL RESOURCES Plant, invertebrate, and vertebrate fossil material in overburden and coal would potentially be lost. Potential for unauth­ orized collection and vandalism would increase. Buried fossil material would potentially be exposed for scientific examination. VISUAL RESOURCES During mining, a landscape altered by presence of facilities and mining operations would be visible from roads and dwellings in the area. Following reclamation, slopes would be smoother and sagebrush would be less dense. NOISE Increased noise levels during mining could affect occupied dwellings within 1 mile and wildlife in immediate vicinity. TRANSPORTATION Railroads would be used to ship coal, employees would travel to and from work on existing roads, existing pipelines, phone lines, and electrical lines would be removed prior to mining. SOCIOECONOMICS State and federal governments would receive revenues from royalties and taxes. Campbell and Converse counties would benefit from economic development, stable employment, and taxes. Impacts would be moderate and short term for mining operations on existing mine area. Impacts would be moderate, beneficial, and short term for mining operations on expanded area of coal removal. Impacts would be moderate, short-term for mining operations on existing mine area Same as the No Action Alternative on expanded area of coal removal Impacts would be moderate and short term on existing mine and surrounding area. Same as the No Action Alternative on expanded area of coal removal. Impacts would be moderate and short term on existing mine area during mining and reclamation. Following reclamation, impacts would be minor and long-term. Same as the No Action Alternative on expanded area of coal removal. Minor, long-term to permanent on existing mine area, some impacts would be beneficial. Same as the No Action Alternative on expanded area of coal removal.

2-22


TABLE 2-3 
 SUMMARY COMPARISON OF CUMULATIVE IMPACTS 

(Chapter 4 for contains an additional description of the impacts.)
MAGNITUDE TYPE AND DURATION OF IMPACT (Impacts are assumed to be adverse unless otherwise indicated) NO ACTION ALTERNATIVE PROPOSED ACTION AND ALTERNATIVES

RESOURCE

TOPOGRAPHY AND PHYSIOGRAPHY After reclamation, reduced topographic diversity could lower big game carrying capacity, increase precipitation infiltration, and reduce peak flows in affected portion of drainages. GEOLOGY AND MINERALS Nonrenewable coal and CBM resources in the PRB would be removed to generate heat and power and would not be available for use in the future. SOILS Soils would be removed and replaced in the mine disturbance areas. Soil disturbance associated with CBM and other proposed development would be less intensive, but would be more widespread. AIR QUALITY Potential cumulative impacts associated with exiting and proposed mining operations and Wyoming PRB Oil and Gas Project EIS Alternative 1 and Montana Statewide Oil and Gas EIS Alternative E would include: - Cumulative near-field concentrations of criteria pollutants. Above PSD Class II increment for PM10 24­ hour. Concentrations of other pollutants below increments. Above PSD Class I increment in Northern Cheyenne Reservation. Concentrations in other areas are below increments. Above PSD Class I increment in Northern Cheyenne Reservation and Washakie Wilderness. Concentrations in other areas are below increments. Potential impacts range from three days above 1.0 dV at Red Rock Lakes Wilderness to 32 days above 1.0 dV at Wind Cave National Park. Potential maximum deciview change is 29.0 dV at U.L. Bend Wilderness. Potential impacts are 180.0 percent of the level of acceptable change (LAC) in Upper Frozen Lake and 10.4 percent of the LAC in Florence Lake. Impacts at other lakes are below the LAC. Same as No Action. Impacts would be moderate and long term. Coal related disturbance would affect approximately 25,300 acres in the northern mine group. Same as the No Action Alternative on up to 921 additional acres of leased federal coal in the northern mine group. Impacts would be moderate and short term. Coal removal would affect approximately 24,715 acres of federal coal in the northern mine group. Same as the No Action Alternative on up to 921 additional acres of leased federal in the northern mine group. Impacts would be minor and long term in the three groups of mines within the corridor extending from north of Gillette to south of Wright; some impacts could be beneficial. Same as the No Action Alternative on up to 921 additional acres of leased federal coal in the northern mine group.

Same as No Action. - Cumulative far-field concentrations of NO2 annual.

Same as No Action.

- Cumulative far-field concentrations of PM10 24-hour.

Same as No Action.

- Cumulative visibility impacts in mandatory Class I areas.

Same as No Action.

- Acidification of sensitive lakes.

2-23


TABLE 2-3
(continued)
MAGNITUDE TYPE AND DURATION OF IMPACT (Impacts are assumed to be adverse unless otherwise indicated) NO ACTION ALTERNATIVE PROPOSED ACTION AND ALTERNATIVES

RESOURCE

WATER QUALITY Surface Water: Mining disturbance would affect surface water quality and quantity within the Little Powder River drainage basin. Disruption and diversions affecting approximately 7% of Little Powder River drainage basin during 50 years of mining and reclamation. Minor, short term, potentially beneficial on existing mine areas. Same as the No Action Alternative on less than 8% of Little Powder River drainage basin.

- Potential for offsetting changes in surface water flow amounts due to overlapping development of coal and CBM resource. Groundwater: Replacement of existing coal and overburden aquifers with backfill material

Same as No Action Alternative on expanded mine area.

Minor to moderate in area of disturbance for existing leases in northern mine group

Size of backfill area would increase by disturbance area associated with mining 921 additional acres of leased federal coal. Size of drawdown area would be affected by coal removal on up to 921 additional acres of leased federal coal. Same as No Action for expanded mine area.

Moderate, long term for existing leases in northern mine area. - Overlapping drawdown in the coal and alluvial aquifers between surface coal mines. Additive, long term in area immediately west of surface coal mines. - Overlapping drawdown in the coal aquifer caused by surface mining and CBM development. - Water-level decline in the sub-coal aquifers as a result of all development. - Change in groundwater quality as a result of all development. ALLUVIAL VALLEY FLOORS (AVFs) AVFs in coal removal area would be removed when coal is mined. WETLANDS Wetlands in coal removal area would be removed when coal is mined. Incremental, not additive, short term on existing leases, jurisdictional wetlands would be replaced as required under Section 404 of the Clean Water Act; nonjurisdictional wetlands would be replaced as required by the surface land owner or WDEQ/LQD. No cumulative impacts anticipated on existing mine area. AVFs disturbed by mining would be replaced.

No cumulative impacts anticipated for subcoal wells separated by 1 mile or more. No cumulative impacts anticipated.

Same as No Action for expanded mine area. Same as No Action for expanded mine area.

Same as the No Action Alternative on expanded area of coal removal.

Same as No Action on expanded area of coal removal.

VEGETATION Existing vegetation would be removed during mining and restored during reclamation. After reclamation, vegetation patterns would be changed, vegetation diversity would be decreased, shrub density could be reduced and wildlife carrying capacity would potentially be reduced. Nonnative plant species would potentially invade. Impacts would be moderate and short term to long-term. Coal removal would affect approximately 24,715 acres of federal coal in the northern mine group. Steps to control invasion by nonnative plant species would be implemented. Same as the No Action Alternative on up to additional 921 acres of leased federal coal in the northern mine group.

2-24


TABLE 2-3
(continued)
MAGNITUDE TYPE AND DURATION OF IMPACT (Impacts are assumed to be adverse unless otherwise indicated) NO ACTION ALTERNATIVE PROPOSED ACTION AND ALTERNATIVES

RESOURCE

WILDLIFE During mining, wildlife would be displaced from and habitat would be lost in active mining areas. Wildlife movement through mine permit areas would be restricted. Small mammal mortality would increase. Foraging and nesting habitat for raptors and migratory birds and habitat for sage grouse would be lost. Habitat for waterfowl and aquatic species would be disturbed. Mine-related traffic would be responsible for road kills. CBM development on or adjacent to coal mines could expand area of impacts to some species including raptors and sage grouse. After reclamation, big game habitat carrying capacity and habitat diversity on reclaimed lands would potentially be decreased. Changes in sagebrush density on reclaimed lands may limit sage grouse repopulation until premining conditions are restored. Post mining aquatic habitat may not duplicate premining habitat. THREATENED, ENDANGERED, AND PROPOSED SPECIES See Appendix G Potential impacts related to coal removal would affect approximately 24,715 acres of federal coal in the northern mine group; impacts may overlap with other developments on adjacent lands. Same as the No Action Alternative on up to 921 additional acres of leased federal coal in the northern mine group. Impacts would be minor to moderate and short term to long-term. Coal removal would affect approximately 24,715 acres of federal coal in the northern mine group. Few sage grouse wintering areas or leks lie within mining disturbance area. Same as the No Action Alternative on up to 921 additional acres of leased federal coal in the northern mine group. No active sage grouse leks would be added to area of mine disturbance.

Impacts would be moderate and short term to permanent. Coal removal would affect approximately 24,715 acres of federal coal in the northern mine group.

Same as the No Action Alternative on up to 921 additional acres of leased federal coal in the northern mine group.

LAND USE AND RECREATION Agricultural production would be lost. Oil and gas development and production would be disrupted while mining is occurring and facilities would be removed. Wildlife habitat would be reduced. Access to public lands users, particularly hunters, would be lost. Impacts would be moderate and short term. Coal removal would affect approximately 24,715 acres of federal coal in the northern mine group. Same as the No Action Alternative on up to 921 additional acres of leased federal coal underlying private surface would be leased in the northern mine group.

CULTURAL RESOURCES Historic and prehistoric sites and isolated artifacts would be disturbed. All sites that meet the eligibility requirements for the NRHP would be avoided or mitigated through data recovery. Potential for vandalism and unauthorized collection would increase. Impacts would be moderate and permanent. Coal removal would affect approximately 24,715 acres of federal coal in the northern mine group.

. Same as the No Action Alternative on up to 921 additional acres of leased federal coal in the northern mine group.

2-25


TABLE 2-3
(continued)
MAGNITUDE TYPE AND DURATION OF IMPACT (Impacts are assumed to be adverse unless otherwise indicated) NO ACTION ALTERNATIVE PROPOSED ACTION AND ALTERNATIVES No impact identified on existing mine area. Native American consultation completed for existing mine permit areas. Same as the No Action Alternative on up to 921 additional acres of leased federal coal underlying private surface in the northern mine group OSM completed Native American consultation on the lands within the analysis area in 2000.

RESOURCE

NATIVE AMERICAN CONCERNS

PALEONTOLOGICAL RESOURCES Plant, invertebrate, and vertebrate fossil material in overburden and coal would potentially be lost. Potential for unauthorized collection and vandalism would increase. Buried fossil material would potentially be exposed for scientific examination. VISUAL RESOURCES During mining, a landscape altered by presence of facilities and mining operations would be visible from roads and dwellings in the area. Following reclamation, slopes would be smoother and sagebrush would be less dense. NOISE Increased noise levels during mining could affect occupied dwellings within 1 mile and wildlife in immediate vicinity. TRANSPORTATION FACILITIES Use of existing transportation facilities at current levels would be extended. Oil and gas pipelines would be removed from all areas to be mined. SOCIOECONOMICS Cumulative mineral and energy related development could increase, which could result in new employment and housing needs. Income to the state and counties from revenues and royalties could be expected. Although short term, benefits would be significant, some benefits would be beneficial. Same as the No Action Alternative on expanded area of coal removal. Impacts would be moderate and short term. Same as the No Action Alternative on expanded area of coal removal. Impacts would be minor to moderate, short term while mining operations are conducted on approximately 24,715 acres in the northern mine group. Impacts would be moderate and short term on approximately 24,715 acres in the northern mine group during mining and reclamation. Following reclama­ tion, impacts would be minor and longterm. Same as the No Action Alternative on up to 921 additional acres of leased federal coal in the northern mine group. Minor, long-term to permanent. Coal removal would affect approximately 24,715 acres of federal coal in the northern mine group. Same as the No Action Alternative on up to 921 additional acres of leased federal coal in the northern mine group.

. Same as the No Action Alternative on up to 921 additional acres of leased federal coal in the northern mine group.

2-26


CHAPTER 3: THE AFFECTED ENVIRONMENT
INTRODUCTION This chapter describes the existing conditions of the physical, biological, cultural, and socioeconomic resources in the study area. The resources that are addressed here were identified during the scoping process or interdisciplinary team review as having the potential to be affected. Figure 3-1 shows the general analysis area for most environmental resources. The analysis area includes the West Hay Creek LBA tract as applied for under the Proposed Action and the action alternatives. The analysis area is also located within the current Buckskin Mine permit area. Environmental baseline studies required by WDEQ/LQD for permitting the mining of the Proposed Action, Alternative 2 (the Preferred Alternative) and Alternative 3 lands were conducted in 1999 and 2000. Annual monitoring has continued over the analysis area and 1 mile adjacent lands. All baseline studies were reviewed and approved by WDEQ/LQD as part of the Hay Creek amendment. This amendment added the lands Triton obtained in 2000 through their acquisition of the EOG Resources, Inc. coal lease exchange tract, which was assigned lease number WYW150152. Critical elements of the human environment (BLM 1988) that could potentially be affected by the proposed actions include air quality, cultural resources, Native American religious concerns, T&E, and candidate species, hazardous or solid wastes, water quality, wetlands/riparian zones, invasive non-native species, and environmental justice. Five other critical elements (areas of critical environmental concern, prime or unique farmlands, flood plains, wild and scenic rivers, and wilderness) are not present in the analysis area and are not addressed further. In addition to the critical elements that are potentially present in the analysis area, the status and potential effects of mining on topography and physiography, geology and mineral resources, soils, water quantity, alluvial valley floors, vegetation, wildlife, land use and recreation, paleontological resources, visual resources, noise, transportation resources, and socioeconomics are discussed. GENERAL SETTING The analysis area is adjacent to the northernmost operating mine within the Wyoming PRB, a part of the Northern Great Plains which includes most of northeastern Wyoming (figure 1-1 in chapter 1). Vegetation is primarily big sagebrush and sandy prairie grassland. The climate is semi-arid, with an average annual precipitation at the Buckskin Mine of about 10.5 inches. June (1.94 inches) and May (1.94 inches) are the wettest months, and January and February (0.12 inches) are the driest. Snowfall at the Gillette 9ESE station averages 58 inches per year, with most occurring in March (10.3 inches) and April (8.6 inches) (Western Regional Climate Center 2002). Potential evapotranspiration, at approximately 31 inches (NOAA 1969), exceeds annual precipitation (Martner 1986).

3-1

R. 73 W.

R. R.
 72 72
 W.

16 18 17 17


21 21
 19 20 20


28 28
 30 29 29


T. 52 N.

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT ANALYSIS AREA

Figure 3-1.

General Analysis Area.

3-2


The mean of the average hourly temperature recorded at the Buckskin Mine during the 1983-1998 time period is 44.6° F. The highest recorded hourly temperature at the mine was 102° F and the lowest was -40° F. August is the warmest month with a mean temperature of 69° F; December is the coldest (23° F). The frost-free period is 100 to 125 days. The average annual wind speed for the period 1983 through 1998 at the Buckskin Mine (refer to figure 3-5 in the “Air Quality and Climate” section) was 10.3 mph. Wind speeds are highest in the winter and spring and are predominantly from the northwest and south-southeast. Winter gusts often reach 30 to 40 mph. During periods of strong wind, dust may affect air quality across the region. An average of 15 air-stagnation events occur annually in the PRB and typically last two days each (BLM 1974). General information describing the area's resources was gathered from draft BLM Buffalo Field office planning documents (BLM 1996a, 1996b, 1996c, 1996d, 1996g) and a BLM coal leasing study (BLM 1996e). TOPOGRAPHY AND PHYSIOGRAPHY The PRB is an elongated, asymmetrical structural downfold. It is bounded by the Casper Arch, Laramie Mountains, and Hartville Uplift to the south; the Miles City Arch in Montana to the north, the Big Horn Mountains on the west, and the Black Hills on the east. The Buckskin Mine is located on the gently dipping eastern limb of the structural basin. The regional dip in the area of the mine is approximately 1º to the northwest. There are local areas where the shallow strata dip at higher angles due to local folding or faulting. The PRB landscape consists of broad plains, low hills, and tablelands. Generally, the topography changes from open hills and elevated ridges with 500 to1,000 feet of relief in the northern part of the PRB to plains and tablelands with 300 to 500 feet of relief in the southern part. Playas are common in the basin, as are buttes and plateaus capped by clinker or sandstone. The LBA tract is in an area consisting primarily of elevated ridges broken by minor drainages with an elevation ranging from 4,100 to 4,340 feet. Hay Creek crosses through the northern portion of the LBA tract, and the entire LBA tract is within the contributory drainage basin of Hay Creek. Hay Creek, which is a minor headwater stream in the regional drainage network of the Little Powder River, flows from west to east through the tract. Its confluence with the Little Powder River is about 3 miles east of the LBA tract. Overall, the West Hay Creek LBA tract is similar in topography to the rest of the Buckskin Mine permit area. Slopes range from flat to about 22% and average about 7%.

3-3


GEOLOGY Stratigraphic units in the mine area that would be impacted if the West Hay Creek LBA tract is mined include, in descending order, recent (Quaternary age) alluvial and eolian deposits, the Eocene age Wasatch Formation (the overburden), and the Paleocene age Fort Union Formation (which contains the targeted coal beds). Surficial deposits in the analysis area include Quaternary alluvial and eolian deposits, Wasatch Formation, clinker, and weathered Wasatch and Fort Union formations. There is some surficial clinker exposed along the northern portion of the LBA tract analysis area, primarily in the SE¼/NE¼ of section 17. There are thin alluvial deposits along the ephemeral stream channel of Hay Creek and other neighboring tributary channels, with deposits restricted to the lower reaches. They typically consist primarily of poorly stratified and poorly sorted, irregularly bedded unconsolidated sand, silt, and fine gravel. (The “Water Resources” section and figure 3-9 contain more information about the Hay Creek alluvial deposits.) The Wasatch Formation forms most of the overburden on top of the recoverable coal seams in the Fort Union Formation in the general analysis area. It consists of interbedded lenticular sandstones, siltstones, shales, and thin discontinuous coals. There is no distinct boundary between the Wasatch Formation and the underlying Fort Union Formation. From a practical standpoint, however, the top of the mineable coal zone is considered as the contact between the two formations. The average overburden thickness on the LBA tract is about 204 feet. Regionally, overburden thickness generally increases to the west due to the westerly dip of the beds in this area. Overburden thickness decreases in stream valleys where it has been eroded. The Fort Union Formation consists primarily of shales, mudstones, siltstones, lenticular sandstones, and coal. It is divided into three members: Tongue River (which contains the target coal seams), Lebo, and Tullock, in descending order (figure 3-2). The Tongue River member consists of interbedded claystone, silty shale, carbonaceous shale and coal, with lesser amounts of fine-grained sandstone and siltstone. At the Buckskin Mine, there are two mineable coal seams. Triton personnel refer to these seams as the Anderson and Canyon. These coal seams are also referred to as the Roland and Smith at the nearby Rawhide and Eagle Butte mines. Figure 3-2 shows the stratigraphic relationships and hydrologic characteristics of the surface and subsurface geologic units in the area of the Buckskin Mine. Figure 3-3 shows two geologic cross-sections drawn through the West Hay Creek LBA tract (one north-south and one east-west). These cross sections are representative of the geology near the tract, with the primary variables being the thickness of overburden, the parting thickness between the Anderson and Canyon coal seams, and the surface topography.

On the West Hay Creek LBA tract, the Anderson coal seam averages 40 feet thick, and the underlying Canyon seam averages 66 feet. The parting thickness between the

3-4


Alternative 2 & 3 Boundary LBA As Applied For Boundary Analysis Area Boundary

East/West Cross Section

20-11C1-C2

17-14B-A5

4150 4100 4050 4000 ANDERSON CANYON 3900 3850 3800 3750 3700 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 9500 414' 336' 300' 340' 335' 233' 3950

52-72-17-5

18

17
4200

Analysis Area Boundary Alternative 2 Boundary Permit Boundary R-17-1/R-17-1C

4250

2042

4300

2043

Alternative 3 Boundary LBA As Applied For Boundary

19

20

ELEVATION, FEET-MSL

Figure 3-2.
8

R. 73 W. W.

R. 72 W.

7

SOUTH

NORTH
4300 4250 4200 4150 4100 4050 4000 3950 3900 3850 3800 3750 3700 10000 10500

DISTANCE, FEET SCALE: HORZ. 1"=1000', VERT. 1"=400'

LEGEND
29

Permit Boundary


Analysis Area Boundary


Alternative 2 & 3 Boundary LBA As Applied For Boundary

Alternative 2 & 3 Boundary LBA As Applied For Boundary

52-72-18-8

17-14B-A5
 North/South Cross Section


Analysis Area Boundary

4150

17-16B

16-13B-O2

4200

2041

ELEVATION, FEET-MSL

North-South and East-West Geologic Cross Sections.
BUCKSKIN MINE PERMIT BOUNDARY
EAST
4300 4250 4200 4150 4100 86' 4050 4000 233' 190' 278' 3950 3900 3850 3800 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 3750 2041

3-5
DISTANCE, FEET SCALE: HORZ. 1"=1000', VERT. 1"=400'

30

WEST HAY CREEK LBA TRACT ANALYSIS AREA WEST HAY CREEK LBA TRACT AS APPLIED FOR (Proposed Action)
 AREA ADDED BY BLM UNDER ALTERNATIVE 2
 AREA ADDED BY BLM UNDER ALTERNATIVE 3 LITHOLOGIES EXISTING GROUND COAL

T. 52 N.

WEST

4300

4250

4100

4050

4000

ANDERSON

3950

3900

CANYON

COARSE GRAINED MATERIAL, INCLUDES SAND AND SANDSTONE SCORIA OR RESIDIUM ON SCORIA EXPLORATION DRILL HOLE OR MONITORING WELL

3850

3800

340'

3750

0

500

1000

1500

Alternative 2 & 3 Boundary LBA As Applied For Boundary Analysis Area Boundary

Alternative 3 Boundary LBA As Applied For Boundary

2043

Analysis Area Boundary Alternative 2 Boundary Permit Boundary

20-11C1-C2

2042

17-14B-A5 East/West Cross Section

52-72-17-5

18
4150 4100 4050 4000 ANDERSON CANYON 335' 414' 336' 300' 233' 3950 3900 3850 3800 3750 3700 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500

5107

19

20

ELEVATION, FEET-MSL

Figure 3-3.
8

R. 73 W.

R. 72 W.

7

SOUTH
4300 4250

NORTH
4300 4250 4200 4150 4100 4050 4000 3950

17
4200

254'

3900 3850 3800 3750 9000 9500 10000 105003700

DISTANCE, FEET SCALE: HORZ. 1"=1000', VERT. 1"=400'

LEGEND
29

Permit Boundary


Analysis Area Boundary


Alternative 2 & 3 Boundary LBA As Applied For Boundary

Alternative 2 & 3 Boundary LBA As Applied For Boundary

52-72-18-8

17-14B-A5
 North/South Cross Section


Analysis Area Boundary

2041

17-16B

16-13B-O2

ELEVATION, FEET-MSL

North-South and East-West Geologic Cross Sections, West Hay Creek LBA Tract.

3-6
EAST
4300 4250 4200 4150 4100 86' ANDERSON 233' CANYON 278' 190' 4050 4000 3950 3900 3850 3800 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 3750 2041

30

BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT ANALYSIS AREA WEST HAY CREEK LBA TRACT AS APPLIED FOR (Proposed Action)
 AREA ADDED BY BLM UNDER ALTERNATIVE 2
 AREA ADDED BY BLM UNDER ALTERNATIVE 3 LITHOLOGIES EXISTING GROUND COAL

T. 52 N.

WEST

4300

4250

4200

4150

4100

4050

4000

3950

3900

COARSE GRAINED MATERIAL, INCLUDES SAND AND SANDSTONE EXPLORATION DRILL HOLE OR MONITORING WELL

3850

3800

340'

3750 0

500

1000

1500

DISTANCE, FEET
 SCALE: HORZ. 1"=1000', VERT. 1"=400'


Anderson and Canyon coal seams average about 15 feet in the tract. In the southern portion of the tract, the parting thickness averages about four feet, but it increases to the north and west. Toward the north, the parting thickness increases to about 150 feet within the Alternative 2 study area as the Anderson seam rises to within 20 feet of the ground surface, and the Canyon seam dips slightly. In the east-west direction, the Canyon seam dips to the west more uniformly than the Anderson; consequently, the parting thickness increases along the western limit of the LBA tract. The Fort Union coal seams are subbituminous and are generally low-sulfur, low-ash coals. Typically, the coal being mined has a lower heating value north of Gillette than south of Gillette. According to the analyses (which were done on an as-received basis) of exploration drilling samples collected in the Buckskin Mine area from the adjacent Hay Creek lease, the recoverable coal reserve has an average heating value of approximately 8,140 Btu per pound and contains an average of 5.31% ash, 0.41% sulfur, and 32.09% moisture. A geologic anomaly known as a splay deposit was encountered at the Buckskin Mine in section 28, T. 52 N., R. 72 W. during 2001. Splay deposits form when the levees bounding a river or stream channel are breached, and a portion of the river/stream flow is diverted out into the swamp. This diverted flow usually terminates some distance from the levee. The sediments of the splay sink into the peat bog allowing the repeated deposition of additional splay deposits. These events usually occur during the flood stages of the river system and may be short or long-lived in time. On occasion, a splay course may become the new course of the river system. These splays may either be syngenetic (contemporaneous) or epigenetic (post-depositional) with the peat deposition in the swamp. The geometry of the Buckskin Mine deposit suggests a syngenetic deposit with the Canyon seam. Geologic modeling indicates this feature extends from the NW¼ of section 28 onto the LBA tract in the SW¼ of section 20. Further drilling should better define the limits and characteristics of the splay, particularly within and adjacent to the LBA tract. The end of the splay is characterized by numerous, narrow fingers of noncoal material interbedded with portions of the coal seam edge resulting in areas of thin or no coal deposition. In the past, this splay has frequently been misidentified as a channel or channel sandstone. Although the deposit is channel-like in appearance and geometry, the terminus features and the typical clay-silt lithology of the splay make it unlike a river/stream channel complex. The interface edges of the splay deposit are very unstable from a rock mechanics standpoint. Differential compaction along the splay boundary has locally thinned or thickened the coal. Steep dips and slippage features such as slickensides and microfaults are abundant in these areas. In areas where splay fingers of steep thin coals extend between thicker coals, sidewall failures might be expected. The Lebo Shale and Tullock members of the Fort Union Formation underlie the Tongue River member (figure 3-2). They consist primarily of sandstone, siltstone, mudstone,

3-7


shale and coal. In general, the Tullock member contains more sand than the Lebo Shale member. MINERAL RESOURCES The PRB contains large reserves of fossil fuels including oil, natural gas or methane (from conventional reservoirs and from coal beds), and coal, all of which are currently being produced. In addition, uranium, bentonite, and scoria are mined in the PRB (BLM 1996g). Coal There are 15 coal mines lying along a north/south line that parallels Wyoming Highway 59 starting north of Gillette, Wyoming, and extending south for about 75 miles (figure 1­ 1 in chapter 1). These mines are located where the Wyodak coal is at its shallowest depths (nearest the outcrop). Two of these mines, the Fort Union and Coal Creek mines, are capable of producing but are not currently active. The Dave Johnston Mine, located in Converse County near Glenrock, Wyoming has shut down coal mining operations and is conducting final reclamation. Oil and Gas Oil and gas have been produced in the PRB for more than 100 years from reservoir beds that range in age from Pennsylvanian to Oligocene (DeBruin 1996). There are approximately 500 producing oil and/or natural gas fields in the basin. The estimated mean amounts of undiscovered hydrocarbons in the basin are 1.94 billion barrels of recoverable oil and 1.60 trillion cubic feet of gas (USGS 1995). Depth to gas and oilbearing strata is generally between 4,000 feet and 13,500 feet, but some wells are as shallow as 250 feet. There are no active conventional oil or gas wells within the LBA tract. One pipeline owned by Western Oil Transportation Company crosses the northwest corner of the tract. Coal Bed Methane Methane gas generation from coal beds is a natural process. Methane may be trapped in the coal by overburden pressure, by the pressure of water in the coal, or by impermeable layers immediately above the coal. Deeper coal beds have higher pressures and generally trap more gas. Under favorable geologic conditions, methane can be trapped at shallow depths in and above coal beds, and this seems to be the case in the PRB. Without the existence of conditions that act to trap the gas in shallow coals or in adjacent sandstones, the gas escapes to the atmosphere. It is likely that a lot of methane generated by the coal beds in the PRB has gradually escaped into the atmosphere because the coal is relatively shallow. However, a large amount also remains in the coal. One study estimates that there are approximately 38.2 trillion cubic

3-8


feet of CBM gas in place in coal beds that are thicker than 20 feet and deeper than 200 feet. This study estimates that there are approximately 25 trillion cubic feet of recoverable CBM reserves (Finley and Goolsby 2000). Historically, methane has been reported flowing from shallow water wells and coal exploration holes in parts of the PRB. According to DeBruin and Jones (1989), most of the documented historical occurrences have been in the northern PRB. Olive (1957) references a water well in T. 54 N., R. 74 W. that began producing gas for domestic use in 1916. CBM has been commercially produced in the Powder River Basin since 1989 when production began at Rawhide Butte field west of the Eagle Butte Mine. CBM occurs in the coal beds of the Fort Union and Wasatch formations throughout the PRB in Wyoming. The predominant CBM production to date has occurred from coal beds of the Wyodak-Anderson zone (USGS 2000) in seams known as the Anderson, Canyon, Wyodak, Big George, and other locally used names. These are generally equivalent to the seams being mined by the surface mines along the eastern margin of the basin, including the Buckskin Mine, the applicant for the proposed West Hay Creek LBA tract. CBM is produced from other, deeper seams locally throughout the PRB. Deeper seams exist in the LBA area, but they are not in production. Leasing or mining the proposed LBA tract would not directly affect CBM resources production within the underlying seams. It could delay any proposed CBM development in deeper seams in order to avoid interference with mining. CBM development requires more extensive facilities in areas where there are splits between the coal seams. Although the Anderson and Canyon coal seams in the West Hay Creek LBA tract are continuous or separated by a thin parting throughout most of the LBA tract, in the northern and western part of the tract, shale interbeds that can be more than 100 feet thick separate the two seams. Current CBM well completion practices within the Powder River Basin generally preclude completion of two seams separated by thick shales within a single wellbore. As a result, in the areas where the parting thickness increases, two wells would be required to produce essentially the same reserve that would be produced from a single well in a single contiguous seam. Since the early 1990s, the BLM has completed numerous EAs and two EISs analyzing CBM projects. The most recent of these was the Final Environmental Impact Statement and Draft Planning Amendment for the Powder River Basin Oil and Gas Project (Wyoming PRB Oil and Gas EIS) (BLM 2003a). This document analyzes the impacts of drilling, completing, and operating about 39,400 new private, state, and federal CBM wells and associated ancillary facilities in the next ten years. This is in addition to the more than 12,000 CBM wells that had been drilled or were permitted for drilling when the Wyoming PRB Oil and Gas EIS was prepared. The study area for this EIS includes an almost 8,000,000-acre area covering all or parts of Campbell, Converse, Johnson, and Sheridan counties. The cumulative impacts of reasonably foreseeable conventional oil and gas development within the Wyoming portion of the PRB are also analyzed in

3-9


the EIS. The most extensive CBM development near the West Hay Creek LBA area occurs west of the proposed tract. On April 9, 2004, WOGCC records indicated that there were 73 active CBM wells, 8 shut in CBM wells, and 4 wells that had begun drilling or were permitted to drill within T. 52 N., R. 72 W. There were six active wells, three shut-in wells, and three wells that were permitted or had started drilling within the LBA tract itself as of April 9 2004. CBM wells were initially drilled on 40-acres spacing in the Wyoming PRB, but the WOGCC has now established 80-acre spacing patterns as the default spacing for CBM wells in the Powder River Basin. Most CBM drilling near the West Hay Creek LBA has occurred on a 40-acre pattern, either because the wells were drilled before the spacing was changed to 80 acres or under the authorization of spacing exceptions granted by WOGCC. There are 16 remaining undrilled complete or partial 40-acre lots within the study area. The ownership of oil and gas resources in the LBA tract is discussed in “Ownership and Use of Land” section. Majestic Petroleum Operations, LLC, Redstone Resources, and Yates Petroleum Corporation are the owners of most of the CBM drilling rights on the West Hay Creek LBA tract. Bentonite Layers of bentonite (decomposed volcanic ash) of varying thickness are present throughout the PRB. Some of the thicker layers are mined where they are near the surface, mostly around the edges of the basin. Bentonite has a large capacity to absorb water, and because of this characteristic it is used in a number of processes and products, including cat litter and drilling mud. No mineable bentonite reserves have been identified on the West Hay Creek LBA tract. Uranium There are substantial uranium resources in southwestern Campbell and northwestern Converse counties. Uranium exploration and mining were very active in the 1950s, when numerous claims were filed in the PRB. Uranium mining decreased in the early 1980s due to decreased demand and increased foreign supply. There are currently two in-situ uranium recovery operations in the PRB. Production at another ended in 2000 (WGS 2003). No known uranium reserves exist on the West Hay Creek LBA tract. Scoria Scoria or clinker has been and continues to be a major source of gravel for road construction in the area. Scoria is present on small portions of the LBA tract as applied for and under the action alternatives.

3-10

There are no active mining claims on the West Hay Creek LBA tract. SOILS The analysis area, which includes the LBA tract, was subjected to two separate order 1­ 2 soils surveys in 1989 and 1999. The majority of the tract was surveyed in 1999. The area covered in the study includes the LBA tract under the Proposed Action and action alternatives, as well as the area that would be disturbed by mining the LBA under any of the action alternatives. Figure 3-4 illustrates the soil series within the analysis area. All soil surveys were completed to an order 1-2 resolution in accordance with WDEQ/LQD Guideline No. 1, which outlines required soils information necessary for a coal mining operation. The inventories included field sampling and observations at the requisite number of individual sites, and laboratory analysis of representative collected samples. The following is a list of the soil series that comprise the various map units delineated on the proposed affected area associated with the West Hay Creek LBA tract under the Proposed Action, including the area added under the action alternatives. Soils developing predominantly in alluvium and residuum from mixed sources • • • • • • • • • • Forkwood-Cushman loams, 0 to 6% slopes Hiland-Bowbac fine sandy loam, 0 to 6% slopes Lawver-Teckla-Wibaux complex, moist, 0 to 10% slopes Spottedhorse-Lieter Complex, 0 to 6% slopes Theedle-Kishona-Shingle loams, 3 to 30% slopes Theedle-Shingle loams, 3 to 30% slopes Ulm-Renohill association, clay loam, 0 to 6% slopes Vonalf-Xema-Mittenbutte fine sandy loam, 3 to 30% slopes Rauzi fine sandy loam, 0 to 3% slopes Ustic Torripsamment, sandy, 0 to 30% slopes

Soils developing predominantly in alluvial or colluvial fan deposits and fan remnants from mixed sources • • • • • • Cambria-Kishona-Aigweid loams, 6 to 15% slopes Decolney-Hiland fine sandy loams, 0 to 6% slopes Heldt-Bidman complex, saline, 0 to 3% slopes Ironbutte-Fairburn-Mittenbutte complex, 6 to 40% slopes Platmak loam, 0 to 6 percent and 6 to 15% slopes Vonalee-Terro-Taluce fine sandy loam, 3 to 30% slopes

3-11


R. 73 W.

R. 72 W.

16 18 17

21 19 20

28 30 29

T. 52 N.

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT ANALYSIS AREA SOIL SERIES w / SALVAGE DEPTH 0" 18" 18" 6" 18" 12" 19" 19" 22" ROCK OUTCROP ARWITE-ELWOP SANDY LOAMS, 0-6 % CAMBRIA-KISHONA-ZIGWEID LOAMS, 6-15 % FELIX CLAY, PONDED, 0-2 % FORKWOOD-CUSHMAN LOAMS, 0-6 % HELDT-BIDMAN COMPLEX, SALINE, 0-3 % HILAND-BOWBAC SAND LOAMS, 0-6 % HILAND-BOWBAC SAND LOAMS, 6-15 % DECOLNEY-HILAND SANDY LOAMS, 0-6 % 22" 18" 12" 13" 12" 10" 13" 12" 12" 14" 8" 18" 18" 12" 19" 0" LAWVER-TECKLA-WIBAUX COMPLEX, 0-10 % PLATMAK LOAM, 0-6 % SPOTTEDHORSE-LIETER COMPLEX, 0-6 % THEEDLE-KISHONA-SHINGLE LOAMS, 3 TO 30 % THEEDLE-SHINGLE LOAMS, 3 TO 30 % ULM-RENOHILL CLAY LOAMS, 0-6 % VONALEE-TERRO-TALUCE SANDY LOAMS, 3 TO 30 % VONALEE, SANDY LOAM, 0-6 % VONALF-XEMA-MITTENBUTTE, FINE SANDY LOAM, 3-30 % HAVERDAD-BORUFF COMPLEX, 0 TO 6 % IRONBUTTE-FAIRBURN-MITTENBUTTE COMPLEX, 6-40 % PLATMAK LOAM, 6-15 % RAUZI FINE SANDY LOAM, 10-30 % USTIC TORRIPSAMMENT, 10-30 % MOLLIC FLUVAQUENT, 0-3 % WATER

Figure 3-4.

Soil Series Within the West Hay Creek LBA Tract Analysis Area.

3-12


Soils developing predominantly in alluvium and eolian deposits derived from mixed sources • • • • Arwite-Elwop sandy loam, 0 to 6% slopes Haverdat-Boruff loams, 0 to 6% slopes Mollic Fluvaquent, hydric, 0 to 1% slopes Vonalee fine sandy loam, 0 to 6% slopes

Table 3-1 provides the extent of six depth classes of suitable soil within the LBA tract analysis area. According to the baseline soils studies, enough suitable soil exists for salvaging within the LBA tract to redistribute suitable soils to an average depth of approximately 15 inches over all disturbed areas. This is true for the Proposed Action and the action alternatives. This depth would be redistributed on all disturbed acres. Areas of unsuitable soils include sites with high alkalinity, salinity or clay content. The soil depths and types on the West Hay Creek LBA tract analysis area are similar to soils currently being salvaged and used for reclamation at the adjacent mine and other mines in the PRB. The site-specific soil surveys have located hydric soils and/or inclusions of hydric soils, which are one component used in identifying wetlands. Please see the “Wetlands” section for discussion of wetland surveys. TABLE 3-1 
 ACRES OF SOIL AVAILABLE FOR RECLAMATION 
 WITHIN THE WEST HAY CREEK LBA TRACT ANALYIS AREA 

Suitable Soil Thickness 0 1-6 7 - 12 13 - 18 19 - 24 Total Acres 19.0 2.5 484.8 533.5 120.9 1,160.8 Percent 1.6 0.2 41.8 46.0 10.4 100.0

AIR QUALITY AND CLIMATE Air quality of any region is controlled primarily by the magnitude and distribution of pollutant emissions and the regional climate. The transport of pollutants from specific source areas is strongly affected by local topography. Generally, local effects are superimposed on the general overall weather pattern and are most important when the large-scale wind flow is weak. 3-13

Topography The West Hay Creek LBA tract analysis area (figure 1-1 in chapter 1) is located in the PRB, a part of the Northern Great Plains that includes most of northeastern Wyoming. The topography is primarily rolling plains and tablelands of moderate relief (with occasional valleys, canyons and buttes). The LBA tract is in an area consisting primarily of elevated ridges broken by minor drainages with an elevation ranging from 4,100 to 4,340 feet. Slopes in the analysis area range from flat to greater than 22%. Climate and Meteorology The climate in the analysis area is semi-arid, with an average annual precipitation at the Buckskin Mine of about 10.5 inches per year. Snowfall at the Gillette 9ESE Station averages 58 inches per year, with most occurring in March and April. Evaporation exceeds annual precipitation, with relatively short warm summers and longer cold winters. The average daily mean temperature is around 45qF. The highest recorded hourly temperature at the mine was 102qF and the lowest was -40qF. August is the warmest month, with a mean daily temperature of 69qF, and December is the coldest (23qF). The frost-free period is between 100 and 125 days. The average annual wind speed for the period from 1983 through 1998 at the Buckskin Mine was 10.3 mph with local variations in speed and direction due to differences in topography. Winds are predominantly from the northwest and south-southeast and tend to be strongest in the winter and spring and calmer in the summer. Wind velocity tends to increase during the day and decrease during the night. The air quality and meteorological sampling locations and associated wind rose diagrams for the Buckskin Mine are shown in figure 3-5. Regulatory Framework Air quality and pollutant emissions to the air are regulated under the federal CAA and Wyoming Air Quality Standards and Regulations (WAQSR) administered by the WDEQ/AQD. A fundamental requirement of both federal and state regulations is that ambient concentrations for specific criteria pollutants not exceed allowable levels, referred to as the ambient air quality standards (AAQS). These standards have been established by the EPA and the WDEQ at levels deemed necessary to preclude adverse impacts on human health and welfare. The National AAQS (or NAAQS) set nationwide thresholds for maximum acceptable concentrations of various pollutants. The Wyoming AAQS (or WAAQS) must be at least as stringent as NAAQS. Selected Wyoming and national ambient air standards are shown in table 3-2. The NAAQS and WAAQS set the absolute upper limits for specific air pollutant concentrations at all locations where the public has access.

3-14


12

R. 73 W.

R. 72 W.

7

8

9

10

11

13

18

17

16

15

14

24

19

20

21

22

23

Site N-A, TSP (through 2000) Site N-B, PM 10 (through 2000) Site N-C, PM 10 (through 2000) Site TEOM-N, PM 10 (2000 forward)

25

30

29

28

27

26

Site W-D, PM 10 (through 2000)
 Site TEOM-W, PM 10 (2000 forward)


36

31

32

33

34

35

T. 52 N. T. 51 N.

T. 52 N. T. 51 N.

HISTORIC WIND ROSE FOR BUCKSKIN MINE
1 6 5 5

(BASED ON DATA FROM 1991-1994 AND 1997-2000)


N

5.38% 9.08% 10.11% 4.57%

12

R. 73 W.

R. 72 W.

3.66%

7

8
5.68% 2.13%

12%

10%

LEGEND
4%

8%

6%

BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT ANALYSIS AREA

W

5.17%

1.66%

E

5.53%

1.99%

TSP AND PM 10 AIR QUALITY SAMPLING LOCATIONS
6.26% 5.3%

METEOROLOGICAL STATION

9.39%

11.36% 12.58% 0.1 5 10 15 20 25

WIND SPEED (Miles Per Hour)

S

Figure 3-5.

Wind Rose, Air Quality, and Meteorological Stations at the Buckskin Mine.

3-15


The assumed background pollutant concentrations included in table 3-2 were derived by Argonne National Laboratory based on a review of available monitoring data measured throughout northeastern Wyoming and southeastern Montana. The assumed background pollutant concentrations are below applicable NAAQS and WAAQS for all criteria pollutants and averaging times. Pursuant to the CAA, the EPA has developed classifications for distinct geographic regions known as air basins and for major metropolitan statistical areas (MSAs). Under these classifications, for each federal criteria pollutant, each air basin (or portion of a basin or MSA) is classified as in “attainment” if the area has “attained” compliance with (that is, not exceeded) the adopted NAAQS for that pollutant, or is classified as “nonattainment” if the levels of ambient air pollution exceed the NAAQS for that pollutant. Areas for which sufficient ambient monitoring data are not available are designated as “unclassified” for those particular pollutants. States designate areas within their borders as being in “attainment” or “non-attainment” with the AAQS. Existing air quality throughout most of the PRB in Wyoming is in attainment with all ambient air quality standards, as demonstrated by the relatively low concentration levels presented in table 3-2. However, the Sheridan, Wyoming area has been designated as a federal nonattainment area (PM10 - moderate) where the applicable standards have been violated in the past. Future development projects which have the potential to emit more than 250 tons per year (tpy) of any criteria pollutant (or certain listed sources that have the potential to emit more than 100 tons per year) would be required to undergo a regulatory PSD increment consumption analysis under the federal new source review permitting regulations. Development projects subject to the PSD regulations must also demonstrate the use of the best available control technology (BACT) and show that the combined impacts of all PSD sources will not exceed the allowable incremental air quality impacts for NO2, PM10, or SO2. The PSD increments are shown in table 3-2. Existing surface coal mining operations in the PRB, including the Buckskin Mine, are not currently affected by the PSD regulations for two reasons. Surface coal mines are not on the EPA list of 28 major emitting facilities for PSD regulation and point-source emissions from individual mines do not exceed the PSD emissions threshold. A new mine would be classified as a major source and subject to PSD review if potential emissions of any regulated pollutant equal or exceed 250 tpy. Fugitive emissions are not included in the definition of potential emissions except for certain specified source types [40 CFR 52.21, (b)(1)(iii)]. Mining related fugitive emissions are exempt from the applicability determination. The WDEQ/AQD administers a permitting program to assist the agency in managing the state's air resources. Under this program, anyone planning to construct, modify, or use a facility capable of emitting designated pollutants into the atmosphere must obtain an air quality permit to construct. Coal mines fall into this category.

3-16


TABLE 3-2 ASSUMED BACKGROUND AIR POLLUTANT CONCENTRATIONS, 
 APPLICABLE AMBIENT AIR QUALITY STANDARDS, AND PSD INCREMENT 
 VALUES

(in µg/m3) 
 PSD Class I Increments --------2.5 PSD Class II Increments ----­ ----­ 25

Pollutant Carbon monoxide

Averaging Time1 1-hour 8-hour

Background Concentration 3,5003 1,500 16.54 825 1305 427 177 197 7.67 86 86 36

Primary NAAQS2 40,000 10,000 100

Secondary NAAQS2 40,000 10,000 100

Wyoming Standards 40,000 10,000 100

Nitrogen dioxide Ozone	

Annual

1-hour 8-hour 24-hour Annual 24-hour Annual 3-hour 24-hour Annual

235 157 150 50 65 15 ----365 80

235 157 150 50 65 15 1,300 ---------

235 157 150 50 65 15 1,300 260 60

--------8 4 --------25 5 2

----­
 ----­
 30
 17
 ----­
 ----­
 512 91 20

PM10	 PM2.5	 Sulfur	 dioxide

Annual standards are not to be exceeded; short-term standards are not to be exceeded more than once 
 per year.
 2 Primary standards are designed to protect public health; secondary standards are designed to protect 
 public welfare.
 3 Amoco Ryckman Creek collected for an 8-month period during 1978-1979, summarized in the Riley Ridge 
 EIS (BLM 1983).
 4 Data collected in Gillette, WY (1996-1997).
 5 Data collected in Pinedale, WY (1992-1994).
 6 Data collected at Devil’s Tower, WY (1983).
 7 Data collected in Gillette, WY (1999). 
 Source: Argonne 2002

1

In addition to the designations relative to attainment of the NAAQS, the CAA requires 
 the EPA to place each airshed within the US into one of three PSD area classifications. 
 PSD Class I is the most restrictive air quality category. It was created by Congress to 
 prevent further deterioration of air quality in national parks and wilderness areas of a 
 given size which existed prior to 1977 or those additional areas which have since been 
 designated Class I under federal regulations (40 CFR 52.21). All remaining areas 
 outside of the designated Class I boundaries were designated Class II areas, which 


3-17


allow a relatively greater deterioration of air quality over that in existence in 1977, although still within the NAAQS. No Class III areas, which would allow air quality to degrade to the NAAQS, have been designated. The federal land managers have also identified certain federal assets with Class II status as “sensitive” Class II areas for which air quality and/or visibility are valued resources. The federal CAA also provides specific visibility protection of mandatory federal Class I areas. Mandatory federal Class I areas were designated by Congress on August 7, 1977 and include wilderness areas greater than 5,000 acres in size and national parks greater than 6,000 acres in size. Table 3-3 is a list of mandatory federal Class I areas, tribal Class I areas, and federal Class II areas in the region and their distance from the general analysis area. Wind Cave National Park, Badlands Wilderness Area, and the Northern Cheyenne Indian Reservation are the closest mandatory federal Class I areas. Table 3-3 also lists other areas which are more distant but were included in the cumulative air quality impact analysis discussed in chapter 4. As shown in table 3-3, the allowable incremental impacts for NO2, PM10, and SO2 within PSD Class I areas are very limited. Most of the PRB in Wyoming is designated as PSD Class II with less stringent requirements. Even though the development activities being considered in this EIS would occur within areas designated PSD Class II, the potential impacts are not allowed to cause incremental effects greater than the stringent Class I thresholds to occur inside any distant PSD Class I area. Existing Air Quality WDEQ detects changes in air quality through monitoring and maintains an extensive network of air quality monitors throughout the state. Particulate matter is most commonly measured as particles finer than 10 microns or PM10. The eastern side of the Powder River Basin has one of the most extensive networks of monitors for PM10 in the nation due to the density of coal mines (figure 3-6). In addition, there are also monitors in Sheridan and Gillette, Wyoming, and the WDEQ installed monitors in Arvada and Wright, Wyoming in November 2002. WDEQ uses monitoring located throughout the state to anticipate issues related to air quality. These monitoring stations are located to measure ambient air quality and not located to measure impacts from a specific source. Monitors located to measure impacts from a specific source may also be used for trends. These data are used to pro-actively arrest or reverse trends towards air quality problems. When WDEQ became aware that particulate readings were increasing due to increased coal bed methane activity and aggravated by prolonged drought, the WDEQ approached the counties, coal mines, and coal bed methane industry. A coalition involving the counties, coal companies and coal bed methane operators have made significant efforts towards minimizing dust from roads. Measures taken have ranged from the implementation of speed limits to paving heavily traveled roads. Monitoring is also used to measure compliance. The WDEQ can take a range of enforcement actions to remedy the situation where monitoring shows a violation of any standard. Where a standard is exceeded specific to an operation, the enforcement

3-18


TABLE 3-3 
 APPROXIMATE DISTANCES AND DIRECTIONS FROM THE WEST HAY CREEK 
 ANALYSIS AREA TO PSD CLASS I AND CLASS II SENSITIVE RECEPTOR AREAS 

Distance (miles)
160 215 205 350 260 205 255 320 210 235 210 195 180 115 210 215 70 190 160 135 105 75 70 40 240 160 100 110 205 160

Receptor Area
Mandatory Federal PSD Class I Badlands Wilderness Area1 Bridger Wilderness Area Fitzpatrick Wilderness Areas Gates of the Mountains Wilderness Area Grand Teton National Park North Absaroka Wilderness Area Red Rock Lakes Wilderness Area Scapegoat Wilderness Area Teton Wilderness Area Theodore Roosevelt National Park (North Unit) Theodore Roosevelt National Park (South Unit) U. L Bend Wilderness Area Washakie Wilderness Area Wind Cave National Park Yellowstone National Park Tribal Federal PSD Class I Fort Peck Indian Reservation Northern Cheyenne Indian Reservation Federal PSD Class II Absaroka-Beartooth Wilderness Area Agate Fossil Beds National Monument Bighorn Canyon National Recreation Area Black Elk Wilderness Area Cloud Peak Wilderness Area Crow Indian Reservation Devils Tower National Monument Fort Belknap Indian Reservation Fort Laramie National Historic Site Jewel Cave National Monument Mount Rushmore National Memorial Popo Agie Wilderness Area Soldier Creek Wilderness Area
1

Direction to Receptor
SE SW SW NW SW NW W NW W NE NE NW SW SE W N NW NW SE NW SE W NW NE NW SE SE E SW SE

Congress designated the wilderness area portion of the Badlands National Park as a mandatory federal PSA Class I area. The remainder of the national park is a PSD Class II area.

3-19


SHERIDAN

BUFFALO GILLETTE

CASPER

DOUGLAS

LEGEND
PM 10 Monitoring Station, Active in 2002 Source:
0 12.5 25 50

U.S. EPA Office of Air and Radiation, AIRS Database and WDEQ/AQD

GRAPHIC SCALE (MILES)

Figure 3-6. Active PM 10Monitoring Stations in Northeastern Wyoming.

3-20


action is specific to the facility. For many facilities, neither the cause nor the solution is simple. The agency normally uses a negotiated settlement in those instances. WDEQ has also located two visibility monitoring stations in the PRB. One of these sites is 32 miles north of Gillette and includes a nephelometer, a transmissometer, an aerosol monitor (IMPROVE protocol), instruments to measure meteorological parameters (temperature, RH, wind speed, wind direction), a digital camera, instruments to measure ozone, and instruments to measure nitrogen oxides (NO, NO2, NOx). The other visibility monitoring station is located 14 miles west of Buffalo and includes a nephelometer, a transmissometer, an aerosol monitor (IMPROVE protocol), instruments to measure meteorological parameters (temperature, RH, wind speed, wind direction), and a digital camera. Other air quality monitoring in the PRB includes NO2 monitoring along the east side of the PRB, Wyoming air resources monitoring system (WARMS) monitoring of sulfur and nitrogen concentrations near Buffalo, Sheridan, and Newcastle, and National Atmospheric Deposition Program (NADP) monitoring of precipitation chemistry in Newcastle. Air quality conditions in rural areas are likely to be very good, as characterized by limited air pollution emission sources (few industrial facilities and residential emissions in the relatively small communities and isolated ranches) and good atmospheric dispersion conditions, resulting in relatively low air pollutant concentrations. Occasional high concentrations of carbon monoxide (CO) and particulate matter may occur in more urbanized areas (for example, Buffalo, Gillette, and Sheridan) and around industrial facilities, especially under stable atmospheric conditions common during winter. The major types of emissions that come from surface coal mining activities are in the form of fugitive dust and tailpipe emissions from large mining equipment. Activities such as blasting, loading and hauling of overburden and coal and the large areas of disturbed land all produce fugitive dust. Stationary or point sources are associated with coal crushing, storage, and handling facilities. In general, particulate matter (PM10) is the major significant pollutant from coal mine point sources. Blasting is responsible for another type of emission from surface coal mining. Overburden blasting sometimes produces gaseous orange-colored clouds that contain NO2. Exposure to NO2 may have adverse health effects, which are discussed in chapter 4. NO2 is one of several products resulting from the incomplete combustion of explosives used in the blasting process. Wyoming’s ambient air standards for NO2 are shown in table 3-2. Other existing air pollutant emission sources within the region include: x	 Exhaust emissions (primarily CO and oxides of nitrogen [NOx]) from existing natural gas fired compressor engines used in production of natural gas and coal bed methane; gasoline and diesel vehicle tailpipe emissions of combustion

3-21

pollutants (volatile organic compounds [VOC], CO, NOx, inhalable particulate matter less than 10 microns in effective diameter [PM10], fine particulate matter less than 2.5 microns in effective diameter [PM2.5], and sulfur dioxide [SO2]); x	 Dust (particulate matter) generated by vehicle travel on unpaved roads, windblown dust from neighboring areas and road sanding during the winter months; x	 Transport of air pollutants from emission sources located outside the region; x	 Emissions from railroad locomotives used to haul coal (primarily NO2 and PM10); and, x	 SO2 and NOx from power plants. Historical Ambient Air Quality: Particulates Until 1989, the federally regulated particulate matter pollutant was measured as TSP. This measurement included all suspendable dust (generally less than 100 microns in diameter). In 1989, the federally regulated particulate matter pollutant was changed from a TSP based standard to a PM10 based standard. PM10 is particulate matter with an aerodynamic diameter of 10 microns or less that can potentially penetrate into the lungs and cause health problems. Wyoming added PM10 based standards to match the federal standards in 1989 and retained the TSP based standards as state standards until March 2000. Wyoming’s ambient air standards for PM10 are shown in table 3-2. Wyoming adopted a PM2.5 standard in March 2000. However, the state of Wyoming will not enforce that standard until EPA has completed its review of the PM2.5 standard and has determined to retain and enforce the standard as promulgated on July 18, 1997. Regional. WDEQ/AQD requires the collection of information documenting the quality of the air resource at each of the PRB mines. Each mine monitored air quality for a 24­ hour period every six days at multiple monitoring sites through the end of 2001. All PM10 monitors are now required by WDEQ/AQD to sample air quality for a 24-hour period every three days beginning in 2002. Data for TSP dates back to 1980; data for PM10 dating back to 1989. This has resulted in over 55,000 TSP and 14,000 PM10 samples collected through 2002 and makes the eastern PRB one of the most densely monitored areas in the world (figure 3-6). Table 3-4 uses the annual arithmetic average of all sites to summarize these data. As indicated in table 3-4, the long-term trend in particulate emissions remained relatively flat through 1998. TSP concentration from 1980 through 1998 averaged 33.1 Pg/m3, ranging between 27.8 Pg/m3 and 39.4 Pg/m3. There were increases in 1988 and 1996, which may have been the result of fires in the region during those years. PM10 concentration from 1989 through 1998 averaged 15.4 Pg/m3, ranging between 12.9 and 16.5 Pg/m3.

3-22

TABLE 3-4 
 SUMMARY OF AIR QUALITY MONITORING 
 IN WYOMING'S POWDER RIVER BASIN, 1980-2000


Year
1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002
1

Coal Produced (mmtpy)
58.7 71.0 76.1 84.9 105.3 113.0 111.2 120.7 138.8 147.5 160.7 171.4 166.1 188.8 213.6 242.6 257.0 259.7 308.6 317.1 322.5 354.1 359.7

Yards Moved (mmbcy)
105.3 133.4 141.1 150.9 169.5 203.4 165.7 174.6 209.7 215.6 223.5 245.9 296.0 389.5 483.9 512.7 605.4 622.0 710.7 758.0 845.3 927.1 1,032.1

Number of Mines Operating/ Monitoring TSP/ Monitoring PM101
10/14/0 11/13/0 11/14/0 13/14/1 14/16/1 16/17/0 16/17/0 16/17/0 16/17/0 15/17/3 17/17/5 17/17/5 17/17/7 17/17/8 17/18/8 16/18/8 17/18/8 16/17/10 16/17/12 15/17/12 15/15/12 12/11/12 13/11/13

Number of Sites TSP/PM102 (µg/m3)
34/0 35/0 40/0 41/1 42/1 49/0 45/0 43/0 43/0 40/3 47/5 46/6 41/7 40/11 44/11 41/12 41/12 39/15 36/17 36/18 31/17 29/29 23/38

TSP Average (µg/m3)
35.5 39.4 31.2 32.6 33.9 32.3 29.3 31.7 37.7 32.1 34.3 32.7 31.7 27.8 31.7 29.6 35.4 33.3 33.9 55.3 56.1 57.5 56

PM10 Average (µg/m3)
na3 na na 11.2 11.1 na na na na 15.9 14.8 16.5 15.9 14.5 15.5 12.9 16.0 15.9 15.9 21.6 23.4 27.2 23.3

Includes Buckskin, Rawhide, Eagle Butte, Dry Fork, Fort Union, Clovis Point, Wyodak, Caballo, Belle Ayr, Caballo Rojo, Cordero, Coal Creek, Jacobs Ranch, Black Thunder, North Rochelle, North Antelope, Rochelle, and Antelope mines. 2 Some sites include more than one sampler, so the number of samplers is greater than the number of sites. 3 Not applicable because no monitoring was done for PM10. Sources: 1980 through 1996 emissions and production data from April 1997 report prepared by WMA for WDEQ/AQD; 1997 through 2000 emissions data from EPA AIRData database, and production data from WDEQ/AQD.

3-23


This period (1980-1998) was associated with significant growth in the surface coal mining industry. Coal production increased from about 59 mmtpy to over 308 mmtpy (an increase of over 249 mmtpy), and associated overburden production increased from 105 mmbcy to over 710 mmbcy per year (a 605 mmbcy per year increase). From 1990 through 2002, the average annual increase in coal production was 7%, while annual overburden production increased an average of 13.9% over the same period. The larger annual increase in overburden production is probably because mines are gradually moving into deeper coals as the shallower reserves are mined out. The relatively flat trend in particulate emissions from 1980 through 1998 is due in large part to the Wyoming air quality program that requires BACT control measures at all permitted facilities. These control measures include watering and chemical treatment of roads, limiting the amount of area disturbed, temporary revegetating disturbed areas to reduce wind erosion, and timely final reclamation. The average annual TSP concentration increased from 33.9 Pg/m3 in 1998 to 55.3 Pg/m3 in 1999 and 57.5 µg/m3 in 2001. The 2002 average annual TSP concentration was 56.0 µg/m3. The average annual PM10 concentration increased from 15.9 µg/m3 in 1998 to 21.6 µg/m3 in 1999 and 27.2 µg/m3 through 2001. In 2002, the average annual concentration was at 23.3 µg/m3. There were no major fires in the region during this time. The increases in coal production over those four years (3.8% per year and 12.8 mmtpy over the four-year period) and associated overburden production (9.8% per year and 72 mmbcy over the four-year period) were not larger than the four-year increases during some of the previous 18 years, but the particulate concentration increase was much larger than in previous years. Site Specific. For the Buckskin Mine monitoring locations, historical particulate matter ambient air quality data generally show the same results as described above for the PRB as a whole. TSP and monitoring locations are shown on figure 3-5. Figure 3-7 presents the average annual TSP and PM10 measured at sites within the West Hay Creek LBA analysis area. These data were collected for 1995 through 2001. Cumulative coal and overburden production for the Buckskin Mine for these years are also shown on figure 3-7. As discussed above, TSP was the federally regulated pollutant until 1989 and was retained as a state regulated pollutant until 2000. PM10 became a federal standard in 1989 and was adopted by the state of Wyoming. There were no violations of the TSP standard at the Buckskin Mine when TSP was the federally regulated pollutant. After 1989 and until recently, TSP measurements were used as a surrogate for PM10 in lieu of having to replace and/or co-locate an existing TSP sampler with a new PM10 sampler. There were no violations of the PM10 standards anywhere in the PRB through the first quarter of 2001. Between April 2001 and June 2003 there were 21 monitored exceedances of the 24-hour PM10 standard at four mines in the Wyoming PRB. The Buckskin Mine was responsible for one of these exceedances

3-24

Figure 3-7.

Coal Production and Overburden Removal vs. Ambient Particulates for Buckskin Mine

3-25

Control Measures. Control of particulate emissions at the southern PRB mines is accomplished with a variety of measures. Emissions at coal crushing, storage, and handling facilities (point sources) are controlled with baghouse dust collection systems, passive enclosure control systems (PECs), or atomizers/foggers. These are all considered BACT controls by WDEQ/AQD. Fugitive emissions are also controlled with a variety of measures that the agency considers BACT. Typically, mine access roads have been paved and water trucks are used to apply water and chemical dust suppressants on all haul roads used by trucks and/or scrapers. Haul truck speed limits are imposed to further help to reduce fugitive emissions from roads. Material drop heights for shovels and draglines (bucket to truck bed or backfill) are limited to the minimum necessary to conduct the mining operations. Timely permanent and temporary revegetation of disturbed areas is used to minimize wind erosion. Fugitive emissions from the coal truck dumps are controlled with stilling sheds. Some of the mines have participated in the control of fugitive emissions from some nearby unpaved county roads by applying dust suppressants. All of these control measures are employed at the Buckskin Mine. The WDEQ/AQD is continually reviewing the data and considering regulatory options. WDEQ/AQD has increased monitoring frequency requirements and required installation of continuous monitors at all PRB coal mines. Other regulatory options may include enforcement actions such as a notice of violation resulting in a consent decree and/or modified permit condition. WDEQ/AQD is also coordinating with EPA to develop additional monitoring requirements in CBM development areas, high PM10 mitigation action plans in permits, and additional mitigation measures under the State Implementation Plan. Some of the coal mines are actively participating in a dust control coalition formed to help address dust from more than 20 miles of regional county roads. The coalition includes the Campbell County Commission and several regional CBM and oil producing companies as well as the coal mine operators. The coalition has used chemical treatments to control dust as well as closing roads where appropriate or necessary and rebuilding existing roads to higher specifications. Other operational control measures that WDEQ/AQD may require at specific mines when exceedances occur include, but are not limited to, watering inactive areas and problem areas; relocating overburden truck-dumping operations; deferring blasting; curtailing topsoil stripping, reclamation dozer operations, and/or production operations; requiring windrows in areas stripped of topsoil; requiring treatment of windrow areas with chemical dust suppressants; interseeding of topsoil stockpiles, and soil stabilization. The mines are experimenting with dust control treatments, including magnesium chloride, surfactants, and petroleum-based products. In addition, WDEQ/AQD may require additional monitoring, action levels based on continuous monitoring, expedited reporting of monitored exceedances, detailed reporting of contributing factors (meteorological conditions, control steps implemented) for monitored exceedances, and continual evaluation of activity plans when exceedances are monitored at surface coal mines. 3-26

Historical Ambient Air Quality: NO2 Regional. NO2 was monitored from 1975 through 1983 in Gillette and from March 1996 through April 1997 at four locations in the PRB. Table 3-5 summarizes the results of that monitoring. Beginning in 2001 the coal industry in cooperation with WDEQ/AQD installed a network of NO2 monitors in the PRB. The 2001 and 2002 data from this regional network are summarized in table 3-6. TABLE 3-5 ANNUAL AMBIENT NO2 CONCENTRATION DATA
Black Thunder Mine Percent of Standard1 Belle Ayr Mine Percent of Standard1

Site Year
1975 1976 1977 1978 1979 1980 1981 1982 19832 19963
1 2

Gillette Percent of Standard1
6 4 4 11 11 12 14 11 17 16

Bill Percent of Standard1
1 5

16

22

22

Based on arithmetic averaging of data.
 Monitoring discontinued December 1983, reactivated March 1996 to April 
 1997.
 3 Arithmetic average - actual sampling ran from March 1996 to April 1997. 
 *Inadequate number of samples for a valid annual average. 
 Source: McVehil-Monnett 1997

Annual NO2 levels measured in the March 1996 to April 1997 timeframe were below applicable standards. The highest reading was 22 Pg/m3 as compared to the 100 Pg/m3 standard. All 2001 annual mean NO2 concentrations are well below the standards of 100 µg/m3. Site Specific. As discussed above, NO2 monitoring results are available from several sites in the PRB. The Gillette monitoring site is located approximately 12 miles south of the West Hay Creek LBA tract, the Belle Ayr Mine site is located approximately 24 miles south, the Black Thunder Mine site is located approximately 53 miles south, and the Bill site is located approximately 73 miles south.

3-27

TABLE 3-6 
 2001 ANNUAL AMBIENT NO2 CONCENTRATION DATA 

Monitor 2001Annual Mean NO2 Concentration (µg/m3)1,2 2002 Annual Mean NO2 Concentration (µg/m3)3,4

Antelope Mine 7 6 Belle Ayr Mine 14 14 Black Thunder Mine 5* 6 TBNG 6** 5 * Data for the 3rd quarter is questionable; therefore, it was not used in 
 determining the annual mean for the site. 
 ** Data for May through December 2001. Monitor was not operational 
 until May 2, 2001.
 1 Mine Data (WDEQ/AQD 2002)
 2 TBNG Site (ARS 2002)
 3 Mine Data (WDEQ/AQD 2003a)
 4 TBNG Site (ARS 2003) 


Control Measures. To date, there have not been any reported events of public exposure to blasting clouds or NO2 releases at the Buckskin Mine. Buckskin has voluntarily committed to limit the size of individual shots to control emissions. As a result, the WDEQ/LQD has not required the Buckskin Mine to implement any specific measures to control or limit public exposure to NO2 from blasting. Some of the mines in the PRB have implemented programs designed to control/limit public exposure to the intermittent, short-term NO2 releases associated with blasting. All mines comply with the blasting plan publication and notification requirements associated with the permits to mine issued by WDEQ/LQD. Voluntary measures that have been instituted by some mines include: x	 telephoning neighbors and workers in the general area of the mine prior to large blasts; x	 monitoring weather and atmospheric conditions prior to the decision to detonate a large blast; x	 minimizing blast size to the extent possible; and x	 posting signs on major public roads that enter the general mine area and on all locked gates accessing the active mine area. WDEQ has received several reports of public exposure to NO2 from blasting operations at

3-28


several mines in the PRB. Measures to prevent future such incidences have been instituted at those mines when large overburden blasts are planned. These measures are required by permit and include: x notification of neighbors and workers in the general area of the mine prior to the blast; x blast detonation between 12:00 p.m. and 3:00 p.m. whenever possible to avoid temperature inversions and minimize inconvenience to neighbors; x monitoring of weather and atmospheric conditions prior to the decision to detonate a blast; x posting of signs on major public roads that enter the general mine area and on all locked gates accessing the active mine area; and x closing public roads when appropriate to protect the public. Mine operators in the eastern PRB have also been working with blasting agent manufacturers to reduce NOx emissions by changing the size of the blasts and using different blasting agents, mixtures, and additives. Operators have tried adding substances like microspheres and rice hulls, using different blends of ANFO and slurries and gels, and using electronic detonation systems that can vary shot timing, different shot hole patterns, and plastic liners. No one single procedure or variation has proven consistently successful due to the numerous factors that are believed to contribute to the production of NO2. The most successful control measure has been reducing the size of the cast blasting shots. (Rick Chancellor 2003). Air Quality Related Values - Visibility and Acidification of Lakes Air quality related values (AQRVs), including the potential air pollutant effects on visibility and the acidification of lakes and streams, are applied to PSD Class I and sensitive Class II areas. The land management agency responsible for the Class I area sets a level of acceptable change (LAC) for each AQRV. The AQRVs reflect the land management agency’s policy and are not legally enforceable standards. Visibility. Potential impacts to visibility were considered at 29 PSD Class I and sensitive Class II areas near the PRB. Table 3-3 shows the nearest distances from the sensitive receptor areas to the West Hay Creek LBA tract analysis area. Visibility can be defined as the distance one can see and the ability to perceive color, contrast, and detail. Fine particulate matter (PM2.5) is the main cause of visibility impairment. Visual range, one of several ways to express visibility, is the furthest distance a person can see a landscape feature. Maximum visual range in the western United States would be about 140 miles.

3-29

Visibility impairment is expressed in terms of deciview (dv). The dv index was developed as a linear perceived visual change (Pitchford and Malm 1994) and is the unit of measure used in the EPA’s Regional Haze Rule to achieve the national visibility goal. A change in visibility of 1.0 dv represents a “just noticeable change” by an average person under most circumstances. Increasing dv values represent proportionately larger perceived visibility impairment. Figure 3-8 shows annual averages for the 20% best, worst and middle visibility days at Badlands and Bridger wilderness areas from 1988 to 1998, respectively (IMPROVE 2002)1. Acidification of Lakes. The acidification of lakes and streams is caused by atmospheric deposition of pollutants (acid rain). Lake acidification is expressed as the change in acid neutralizing capacity (ANC) measured in microequivalents per liter (Peq/l), the lake’s capacity to resist acidification from acid rain. Table 3-7 shows the existing ANC monitored in some mountain lakes disturbed by mining activities.

TABLE 3-7 EXISTING ACID NEUTRALIZING CAPACITY IN SENSITIVE LAKES
Distance from Analysis Area (miles)
210 210 225 215 85 80 215 210

Wilderness Area
Bridger

Lake
Black Joe Deep Hobbs Upper Frozen Emerald Florence Ross Lower Saddlebag

Background ANC (Peq/L)
69.0 61.0 68.0 5.81 55.3 32.7 61.4 55.5

Cloud Peak Fitzpatrick Popo Agie
1

The background ANC is based on only 6 samples taken between 1997 and 2001

Source: Argonne 2002

1 Summaries are based on IMPROVE aerosol data using procedures from the EPA Draft Guidance for Tracking Progress under the Regional Haze Rule.

3-30

Visibility in Badlands National Park 20 18 16 14 Visibility (dv) 12 10 8 6 4 2 0 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 IMPROVE Station: BADL 20% Cleanest Average 20% Haziest

Visibility in Bridger Wilderness 20 18 16 14 Visibility (dv) 12 10 8 6 4 2 0 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 IMPROVE Station: BRID 20% Cleanest Average 20% Haziest

Figure 3-8. Visibility in the Badlands and Bridger Wilderness Areas.

3-31


WATER RESOURCES Groundwater Within the West Hay Creek LBA tract there are three water-bearing geologic units that could be disturbed by mining. In descending order, these units are the alluvium, Wasatch Formation overburden, and the Wyodak coal seam or its local equivalent, which in this case would be the Anderson and Canyon coal seams. The subcoal Fort Union Formation is used for water supply at the Buckskin Mine but will not be physically disturbed by mining activities. Figure 3-2 shows the stratigraphic units beneath the West Hay Creek LBA tract and their hydrologic properties. Triton has completed 22 monitoring wells within the West Hay Creek tract analysis area, most in 1999. Six of these are in the alluvium of Hay Creek, six are in Anderson Coal, four are in Canyon Coal, and six are in the Wasatch Formation overburden. The location of these monitoring wells is shown on figure 3-9. Data from these wells, as well as previously collected data at the Buckskin Mine, were used to prepare the following description of baseline groundwater conditions within the LBA tract analysis area. Recent Alluvium. Within the West Hay Creek LBA tract, the surface drainages are generally dry draws and the alluvium, colluvium, and slope wash deposits associated with these draws are generally thin. In addition, these unconsolidated deposits are typically of limited lateral extent precluding any significant storage and movement of groundwater. The texture of the alluvium becomes coarser with depth. Wasatch Formation. Within the PRB this formation consists of interbedded sandstones, siltstones, and shale with occasional discontinuous coal stringers and clinker deposits, and this description basically holds true for the LBA tract. Saturated strata within the Wasatch are limited in areal extent and are typically thin, lenticular sandstones. The hydraulic connection between sandstone lenses is tenuous due to intervening shale aquitards; thus, groundwater movement through the Wasatch Formation overburden is limited. The sandstone and thin coal stringers, where saturated, will yield water to wells, and this water is largely used for stock watering. Because the saturated sandstone and coal units within the Wasatch Formation are not continuous, the Wasatch is not considered a regional aquifer. Another geologic unit which may be considered a part of the Wasatch Formation is scoria, also called clinker or burn. It consists of Wasatch sediments that overlaid the coal at one time in the past before the coal burned naturally. These sediments were baked, fused and melted in place, then collapsed into the void left by the burned coal. Scoria deposits can be a very permeable aquifer and can extend laterally for miles in the eastern PRB. These deposits occur along the northern boundary of the LBA tract under the Proposed Action and within the action alternative tracts. The hydrologic function of scoria in the general area is to provide infiltration of precipitation and recharge to laterally contiguous overburden and Wyodak coal.

3-32

12

R. 73 W.

R. R.
 72 W.

7

8

9

10

11 11


9-14A-C5 16-4B-C4 16-4B-O2 18-1C-O5	 17-2D-C4
 17-2D-O5
 16-12B-C5 17-7D-O5 17-9A2-AL5 17-7D-C5 16-12B-C4 17-9A1-AL5 17-9A-A4 17 17-9A-A5 BH-19 17-10A-C5 17-10B-AL5 17-10C-C4 17-14B-A5 17-9C1-O5 17-9C-A5 16-3D-O2 16-4C2-O2 16-6C-C5 16-6C-O2 16-7C-C2 16-7D1-A5 16-1A-C4 16-1A-O2

13

18
18-9B2-O5 18-9B1-A5 18-9B-C5

16
16-11C-S10 16-14A-O5 16-14A-C8 16-14A-C4 16-9D-A5 16-9D-A4 16-16B-A5 16-16C-A5 21-4A-C5C 21-4D-A5 21-4D1-C5 21-3D-S10 21-3D-S5S

16-13A-O2 16-13D-C5

16-8C2-AL5 16-8C3-AL2 16-9B-AL5 16-9B1-AL5 16-8C-AL5 16-8D-A5 16-8C1-AL2 16-8D-A4 15 16-6C1-A2 16-12A1-O5 BH-18 BH-8 16-12A-A2 16-12B-AL5 16-12A-C5

14

20-2C-C5C 20-2C1-C5 20-5B-C5 20-5B1-O5

16-13C-O4 16-13C-C5

24

19

20
20-11C-O5 20-11C3-O2 20-11C1-C2

20-9B-O5

21
21-14A1-A2 21-14A-A5

22

23

24-13A-5C 24-13A-5A

COUNTY ROAD #1 25-2B-5I 25-2C-5A 30-4C-5C 25-8B-5O 25-7C-5C

WHITESIDE #1 FRANK OEDEKOVEN #1 30-2C-5A RED STONE #1 29-4C-5C 29-2C-2C 29-2C1-5A 29-2C-5A 27-3C-5S 27-4C-5U

28-4C-5C

28-2C-5A 28-2C1-5A

25 25	

30
25-9C-5A 30-11D-50 30-10C-5C 29-12C-50 29-12C-5C 29-12C-5A

29

28
28-10D-5O 28-10C-5C 27-12C-5S

27

26

25-10C-5A 25-10C-5I

S BARBOUR #1


25-16C-5O WOOFTER #1
 31-2A-5A
 31-4C-5A 31-2A-2A


28-15C-5R

27-14C-5S

33-1D-5C

36 36	
31-12B-5I

31
E2

PM-6 PM-11

E-3

32
PM-2 EVERCLEAR #2 PM-3 P-12 E-7 MW1-A2 E-8 PM-5 P-6-O

33

34

35

T. 52 N.	 N. T. 51 N.	 N.

MW4-C4

PM-12 PM-8 PM-9

PM-10

PM-7

EVERCLEAR #1 PM-1

E-9 MW1-A4

T. 52 N. T. 51 N.

1

6 6	
E-4

5

4

3

2

12

R. 73 W.

R. 72 W.

7

8

9

10

11

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT
 ANALYSIS AREA
 MONITORING WELL FORT UNION FORMATION WATER SUPPLY WELL

Figure 3-9.	

Monitoring Well Locations Within and Near the West Hay Creek LBA Tract and Fort Union Formation Water Supply Well Locations at the Buckskin Mine.

3-33

Recharge to the Wasatch Formation is from the infiltration of precipitation and lateral movement of water from adjacent clinker bodies. Regionally, groundwater is discharged from the Wasatch Formation by evaporation and transpiration, by pumping wells, and by seepage into the alluvium along stream drainages. For the Wasatch Formation as a whole, the discontinuous nature of the water bearing units results in low overall hydraulic conductivity and low groundwater flow rates. Because of the varied nature of the aquifer units within the Wasatch, hydraulic properties are variable as well. Martin, et al. (1988) reported that hydraulic conductivities within the Wasatch ranged from 104 feet per day to 102 feet per day. The geometric mean hydraulic conductivity based on 203 tests was 0.2 feet per day. The geometric mean hydraulic conductivity from 70 aquifer tests using wells completed in sandstone in the Wasatch overburden was 0.35 feet per day, while that from 63 aquifer tests completed in siltstone and claystone in the Wasatch overburden was 0.007 feet per day (Rehm et al. 1980). Aquifer tests from Wasatch overburden within and adjacent to the West Hay Creek LBA tract present an aquifer hydraulic conductivity range of 0.04 to 13 feet per day, depending primarily on the presence and amounts of shallow sands within the lowpermeability silts and clays that make up the majority of the overburden (Appendix D6, Buckskin Mine WDEQ/LQD permit). Water quality in the Wasatch Formation is generally poor, with total dissolved solids (TDS) concentrations ranging from approximately 1,800 mg/L to 3,400 mg/L near the LBA tract. Groundwater from the Wasatch Formation is predominantly a calcium and magnesium sulfate type within the Buckskin Mine area and the West Hay Creek LBA tract. Wyodak Coal. Due to its continuity, the Wyodak coal seam is considered a regional aquifer within the PRB. Within the West Hay Creek LBA tract, the Wyodak coal contains a parting, which divides the seam into two separate mineable seams (the Anderson and Canyon). Despite the occurrence of separate seams, the Wyodak coal is considered a single aquifer in the general analysis area. Hydraulic conductivity within the Wyodak coal seam is highly variable and is reflective of the amount of fracturing the coal has undergone, as unfractured coal is virtually impermeable. The yield of groundwater to wells and mine pits is smallest where the permeability of the coal is derived primarily from localized unloading fractures. These fractures, which are the most common, are created by the expansion of the coal as the weight of overlying sediments is slowly removed by erosion. The highest permeability is imparted to the coal by tectonic fractures. These are through-going fractures of areal importance created during deformation of the Powder River structural basin. The presence of these fractures can be recognized by their linear expression at the ground surface, controlling the orientation of stream drainages and topographic depressions. Due to their pronounced surface expression, these tectonic fractures are often referred to as “lineaments.” Coal permeability along lineaments can be increased by orders of magnitude over that in the coal fractured by unloading only.

3-34

Aquifer tests conducted in the monitoring wells completed in the Anderson and Canyon seams within and adjacent to the West Hay Creek LBA tract. Coal aquifer hydraulic conductivity measured within and adjacent to the LBA tract at the Buckskin Mine ranges from 0.13 to 950 feet per day (Appendix D6, Buckskin Mine WDEQ/LQD permit). The USGS reports an average coal aquifer hydraulic conductivity of 0.8 feet per day for the general area (Martin et al. 1988). The chemistry of groundwater in the coal within the adjacent Buckskin Mine and the West Hay Creek LBA tract is variable. Quality is similar between the Anderson and Canyon seams. In general, it is a calcium sulfate type with relatively high TDS concentrations (1,000 to 3,900 mg/L) although sodium bicarbonate type samples have also been identified. Calcium, magnesium and sulfate-rich Anderson coal groundwater found within the LBA tract and adjacent areas is uncharacteristic of the sodium bicarbonate dominated groundwater from the same unit within Buckskin Mine’s historic permit area. Some groundwater influence to both coal units by overlying overburden aquifers occurs east of the proposed LBA tract near overburden and scoria contacts where both seams are shallow. In two wells in the Canyon seam within the LBA tract, TDS concentrations are less than 1,500 mg/L; low relative to typical overburden units. Prior to mining, the direction of groundwater flow within the coal aquifer was generally from recharge areas near the outcrop and burn zone into the basin, following the dip of the coal. Site-specific water-level data collected by Triton near the LBA tract and presented in the GAGMO 20-year report (Hydro Engineering 2001) indicate that the groundwater flow directions have been influenced by mining and CBM activities. Groundwater flow within the coal aquifer near the LBA tract is now to the west and southwest. Subcoal Fort Union Formation. The subcoal Fort Union Formation can be divided into three hydrologic units: the Tongue River aquifer, the Lebo Member, and the Tullock aquifer (Law 1976). The hydrologic units below the Wyodak coal are not directly disturbed by mining, but many mines use them for water supply wells. In a few cases there have been drawdowns in the subcoal aquifer due to leakage into mine pits, dewatering, and CBM development. The Tongue River aquifer consists of lenticular fine-grained shale and sandstone. The Lebo Member, also referred to as the Lebo Confining Layer, is typically more fine-grained than the other two members and generally retards the movement of water (Lewis and Hotchkiss 1981). The Tullock aquifer consists of discontinuous lenses of sandstone separated by interbedded shale and siltstone. Transmissivity is the product of an aquifer’s hydraulic conductivity or permeability times the thickness of the aquifer. It is commonly used when discussing the hydraulic properties of the Fort Union Formation, where wells are completed by exposing many discrete sand lenses to the well bore. Transmissivities are generally higher in the deeper Tullock aquifer than in the Tongue River or Lebo, and many mines in the PRB have water-supply wells completed in this interval (Martin et al. 1988). The average transmissivity for this member as reported by OSM (1984) is 290 square feet per day.

3-35

Triton has completed two wells in the subcoal Fort Union Formation to supply water to the Buckskin Mine. The wells range in depth from 1,362 to 1,510 feet. Figure 3-9 shows the Buckskin Mine supply wells, designated as Everclear-1 and Everclear-2. A search of groundwater rights was conducted using Wyoming State Engineer’s Office (SEO) records for the West Hay Creek LBA tract analysis area. This search identified a total of 656 permitted groundwater rights within 3 miles of the tract, of which 231 wells are owned by coal mining companies. The remaining 425 wells are presented in appendix F. The SEO data does not record the water-producing formation but typically does record the well depth. Of the 656 wells identified, only 12 wells had completion depths in excess of 1,000 feet. Wells of this completion depth could conceivably be producing from the Tullock Member of the Fort Union Formation. The water quality of the Fort Union Formation is generally good. Water from this aquifer is typically of the sodium bicarbonate type. Lance and Fox Hills Formations. Underlying the Fort Union Formation is the Lance Formation of Cretaceous age. At the base of the Lance Formation is the Fox Hills Sandstone. The Lance and Fox Hills formations are not used to supply water for the Buckskin Mine. Surface Water Overall, the West Hay Creek LBA tract is similar in topography to the Buckskin Mine permit area. Slopes range from flat to about 22%. The area surrounding the West Hay Creek LBA tract consists of gently rolling topography. In general, the streams within this area are typical for the region, and their flow events are closely reflective of precipitation patterns. Flow events frequently result from snowmelt during the late winter and early spring. Although peak discharges from such events are generally small, the duration and therefore percentage of annual runoff volume can be considerable. During the spring, both rain and snow storms increase soil moisture, hence decreasing infiltration capacity. Subsequent rainstorms can result in both large runoff volumes and high peak discharges. The surface water quality varies with streamflow rate; the higher the flow rate, the lower the TDS concentration but the higher the suspended solids concentration. Surface water features within and adjacent to the West Hay Creek LBA tract are displayed in figure 3-10. The only named stream within the LBA tract is Hay Creek, which flows from west to east through the LBA tract and joins the Little Powder River about 3 miles east of the LBA tract. Hay Creek is a minor headwater stream in the regional drainage network of the Little Powder River. Hay Creek exhibits both intermittent and ephemeral flow characteristics. It is not identified on the USGS hydrologic map of the state of Wyoming nor is it specifically listed in the Surface Water Classification List described in chapter I of the WDEQ/WQD Rules and Regulations. Under the WDEQ/WQD regulations, Hay

3-36


Creek is classified as a Class 3B stream that is protected for aquatic life (other than fish), recreation, agriculture, industrial uses, and scenic value. Class 3B waters are tributary waters including adjacent wetlands that are not known to support fish populations or drinking water supplies and where those uses are not attainable. Class 3B waters are intermittent and ephemeral streams with sufficient hydrology to normally support and sustain communities of aquatic life including invertebrates, amphibians, or other flora and fauna that inhabit waters of the state at some stage of their life cycles. Hay Creek is a third order stream where it leaves the Buckskin Mine’s downstream permit boundary but a first order stream where it enters the permit boundary. Hay Creek’s watershed at the upstream LBA tract boundary is 2.34 square miles, excluding a closed basin occupying 0.14 square miles primarily in the W½ of section 18. At its confluence with the Little Powder River, Hay Creek drains 14.96 square miles, again excluding closed basin watersheds. Within the Buckskin Mine permit boundary, the Hay Creek channel has a horizontal length of approximately 16,580 feet based on measurements made on a 10-foot contour interval map prepared from aerial photography and extrapolating the original channel alignment through several channel impoundments. The valley length over the same reach is about 13,290 feet; hence, the ratio of the channel length to valley length (sinuosity ratio) is 1.25. This is a relatively small sinuosity characteristic of immature streams of low order. The channel elevation declines 99.5 feet over the channel length between the permit boundary crossings. This is equivalent to an average channel slope of 0.0060 feet per feet. Within the LBA tract analysis area, there are three small impoundments on the main channel of Hay Creek: Impoundment 3, Impoundment 4, and McGee Reservoir (figure 3-10). Immediately to the south of McGee Reservoir, another small impoundment known as Mader Reservoir is located just outside of the LBA tract analysis area on a side channel of Hay Creek. All of these have estimated storage capacities of less than 2 acre-feet, with the exception of McGee Reservoir which has an estimated capacity of about 21 acre-feet. McGee Reservoir typically fills each summer because of runoff and groundwater overflow from Impoundment 4. Pool elevations in McGee Reservoir fluctuate some five to six feet each year but storage is sufficient to support small fish (fat-head minnows and green sunfish). Mader Reservoir intercepts the water table in sandy slope wash/sheetwash sediments derived from weathering of local, surficial sandstone units. The pool elevation in Mader Reservoir fluctuates little, and it is only about one to two feet deep. Upstream from McGee Reservoir, the Hay Creek channel is little more than a grassed swale except for a few bedrock cutbanks. Downstream from the reservoir, the channel becomes progressively more incised in slope wash deposits and is typically rectangular

3-37


12

R. 73 W.

R. 72 W.

7

8

9

10

11

13

18

17

16

15

14

24

19

20

21

22

23

25

30

29

28

27

26

36

31

32

33

34

35

T. 52 N. T. 51 N.

T. 52 N. T. 51 N.

1

6

5

4

3

2

12

R. 73 W.

R. 72 W.

7

8

9

10

11

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT
 ANALYSIS AREA
 STREAM FLOW LINE

Figure 3-10. Surface Water Features Within and Adjacent to the West Hay Creek LBA Tract.

3-38


to parabolic in shape. The Buckskin Mine monitored flows and water quality in Hay Creek during 1999 and 2000. Several seeps and springs associated with the Hay Creek drainage within the Buckskin Mine permit area were also monitored. Most local surface waters are a calcium sulfate-type that exceeds WDEQ domestic use standards for sulfate and TDS depending on flow rate and sample location. Several of the upstream samples are sodium bicarbonate type and are believed to be influenced by CBM pumping activities. Surface water quality is usually unsuitable for domestic use, marginal for irrigation, and suitable for stock and wildlife. Water Rights Records at the Wyoming State Engineer’s Office were searched for groundwater rights within a 3-mile radius of the West Hay Creek LBA tract analysis area. This information is required for WDEQ permitting. SEO data from a records search conducted March 2004 indicate there are 656 permitted water wells within 3 miles of the tract, of which 36 permitted wells are within the LBA tract Preferred Alternative. Water rights, which have been abandoned or cancelled, have been excluded from the search. Of the total number of wells within the search area, coal mining companies own 231 wells (35%). Of the remaining 425 wells within the search area, approximately 68% are permitted for stock watering, 17% are permitted for miscellaneous use, 81% are permitted for CBM development, and 9% are permitted for domestic use. Other uses amounted to less than 1%. Most of these wells have been permitted for multiple uses. Appendix F contains a listing of the 425 non-coal mine wells and associated water rights information. SEO records were searched for surface water rights using the SEO’s computer database. The search was conducted for surface-water rights within ½ mile of the LBA tract and 3 miles downstream from the permit boundary, as required for WDEQ permitting. This search area covers all of the LBA as applied for and all alternatives. SEO records indicate 21 permitted surface water rights within the search area. Eleven of the surface water rights are held by a coal mining company, and two are held by oil and gas companies. The remaining eight other surface water rights are for irrigation, stock watering, and domestic use. Appendix F shows a listing of the 10 non-coal mine surface water rights. Alluvial Valley Floors (AVFs) WDEQ regulations define AVFs as unconsolidated stream laid deposits where water availability is sufficient for subirrigation or flood irrigation agricultural activities. Prior to leasing and mining, AVFs must be identified because SMCRA restricts mining activities that affect AVFs that are determined to be significant to agriculture. Impacts to designated AVFs are generally not permitted if the AVF is determined to be significant

3-39


to agriculture. If the AVF is determined not to be significant to agriculture, or if the permit to affect the AVF was issued prior to the effective date of SMCRA, the AVF can be disturbed during mining but must be restored as part of the reclamation process. The determination of significance to agriculture is made by WDEQ/LQD, and it is based on specific calculations related to the production of crops or forage on the AVF and the size of the existing agricultural operations on the land of which the AVF is a part. Investigations conducted by Triton to determine the presence of AVFs within and surrounding the Buckskin Mine and analysis area determined there were no AFVs within that area. The WDEQ has concurred with that finding. The nearest declared AVF is south of the analysis area along Rawhide Creek. Portions of that AVF area have been disturbed by mining and re-established by Triton. Wetlands “Waters of the US” is a collective term for all areas subject to regulation by the Corps of Engineers (COE) (section 404 of the Clean Water Act). “Waters of the US” include special aquatic sites, wetlands, and jurisdictional wetlands. Special aquatic sites are large or small geographic areas that possess special ecological characteristics of productivity, habitat, wildlife protection, or other important and easily disrupted ecological values (40 CFR 230.3). Wetlands are a type of special aquatic site, which includes those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas (33 CFR 328.3(a)(7)(b)). Jurisdictional wetlands are defined by 33 CFR 328.1 and .2 as “those wetlands which are within the extent of COE regulatory review.” They must contain three components: hydric soils, a dominance of hydrophytic plants, and wetland hydrology. As the result of a recent Supreme Court ruling (Solid Waste Agency of Northern Cook County v. United States Army Corps of Engineers, January 9, 2001) non-navigable, isolated intrastate wetlands (playas) and other waters of the US are not considered jurisdictional. Navigable, non-isolated wetlands and other waters of the US are still considered jurisdictional by the COE. Many wetland scientists consider areas that contain only one of the three criteria listed above as functional wetlands. The FWS used this categorization in producing the National Wetland Inventory (NWI) maps. These maps were produced using aerial photo interpretation with limited field verification. The presence of jurisdictional wetlands on a mine property does not preclude mining. Jurisdictional wetlands must be identified and special permitting procedures are required to assure that after mining there will be no net loss of wetlands. A wetland delineation must be completed according to approved procedures (COE 1987) and submitted to the COE for verification as to the amounts and types of jurisdictional wetlands present. In Wyoming, once the delineation has been verified, it becomes a part of the mine permit document. The reclamation plan is revised to incorporate at least an equal type and number of jurisdictional wetlands.

3-40

Jurisdictional wetland inventories were conducted within the analysis area in 1999 and 2000. The 2000 survey also redelineated the jurisdictional wetlands on land in the S½S½ of sections 19 and 20, T. 52 N., R. 72 W. These lands were first surveyed in 1993. The wetlands delineation was completed in accordance with the procedures and criteria contained in the Wetland Delineation Manual. The consolidated delineation was subsequently approved by the COE in April 2001. Buckskin Mine then obtained authorization under the COE Programmatic General Permit 99-03 in July 2001. A total of 23.86 acres of waters of the US have been identified within the LBA analysis area, of which 17.52 acres are jurisdictional wetlands (figure 3-11). Identified jurisdictional wetlands include Riverine - emergent marsh (9.82 acres) and Riverine - wet meadow (7.7 acres). The additional 6.34 acres of waters of the US, which did not qualify as jurisdictional wetlands, include impoundment - stockponds, intermittent/perennial pool (4.20 acres), and riverine - natural ponds (2.14 acres). In addition, approximately 1,811 linear feet of nonwetland waters of the US have been inventoried within the LBA analysis area. VEGETATION A vegetation baseline study was completed by Triton on the lands contained within the West Hay Creek LBA tract as applied for under the Proposed Action and the action alternatives in 1999. The baseline study area is located within the northwest portion of the current Buckskin Mine permit area. The vegetation communities in this area were delineated, mapped, and sampled in accordance with the current WDEQ/LQD requirements. The results of the baseline studies, including the Proposed Action lands, were reviewed and approved by WDEQ/LQD as part of an earlier permit amendment. Sampling was conducted on a large enough area to include sufficient room for overburden layback and other mining needs to recover the coal under the Proposed Action, the Preferred Alternative, and Alternative 3 tracts. A total of eight vegetation types have been identified and mapped within the analyses area. Table 3-8 presents the acreage and percent of the area encompassed by each vegetation type. Figure 3-12 shows the eight vegetation communities, previously disturbed areas, and areas covered by surface water. The vegetation types include lowland prairie, mixed grass prairie, sand prairie, big sagebrush, silver sagebrush, riparian bottomland, agricultural pasture, and agricultural cropland. In addition to the eight vegetation communities, there is also a plains cottonwood tree shelterbelt containing 37 trees located within the analysis area.

3-41


R. 73 W.

R. 72 W.

16 18 17

21 19 20

28 30 29

T. 52 N.

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT ANALYSIS AREA JURISDICTIONAL WETLANDS RIVERINE - WET MEADOW RIVERINE - EMERGENT MARSH OTHER WATERS OF THE UNITED STATES RIVERINE - DRAINAGE CHANNEL RIVERINE - NATURAL POND IMPOUNDMENT - STOCK POND INTERMITTENT/PERENNIAL POOL

Figure 3-11. Wetlands Within the West Hay Creek LBA Tract Analysis Area.

3-42

TABLE 3-8 
 VEGETATION TYPES WITHIN THE ANALYSIS AREA 

Vegetation Type Sandy Prairie Grassland Big Sagebrush Shrubland Agricultural B Pastureland, High Management Agricultural B Cropland Lowland Prairie Grassland Silver Sagebrush Shrubland Agricultural B Pastureland, Moderate Management Riparian Bottomland Mixed Grass Prairie Disturbed by previous Nonmining activities Surface Water Cottonwood Shelterbelt Total Acres 461.4 238.9 129.7 117.3 55.0 50.7 47.8 19.4 7.3 25.5 6.9 0.9 1,160.8 Percent of Area 40% 21% 11% 10% 5% 4% 4% 2% 1% 2% 1% < 0.1% 100.00%

Vegetation Types The Lowland Prairie Type occurs on gently sloping plains and benches adjoining subirrigated bottoms and in closed basins. This type tended to occur on saline soils. Vegetative cover in the lowland prairie type averages 76%; total ground cover averaged 97%. In order of relative cover, perennial graminoids were dominant with 61% cover followed by perennial forbs (12%) and subshrubs (2%). Dominant grass/grasslike species include Kentucky bluegrass (Poa pratensis), alkali bluegrass (Poa juncifolia), inland saltgras (Distichlis stricta), crested wheatgrass (Agropyron cristatum), slender wheatgrass (Elymus trachycaulus), Douglas sedge (Carex douglasii), and alkali sacaton (Sporobolus airoides). The common forbs are yellow sweetclover (Melilotus officinalis), western ragweed (Ambrosia psilostachya), wild licorice (Glycyrrhiza lepidota), prostrate verbena (Verbena bracteata), wavyleaf thistle (Cirsium undulatum), western yarrow Achillea lanlulosa), and blue lettuce (Lactuca oblongifolia). Shrubs and subshrubs are not dominant components. Common shrubs and subshrubs include rubber rabbitbrush (Chrysothamnus nauseosus), cudweed sagewort (Artemisia ludoviciana), fringed sagewort (Artemisia frigida), and broom snakeweed (Guiterrezia sarothrae). Total perennial/biennial herbaceous production averages 1,849 pounds per acre. Perennial grasses (77% relative production) and perennial forbs (12% relative production) provided most production.

3-43

R. 73 W.

R. 72 W.

16 18 17

21 19 20

28 30 29

T. 52 N.

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT ANALYSIS AREA LOWLAND PRAIRIE GRASSLAND MIXED GRASS PRAIRIE GRASSLAND SANDY PRAIRIE GRASSLAND VEGETATION COMMUNITIES AGRICULTURAL CROPLAND AGRICULTURAL PASTURE - HIGH MANAGEMENT AGRICULTURAL PASTURE - MODERATE MANAGEMENT DISTURBED BY PREVIOUS NON-MINING ACTIVITIES COTTONWOOD SHELTER BELT RIPARIAN BOTTOM LAND BIG SAGEBRUSH SHRUB LAND SILVER SAGEBRUSH SHRUB LAND SURFACE WATER

Figure 3-12. Vegetation Communities Within the West Hay Creek LBA Tract Analysis Area.

3-44


Shrub density averaged 53 plants per acre. Silver sagebrush was the predominant shrub (85% of all shrubs). Subshrub density averages 16 plants per acre (50% broom snakeweed and 50% fringed sagewort). The Mixed Grass Prairie Type occupies rolling hills and ridges where soils are moderately deep to deep. This type occurs most frequently on loams, sandy clay loams, fine sandy loams, and sandy loams and is likely to occur on the Bidman, Cambria, Kishona, Lawver, Teckla, Wibaux, and Hiland soil series. Vegetative cover averages 60%; total ground cover averages 88%. In order of relative cover, perennial graminoids are dominant with 62% followed by perennial forbs (10%), shrubs (1.3%) and subshrubs (1%). Dominant grass/grasslike species in the mixed grass prairie include needle-and-thread (Stipa comata), prairie junegrass (Koeleria macrantha), and western wheatgrass (Agropyron smithii). Dominant forbs include western ragweed (Ambrosia psilostachya), Sawatch knotweed (Polygonum sawatchense), scarlet globemallow (Sphaeralcea coccinea), Hood's phlox (Phlox hoodii), prairie coneflower (Ratibida columnifera), and prairie evening primrose (Oenothera albicaulus). Common shrubs and subshrubs are big sagebrush, silver sagebrush, four-wing saltbush (Atriplex canescens), broom snakeweed (Guiterrezia sarothrae), and fringed sagewort (Artemisia frigida). Total perennial/biennial herbaceous production average 934 pounds per acre. Perennial grasses (78% relative production), perennial forbs (10% relative production), forbs (10%), provided the most production, with shrubs (1.3%), and subshrubs (1%) providing a minor component of production. Shrub density averages 700 plants per acre, 63% of which are Wyoming big sagebrush, 35% of which are silver sagebrush, and 2% of which are four-wing saltbush. Subshrub density averages 571 plants per acre (26% broom snakeweed, 64% fringed sagewort, and 3% four-wing saltbush). The Sandy Prairie Type occurs on rolling hills and plains and is associated with windblown areas. This type commonly occupies areas with deep to moderately deep fine sandy loams and sandy loams. Thus, it is likely to occur in Terro, Vonalee, and Vonalf soils. Vegetative cover averages 57%; total ground cover averages 84%. In terms of relative cover, perennial graminoids are dominant at 65% followed by perennial forbs (11%) and shrubs (3%). Dominant grass/grasslike species include needle-and-thread (Stipa comata), prairie sandreed (Calamovilfa longifolia), prairie junegrass (Koeleria macrantha), threadleaf sedge (Carex filifolia), sand bluestem (Andropogon hallii) and crested wheatgrass (Agropyron cristatum). The common forbs are western ragweed (Ambrosia psilostachya), hairy golden aster (Heterotheca villosa), scarlet guara (Gaura coccinea), wild licorice (Glycyrrhiza lepidota), and low pussytoes (Antennaria dimorpha). Common subshrubs and shrubs are prickly phlox (Leptodactylon pungens), silver sagebrush (Artemisia cana), and Wyoming big sagebrush (Artemisia tridentata wyo.).

3-45


Total perennial/biennial herbaceous production averages 1,224 pounds per acre and is mainly perennial grasses (78% relative production) and perennial forbs (11% relative production). Shrub density averages 789 plants per acre--silver sagebrush (48%), Wyoming big sagebrush (20%) and four-wing saltbush (12%) are predominant. Subshrub density averages 1,085 plants per acre with fringed sagewort (90%) and yucca (7%). The Big Sagebrush Type occurs on a variety of topographic locations including gentle slopes, and rolling hills within the analysis area. It commonly occurs on shallow clay loams (such as Theedle and Shingle series) and deep loams (such as Forkwood and Cushman series) and occasionally occurs on sandy loams. Thus, it could occur throughout the analysis area although it was unlikely to occur on sandy windblown deposits. Vegetative cover in the big sagebrush type averages 63%; total ground cover averages 90%. In order of relative cover, perennial graminoids contribute 42% followed by shrubs (19%), subshrubs (6%), and perennial forbs with 4%. Dominant grass/grasslike species include needle-and-thread (Stipa comata), prairie junegrass (Koeleria macrantha), Kentucky bluegrass (Poa pratensis), western wheatgrass (Agropyron smithii), native bluegrass (Poa secunda secunda), and green needlegrass (Stipa viridula). Common forbs include Hood's phlox (Phlox hoodii), silverleaf scurfpea (Psoralea argophylla) scarlet gaura (Gaura coccinea), and western yarrow (Achillea lanulosa). Common shrubs and subshrubs are Wyoming big sagebrush (Artemisia tridentata wyo.), broom snakeweed (Guiterrezia sarothrae), and fringed sagewort (Artemisia frigida). Total perennial/biennial herbaceous production averages 1,041 pounds per acre, most of which was provided by perennial grasses (75% relative production), annual grasses (19% relative production), and perennial forbs (4% relative production). Shrub density averages 5,186 plants per acre (88% big sagebrush and 11% silver sagebrush). Subshrub density averages 3,000 plants per acre (64% broom snakeweed, 34% fringed sagewort, and 2% winterfat). The Silver Sagebrush Type occurs on gentle to moderately sloping plains and rolling hills as well as ephemeral drainage bottoms and adjacent terraces. This type is found on a variety of soil textures in the Lawver, Teckla, Wibaux and Vonalee series. Vegetative cover averages 70%; total ground cover averages 95%. Dominant species are needle-and-thread (Stipa comata), native bluegrass (Poa secunda secunda), Kentucky bluegrass (Poa pratensis), threadleaf sedge (Carex filifolia), western wheatgrass (Agropyron smithii), and prairie sandreed (Calamovilfa longifolia). Western ragweed (Ambrosia psilostachya), Silverleaf scurfpea (Psoralea argophylla), scarlet globemallow (Sphaeralcea coccinea) are common forbs. The most common shrubs and subshrub are silver sagebrush (Artemisia cana), four-wing saltbush (Atriplex

3-46


canescens), Wyoming big sagebrush, and cudweed sagewort (Artemisia ludoviciana). Total perennial/biennial herbaceous production averages 1,086 pounds per acre as follows: perennial grasses (56% relative production), annual grasses (33% relative production) and perennial forbs (9% relative production). Shrub density averages 3,988 plants per acre. Silver sagebrush is the dominant shrub at 90%, followed by four-wing saltbush (6%) and Wyoming Big sagebrush (4%). Subshrub density averages 248 plants per acre dominated by fringed sagewort (89%) and broom snakeweed (11%). The Riparian Bottomland Type is limited in distribution and occurs primarily along Hay Creek. Atypical instances are also located on hillsides associated with groundwater seeps and reservoirs. The riparian bottomland type can be subdivided into two sub­ communities: riparian bottomland-meadow and riparian bottomland-marsh. Riparian bottomland-meadow is the predominant subcommunity. The riparian bottomland-marsh type is limited to the perimeters of stock ponds and creek pools. Substrates are characteristically deep and poorly drained and include Boruff series and mollic fluvaquents. Vegetative cover averages 96%; total ground cover averages 99%. In order of relative cover, perennial/grasslike species provide 85% followed by perennial forbs with 9%. Dominant species are cordgrass (Spartina pectinata), common spikesedge (Eleocharis palustris), American bullrush (Scirpus pungens poly.), thickspike wheatgrass (Elymus lanceolatus lan.), Canada bluegrass (Poa compressa), clustered field sedge (Carex praegracilus), and softstem bulrush (Scirpus validus). Common forbs include tufted white prairie aster (Aster ericoides pansus), maximilian sunflower (Helianthus maximiliani), wild licorice (Glycyrrhiza lepidota), and showy milkweed (Asclepias speciosus). Wood’s rose (rosa woodsii) is the most common shrub. Total perennial/biennial herbaceous production averages 3,103 pounds per acre, most of which was provided by perennial grasses and grasslike species (95% relative production) followed by perennial forbs (3% relative production). Annual grass production was insignificant at less than 1%. Agricultural - Pastureland Type. All agricultural pastures within the analysis area are under either moderate or high management levels. Based on the level of management, total vegetation cover ranges from 50% to 78%. Total ground cover ranges from 84% to 95%. Perennial grasses and grasslike species provide 91% relative cover. Dominant grasses and grasslike species include crested wheatgrass (Agropyron cristatum), Kentucky bluegrass (Poa pratensis), Canada bluegrass (Poa compressa), Russian wildrye (Elymus junceus), bulbous bluegrass (Poa bulbosa) and thickspike wheatgrass (Elymus lanceolatus lanceolatus). Yellow sweetclover (Melilotus officinalis) is the most common forb. Shrubs and subshrubs were not present in the transect samples.

3-47

Herbaceous productivity for the pasture community is based on countywide hay production values for various soil series present in the analysis area as provided by the Natural Resources Conservation Service. Under average annual rainfall conditions, estimated forage production may range from 1,200 to 3,000 pounds per acre. Agricultural - Cropland Type. The western portion of the analysis area contains a large amount of croplands. Various small grains were on these lands for quite some time. No vegetation studies were conducted for these croplands. Threatened, Endangered, and Candidate Plant Species No federally listed threatened, endangered, or candidate plant species are known to occur within the analysis area. The analysis area was surveyed in 1999 for threatened, endangered and candidate species using the Wyoming Rare Plant Field Guide (Thorne 1994) as their reference. Ute ladies’-tresses surveys were conducted by Habitat Management, Inc., who met with FWS personnel on August, 30, 1999 to review currently acceptable Ute ladies’-tresses survey methods and practices. The FWS memorandum published November 23, 1992 entitled “Interim Survey Requirements for Spiranthes diluvialis” was also used as a guide in conducting the survey. All individuals who conducted the survey have received written recognition from the FWS Colorado Field Office as being qualified to conduct Ute ladies’-tresses surveys and are on the FWS’s list of qualified consultants (appendix G). WILDLIFE RESOURCES Background information on wildlife near the West Hay Creek tract was gathered from several sources including: Buckskin Mine WDEQ/LQD permit and annual reports, Wyoming Game and Fish Department (WGFD) and FWS records and personnel contacts with WGFD and FWS biologists. Site-specific data for the entire proposed lease area were obtained from sources including the WDEQ/LQD permit and annual reports for the Buckskin Mine. Baseline and monitoring surveys cover large perimeters around the permit area. Consequently, the LBA tract has been surveyed during annual wildlife monitoring for the Buckskin Mine. Thunderbird Wildlife Consulting, Inc. (TWC), formerly Powder River Eagle Studies (PRES) have conducted annual wildlife monitoring surveys at Buckskin Mine from 1984 through 2003. Their current monitoring plan complies with Appendix B of the WDEQ/LQD Coal Rules and Regulations. The study area has included most of the LBA analysis area throughout TWC’s monitoring timeframe. Baseline wildlife monitoring was conducted on the analysis area concurrent with the Belco Exchange lands (February 1999 through February 2000). Thus, extensive wildlife data are available for the analysis area. The data presented herein is from TWC’s baseline and annual monitoring data. The LBA tract and adjacent area consists primarily of uplands. The topography is level

3-48


to rolling, with some areas sloping to steeply sloping. Sagebrush-grassland and grassland are the principal native habitat types in the south and eastern portions of the analysis area. Agricultural pasturelands and croplands dominate the northwest quarter of the analysis area. Bottomland habitat is along Hay Creek (ephemeral stream) in the northern portion of the analysis area. No designated critical, crucial, or unique habitats are present. Several stockponds and natural pools exist on the analysis area. The only trees in the analysis area are 37 cottonwoods in a shelterbelt located near the center of section 20, T. 52 N., R. 72 W. Hay Creek and other unnamed channels on the LBA tract are ephemeral. Big Game Pronghorn (Antilocapra Americana) and mule deer (Odocoileus hemionus) are the only big game species that regularly occur on or near the analysis area. Rare sightings of white-tailed deer (Odocoileus virginianus) have been recorded. The WGFD has classified the entire area as yearlong pronghorn range. The Buckskin Mine is at the north end of a larger multi-mine survey area (including Buckskin Mine, Eagle Butte Mine, and Rawhide Mine) that has been surveyed each winter since 1993. Pronghorn densities in the Buckskin area have consistently been lower than those of the multi-mine area. It is likely that the analysis area is a fringe area of pronghorn use (Triton 2000). Longterm (1987-1998) winter pronghorn density in the Buckskin area has ranged from 2 to 14 animals per square mile (/mi2) but has generally been greater than 8 animals/mi2. August 1999 pronghorn density on a 36-mi2 survey area, which included the analysis area, was a minimum of 5.6 animals/mi2. Records show that the pronghorn reproductive ratio in the Buckskin area often reaches 90 or more fawns per 100 does. This exceeds the WGFD data for northern Campbell County, which indicated a ratio of 57 fawns per 100 does (BLM 2001a). The analysis area is located within the WGFD’s Gillette antelope herd located north of Interstate 90 and is in hunt area 17. The 2001 postseason population estimate is about 12,000 antelope, slightly above the herd objective of 11,000. This is the first time since 1996 that the herd has been at or slightly above objective levels. Drought conditions the past two years has tended to slow herd growth through lower than average fawn survival four of the past five years. The long term average for preseason fawn ratios is approximately 75 fawns to 100 does. However, this herd has not produced an average fawn ratio for 8 years. Historically, the major management problem with this herd has been the ability to achieve an adequate harvest. Most of the antelope are on private land. This is also the case in the LBA tract area. There are no public lands within the analysis area, and public hunting access is limited. It is unlikely that enough licenses can be sold in the future to achieve the harvest needed to keep this population at its objective (Oedekoven 2002). The analysis area is located within the Powder River mule deer herd and deer hunt area

3-49


18. The herd is currently estimated at 44,000 (postseason 2001), which is approximately 16% below its objective of 52,000 deer. As with antelope, access to private land is limited. WGFD has classified the majority of the analysis area as yearlong mule deer habitat with a portion of the southeast classified as winter/yearlong. The area is not considered whitetail deer habitat (Oedekoven 2002). Deer were not numerous in the analysis area during the 1999-2000 baseline study. Only five mule deer were identified in the analysis area during the winter aerial survey. Ground and aerial survey data indicate that deer use was negligible in 1999. Annual monitoring results for the entire Buckskin Mine survey area has shown that the area supports low to moderate numbers of mule deer with the highest numbers generally observed in winter and spring (Triton 2000). Ground counts suggest that mule deer numbers have declined somewhat from the mid-1990s (Triton 2001). Mule deer were recorded in a wide variety of habitat types from 1995 through 2001 but more were generally observed in either mine reclaimed grassland or sagebrush grassland (Triton 2001). Crucial or critical mule deer habitat does not occur on or adjacent to the analysis area (Triton 2000). Other Mammals A variety of small and medium-sized mammal species occur near the analyses area. These include predators and furbearers, such as coyote (Canis latrans), red fox (Vulpes vulpes), striped skunk (Mephitis mephitis), raccoon (Procyon lotor), and feral cats. Prey species include rodents such as mice, pocket gophers, voles, chipmunks, and lagomorphs (jackrabbits and cottontails). Surveys for prairie dog towns were conducted on the analysis area and adjacent lands. No prairie dog towns were identified within the analysis area. The closest prairie dog town to the LBA tract is located in the SE¼ of section 9 and the SW¼ of section 10, T. 52 N., R. 72 W. There is also another prairie dog town located in section 4, T. 52 N., R. 72 W. approximately 1.75 miles north of the analysis area. Both of these towns are shown on figure 3-13. These mammal species are cyclically common and widespread throughout the region. These prey species are important for raptors and other predators. Raptors Numerous raptor species have been observed on or adjacent to the West Hay Creek LBA tract. These species include the golden eagle (Aquila chrysaetos), bald eagle (Haliaeetus leucocephalus), northern harrier (Circus cyaneus), Swainson’s hawk (Buteo swainsoni), red-tailed hawk (Buteo jamaicensis), ferruginous hawk (Buteo regalis), rough-legged hawk (Buteo lagopus), prairie falcon (Falco peregrinus), American kestrel (Falco sparverius), turkey vulture (Carthartes aura), great horned owl (Bubo virginianus), short-eared owl (Asio flammeus) and burrowing owl (Athene cunicularia). Although numerous raptor species have been observed in the area, none have nested on the site due to limited suitable habitat (cliffs and tall trees). Figure 3-13 shows the

3-50


locations of raptor nest sites identified since monitoring began for Buckskin Mine in an area that includes the West Hay Creek LBA tract. The figure shows 13 intact nest sites. As of June 2002, all of the nest sites were still intact; there were three active nests, all of which were used by red-tailed hawk pairs. Two nests previously used by great horned owls in 1999 through 2001 were not used in 2001. The golden eagle nest site was not used from 1999 through 2002. Game Birds Three species of upland game birds were observed during the 1999 baseline study: the sage grouse (Centrocercus urophasianus), sharp-tailed grouse (Pedioecetes phasianellus), and gray partridge (Perdix perdix). The FWS has received several petitions to list the greater sage grouse under the Endangered Species Act because of range-wide population declines and, in a press release issued on April 15, 2004, the agency announced that is has determined that enough biological information exists to warrant a more in-depth examination of the status of the greater sage grouse. According the press release, this decision, known as a “90-day Finding,” triggers a more thorough review of the available biological information. The causes for the sage grouse range-wide decline are not completely understood and may be influenced by local conditions. However, habitat loss and degradation, as well as loss of population connectivity are important factors (Braun 1998, Wisdom et al. 2002). The greater sage grouse is found at elevations ranging from 4,000 to 9,000 feet. Greater sage grouse are dependent on sagebrush for food and protection from predators. In the summer, the grouse depend on the grass and plants that grow under the sagebrush to provide nesting material and high protein insects that are critical to sage grouse chicks in their first month of life. In winter, more than 99% of the species’ diet is sagebrush leaves and buds. Population and habitat analyses suggest that wintering habitat can be as limiting as mating and breeding habitats. Anecdotal information from several sources in Wyoming suggests that sage grouse populations are negatively affected by construction (energy development) activities, especially those that degrade important sagebrush habitat, even when mitigative measures are implemented (Braun 1998, Lyon 2000). There is some evidence that grouse populations do repopulate areas developed for resource extraction after reclamation for the species (Braun 1987). However, there is no evidence that populations attain their previous levels. Reestablishment of sage grouse in a reclaimed area may take 20 to 30 years, or longer (Braun 1998). The sage grouse is the most commonly encountered upland game bird species in the analysis area. No sage grouse leks were identified within the analysis area. One abandoned lek is present in the NE¼4SW¼ of section 16, T. 52 N, .R. 72 W. (a state section). The abandoned lek is located approximately 1/2-mile east of the analysis area, within the existing Buckskin Mine permit area (figure 3-13). This lek was active

3-51


1 2 2


R. 73 W.

R. 72
 W.

6

5

4

3 3


12 12


7 7	

8

9 9


10 10


13 13


18

17

16

15 15


24 24


19 19


20 20


21

22 22


25 25	

30

29

28 28


27 27


36 36	

31

32

33

34 34


T. 52 N. T. 51 N. R. 73 W. R. 72
 W.

T. 52 N. T. 51 N.

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY SEARCH BOUNDARY WEST HAY CREEK LBA TRACT ANALYSIS AREA FORMER SAGE GROUSE LEK ACTIVE SHARP-TAILED GROUSE LEK BLACK TAILED PRAIRIE DOG COLONY INTACT RAPTOR NEST SITE BURROWING OWL FERRUGINOUS HAWK GOLDEN EAGLE GREAT HORNED OWL RED-TAILED HAWK

Figure 3-13.	 Raptor Nest Sites, Grouse Leks, and Prairie Dog Colonies Within and Adjacent to the West Hay Creek Analysis Area (Status as of 06-05-02).

3-52


from 1989 through 1992. The lek was active again in 2001, but no activity was observed from 1993 through 2000, or in 2002 and 2003. No broods were recorded during formal brood surveys, but two broods were observed in July on adjacent lands east of the LBA tract. Wintering habitat is limited in the analysis area, and no sage grouse or sage grouse sign was found during the winter baseline surveys. Two active sharp-tailed grouse leks were identified in 2002 on lands adjacent to the LBA tract. As shown on figure 3-13, one lek is within ¼ mile of the analyses area (Triton 2002). Gray partridge, an introduced species, is most commonly observed in the vicinity of seeded grass/haylands and small grain croplands. Three observations, all outside of the analysis area, were recorded during the 1999 baseline study (Triton 2000). Mourning doves (Zenaida macroura) were on or near the analysis area during spring and summer surveys. This species is a relatively common breeding bird in Campbell County. Occasional turkey (Meleagris gallopavo) and pheasant (Phasianus colchicus) observations have been recorded during wildlife monitoring activities at the Buckskin Mine. Therefore, both species could possibly be recorded within the 2-mile perimeter of the analysis area (Triton 2000). Migratory Birds of Management Concern Table 3-9 provides a list of the 40 migratory bird species of management concern in Wyoming that the FWS uses for reviews concerning existing and proposed coal mine leased land (FWS 2002). This listing was taken directly from the Wyoming Bird Conservation Plan (Cerovski et al. 2000). The regional status and expected occurrence, historical observations, and breeding records on and near the West Hay Creek LBA tract for each listed species are included in table 3-9. The following listed species were observed during the 1999 through 2002 surveys or are expected to occur in or adjacent to the analysis area. The ferruginous hawk (Buteo regalis) is classified as common and an historical breeder. Only one observation of a ferruginous hawk was recorded during the entire baseline study. However, they are assumed to have nested in the analyses area because nests characteristic of the ferruginous hawk were found within 1 mile north of the analyses area. Such ground nests can persist for many years. No nesting activity was observed during the 1999 baseline study or 2000 through 2002 annual surveys. Suitable nesting habitat for the short-eared owl (Asio flammeus) such as hayfields and tall weeds is present though no nests were located during the baseline survey. It was classified as uncommon and infrequently observed. The Swainson’s hawk (Buteo swainsoni) was classified as common but a rare breeder to the area. The bald eagle (Haliaeetus leucocephalus) is seasonally common and most frequently observed in the winter (Triton 2000, 2002). Sage grouse (Centrocercus urophasianus), recently added to the Level 1 list, is common to the area and is classified as an occasional breeder. See additional discussion above. 3-53

Sage grouse (Centrocercus urophasianus), recently added to the Level 1 list, is common to the area and is classified as an occasional breeder. See additional discussion above. The grasshopper sparrow (Ammodramus savannarum) and lark bunting (Calamospiza melanochorys) were observed several times within the grassland habitat. Based on 1999 through 2002 data, lark buntings are common breeders and the grasshopper sparrow is an occasional breeder within the area. The vesper sparrow (Pooecetes gramineus) and the lark sparrow (Chondestes grammacus) were classified as common to the area. The McCowan’s longspur (Calcarius mccownii) and the less common chestnut-collared longspur (Calcarius ornatus) were also infrequently or rarely observed and classified as potential breeders within the grassland habitat type. Lark buntings were also common to the sagebrush-grasslands and bottomlands. Though not found in the grasslands, the Brewer’s sparrow (Spizella brewerii) is a very common species and breeder in the sagebrush-grasslands within the analysis area. The upland sandpiper (Bartramia longicauda) was classified as infrequently observed and as a potential breeder within the analysis area. The burrowing owl (Athene cunicularia) is uncommon and classified as an infrequent breeder within the analyses area. The loggerhead shrike (Lanius ludovicianus) and long-billed curlew (Numenius americanus) were classified as uncommon and infrequently observed (Triton 2002). TABLE 3-9 REGIONAL STATUS OF 40 MIGRATORY BIRDS OF MANAGEMENT CONCERN IN WYOMING FOR COAL MINES AND EXPECTED AND ACTUAL OCCURRENCE ON AND WITHIN ½ MILE OF THE WEST HAY CREEK LBA TRACT
Seasonal Status/ Breeding Records in Northeastern WY1 LEVEL I summer/observed resident/breeder never recorded resident/breeder summer/breeder summer/observed Expected Occurrence in Vicinity of West Hay Creek 2 rare common rare common common uncommon Occurrence and Historical Breeding Status at West Hay Creek never recorded occasional breeder never recorded historical breeder regular breeder never recorded

Species Mountain plover Charadrius montanus Sage grouse* Centrocercus urophasianus Baird’s sparrow Ammodramus bairdii Ferruginous hawk* Buteo regalis Brewer’s sparrow* Spizella breweri Sage sparrow Amphispiza belli

3-54


TABLE 3-9 (cont)
Expected Seasonal Status/ Occurrence in Breeding Records in Vicinity of Northeastern WY1 West Hay Creek 2 LEVEL I (continued) summer/breeder summer/breeder summer/breeder resident/breeder resident/observed summer/breeder resident/observed summer/breeder uncommon common uncommon uncommon rare uncommon seasonally common uncommon Occurrence and Historical Breeding Status at West Hay Creek infrequently observed rare breeder infrequent spring migrant infrequently observed never recorded Infrequent breeder frequent in winter infrequently observed

Species McCown’s longspur* Calcarius mccownii Swainson’s hawk* Buteo swainsoni Long-billed curlew* Numenius americanus Short-eared owl* Asio flammeus Peregrine falcon Falco peregrinus Burrowing owl* Athene cunicularia Bald eagle* Haliaeetus leucocephalus Upland sandpiper* Bartramia longicauda Cassins’s Kingbird Tyrannus vociferans Lark bunting* Calamospiza melanocorys Dickcissel Spiza americana Chestnut-collared longspur* Calcarius ornatus Black-chinned Hummingbird Archilochus alexandri Pygmy nuthatch Sitta pygmaea Marsh wren Cistothorus palustris Western bluebird Sialia mexicana Sage thrasher* Oreoscoptes montanus Grasshopper sparrow* Ammodramus savannarum Bobolink Dolichonyx oryzivorus Common loon Gavia immer Black-billed cuckoo Coccyzus erythropthalmus

LEVEL II summer/breeder uncommon summer/breeder summer/observed summer/breeder never recorded resident/observed summer/observed summer/observed summer/breeder summer/breeder summer/observed summer/observed summer/breeder common rare uncommon not expected not expected uncommon uncommon common common uncommon not expected uncommon

never recorded common breeder never recorded rarely recorded never recorded never recorded never recorded never recorded rarely observed occasional breeder never recorded never recorded never recorded

3-55


TABLE 3-9 (cont)
Expected Seasonal Status/ Occurrence in Breeding Records in Vicinity of Northeastern WY1 West Hay Creek 2 LEVEL Il (continued) summer/observed never recorded never recorded never recorded never recorded summer/breeder summer/breeder summer/breeder never recorded never recorded resident/breeder migrant/observed summer/breeder uncommon uncommon uncommon uncommon uncommon uncommon common common abundance unknown uncommon uncommon uncommon abundance unknown Occurrence and Historical Breeding Status at West Hay Creek never recorded never recorded never recorded never recorded never recorded infrequently observed common breeder occasional breeder never recorded never recorded rarely observed never recorded never recorded

Species Red-headed woodpecker Melanerpes erythrocephalus Yellow-billed cuckoo Coccyzus americanus Eastern screech-owl Otus asio Western screech-owl Otus kennicottii Western scrub-jay Apheloma californica Loggerhead shrike* Lanius ludovicianus Vesper sparrow* Pooecetes gramineus Lark sparrow* Chondestes grammacus Ash-throated flycatcher Myiarchus cinerascens Bushtit Psaltriparus minimus Merlin* Falco columbarius Sprague’s pipit Anthus spragueii Barn owl Tyto alba
1 2 *

Compiled from Luce et al. (1999), for lat-long block that encompasses northern Campbell County.
 Expected occurrence on or within ½ mile of Buckskin Mine was based on range, history of occurrence, and habitat availability.
 Species highlighted with asterisks were recorded on or within ½ mile of Buckskin Mine during baseline or monitoring studies at 
 least once before or during May 2002. 
 Source: Luce, B., A. Cerovski, B. Oakleaf, J. Priday, and L. Van Fleet. 1999. Atlas of Birds, Mammals, Reptiles, and 
 Amphibians in Wyoming. Wyoming Game and Fish Department, Cheyenne, Wyoming.


Suitable habitat for the mountain plover occurs in the analysis area, particularly in the sandy prairie grassland areas; however, mountain plovers have not been recorded in the area. Additional migratory bird species of management concern in Wyoming are not expected to occur on the analysis area, although marginal potential habitat for some species was identified within the 1999 survey area. These include the barn owl (Tyto alba), Sprague’s pipit (Anthus spragueii), dickcissel (Spiza americana), and Baird’s sparrow (Ammodramus baridii). Of these species, PRES only observed one dickcissel during their years of monitoring the mines in northern Campbell County. Other species listed on table 3-9 have been rarely or never recorded in the analyses area.

3-56

Other Species Wildlife surveys completed specifically in the analyses area and surveys completed for the adjacent mines have documented numerous other wildlife species that inhabit the area. All of these species were generally common inhabitants of the area and none were of specific concern to state or federal agencies. Lists of species recorded at the Buckskin Mine and within the analyses area are in the mine’s permit document available at WDEQ/LQD. Under current natural conditions, the LBA tract provides limited waterfowl and shorebird habitat. This habitat is mainly available during spring migration as ponds and ephemeral streams. Many of these water features generally get quite low or dry up during the summer. However, persistent ponds do remain on the upper reaches of Hay Creek within the analyses area. Broods from the American wigeon (Anas Americana), blue-winged teal (Anas discors), mallard (Anas platyrhynchos), northern pintail (Anas acuta), and northern shoveler (Anas clypeata) were observed during the 1999 baseline study. CBM activity also provides additional water to some small stock ponds adjacent to the analyses area Fish species are not normally found on the LBA tract. Pool elevations in McGee Reservoir fluctuate some five to six feet each year but storage is sufficient to support small fish (fat-head minnows and green sunfish). Due to the ephemeral drainages within the analyses area, fish surveys were not required during the baseline study by the WGFD or WDEQ/LQD. All wildlife baseline study procedures were reviewed with Mr. Vern Stelter of the WGFD. PRES submitted the final study plan to Mr. Stelter in a letter dated May 14, 1999. Tom Collins, Coordinator with the WGFD, accepted the scope of work as “both complete and appropriate” in his letter dated May 18, 1999 to PRES. In addition, Buckskin Mine received a letter from WGFD Deputy Directory Gregg Arthur dated December 23, 2003 recommending approval of the temporary diversion of Hay Creek. His letter of recommendation also addressed the adequacy of the biological information available for Hay Creek and the fact that the post-mining reclamation plan was already in place. Appendix G contains a discussion of threatened, endangered and proposed animal species. OWNERSHIP AND USE OF LAND Triton Coal Company, LLC owns the surface on the West Hay Creek LBA tract analysis area, including the LBA area as applied for and areas added under the action alternatives (figure 3-14). The principal land use within the tract is domestic grazing and wildlife habitat (Triton 2002). Secondary land uses are agricultural cropland and hayland. Areas of disturbance within the West Hay Creek LBA tract include plugged and abandoned oil and gas well sites, CBM wells and associated utilities/easement corridors, ranch access roads, and mine monitoring access roads. All of the coal estate included in the LBA tract is federally owned. Figure 3-15 shows that the oil and gas estate within the analyses area is both federally and privately 3-57

owned. All of the federally owned oil and gas estate is leased. Table 3-10 provides a list of the lessees of record for the federally owned oil and gas estate. The Supreme Court has ruled that CBM rights belong to the owner of the oil and gas rights (98-830). Therefore, the oil and gas lessees have the right to develop the CBM in the coal as well as the right to develop conventional oil and gas on the tract. There are no conventional oil or gas wells in the analyses area. According to the WOGCC database, there were nine CBM wells located on the LBA tract that were producing or capable of producing and three additional locations had been permitted to drill or had started drilling as of April 9, 2004. Extensive CBM development has occurred west of the tract. CBM wells were initially drilled on 40-acre spacing patterns in the Wyoming PRB, but the WOGCC has established 80-acre spacing patterns as the default spacing for CBM wells in the Powder River Basin. Most CBM drilling near the West Hay Creek LBA tract has occurred on a 40-acre pattern, either because the wells were drilled before the spacing was changed to 80 acres or under the authorization of spacing exceptions granted by WOGCC. There are 16 remaining undrilled complete or partial 40-acre lots within the study area. Certain ancillary facilities are needed to support oil and gas production. These support facilities may include well access roads, well pads, production equipment at the wellhead (which may be located on the surface and/or underground), well production casing (which extends from the surface to the zone of production), underground pipelines (which gather the oil, gas and/or water produced by the individual wells and carry it to a larger transmission pipeline or collection facility), facilities for treating, discharging, disposing of, containing, or injecting produced water, central metering facilities, electrical power utilities, gas compressor stations, and high-pressure transmission pipelines for delivering the gas to market. Coal mining is a dominant land use in the area surrounding the LBA tract. The Buckskin Mine is within a group of five operating surface coal mines located in northern Campbell County (figure 1-1 in chapter 1). Coal production at these five mines increased by about 17% between 1993 (about 44 million tons) and 2001 (about 51 million tons). Since 1992, one maintenance coal lease was issued and one lease exchange was completed within this mine group. Applications have been submitted for two maintenance tracts in this same group, including the LBA being evaluated in this EIS (tables 1-1 and 1-2). Campbell County has no applicable countywide land use plans, and the LBA tract has no designated zoning classification. The City of Gillette/Campbell County Comprehensive Planning Program (City of Gillette 1978) provides general land use goals and policies for state and federal coal leases in the county.

3-58

R. 73 W.

R. 72 W.

16 18 17

21 19 20

28 30 29

T. 52 N.

LEGEND

BUCKSKIN MINE PERMIT BOUNDARY
 WEST HAY CREEK LBA TRACT ANALYSIS AREA SURFACE OWNERSHIP TRITON COAL COMPANY, LLC. STATE OF WYOMING

BYRON F. & MARJORIE OEDEKOVEN

CECLE L. & LAVERNE COOK

Figure 3-14. Surface Ownership on the West Hay Creek LBA Tract.

3-59


R. 73 W.

R. 72 W.

16 18 17

21 19 20

28 30 29

T. 52 N.

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT ANALYSIS AREA CBM LOCATION, SHUT-IN PRIVATE OWNERSHIP FEDERAL LEASE

STREAM FLOW LINE YATES PETROLEUM CORPORATION MAJESTIC PETROLEUM OPERATIONS, LLC.

CBM LOCATION, SPUDDED

CBM LOCATION, PERMIT TO DRILL

Figure 3-15. Oil and Gas Ownership on the West Hay Creek LBA Analysis Area.

3-60


TABLE 3-10 
 OIL AND GAS OWNERSHIP ON THE WEST HAY CREEK LBA TRACT 

(T. 52 N., R. 72 W) Location Section 17 Lot 8 Lease Number Lessee of Record

WYW 134209

Majestic Petro Operations, LLC; Preston Reynolds & Co., Inc.; Redstone Resources, Inc.; Woodward Enterprises, LLC, CH4 Energy, LLC Maurice W. Brown

Lots 6, 7, 10, 11, 14 Section 19 Lots 13, 20 Section 20 Lots 3, 6, 10, 11

WYW 138419

WYW 138419

Maurice W. Brown

WYW 138419

Maurice W. Brown

Note: Oil and gas rights (including coal bed methane) for the remainder of the LBA tract are privately owned.

Big game hunting is the principal recreational use in the analysis area. Landownership within the PRB is 80% private, but some private landowners permit sportsmen to cross and/or hunt on their land. Others charge an access fee, and some do not allow any access. There has been a trend over the past two decades towards a substantial reduction in lands open and reasonably available for hunting. Access fees continue to rise, and many resident hunters feel these access fees are unreasonable. This trend has created problems for the WGFD in their attempt to distribute and control harvest at optimal levels, as well as to sportsmen who desire access to these animals (WGFD 1996). Due to safety concerns, public lands contained within an active mining area are often closed to the public, further limiting recreational use. In the PRB, the publicly owned Thunder Basin National Grasslands, BLM-administered public lands, and state school sections (normally sections 16 and 36) are generally open to hunting if legal access is available. As shown in figure 3-14, there are no public surface lands included in the West Hay Creek LBA tract. The surface estate of all of the lands within the LBA tract under the Proposed Action and the alternative configurations is privately owned, and recreational use is allowed only with landowner permission. Sport hunting in varying degrees occurs on the LBA tract. Pronghorn and mule deer occur on and adjacent to the LBA tract. Sage grouse, mourning dove, waterfowl, rabbit, and coyote are hunted in the vicinity, and some coyote and red fox trapping may occur.

3-61


CULTURAL RESOURCES Cultural resources, protected under the National Historic Preservation Act of 1966, are the nonrenewable remains of past human activity. The PRB appears to have been inhabited by aboriginal hunting and gathering people for more than 11,000 years. Throughout the prehistoric past, highly mobile hunters and gatherers who exploited a wide variety of resources used the area. The general chronology for aboriginal occupation (dated as years before present [B.P.]) is: - the Paleoindian period (11,000-7,500 years B.P.), - the Archaic period (7,500-1,800 years B.P.), - the Prehistoric period (1,800-400 years B.P.), - the Protohistoric period (400-200 years B.P.), and - the Historic period (200-120 years B.P.). The Paleoindian period includes a series of cultural complexes identified by distinctive large projectile points (spear points) often associated with the remains of large, nowextinct mammals (mammoth, bison, camel, etc.). The Archaic period is characterized by a range of smaller side-notched, stemmed, or corner-notched projectile points and by more generalized subsistence pursuits including gathering plants. This lifeway continued to the late Prehistoric period, which is marked by a technological change from dart projectiles to the bow and arrow and by the appearance of ceramics. During the Archaic and late Prehistoric periods, the PRB was occupied by small bands of hunters and gatherers whose movements were determined largely by seasonal and environmental changes that influenced the occurrence of subsistence resources (BLM 1979). Protohistoric and early Historic sites are found in the PRB, including rare historic trade goods, sites, and routes associated with early trappers and military expeditions, and early ranching attempts dating to the 1880s. A few small coal mining sites also exist. A Class III cultural resources survey is a professionally conducted, intensive inventory of a target area, designed to locate all cultural properties that have surface and exposed profile indications. Cultural properties are recorded and sufficient information collected on them to allow evaluation for possible inclusion in the National Register of Historic Places (NRHP). That determination is made by the managing federal agency in consultation with State Historic Preservation Office (SHPO). Consultation with SHPO must be completed before the MLA mining plan is approved. Until consultation with SHPO has occurred and agreement regarding NRHP eligibility has been reached, all sites should be protected from disturbance. Once a Class III survey is completed, site-specific testing or limited excavation is used, if necessary, to gather additional data which will: 1) determine the final evaluation status of a site and/or 2) form the basis of additional work that will be conducted during implementation of a treatment plan if the site is eligible for the NRHP. A treatment plan

3-62


is developed for those sites that are eligible for the NRHP and are within the area of potential effect. Treatment plans are implemented before mining and can include such mitigating measures as avoidance (if possible), large-scale excavation, complete recording, historic American building survey/historic American engineering record documentation, archival research, and other acceptable scientific practices. TRC Mariah Associates of Laramie, Wyoming subjected the West Hay Creek LBA analysis area to a Class III cultural resource inventory and assessment in 1999. The analysis area covered all lands proposed for coal lease and a buffer zone that would include all disturbances for the Proposed Action, the Preferred Alternative, and Alternative 3 assuming the area is mined as a maintenance tract for the existing adjacent mine. The goal of the inventory was to locate and evaluate for the NRHP all cultural resources 50 years and older within the study area. WDEQ, OSM, and the Wyoming SHPO reviewed and approved the survey results. Previous cultural resource inventories were conducted in and adjacent to the analysis area in association with oil and gas development and previous mine permitting activities. Table 3-11 summarizes the distribution of cultural sites identified during the inventory by type. TABLE 3-11 
 RESULTS OF THE CLASS III CULTURAL RESOURCE INVENTORY OF THE 
 WEST HAY CREEK LBA TRACT ANALYSIS AREA 

Prehistoric Sites Lithic scatter or possible open camp Isolated finds Historic Sites Homestead Earthen dams/ structures Stone alignment

48CA857, 858, 859, 1615, 3377, 3379, 3380, 3385, and 3387 13 lithic items

48CA1836 48CA3376 48CA3386

Three historical sites were identified within the analysis area. Site 48CA1836 is a homestead that was originally recorded in 1982. The site consists of the remains of the main house, three bunkhouses, four sheds, one corral and one dugout depression. Site 48CA3376 consists of three earthen dams and their reservoirs, one three-sided rock foundation, and a detached separate roof. The third site, 48CA3386, is a linear rock alignment. No other artifacts were found in association with the site. None of the sites met the criteria for eligibility to the NRHP.

Nine prehistoric sites were identified in the analysis area. All of the nine sites potentially located within the Proposed Action and alternative areas are lithic scatters. Two of four previously recorded sites could not be located again in 1999. One site met the eligibility

3-63


criteria for the NRHP. The survey results have been reviewed and approved by WDEQ, OSM, and the Wyoming SHPO. A data recovery plan has been developed and will be implemented. Native American Concerns Native American heritage sites are classified as prehistoric or historic. Some may be being used as offering sites and fasting or vision quest sites, and selected rock art sites. Other sites of cultural interest and importance may include rock art sites, stone circles and various rock features, fortifications or battle sites, burials, as well as locations that are sacred or part of the oral history and heritage that have no man-made features. To date, no Native American sacred sites in the general analysis area have been documented. However, the position of the area between mountains considered sacred by various Native American cultures (the Big Horn Mountains to the west, the Black Hills, and Devils Tower to the east) creates the possibility of existing locations which may have special religious or heritage significance to Native American groups. Native American tribes were consulted at a general level in 1995-1996 as part of an effort to update the BLM Buffalo RMP. Tribes that have been potentially identified as having concerns about actions in the PRB include: the Crow, Northern Cheyenne, Shoshone, Arapaho, Oglala Lakota, Rosebud Sioux, Flandreau Santee Sioux, Santee Sioux, Crow Creek Sioux, Lower Brule Sioux, Standing Rock Sioux, and Cheyenne River Sioux. OSM completed the Native American consultation in 2000 on lands within the analysis area. No comments were received. OSM then notified the SHPO that the one site of concern, 48CA860, was not a traditional cultural property. PALEONTOLOGICAL RESOURCES The formations exposed on the surface of the PRB are the sedimentary Eocene Wasatch and Paleocene Fort Union formations, which are both known to contain fossil remains. Some paleontological surveys have been conducted in the PRB. Vertebrate fossils that have been described from the Wasatch Formation include mammals such as early horses, tapiroids, condylarths, primates, insectivores, marsupials, creodonts, carnivores and multituberculates; reptiles such as crocodilians, alligators, lizards, and turtles; birds, eggs, amphibians, fish, plants, and nonmarine invertebrates such as mollusks and ostrocods. The Fort Union also contains fossils of plants, reptiles, fish, amphibians, and mammals. A paleontological survey was conducted within and adjacent to the West Hay Creek LBA tract in 1999 to determine the potential for recovery of significant fossils prior to disturbance. Fragmentary crocodile scutes and invertebrate gastropod and bivalve shell fragments were located in section 21, T. 52 N., R. 72 W. Petrified wood was also abundant on the hill slopes in that area. No vertebrate or invertebrate fossils or plant material was collected, as all of it was fragmentary and considered to be of limited scientific significance.

3-64

VISUAL RESOURCES Visual sensitivity levels are determined by people's concern for what they see and the frequency of travel through an area. Common throughout the analysis area are landscapes that include rolling sagebrush and short-grass prairie. Existing surface mines form a somewhat continuous band on the east side of US Highway 14-16 north of Gillette. Other man-made intrusions include ranching activities (fences, homesteads, and livestock), oil and gas development (pumpjacks, pipeline right of ways, CBM well shelters, and CBM compressor stations), transportation facilities (roads and railroads) and electric power transmission lines. The natural scenic quality in the immediate lease area is relatively low because of this development and the existing surface coal mining operations. The Buckskin and Rawhide Mine facilities and some mining activities are visible from US 14-16 and Collins and McGee county roads. This is also true for portions of the LBA tract. For management purposes, BLM evaluated the visual resources on lands under its jurisdiction in the 1985 Buffalo RMP. The inventoried lands were classified into visual resource management (VRM) classes as follows: Class I -	 Natural ecologic changes and very limited management activity is allowed. Any contrast (activity) within this class must not attract attention. Class II - Changes in any of the basic elements (form, line, color, texture) caused by an activity should not be evident in the landscape. Class III - Contrasts to the basic elements caused by an activity are evident but 
 should remain subordinate to the existing landscape. 
 Class IV - Activity attracts attention and is a dominant feature of the landscape in terms of scale. Class V - This classification is applied to areas where the natural character of the landscape has been disturbed up to a point where rehabilitation is needed to bring it up to the level of one of the other four classifications. The lands in the West Hay Creek LBA tract are generally classified as VRM Class IV. The existing mining activity is visible from several sites on the LBA tract. NOISE Existing noise sources in the area include adjacent coal mining activities, traffic on Wyoming 59, US 14-16, and the Collins and McGee county roads, rail traffic, ranching activities, and wind. No site-specific noise level data are available for the area. Because the Buckskin Mine is adjacent to the proposed LBA, a median noise level is

3-65


estimated to be 40 to 60 dBA for day, evening, and nighttime, with the noise level increasing with proximity to active mining at the Buckskin Mine. Mining activities are characterized by noise levels of 85 to 95 dBA at 50 feet from actual mining operations and activities (BLM 1992b). Figure 3-16 presents noise levels associated with some commonly heard sounds. The nearest occupied dwelling to the LBA tract is located approximately ½ mile north of the northwestern corner of the LBA tract analysis area, in the SW¼SE¼ of section 7, T. 52 N., R. 72 W. Occupied dwellings and publicly accessible roads near the West Hay Creek LBA Tract are shown in Figure 3-17. TRANSPORTATION FACILITIES Transportation resources near the West Hay Creek LBA tract include US 14-16, Wyoming 59, and the Collins and McGee county roads. US 14-16 is about 2 miles west of the LBA tract area, and Wyoming 59 lies approximately 3 miles east. Both highways are paved two-lane roads that run generally north-south. The county roads are improved two-lane roads that also run roughly north-south. The Collins County Road is about 1 mile west of the LBA tract area; and the McGee County Road branches east of Collins Road about 3,000 feet from the northeast corner of the analysis area. Several unnamed two-track roads either cross the area or are adjacent to it. Access to the LBA tract is on unnamed two-track roads off McGee Road via Collins Road and US 14-16. The nearest railroad facilities are the Burlington Northern/Santa Fe Railroad spurs accessing the Buckskin Mine 1.5 miles south of the proposed LBA tract area, and the Rawhide Mine approximately 5 miles southeast of the proposed LBA tract area. The Buckskin Mine railroad loop is the northern terminus of a series of spur lines that serve the surface coal mines north of Gillette. Oil and gas pipelines, power lines, and associated rights of way (ROWs) are found in the analysis area. However, no telephone lines are located within the proposed tracts. Figure 3-17 shows the location of transportation facilities within and adjacent to the West Hay Creek LBA tract. Since the West Hay Creek LBA tract as applied for would be an extension of the existing Buckskin Mine operations, the existing coal transportation facilities and infrastructure would be used during mining of the LBA tract. SOCIOECONOMICS The social and economic study area for the proposed project involves primarily Campbell County and the cities of Gillette and Wright. The community of Gillette would most likely attract the majority of any new residents due to its current population level and the availability of services and shopping amenities. A comprehensive socioeconomic profile of the Buffalo Field Office area (formerly the Buffalo Resource Area, which includes all of Campbell County) was prepared for the BLM under contract with the Department of Agricultural Economics, College of

3-66


Figure 3-16. Relationsip Between A-Scale Decibel Readings and Sounds of Daily Life.

3-67

1 2

R. 73 W.

R. 72 W.

6

5

4

3

12

7

8

9

10

13

18

17

16

15

24

19

20

21

22

25

30

29

28

27

36

31

32

33

34

T. 52 N. T. 51 N. R. 73 W. R. 72 W.

T. 52 N. T. 51 N.

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY SEARCH BOUNDARY (3/4 MILE RADIUS) SEARCH BOUNDARY - EPA (2 MILE RADIUS) WEST HAY CREEK LBA TRACT ANALYSIS AREA ELECTRIC POWER TRANSMISSION LINES UNDERGROUND ELECTRIC POWER TRANSMISSION LINES FUEL PIPELINES WATER PIPELINES TELEPHONE LINES RESIDENCE (80) BUS STOP (12)

Figure 3-17.	 Transportation Facilities Within and Adjacent to the West Hay Creek LBA Tract Analysis Area.

3-68

Agriculture, through the University of Wyoming’s Cooperative Extension Service (University of Wyoming 1994). The portion of the following discussion that deals with Campbell County is from this report. Additional data came from the Wyoming Department of Commerce, Wyoming Division of Economic Analysis, Wyoming Department of Employment, Wyoming Economic Development Office, and personal communications with local community development staff. Population According to 2000 census data, Campbell County had a population of 33,698, with Gillette accounting for 19,646 of the county's residents and Wright with 1,347. The estimated July 2002 Campbell County population was 36,110, which represents a greater than 3% percent annual growth rate in recent years and makes Campbell County the fastest growing county in the state (Wyoming Department of Administration and Information 2003a). The estimated December 2003 population of Gillette was 24,235. Between 1990 and 2003, it is estimated that Gillette grew by 4,950 persons. This represents a 25.7% increase in estimated population over a 13 years period, and an average annual growth rate of 1.97% per year (Gillette Department of Community Development 2004). Wright had an average growth rate of 0.9% during the time period from 1990 to 2000 (US Department of Commerce 1990 and 2000). Local Economy Coal production, as reported by the Wyoming State Inspector of Mines, showed the Wyoming’s coal producers set a new yearly production record of 373.2 million tons in 2002. This was an increase of 1.2% over the 368.9 million tons produced in 2001. Coal production in Campbell County increased by 1.0% (329.5 million tons to 332.8 million tons) from 2001 to 2002. The 2002 Campbell County coal production was 89% of the state total. In the second quarter of 2002, 29% of the total employment and 43% of the total payroll in Campbell County were attributed to mining, which also includes oil and gas employment. During the same time period in Converse County, 8% of the employment and 12% of the payroll were attributed to mining (Wyoming Department of Employment 2003). Table 3-12 shows approximate tax revenues from coal production in Campbell County. Sales and use taxes are distributed to cities and towns within the county and to the county’s general fund. Severance taxes are collected by the state for the removal or extraction of resources such as oil, natural gas, coal, and trona. The state of Wyoming retains approximately 83% of the severance tax, and the remainder is returned to the cities, towns, and counties. Ad valorem taxes, which include property taxes, are collected by the county and disbursed to schools, cities, towns, the state foundation, and various other subdivisions within the county. Mineral royalties are collected on the

3-69


amount of production and the value of that production. The current royalty rate for federal coal leases is 12.5%, with half of this revenue returned to the state. Additional sources of revenue include lease bonus bids (also split with the state) and annual rentals that are paid to the federal government. The total fiscal benefit to the state of Wyoming from coal mining in the PRB was estimated at $1.10 per ton of coal mined in a 1994 study conducted for BLM by the University of Wyoming (University of Wyoming 1994). TABLE 3-12 
 CAMPBELL COUNTY ESTIMATED 2003 FISCAL REVENUES1
 FROM 2002 COAL PRODUCTION 

(in millions) Severence Tax Collections $81.3 Ad Valorem Tax Collections $72.0

County Campbell
1

Sales and Use Collections $6.3

Royalty Collections $230.9

Total Collections $390.50

Estimated tax receipts are based on information from the Wyoming Department of Revenue and from results of a survey conducted by the Wyoming Mining Association (WMA).

Nationally, the minerals industry was 1.3% of the gross national product (GNP) in 2001. In Wyoming, the minerals industry (including oil and gas) is 23% of the gross state product (GSP) in 2001, which makes it the largest sector of the Wyoming economy. Coal mining alone accounted for 5.4% of the Wyoming GSP (Wyoming Department of Administration and Information 2003). Employment Coal mining has changed a great deal since the 1970s, and new technologies have been a major contributor to these changes. The local coal mining labor force grew during the 1970s but declined during the 1980s. Since 1973, overall production has risen while employee numbers have decreased. This employment decline followed large industry capital investments in facilities and production equipment, the majority of which was aimed at increasing productivity. The coal mining labor force in Campbell County remained relatively constant for several years but has recently increased. Coal mining employment in Campbell County increased from 3,011 to 3,580 from 1998 to 2002 (Wyoming Department of Employment, Office of the State Inspector of Mines 1998-2002). In 2001, Campbell County had an average total labor force of 22,360 with an unemployment rate of 2.9%, compared to 3.4% in 2000. Coal mining employment

3-70


represented 16% of the total labor force in Campbell County in 2000 (Wyoming Department of Employment, Research and Planning 2001). Housing The US Census Bureau (DOC 2003a) estimated 13,608 housing units in Campbell County in July 2002. This represents a 2.4% increase above the 13,288 housing units reported in the 2000 census and an 18% increase above the 11,538 housing units reported in the 1990 census. Campbell County residential building permits rose from 15 in 1990 to 144 in 2002 (Wyoming Housing Database Partnership 2003). According to the Wyoming Housing Database Partnership (2003), the average valuation of a single family housing unit in Campbell County in 2002 was $139,200, which was 6.1% higher than the average 2001 valuation. The housing vacancy rate in Gillette has been low in the past few years due to population growth associated with CBM development; however, that growth has slowed. According to the Gillette Department of Community Development (2004), the total number of dwelling units in Gillette increased by 340 units, to 9,035 in 2003, a 3.9% increase. The estimated overall residential vacancy rate for December 2003 was estimated to be 1.9%. This is an increase as compared to an overall vacancy rate of 1% in 2002, but is still a very low vacancy rate (Gillette Department of Community Development 2004). Local Government Facilities and Services Gillette has generally maintained a steady population growth since 1987, when it totaled 17,054. Owing to the substantial revenues generated by mineral production, local government facilities and services have kept pace with growth and are adequate for the current population. The opening of the new South Campus of Campbell County High School in 1999 has helped to alleviate overcrowding at the North Campus. The combined enrollment in both campuses for the 2003-2004 school year is approximately 1,500 students with 124 teachers (Campbell County School District 2003).

Social Conditions Despite past boom and bust cycles in the area's economy, a relatively stable social setting now exists in these communities. Most residents have lived in the area for a number of years, social ties are well established, and residents take great pride in their communities. Many of the people place a high priority on maintaining informal lifestyles and small town traditions. There are some concerns that the area could be adversely affected by more than a modest growth in population. At the same time, there is substantial interest in enhancing the economic opportunities available in the area and a desire to accommodate reasonable levels of growth and development. Wyoming’s economy reached the bottom of an energy bust in 1987 and started to

3-71


recover (Wyoming Department of Administration and Information 1999). That recovery began to slow in 1996. The forecast is for slow growth through 2008; Wyoming’s population is projected to increase at 0.5% per year. Nonagricultural employment is projected to increase by 22% by 2008, increasing 1.4% in 2000 and then slowing to 1.1% per year by 2006. Mining employment is projected to decline by 8.2% by 2008. In 1998, there were 17,000 jobs in the mining sector. This dropped to 15,600 in 1999, with 1,000 jobs lost in oil and gas extraction, 300 in nonmetallic minerals and 100 in coal mining (Wyoming Department of Administration and Information 2000). Environmental Justice Environmental justice issues are concerned with actions that unequally affect a given segment of society because of physical location, perception, design, and noise. On February 11, 1994, Executive Order 12898, “Federal Action to Address Environmental Justice in Minority Populations and Low-Income Populations” was published in the Federal Register (59 FR 7629). The executive order requires federal agencies to identify and address disproportionately high and adverse human health or environmental effects of their programs, policies, and activities on minority populations and low-income populations (defined as those living below the poverty level). The executive order makes it clear that its provisions apply fully to Native American populations and Native American tribes, specifically to effects on tribal lands, treaty rights, trust responsibilities, and the health and environment of Native American communities. Communities within Campbell County, entities with interests in the area, and individuals with ties to the area all may have concerns about the presence of a coal mine within the general analysis area. Communities potentially impacted by the presence or absence of a coal mine are identified in this section of the EIS. Environmental justice concerns are usually directly associated with impacts on the natural and physical environment, but these impacts are likely to be interrelated with social and economic impacts as well. Native American access to cultural and religious sites may fall under the umbrella of environmental justice concerns if the sites are on tribal lands or treaty right has granted access to a specific location. Compliance with Executive Order 12898 concerning environmental justice was accomplished through opportunities for the public to receive information on this EIS in conjunction with the consultation and coordination described in chapter 5 of this document. This EIS and contributing socioeconomic analysis provide a consideration of impacts with regard to disproportionately adverse impacts on minority and/or lowincome groups, including Native Americans.

3-72


HAZARDOUS AND SOLID WASTE Potential sources of hazardous or solid waste on the West Hay Creek LBA tract would include spilling, leaking, or dumping hazardous substances, petroleum products, and/or solid waste associated with mineral, coal, oil and/or gas exploration and development, or agricultural or livestock activities. No such hazardous or solid wastes are known to be present on the LBA tract. Wastes produced by current mining activities at the Buckskin Mine are handled according to the procedures described in chapter 2.

3-73


CHAPTER 4: ENVIRONMENTAL CONSEQUENCES
INTRODUCTION This chapter discloses the potential environmental consequences that may result from implementing the proposed action or alternatives to the proposed action for the West Hay Creek LBA. The effect or impact a consequence would have on the quality of the human environment is also discussed. For instance, the consequence of an action may be to greatly increase the number of roads in an area. If the number of roads in an area is increased, opportunities for road-based recreation would be increased but opportunities for primitive recreational activities and solitude would be decreased. Evaluation of the impact would depend on an individual’s (or a group’s) preferred use of that area. If the West Hay Creek LBA tract is leased to the applicant as a maintenance tract under the proposed action, the preferred alternative, or alternative 3, the permit area for the adjacent Buckskin Mine would not have to be amended to include the new lease area before it could be disturbed by mining activities. I Table 4-1 shows the area to be mined and disturbance area for the existing Buckskin Mine (which represents the no action alternative), and how the mine area would change under the proposed action or the action alternatives. Portions of the LBA tract that are contiguous to the existing leases will be disturbed under the current mining plans in order to recover the coal in the existing leases. The environmental consequences of implementing the proposed action or the action alternatives would be similar in nature, but selection of the proposed action would disturb the smallest area. Surface mining and reclamation have been ongoing in the PRB for over two decades. During this time, effective mining and reclamation technologies have been developed and continue to be refined. Mining and reclamation operations are regulated under SMCRA and Wyoming statutes. WDEQ technically reviews all mine permit application packages to ensure that the mining and reclamation plans comply with all state permitting requirements and that the proposed coal mining operations comply with the performance standards of the DOI-approved Wyoming program. BLM attaches special stipulations to all coal leases (appendix D), and there are a number of federal and state permit approvals that are required in order to conduct surface mining operations (appendix A). The regulations are designed to ensure that surface coal mining impacts are mitigated. The impact assessment that follows considers all measures required by federal and state regulatory authorities as part of the proposed action and alternatives.

4-1


TABLE 4-1 
 COMPARISON OF EXISTING AND PROPOSED DISTURBANCE

No Action Alternative (existing leases) Additional lease area (acres) Total lease area1 Increase in lease area Estimated total disturbance area (acres)2 Increase in estimated disturbance area Estimated recoverable coal remaining as of 1/20013 (mmt) Increase in estimated recoverable coal as of 1/2001
1

Proposed Action 838.1 5,787.6 16.9% 5,929 16% 564 30%

Alternative 2 (BLM’s Preferred Alternative) 921.18 5,870.7 18.6% 5,996 18% 574 32%

Alternative 3 869.3 5,818.8 17.6% 5,929 16% 564 30%

--4,949 --5,099 --434 ---

Notes: Includes federal coal leases only; does not include state and private coal within the permit area. The area to be mined plus area disturbed for mine facilities, access roads, haul roads, railroad facilities, and stockpiles. For the proposed action and alternatives, disturbance is estimated based on the portion of boundary outside the current affected area boundary, plus lease acreage area, plus 20 acres for disturbance of fee coal in the N½SW½SE½ of section 17, plus a 500-foot buffer around the northern and western perimeters. The additional disturbance areas are less than the additional lease areas for the action alternatives because portions of the lease areas are included in the existing disturbance area for Buckskin Mine. Extractable coal tons x recovery factor. For the West Hay Creek LBA tract, extractable coal = 145 millions tons (Proposed Action), 160 million tons (Alternative 2) or 145 million tons (Alternative 3) and Triton’s estimated recovery factor of 90% to 92%, based on historic operations. Table 2-1 in chapter 2 contains additional information on extractable coal and recoverable coal.

2

3

DIRECT AND INDIRECT IMPACTS OF THE PROPOSED ACTION Impacts can range from beneficial to adverse, and they can be a primary result of an action (direct) or a secondary result (indirect). They can be permanent, long-term (persisting beyond the end of mine life and reclamation), or short-term (persisting during mining and reclamation and through the time the reclamation bond is released). Impacts also vary in terms of significance. The basis for conclusions regarding significance are the criteria set forth by the Council on Environmental Quality (40 CFR 1508.27) and the professional judgment of the specialists doing the analyses. Impact

4-2


significance may range from negligible to substantial; impacts can be significant during mining but be reduced to insignificance following completion of reclamation. Topography and Physiography Surface coal mining would permanently alter the topography of the LBA tract if it is leased. Topsoil would be removed from the land and stockpiled or placed directly on recontoured areas. Overburden would be blasted and stockpiled or placed directly into the already mined pit and coal would be removed. The existing topography on the LBA tract would be substantially changed during mining. A highwall with a vertical height equal to overburden plus coal thickness would exist in the active pits. If necessary, Hay Creek would be diverted into temporary channels or blocked to prevent pits from being flooded. Typically, a direct permanent impact of coal mining and reclamation is topographic moderation. After reclamation, the restored land surfaces are generally gentler, with more uniform slopes and restored basic drainage networks. The original topography of the West Hay Creek LBA tract ranges from relatively flat to gently rolling hills, with an average slope of about seven percent. As a result, the expected post-mining topography would be gentler and more uniform than the pre-mining topography. Following reclamation, the average surface elevation would be approximately 75 feet lower due to coal removal. (The removal of the coal would be partially offset by the swelling that occurs when the overburden and interburden are blasted and removed.) The land surface would be restored to the approximate original contour or to a configuration approved by WDEQ/LQD when the mining and reclamation permit for the existing mine is revised to include coal removal from the LBA tract. Direct adverse impacts resulting from topographic moderation include a reduction in microhabitats (cutbank slopes) for some wildlife species and a reduction in habitat diversity, especially in slope-dependent shrub communities and associated habitat. A potential indirect impact may be a long-term reduction in big game carrying capacity. A direct beneficial impact of the lower and flatter terrain would be reduced water runoff, which would allow increased infiltration and result in a minor reduction in peak flows. This may help counteract the potential for increased erosion that could occur as a result of higher near-surface bulk density of the reclaimed soils. It may also increase vegetative productivity, and potentially accelerate recharge of groundwater. The approximate original drainage pattern would be restored, and stock ponds and playas would be replaced to provide livestock and wildlife watering sources. These topographic changes would not conflict with regional land use, and the postmining topography would adequately support anticipated land use. These impacts are occurring on the existing Buckskin Mine coal leases as coal is mined and mined-out areas are reclaimed. Under the proposed action or the action alternatives, the approximate area that would be permanently topographically changed would increase as shown in table 4-1.

4-3

Geology and Minerals The estimated coal, overburden, and interburden thicknesses for the existing Buckskin Mine lease area are compared to the estimated coal, overburden, and interburden thickness for the West Hay Creek LBA tract as applied for, and the action alternatives in table 4-2. Results are similar between proposed action and alternatives because of the similarity in boundary configurations. These acreage figures represent the estimated area of actual coal removal under the proposed action and the action alternatives. TABLE 4-2 COMPARISON OF COAL, OVERBURDEN, AND INTERBURDEN THICKNESSES

No Action Alternative (existing leases) Average Overburden Thickness (feet) Average Coal Thickness (feet) Average Interburden Thickness (feet) 198

Proposed Action (as applied for LBA tract) 204

Alternative 2 (BLM’s Preferred Alternative) 195

Alternative 3 205

105

106

105

106

22

15

18

15

The replaced overburden and interburden would be a relatively identical (compared to the premining layered overburden and interburden) and partly recompacted mixture averaging about 230 feet thick under the proposed action and alternatives. Approximately 130 million additional tons of coal would be recovered under the proposed action, compared to 140 million tons under the preferred alternative or 130 million tons under alternative 3. The geology from the base of the coal to the land surface would be permanently changed on the LBA tract under the proposed action or the alternatives. The subsurface characteristics of these lands would be radically changed by mining. The replaced overburden and interburden (backfill) would be a mixture of the geologically distinct layers of sandstone, siltstone, and shales that currently exist. The resulting physical characteristics would also be significantly altered. Drilling and sampling programs are conducted by all mine operators to identify overburden material that may be unsuitable for reclamation (material that is not suitable for use in reestablishing vegetation or that may affect groundwater quality due to high concentrations of certain constituents such as selenium or adverse pH levels). As part

4-4


of the mine permitting process, each mine operator develops a management plan to ensure that this unsuitable material is not placed in areas where it may affect groundwater quality or revegetation success. Each mine operator also develops backfill monitoring plans as part of the mine permitting process to evaluate the quality of the replaced overburden. These plans are in place for the existing Buckskin Mine and would be developed for the West Hay Creek LBA tract if it is leased. During mining, other minerals present on the tract could not be developed, but some could be developed after mining. There are no conventional oil and gas wells within the LBA tract. Therefore, options such as plugging during mining and reestablishing after mining or establishing a value for the remaining reserves are not an issue at this time. Coal mining affects CBM development by removing the coal in which the CBM resource occurs. CBM resources that are not recovered before mining would be irretrievably lost when the coal is removed. Seam dewatering in advance of mining also draws down coal seam water levels and reduces the hydrostatic pressure, which may allow CBM to desorb and escape from the coal bed. As discussed in chapter 3, there were six active wells and three shut-in wells within the LBA tract itself as of April 9, 2004. Three additional wells were permitted to drill or had started drilling for CBM as of April 9, 2004. CBM could be produced from the existing wells, and other wells could be drilled during the time it takes to lease and permit the LBA tract and, on a case by case basis, until mining activity approaches each well. For the purposes of this EIS, the BLM’s Wyoming State Office, Reservoir Management Group (RMG) reviewed the existing CBM resource and production data in this area as of October 2002. A limited amount of production data was available at that time to estimate well life and reserves for existing or future CBM wells in the West Hay Creek LBA area. Several wells, including some located inside the West Hay Creek LBA tract in section 18, T. 52 N., R. 72 W., had enough production history to support production decline curve analysis. These wells were used to develop a model production decline curve which can be used for generalized production and reserve forecasts. The model decline data suggest that typical CBM wells located in much of this area might be expected to ultimately recover approximately 132,000 mcf of producible reserves. A typical economic well life might be approximately six years. Because of the complexity of CBM occurrence and reservoir character and performance, along with the uncertain extent of seam dewatering due to mining and CBM production, these forecasts may overestimate CBM resources within the LBA tract. RMG's reservoir analyses show that mine dewatering has resulted in a "regional" lowering of the water table in the mined seam(s). Hydrostatic pressure within the coal seam has declined near the mines. Where the hydrostatic pressure has declined sufficiently, CBM gas has been allowed to desorb from these coals and escape from the reservoir(s). As a result, the CBM reservoir near the active mine is probably depleted relative to the original/undisturbed reservoir encountered farther west. Decline curve analysis based solely on the wells located in section 18, where dewatering has occurred, project recoverable reserves of approximately 54,800 mcf per well and an approximate 2.5-year

4-5


economic well life. While still economic, these reserves are substantially less than the projected reserves for other parts of the township. The lower forecasts may be most representative of the CBM reserves within the West Hay Creek LBA. Based on the reserve estimates derived from this decline curve analysis, the entire LBA parcel could be expected to contain an estimated 1, 205,732 mcf of producible reserves in twentythree 40-acre spacing units (under the preferred alternative). CBM resources or initial gas in place can also be estimated using volumetric methods. The RMG has prepared detailed CBM resource analyses in support of coal leasing actions and other program activities at other localities in the PRB mining area. Coal seam gas-in-place depends on a number of factors, including coal rank, coal lithology and, significantly for the purposes of these analyses, methane adsorptive capacity of the coals in question. Methane adsorption analyses describe the volume of methane that can be adsorbed by a specific sample of coal across a varying range of temperature and pressure conditions. This pressure/volume relationship can be represented by an equation and curve known as an adsorption isotherm, which can be used to predict gas content based on pressure. Although gas content can vary widely from sample to sample depending on other properties of the coal, the adsorption data provide a generalized means of predicting coalbed methane adsorptive capacity, or potential initial gas in place, based on pressure. The RMG has developed preliminary CBM reservoir models based on these principles to estimate CBM gas content and in-place resources in the mining areas and elsewhere in the PRB. These analyses use a variety of data including methane adsorption data collected cooperatively by BLM's RMG and the USGS, coal geology from publicly available coal drill holes, and hydrologic data from groundwater monitoring wells reported to the public by the Gillette Area Groundwater Monitoring Organization (GAGMO). Only publicly available data sources were used to conduct this analysis. Some uncertainty exists in the GAGMO water monitoring data and the estimated hydrostatic pressures in this area because specific premining water levels were not available. GAGMO estimated 1980 water levels in this area from an unspecified 1980 water level map (reference not provided) rather than actual monitoring well measurements. As a result, the initial pressures based on the 1980 water level, and the derived change from 1980 to 2000 could be in error. The GAGMO data for the year 2000 were used in this analysis, although groundwater drawdown has continued since that time. These uncertainties notwithstanding, the data and model were used to calculate and map estimated coal gas content (in standard cubic feet per ton) across T. 52 N., R. 72 W. and the West Hay Creek LBA area. Premining (1980) and current (year 2000) calculations and maps were made to evaluate the original and current reservoir conditions and the effects over time. Average current gas content was estimated for the LBA tract from the 2000 gas content map. An estimate of CBM gas-in-place was prepared using the coal reserves (in tons) reported in the LBA application and the estimated coal gas content (standard cubic feet per ton) for the tract.

4-6

The weighted average current gas content for the LBA parcel was estimated to be 11.74 scf/ton and average initial gas content in 1980 was estimated to be 13.65 scf/ton. The proposed LBA parcel contains an estimated 145 million tons of coal in place under the proposed action (160 million tons of coal under the Preferred Alternative). Based on these values, total current CBM gas-in-place for the LBA tract is estimated to be 1,702,300 mcf under the proposed action (1,878,400 mcf under the Preferred Alternative). Initial (1980) gas in place is similarly estimated to have been 1,979,250 mcf under the proposed action (2,184,000 mcf under the Preferred Alternative. This estimate compares favorably with the recoverable reserves estimate using decline curve analysis. However, the reserves projected by both methods are estimates and are subject to a number of remaining uncertainties in assessing CBM resources. Implicit in this analysis is the observation that coal mining and mine-related dewatering affects CBM resources and development potential. Water production from the coal seams is required to reduce hydrostatic pressure in the coal seams so that methane can desorb from the coals for production. Mine-related dewatering of the coal seams has the same effect of reducing hydrostatic pressure and methane desorbtion. The preliminary CBM reservoir models indicate that depletion of the hydrostatic pressures and methane resources has occurred adjacent to mining areas since not long after mining began. Based on the methane adsorption/pressure analyses, the preliminary model shows that 10% to 20% of the original in-place CBM resources in the West Hay Creek LBA area have been depleted since 1980. This effect will be enhanced as mining proceeds toward the LBA area and will continue whether or not the LBA is leased or mined. The short productive life inferred for CBM wells in the LBA suggests that, if wells were completed and produced in the near future, substantial portions of the remaining CBM reserves could be produced before mining occurs within the LBA. Soils Under the currently approved mining and reclamation plan, approximately 5,099 acres of soil resources will be disturbed in order to mine the coal in the existing leases at the Buckskin Mine (table 4-1). Disturbance related to coal mining would directly affect an additional 830 acres of soil resources on and adjacent to the LBA tract under the proposed action, around 897 acres under the preferred alternative, or up to 830 acres under alternative 3. The reclaimed soils would have different physical, biological, and chemical properties than the premining soils. They would be more uniform in type, thickness, and texture. Average topsoil thickness would be 14 to 18 inches across the entire reclaimed surface. Soil chemistry and soil nutrient distribution would be more uniform, and average topsoil quality would be improved because soil material that is not suitable to support plant growth would not be salvaged for use in reclamation. This would result in more uniform vegetative productivity on the reclaimed land. The replaced topsoil would support a stable and productive vegetation community adequate in quality and quantity to support the planned postmining land uses (wildlife habitat and rangeland). 4-7

Specific impacts to soil resources would include an increase in the near-surface bulk density of the reclaimed soil resources. As a result, the average soil infiltration rates would generally decrease, which would increase the potential for runoff and soil erosion. Topographic moderation following reclamation would potentially decrease runoff, which would tend to offset this potential increase in runoff due to decreased soil infiltration capacity. The change in soil infiltration rates would not be permanent because revegetation and natural weathering action would form new soil structure in the reclaimed soils, and infiltration rates would gradually return to premining levels. The reclaimed landscape would contain stable landforms and drainage systems that would support the postmining land uses. Reconstructed stream channels and floodplains would be designed and established to be erosionally stable. Direct biological impacts to soil resources would include a short-term to long-term reduction in soil organic matter, microbial populations, seeds, bulbs, rhizomes, and live plant parts for soil resources that are stockpiled before placement. Sediment control structures would be built to trap eroded soil; revegetation would reduce wind erosion. Soil or overburden materials containing potentially harmful chemical constituents (such as selenium) would be specially handled. These measures are required by state regulations and are considered part of the proposed action and alternatives. Air Quality This section deals with how the air quality impacts related to mining the LBA tract would be expected to differ from air quality impacts associated with existing approved mining in this area. As discussed in chapter 1, BLM does not authorize mining by issuing a lease for federal coal, but mining the West Hay Creek LBA tract is considered to be a logical consequence of leasing the tract. Thus, it is actually the impacts of mining on ambient air quality that are addressed in this section. The impacts to air quality of mining the tract in conjunction with other activities in the area are addressed in the “Cumulative Impact” section” in this chapter. Regulatory Background Air pollution impacts are limited by local, state, tribal, and federal air quality regulations and standards, and implementation plans established under the federal CAA and the Clean Air Act amendment (CAAA) of 1990. In Wyoming, air pollution impacts are managed by WDEQ/AQD under the WAQSR and the EPA approved state implementation plan. Regulations applicable to surface coal mining may include NAAQS/WAAQS, PSD, NSPS, and Federal Operating Permit Program (Title V). A company initiating a project must go through the WDEQ/AQD new source review permitting process to obtain either a construction or modification permit or a permit waiver. The permitting process ensures sources comply with the standards and regulations stated above.

4-8

The Federal CAA requires the EPA to identify NAAQS to protect the public health and welfare. Currently the EPA has established NAAQS for six pollutants (also known as “criteria pollutants”). The State of Wyoming has also established ambient air quality standards (WAAQS) for those pollutants that are as stringent as or more stringent than the NAAQS, and are enforceable under WAQSR. Table 4-3 shows the NAAQS and the WAAQS. During the new source review permitting process applicants must demonstrate compliance with these standards; this can be done by modeling or other methods approved by the WDEQ/AQD administrator. The “Air Quality” section in chapter 3 contains more information. The PSD regulation is intended to prevent deterioration of air quality in areas that are in attainment with the NAAQS. This is achieved by establishing increments, or maximum allowable increases in the ambient concentration, of PM10, NO2 and SO2 for Class I and Class II areas. A proposed new point source that has the potential to emit more than 250 tpy of any criteria pollutant (or a listed source that has the potential to emit 100 tpy or more) must undergo a regulatory PSD increment consumption analysis during the WDEQ-AQD permitting process as well as BACT review. Modifications to existing major PSD sources are subject to PSD regulation if the modification results in a significant net emissions increase of any regulated pollutant. The net emissions increase is figured by the modification plus permits issued after a baseline date. In the PRB, the PM10 baseline year is 1997, the NO2 baseline year is 1988. There are currently no coal mines within Wyoming that have been subject to PSD review in the permitting process (refer to the “Air Quality” section in chapter 3). This NEPA analysis presents the modeled impacts for the applicant mine in terms of pollutant concentration. Any comparisons with the PSD increment do not constitute a regulatory PSD analysis. The modeling results are presented strictly for informational purposes. The National Source Performance Standards (NSPS) were established by the CAA and adopted by reference into the WAQSR. The standards, which are for new or modified stationary sources, require the sources to achieve best demonstrated emission control technology. The NSPS apply to specific processes which are listed in the standards. For surface coal mining in the PRB this includes certain activities at coal preparation plants. The requirements applicable to these existing units can be found in 40 CFR Part 60, Subpart Y (Standards of Performance for Coal Preparation Facilities). All sources being permitted within Wyoming must utilize BACT, not just sources subject to PSD review. During the new source review permitting process, a BACT analysis is performed for the proposed construction or modification. The BACT process evaluates possible control technologies for the proposed action on the basis of technical feasibility and economic reasonability. Decisions are made on a case by case basis of which technology to apply and are mandated through the permit. The “Control Measures” section contains BACT measures that have been applied at coal mines. Major sources of air pollutants must obtain an operating permit from WDEQ/AQD Operating Permit Program (also known as Title V). A “major source” is, generally, a

4-9


TABLE 4-3 


FEDERAL AND STATE AMBIENT AIR QUALITY STANDARDS FOR CRITERIA POLLUTANTS

a

Criteria Pollutant

Ozone (O3)

Carbon Monoxide (CO)

Oxides of Nitrogen (NOx) as Nitrogen Dioxide (NO2) Sulfur Dioxide (SO2) 60 Pg/m3 (20 ppbv) 260 Pg/m3 (100 ppbv) 1,300 Pg/m3 (500 ppbv) 150 Pg/m3 ---80 Pg/m3 (30 ppbv) 365 Pg/m3 (140 ppbv) ---150 Pg/m3 150 Pg/m3

Averaging Period 1-hour b 8-hour d 8-hour e 1-hour Annual

Wyoming Standards a Concentration 120 ppbv (235 Pg/m3) 80 ppbvc (157 Pg/m3) 9 ppmv (10 mg/m3) 35 ppmv (40 mg/m3) 100 Pg/m3 (50 ppbv) Primary Concentration 120 ppbv (235 Pg/m3) 80 ppbv (157 Pg/m3) 9 ppmv (10 mg/m3) 35 ppmv (40 mg/m3) 100 Pg/m3 (53 ppbv)

Federal Standards b Secondary Concentration Same as primary standards ---------Same as primary standards ------1,300 Pg/m3 (500 ppbv) Same as primary standards ----

Particulate Matter d10 Microns in Aerodynamic Diameter (PM10) 50 Pg/m3 65 Pg/m3 50 Pg/m3 65 Pg/m3

Annual d 24-hour d 3-hour d 24-hour 24-hour (based on the 99th percentile averaged over 3 years) Annual Arithmetic Mean

Particulate Matter d2.5 Microns in Aerodynamic Diameter (PM2.5)

Same as primary standards ----

4-10


Lead (Pb) Hydrogen Sulfide

---15 Pg/m3 15 Pg/m3 Same as primary standards 1.5 Pg/m3 1.5 Pg/m3 e ------Primary 70 Pg/m3 f ------Secondary 40 Pg/m3 Suspended Sulfates ------250 Pg/m3 ------500 Pg/m3 Fluorides in Ambient Air ------3 Pg/m3 ------1.8 Pg/m3 ------0.5 Pg/m3 ------0.4 Pg/m3 a Equivalent units given in parentheses are based on a reference temperature of 25ºC and a reference pressure of 760 mm mercury. Measurements of air quality are corrected to a 
 reference temperature of 25ºC and a reference pressure of 760 mm mercury (1,013.2 millibar); ppmv and ppbv in this table refer to parts per million by volume and parts per billion 
 by volume, respectively, or micro-moles of pollutant per mole of gas.
 b The 8-hour ozone standard would be implemented once an area achieves attainment for the 1-hour standard. 
 c The 8-hour ozone standard is met when the average of the annual fourth highest daily maximum 8-hour average ozone concentration is less than or equal to .008 ppm (80 ppbv). 
 d A violation occurs on the second exceedance during a calendar year.
 e Not to be exceeded more than two times per year.
 f Not to be exceeded more than two times in five consecutive days.


24-hour (Based on the 98th percentile averaged over 3 years) Annual Arithmetic Mean (averaged over three years) Calendar quarter ½ hour ½ hour Annual 30-day 12 hours 24 hours 7 days 30 days

facility that emits over 100 tpy of any criteria pollutant, 25 tpy of combined hazardous air pollutants (HAPs) or 10 tpy of an individual HAP. The operating permit compiles all applicable air quality requirements for a facility and specifies compliance assurance in the form of testing, monitoring, reporting and recordkeeping requirements. Currently, the Buckskin Mine does not have a Title V operating permit. A new mine or a modification to an existing coal mine must be permitted by WDEQ/AQD under WAQSR chapter 6, section 2 and must demonstrate that they will comply with all applicable aspects of WAQSR. The following summarizes the construction/modification permitting analysis for surface coal mines. When a company decides to construct a new surface coal mine or modify operations at an existing surface coal mine that will cause an increase in pollutant emissions, they must submit an application, which is reviewed by WDEQ/AQD new source review staff and the applicable WDEQ/AQD field office. Typically, a company will meet with the WDEQ/AQD prior to submitting an application to determine issues and details that need to be included in the application. A surface coal mining application will include the standard application, BACT measures that will be implemented, an inventory of point and fugitive sources in the area, and modeling analyses. BACT must be used for all sources being permitted within Wyoming. WAQSR chapter 6, section 2(b) (v) lists BACT measures to be used (but not limited to) at large mining operations. An applicant uses these and other BACT measures in the development of their own PM10 and NO2 point and fugitive source inventories (see chapter 3 for a discussion of mining BACT measures). During the application review WDEQ/AQD can also require further control measures through the BACT review process. For the modeling analyses, an applicant must put together an emission inventory of PM10 from their facility and surrounding sources. For PM10 both point sources and fugitive dust emissions are quantified. The emissions are based on the facility’s potential to emit in the highest production year. The applicant also examines the surrounding coal facilities and their previous air quality permits to determine the worst case emission year for those facilities, based on potential to emit. They will then choose two or more years for modeling analyses. Coal mines in the PRB are also required to quantify NO2 emissions from their facility. Dispersion modeling is required to demonstrate compliance with the ambient standard. Potential emissions from diesel powered mining equipment and blasting are modeled. Locomotive emissions are also quantified and included in the NO2 modeling analysis. Long term PM10 modeling is conducted for the permit application to demonstrate compliance with the annual PM10 standard. For both point and area sources, the Industrial Source Complex Model-Long Term version 3 (ISCLT3) is used. A background of 15µg/m3 is used to represent PM10 concentration in the PRB prior to operation of coal mine sources. The modeling results are added to the background and compared to the annual standard. Short-term PM10 modeling is not required by WDEQ-AQD, nor does WDEQ-AQD

4-11


consider it to be an accurate representation of short term impacts. The CAAA (section 234) mandates the administrator of the EPA to analyze the accuracy of short-term modeling in regard to fugitive particulate emissions from surface coal mines. A June 26, 1996 letter from EPA Region VIII to Wyoming state representatives details the results of a study where the short term model failed to meet evaluation criteria and tended to overpredict 24-hour impacts of surface coal mines. The memorandum of agreement of January 24, 1994 between EPA Region VIII and the state of Wyoming allows WDEQ­ AQD to conduct monitoring in lieu of short-term modeling for assessing coal miningrelated impacts in the PRB. This regulatory procedure remains in place and in effect. Ambient particulate monitoring is required of each coal mine through conditions of their respective permits. The application is reviewed by WDEQ/AQD to determine compliance with all applicable air quality standards and regulations. This includes review of compliance with emission limitations established by NSPS, review of compliance with ambient standards through modeling analyses, and establishment of control measures to meet BACT requirements. The WDEQ/AQD proposed permit conditions are placed on public notice for a 30-day review period after which a final decision on the permit is made. In order to demonstrate that mining operations will comply with all applicable aspects of the WAQSR, the Buckskin Mine has conducted air quality modeling analyses as required by WDEQ/AQD. WDEQ/AQD air quality permit analyses use a background PM10 concentration of 15 µg/m3 and 20 µg/m3 for NOx. These concentrations represent estimated background ambient air quality in the area prior to operation of the coal mine sources. Potential emissions corresponding to the maximum production level from the coal mines in the area are then added to this background concentration. The resulting particulate levels are then compared to the average annual PM10 standard of 50 µg/m3 and the average annual NOx standard of 100 µg/m3 to determine compliance with the annual NAAQS. This constitutes a demonstration of compliance with the “long-term” or annual NAAQS. In conducting an analysis of air quality impacts in the PRB for the Wyoming and Montana BLM, Argonne National Laboratory used a background concentration of 17 µg/m3 for PM10 and 16.5 µg/m3 for NOx for the entire PRB (table 3­ 2). These background concentrations are based on recently monitored values in Gillette, Wyoming which include all sources operating at the time the value was measured, including existing coal mine operations located around Gillette. The Argonne analysis then inventoried and modeled impacts from sources constructed after the date of the monitored background concentration. In the case of the surface coal mines, the Argonne National Laboratory analysis modeled impacts from the projected production increases at each coal mine. The Buckskin Mine performed dispersion modeling using the ISCLT3 program to model impacts from point and area sources.

4-12


Existing Air Quality Issues As discussed in chapter 3, the major types of emissions that come from surface coal mining activities are particulates from mining activities such as blasting and hauling coal and overburden, tailpipe emissions from large mining equipment, and gaseous clouds containing NO2 that are produced by overburden blasting. Surface coal mines in the Wyoming PRB have not been subject to PSD requirements. Only some fraction of the mine emissions included in the WDEQ/AQD air quality permit analyses consume increment based on permits in place in the baseline year of 1997. As a result, the concentrations predicted by the WDEQ/AQD air quality permit analyses should not be compared to PSD increments. Public exposure to surface mining operations is most likely to occur along publicly accessible roads and highways that pass through the area of the mining operations. Occupants of dwellings in the area could also be affected. Although this is a sparsely populated area, there are several occupied dwellings in the area. Roads, highways, and currently occupied dwellings in the vicinity of the West Hay Creek LBA tract are shown in figure 3-17. Particulates include solid particles and liquid droplets that can be suspended in air. The “Air Quality” section of chapter 3 describes historical, regional, and site-specific particulate levels, including recently occurring exceedances of the 24-hour PM10 standard detected by monitors at several mines in the Wyoming PRB. This includes one exceedance at the Buckskin Mine, the applicant for the West Hay Creek LBA tract. Chapter 3 also discusses the control measures that WDEQ/AQD has or may require to reduce PM10 levels. Particulates, especially fine particles, have been linked to numerous respiratory-related illnesses and can adversely affect individuals with pre-existing heart or lung disease. They are also a major cause of visibility impairment in many parts of the US. While individual particles cannot be seen with the naked eye, collectively they can appear as black soot, dust clouds, or gray hazes. Gaseous NO2 is reddish-brown, heavier than air, and has a pungent odor. It is highly reactive and combines with water to form nitric acid and nitric oxide. Nitrogen dioxide gas may cause significant toxicity because of its ability to form nitric acid with water in the eye, lung, mucous membranes, and skin (EPA 2001). Acute exposure may cause death by damaging the pulmonary system. Chronic or repeated exposure to lower concentrations of NO2 may exacerbate pre-existing respiratory conditions or increase the incidence of respiratory infections. (EPA 2001). NO2 is a product of incomplete combustion at sources such as gasoline and diesel burning engines or from mine blasting activities. The incomplete combustion during blasting activities may be caused by wet conditions, incompetent or fractured geological formations, deformation of bore holes, and other factors. Generally, NOx emissions are

4-13


more prevalent at operations that use the cast blasting technique. The combination of these factors makes it difficult to eliminate NOx production. (personal communication, Rick Chancellor, 6/16/2003). Efforts to eliminate NOx production have included use of different blasting agents, different blends of blasting agents, different additives, different initiation systems and sequencing, borehole liners, and smaller cast blasts. Using these techniques, the mines have been able to reduce, but not eliminate, the production of NOx during blasting. The Eagle Butte Mine has almost eliminated NOx production, while the North Antelope/Rochelle Complex has had success in eliminating NOx in over 75% of their cast blasting by using borehole liners and changing their blasting agent blends (personal communication, Rick Chancellor, 6/16/2003). Several of the mines in the Wyoming PRB have undertaken voluntary blasting restrictions to avoid NOx impact to the public. WDEQ has required several mines, including Antelope, North Antelope/Rochelle, Black Thunder, Belle Ayr, Eagle Butte, and Wyodak, to stop traffic on public roads during blasting due to concerns with fly rock and the “startle factor.” Two mines in the Wyoming PRB, Black Thunder and Eagle Butte, currently have blasting restrictions in their permits to address NOx. These voluntary and required restrictions are described further in chapter 3. The WMA, with participation from the WDEQ/LQD and WDEQ/AQD, conducted a study in August 1999 and completed in April 2000 because of the concern with the health risk that could be potentially associated with short-term exposure to NOx. The study involved collecting 15-minute average NO2 concentrations in areas that are near PRB coal mining operations and that would be accessible to the public. It was designed to help evaluate potential exposure of the public to NO2 emissions resulting from blasting activity at surface coal mines. Six monitor locations were selected “based on their proximity to mining activity and accessibility to the public. Roads adjacent to mining activity were felt to be areas where the public exposure would most likely occur. Locations were also chosen based on dominant wind direction, and to represent areas having the greatest chance of being impacted by several mining operations” (WMA 2000). A brief summary of the findings follows. x	 Approximately 95% of the valid data points were readings of 0 ppm (0 µg/m3) NO2. x	 The maximum 15-minute average valid values observed for each of the six monitors ranged from 0 to 1.65 ppm (0-3,102 µg/m3) NO2. x	 Where readings greater than 0 ppm did occur there was a strong correlation between NO2 readings and temperatures. This correlation indicates that the NO2 readings may have been inflated due to temperature considerations.

4-14

The Black Thunder Mine also conducted a study designed to provide information on safe setback distances for blasting activities at that mine (TBCC 2002). Monitors for that report were located close to blasts in order to collect data for a modeling project. The monitors were located within the mine permit boundary in areas that are not and would not be accessible to the public during mining. These areas are also cleared of employees during blasting activities. The measured NOx levels ranged from nondetectable to 21.4 ppm. The highest value was measured 361 feet from the blast. There are no NAAQS for NO2 for periods shorter than one year, but there is concern about the potential health risk associated with short-term exposure to NO2 from blasting emissions. According to EPA “…the exact concentrations at which NO2 will cause various health effects cannot be predicted with complete accuracy because the effects are a function of air concentration and time of exposure, and precise measurements have not been made in association with human toxicity. The information that is available from human exposures also suggests that there is some variation in individual response.” (EPA 2001). The National Institute of Occupational Safety and Health (NIOSH), Occupational Safety and Health Administration (OSHA), and EPA have identified the following short-term exposure criteria for NO2: •	 NIOSH’s recommended “immediately dangerous to life and health” level is 20 ppm (37,600 Pg/m3); •	 EPA’s “significant harm level,” a one-hour average, is 2 ppm (3,760 µg/m3);ҏ •	 OSHA’s “short-term exposure limit,” a 15-minute time-weighted average developed for workers, is 5 ppm (9,400 Pg/m3, which must not be exceeded during any part of the workday, as measured instantaneously); •	 NIOSH’s recommendation for workers is a limit of 1 ppm (1,880 µg/m3) based on a 15-minute exposure that should not be exceeded at any time during the workday; and •	 EPA recommends that concentrations not exceed 0.5 ppm (940 µg/m3) for a 10­ minute exposure to protect sensitive members of the public (EPA 2003). There are no state or federal rules that require the public or employees to stay back a certain distance from mine blasting operations in order to limit their exposure to NO2. According to WDEQ/LQD, mitigation measures that are currently being implemented in the Wyoming PRB are not dependent on a numerical standard, but are administrative controls designed to prevent NO2 from reaching receptors. At this time, only the Eagle Butte Mine is required to use a set back distance that is based on a numerical exposure limit. (personal communication, Rick Chancellor, 6/16/2003). An administrative ruling by the Wyoming EQC has approved a 2,500-foot setback of blasting operations from the southern boundary of the Eagle Butte Coal Mine when prevailing winds are blowing toward the mine’s downwind neighbors (Casper Star Tribune 2003). The Eagle Butte Mine is located north of Gillette, Wyoming, and south of the Buckskin Mine. Impacts to the particulate annual ambient air quality standard and the NO2 annual ambient air quality standard are discussed in the following sections. Regional air quality impacts are evaluated in the “Cumulative Impact” section in chapter 4 of this EIS.

4-15


Impacts of the Proposed Action and Action Alternatives Air quality impacts from the proposed action or action alternatives would not be expected to be substantially different. If the West Hay Creek LBA tract is not leased (the No Action alternative), post-2002 coal production is expected to be 25 mmtpy for about 12 years. As shown on table 2-1 in chapter 2, if the West Hay Creek LBA tract is leased and mined as proposed, Triton estimates that annual production at the Buckskin Mine would be 25 million tons for an additional five to six years under the proposed action and action alternatives. In 2001 the mine produced approximately 19.1 million tons; in 2002, the mine produced approximately 18.3 million tons. WDEQ/AQD issued an air quality permit (MD-707) for the Buckskin Mine on February 15, 2002. This air quality permit authorizes a maximum coal production rate of 27.5 mmtpy. The permit is based on the results of computer modeling that predicted no violation of air quality standards and demonstrated that emissions would have no significant cumulative effect when added to emissions from neighboring sources (Triton 2002). Figure 4-1, which was prepared using the MD-707 air quality modeling analysis, illustrates the maximum modeled annual average PM10 concentrations in 2005, which is the predicted worst-case scenario year based on maximum particulate emissions from the Buckskin Mine and adjacent emission sources. Figure 4-1 indicates that at a coal removal rate of 27.5 mmtpy, the highest predicted annual mean PM10 concentration is 36.90 µg/m3 (including 15 µg/m3 background concentration) at the model receptor location shown. The predicted PM10 concentrations at all other model receptor locations are less than this value. Short-term concentrations above 50 µg/m3 are predicted in the active pit areas. The state standard requires that annual average particulate concentrations above 50 µg/m3 not be exceeded at a mine’s permit boundary. The MD-707 application presented an emissions inventory for all sources within the Buckskin Mine, from neighboring sources (Dry Fork Mine, Eagle Butte Mine, Rawhide Mine, Wyodak Mine, ENCOAL, and the Wyodak and Neil Simpson 1 and 2 power plants) and proposed neighboring sources (Two Elk Unit 1 power plant and ENCOAL power plant) for each year of mine life. These sources were input to the dispersion modeling analysis to determine potential air quality impacts in the vicinity. Several proposed projects discussed elsewhere in this EIS (DM&E Railroad expansion, Wygen II power plant, Two Elk Unit 2, and the Middle Bear power plant) were not included in the air quality model’s emissions inventory. WDEQ/AQD approved the list of proposed sources at the time of modeling. A surface coal mine is not a named facility under Wyoming’s PSD regulations. Therefore, it is not considered a “major emitting facility” unless it has the potential to emit 250 tons or more per year of any regulated pollutant. Fugitive dust emissions are not considered in determining potential to emit. Because the maximum annual mass emission rate of PM10 or NOX from all point sources at the Buckskin Mine will be less

4-16


12

R. 73 W.

R. R.
 72 W.

7

8

9

10 10


11

13

18 18


17 17


16

15

14 14


24 24


19

20 20


21

22

23 23


MAXIMUM PM10
 AT BUCKSKIN MINE
 LNCM BOUNDARY 
 = 36.90 µg/m 3

25 25	 30 29 29
 28 28
 27 26 26


36 36	

31

32 32


33 33


34

35 35


T. 52 N. T. 51 N.

T. 52 N. T. 51 N.

1

6 6	

5

4

3

2 2


12

R. 73 W.

R. 72 72
 W.

7

8

9

10

11 11


LEGEND

BUCKSKIN MINE PERMIT BOUNDARY
 WEST HAY CREEK LBA TRACT
 ANALYSIS AREA
 BUCKSKIN MINE LANDS NECESSARY TO CONDUCT MINING (LNCM) BOUNDARY
 AREA SOURCE
 LINE SOURCE
 POINT SOURCE

Figure 4-1.	

Modeled Maximum PM 10 Concentration at Buckskin Mine LNCM Boundary, Year 2005 
 Worst-Case Scenario Resulting from 27.5 Million Tons Per Year of Coal Production from
 Existing Leases.


4-17


than 250 tons per year (NOX is negligible, and PM10 from all point sources is 88.3 tons per year), the mine was not subject to an increment analyses under PSD regulations. PM10 and TSP data collected from 1995 through 2001 at air quality monitoring stations operated by the Buckskin Mine are shown in figure 3-7 in chapter 3. These data indicate that the average annual TSP levels at both sites did not exceed the TSP standard from 1995 through 1999, nor was the current PM10 standard exceeded through 2001. On August 16, 2002, there was one exceedance of the PM10 24-hour standard at one of the Buckskin Mine’s air quality monitoring sites. This exceedance has been flagged by WDEQ/AQD in the AIRS database as having been impacted by winds in excess of 40 mph during the collection period. Modeling and permit approval are done with the understanding that BACT will be applied. For the Buckskin Mine, BACT includes watering and/or chemical stabilization on haul roads and access roads; watering topsoil removal and laydown areas; minimizing overshoot and stemming in blasting areas; minimizing fall distance in overburden and coal removal areas; prompt and contemporaneous reclamation; stilling sheds for coal truck dumps; and covered conveyors, silos, water sprays, baghouses, and other dust control systems for coal handling and storage. If the West Hay Creek LBA tract is leased and mined as proposed, the average annual PM10 levels are expected to remain within the current air quality standards with the coal production projected to occur under either of the alternatives based on the Buckskin Mine’s air quality monitoring information and modeling analyses summarized above. Overburden thickness, coal thickness, and interburden thickness in the LBA tract under the proposed action and action alternatives are similar to the existing mine, as shown in table 4-1. Thus, there would not be increased dust emissions related to coal blasting and removal activities. Haul distances from the pit to the crushing facilities would be increased, so dust emissions may increase in proportion to the increased haul distance. Fugitive dust and gaseous pollutant emissions would be expected to remain within levels allowed by the current permit. If Triton acquires the LBA tract, they would mine it and their existing leases using basically the same equipment with similar BACT emission controls. The PM10 concentrations predicted along the edges of the existing Buckskin Mine permit area may be shifted northward depending on the model year selected. If the tract is leased as proposed, mining at the Buckskin Mine would be extended from five years (under the proposed action and alternative 3) to six years (under the preferred alternative). As a result, there would be a continuation of the impacts that are occurring as a result of the currently permitted mining operations. If Triton acquires the West Hay Creek LBA tract, they would be required to modify their WDEQ/AQD air quality permit to include the LBA tract before it could be mined. If the projected maximum production rate remains at or below the modeled rate of 27.5 mmtpy and emissions from all considered sources do not increase, additional modeling may or may not be required for the revision. As discussed in chapter 3, NO2 is created by some of the emission-producing activities in the vicinity of the LBA tract. To date, there have been no complaints to the mine or

4-18


the WDEQ about clouds produced from blasting activities at the Buckskin Mine. Based on the size and nature of their blasting, the WDEQ has not directed the mine to take any steps to mitigate or prevent blasting clouds. Several mines have been directed by WDEQ to take steps designed to mitigate the effects of NO2 emissions occurring from overburden blasting. The steps that may be required include: notifying the public (in the form of warning signs along public roadways for example); temporarily closing public roadways near a mine during and after a blast; establishing safe set-back distances from blasting areas; prohibiting blasting when wind direction is toward a neighbor; prohibiting blasting during temperature inversions; establishing monitoring plans; estimating NO2 concentrations; and developing blasting procedures that will protect public safety and health. The impacts to air quality under alternative1, the No Action Alternative, would be the same as impacts of the currently permitted operation. Triton anticipates that coal production would remain unchanged from projected 2004 levels if they acquire the West Hay Creek LBA tract. Therefore, current mining techniques and blasting procedures would be expected to continue. The impacts to air quality under the proposed action and action alternatives would be similar to the impacts under the No Action Alternative, but they would be extended by five to six years. If the West Hay Creek LBA tract is leased as a maintenance tract, the blasting processes and required mitigation measures would be reviewed when the mining and reclamation permit is amended to include the new lease. At that point, the blasting plan would be reviewed and modified to incorporate the procedures and protection measures that are in effect at that time. Air quality impacts resulting from, or associated with, mining operations would be limited primarily to the operational life of the mine. If the West Hay Creek tract is leased and mined as proposed, the elevated levels of particulate matter in the vicinity of the mining operations would be extended, as would the elevated concentrations of gaseous emissions due to fuel combustion. Compliance with all state and federal air quality standards would be maintained. As with current operations, mining would occur near Wyoming 14-16, the Collins Road and the McGee Road making dust visible to the public. The required mitigation measures would minimize this impact. The nearest mandatory Class I area is Wind Cave National Park, located approximately 115 miles east of the LBA tract. The Northern Cheyenne Reservation in southern Montana, located approximately 80 miles northwest of the LBA tract, is a triballydesignated Class I area. Mines are not considered to be major emitting facilities in accordance with chapter 6, section 4 of WDEQ/AQD rules and regulations. Therefore, the state of Wyoming does not require mines to evaluate their impacts on that Class I area. However, BLM evaluates such issues for leasing. For this EIS regional air quality impacts are evaluated in the cumulative air quality impact section.

4-19


Water Resources Groundwater Mining the LBA tract would impact the groundwater resource quantity in two ways: 1) the coal aquifers and any overburden aquifers on the mined land would be removed and replaced with unconsolidated backfill; and, 2) water levels in the coal and overburden aquifers adjacent to the existing approved mining operations would continue to be depressed as a result of seepage and dewatering from the open cut on the LBA tract. The area subject to lower water levels would be increased roughly in proportion to the increase in area affected by mining. In addition to these two direct impacts, there would be some co-mingling of the overburden aquifer with the coal aquifer along the margins of the mining area. Locally, this would result in an alteration of water chemistry in the coal aquifer. Mining the LBA tract would remove shallow aquifers on an additional area ranging from 830 acres (proposed action and alternative 3), to around 897 acres (the preferred alternative) and replace the separate aquifer units with backfill material composed of an unlayered mixture of the shale, siltstone, and sand that make up the existing Wasatch Formation overburden and Fort Union Formation interburden. Impacts to the local groundwater system resulting from mining include completely dewatering the coal, overburden, and interburden within the area of coal removal, and extending drawdowns some distance away from the active mine area. The extent that drawdowns will propagate away from the mine pits is a function of the water-bearing properties of the aquifer materials. In materials with high transmissivity and low storage capacity, drawdowns will extend further from the pit face than in materials with lower transmissivity and higher storage capacity. In general, due to the geologic makeup of the Wasatch Formation overburden (discontinuous sands in a matrix of shale), overburden drawdowns do not extend great distances from the active mine pit (Hydro Engineering 1997, 1998, 1999). Of the 12 overburden wells monitored by Triton during 2003, no substantial water level changes were observed. Because of the regional continuity and higher transmissivity within the Wyodak coal seam, drawdowns propagate much further in the coal aquifer than in the overburden. Several coal wells within the vicinity of Buckskin Mine have shown little or no changes since 1994 while several wells (16-12B-C4, 20-2C-C5C, 24-13A-5C, 25-7C-5C, and 29­ 4C-5C) have experienced rapid drawdowns during the same time period. The Buckskin Mine’s permit document suggests that future mining is expected to encounter relatively little groundwater remaining in the coal seams, primarily as a result of CBM activities. In 2003 Triton monitored water levels in 12 wells in overburden, 22 monitor wells in the Anderson and Canyon coal seams, six reclaimed alluvial wells, and five wells completed in the backfill. Water levels and maps showing drawdowns in the immediate vicinity of the pit are included in each year’s annual report to WDEQ/LQD (Triton 2003)

4-20

Triton originally used the MODFLOW model to predict the extent of water drawdown in the Anderson and Canyon coal seams as a result of mining at the Buckskin Mine. The results of the groundwater modeling are reported in mine plan addendum MP-B of the Buckskin Mine 500-T6 permit document. However, the current mine permit describes the groundwater drawdown predicted by MODFLOW for the coal aquifers as a result of mining as having been rendered obsolete by the dewatering effects of CBM wells operating since the mid-1990s in areas within and contiguous to Buckskin Mine. Predicted drawdowns from the MODFLOW model over the life of mine are shown on figure 4-2. These predictions are approximate and were based on extrapolation of Triton’s earlier predictions by extending the drawdowns westward and northward by the dimensions of the West Hay Creek tract. More precise predictions of the extent of drawdowns may be required in order to obtain a WDEQ/LQD permit for mining, if the West Hay Creek LBA tract is leased. Wyoming SEO records indicate a total of 656 permitted water wells located within 3 miles of the LBA tract. Many of these (231wells) are owned by coal mining companies and are used for groundwater monitoring and water supply. Of the remaining 425 non mine-related wells within the search area, approximately 68% are permitted for stock watering, 17% are permitted for miscellaneous use, 81% are permitted for CBM development, and 9% are permitted for domestic use. Other uses amounted to less than 1%. Most of these wells have been permitted for multiple uses. Some of these wells will likely be impacted (either directly by removal of the well or indirectly by water level drawdown) by approved mining operations occurring at Buckskin and the adjacent mines. In compliance with SMCRA and Wyoming regulations, mine operators are required to provide the owner of a water right whose water source is interrupted, discontinued, or diminished by mining with water of equivalent quantity and quality; this mitigation is part of the action alternatives. The most probable source of replacement water would be one of the aquifers underlying the coal. Before they acquired the Belco exchange tract, Triton determined that the effects of mining their existing coal leases could impact approximately 24 wells belonging to neighboring groundwater users. These wells are listed on table MP5-1 of the Buckskin Mine permit. As of March, 2004 there were no known adverse impacts to any private groundwater well. If the West Hay Creek LBA tract is leased, the mine operator would be required to update the list of potentially impacted wells and predict impacts to these and other water-supply wells within the five-foot drawdown contour as part of the permitting process. The operator would be required to commit to replacing these water supplies with water of equivalent quality and quantity if they are affected by mining. The subcoal Fort Union aquifers are not removed or disturbed by coal mining, so they are not directly impacted by coal mining activity. Triton has two water supply wells

4-21


LEGEND
WEST HAY CREEK LBA TRACT ANALYSIS AREA EXTENT OF WORST-CASE MODELED LIFE OF MINE CANYON COAL DRAWDOWN WITH WEST HAY CREEK LBA TRACT, AS APPLIED FOR EXTENT OF WORST-CASE EXTRAPOLATED LIFE OF MINE CANYON COAL DRAWDOWN WITH WEST HAY CREEK LBA TRACT, AS APPLIED FOR CLINKER (SCORIA)

APPROXIMATE COAL OUTCROP LINE

Figure 4-2.

Life of Mine Drawdown Map, Resulting From Proposed Action.

4-22


completed in aquifers below the coal. If the LBA tract is leased by the applicant, water would be produced from these wells for a longer period of time, but Triton would not require additional subcoal wells to mine the LBA tract. Mining would also impact groundwater quality; the TDS in the water resaturating the backfill is generally higher than the TDS in the groundwater before mining. This is due to the exposure of fresh overburden surfaces to groundwater that moves through the reclaimed backfill. Research conducted by the Montana Bureau of Mines and Geology on the coal fields of the northern PRB (Van Voast and Reiten 1988) indicates that, upon initial saturation, mine backfill is generally high in TDS and contains soluble salts of calcium, magnesium, and sodium sulfates. As the backfill resaturates, the soluble salts are leached by groundwater inflow. TDS concentrations tend to decrease with time, indicating that the long-term groundwater quality in mined and off-site lands would not be compromised (Van Voast and Reiten 1988). Groundwater quality within the backfill aquifer at the West Hay Creek LBA tract would be expected to be similar to the groundwater quality measured in existing wells completed in the backfill at the Buckskin Mine. To date, 12 wells have been installed to monitor water level and water quality in the backfill at the Buckskin Mine. In 2003, the six sampled TDS concentrations in the three sampled backfill wells ranged from 1,238 mg/Lto 8,730 mg/L. TDS concentrations observed in the Buckskin Mine backfill monitoring wells are generally higher than those found in the undisturbed Wasatch Formation overburden or Wyodak coal aquifers. Using data compiled from ten surface coal mines in the eastern PRB, Martin et al. (1988) concluded that backfill groundwater quality improves markedly after the backfill is leached with one pore volume of water. The same conclusions were reached by Van Voast and Reiten (1988) after analyzing data from the Decker and Colstrip Mine areas in the northern PRB. Clark (1995) conducted a study to determine if the decreases that were predicted by the laboratory studies actually occur onsite. In the area of the West Decker Mine near Decker, Montana, his study found that dissolved solids concentrations increased when water from an upgradient coal aquifer flowed into a backfill aquifer, and apparently decreased along an inferred path from a backfill aquifer to a downgradient coal aquifer. Postmining groundwater quality is expected to improve after one pore volume of water moves through the backfill. In general, the mine backfill groundwater TDS can be expected to range from 3,000 to 6,000 mg/L. Water chemistry is expected to be similar to the premining Wasatch Formation aquifer and meet Wyoming Class III standards for use as stock water. The hydraulic properties of the backfill aquifer reported in Buckskin permit documents are within the range reported for both the Wasatch Formation overburden and Wyodak coal. At the Buckskin Mine, one backfill drawdown test has been performed, and the hydraulic conductivity was 2.67 feet per day. These results provide a preliminary indication that Buckskin Mine backfill will readily resaturate as postmining potentiometric elevations recover in the surrounding undisturbed aquifers. The backfill will be capable of supplying sufficient yields to wells constructed for stock watering uses.

4-23

Direct and indirect impacts to the groundwater system resulting from mining the LBA tract would add to the cumulative impacts that will occur due to mining existing leases, which is discussed in the cumulative impact section. Surface Water Changes in runoff characteristics and sediment discharges would occur during mining of the LBA tract as a result of the destruction and reconstruction of drainage channels as mining progresses. Erosion rates could reach high values on the disturbed area because of vegetation removal. However, both state and federal regulations require that all surface runoff from mined lands be treated as necessary to meet effluent standards. Generally, the surface runoff sediment is deposited in ponds or other sediment-control devices inside the permit area. Due to its location in the headwater area of Hay Creek and the existing topography, runoff within the LBA tract is not expected to be significant. During mining, hydrologic control will most likely consist of allowing runoff to accrue to the mine pit, where it will be treated and discharged according to the standards of WDEQ/WQD. Large flood control reservoirs are not anticipated for the LBA tract, but it may be necessary to build a diversion for Hay Creek. Sediment produced by large storms (greater than the 10-year, 24-hour storm) could adversely impact downstream areas. Since the tract would be mined as an extension of the existing Buckskin Mine under the action alternatives, there would not be a large increase in the amount of area disturbed and not reclaimed at any given time. WDEQ/LQD would also require a monitoring program to assure that ponds would always have adequate space reserved for sediment accumulation. The loss of soil structure would act to increase runoff rates on the LBA tract in reclaimed areas. The general decrease in average slope in reclaimed areas would tend to counteract the potential for an increase in runoff. Soil structure would gradually reform over time, and vegetation (after successful reclamation) would provide erosion protection from raindrop impact, retard surface flows, and control runoff at approximately premining levels. After mining and reclamation are complete, surface water flow, quality, and sediment discharge from the LBA tract would approximate premining conditions. The impacts described above would be similar for both the proposed action and the action alternatives, and they are similar to the expected impacts for currently permitted mining. Alluvial Valley Floors (AVFs) The West Hay Creek LBA tract has been evaluated for the presence of AVFs, and there are none. The nearest declared AVF is located on Rawhide Creek south of the LBA tract within the current Buckskin Mine WDEQ/LQD permit area. That portion of the AVF within Buckskin Mine’s permit area has been mined and reclaimed in accordance with

4-24


their approved reclamation plan. Mining within the LBA tract is not expected to impact lands within the Rawhide Creek drainage. Therefore, no direct, indirect, or cumulative impacts are anticipated to off-site AVFs through mining of the LBA tract. Wetlands As discussed in chapter 3, Buckskin Mine has completed a wetlands inventory and subsequently received COE approval of the inventory in April 2001. This inventory identified the acres of jurisdictional wetlands within the entire Buckskin Mine permit boundary, including all lands within the West Hay Creek LBA tract under the proposed action and the action alternatives. A total of 17.51 acres of jurisdictional wetlands comprised of 9.82 acres of riverine-emergent marsh and 7.69 acres of riverine-wet meadow were identified within the analysis area. Existing wetlands located in the LBA tract would be impacted by mining operations. As a result of recent court directives, playas may no longer be identified as jurisdictional waters of the US under section 404 of the Clean Water Act. A total of 10 of these nonjurisdictional wetland features, all formed in unconsolidated sandy residuum that precludes all but the briefest periods of water storage, occupy 7.6 acres within the analysis area. Although COE may not require their replacement as a result of the recent court directive, Triton may continue establishing playa/depressional features within the reclaimed topography if the LBA tract is mined as an extension of the existing operation. If no special segregation and placement of overburden and soils is necessary, reclamation costs incurred to restore playa/depressional features are not increased. However, if special handling of materials is necessary the reclamation costs generally increase on a site-specific basis. COE requires replacement of all impacted jurisdictional wetlands in accordance with section 404 of the Clean Water Act and determines the number of acres to be restored. COE considers the type and function of each jurisdictional wetland that will be impacted and may require restoration of additional acres if the type and function of the restored wetland will not completely replace the type and function of the original wetland. The wetland mitigation plan approved by COE becomes part of the WDEQ mining permit. WDEQ/LQD allows and sometimes requires mitigation of nonjurisdictional wetlands affected by mining, depending on the values associated with the wetland features. Replacement of nonjurisdictional and functional wetlands on privately owned surface may occur in accordance with agreements with the private landowners. Triton owns the surface of the West Hay Creek LBA tract. During the period of time after mining and before replacement of wetlands, all wetland functions would be lost. The replaced wetlands may not duplicate the exact functions and landscape features of the premine wetlands, but replacement would be in accordance with the requirements of section 404 of the Clean Water Act. Vegetation Under the proposed action, mining the LBA tract would progressively remove the native

4-25


vegetation on about 830 additional acres on and near the LBA tract. About 897 additional acres would be disturbed under the preferred alternative, while acreage disturbed under alternative 3 would be approximately the same as the proposed action. Short-term impacts associated with this vegetation removal would include increased soil erosion and habitat loss for wildlife and livestock. Potential long-term impacts include loss of habitat for some wildlife species as a result of reduced species diversity, particularly big sagebrush, on reclaimed lands. However, grassland-dependent wildlife species and livestock would benefit from the increased grass cover and production. Reclamation, including revegetation of these lands, would occur at the same time as mining on adjacent lands (for example, reclamation would begin once an area is mined). Estimates of the time elapsed from topsoil stripping through reseeding of any given area range from two to four years. This would be longer for areas occupied by stockpiles, haul-roads, sediment-control structures, and other mine facilities. Some roads and facilities would not be reclaimed until the end of mining. No new life-of-mine facilities would be located on the LBA tract under the proposed action or the action alternatives. Grazing and farming restrictions prior to mining and during reclamation would remove up to 100% of the LBA area from livestock grazing and agricultural crop production. This reduction in vegetative production would not seriously affect livestock and farm production in the region. Long-term productivity on the reclaimed land would return to premining levels within several years following seeding with the approved final seed mixture. Wildlife use of the area would not be restricted throughout the operations. Re-established vegetation would be dominated by species mandated in the WDEQapproved reclamation seed mixtures. The majority of the approved grassland and shrubland species are native to the LBA tract. The premining agricultural lands may be established as haylands, pasturelands, or croplands to replace the premining land uses. Initially, the reclaimed grassland would be dominated by grassland vegetation that would be less diverse than the premining vegetation. At least 20% of the native vegetation area would be reclaimed to native shrubs at a density of one per square meter as required by current regulations. Estimates for the time it would take to restore shrubs, including sagebrush, to premining density levels range from 20 to 100 years. This may delay the return of shrub dependent species, such as sage grouse, to the reclaimed areas. An indirect impact of this vegetative change could be decreased big game habitat carrying capacity. Following completion of reclamation (seeding with the final seed mixture) and before release of the reclamation bond (a minimum of ten years), a diverse, productive, and permanent vegetative cover would be established on the LBA tract. The decrease in plant diversity would not seriously affect the potential productivity of the reclaimed areas. The proposed postmining land use (wildlife habitat rangeland and agricultural lands) should be achieved even with the changes in vegetation composition and diversity. On average, about 150 acres of surface disturbance per year of mining would occur on the LBA tract at the proposed rate of production regardless of which action alternative is selected. By the time mining ceases, over 75% of these disturbed lands would have been reseeded. The remaining 25% would be reseeded during the following two to

4-26


three years as the life-of-mine facilities areas are reclaimed. The reclamation plans for the existing mine include steps to control invasion by weedy (invasive nonnative) plant species. The reclamation plans for the West Hay Creek LBA tract would also include steps to control invasion from such species. Native vegetation from surrounding areas would gradually invade and become established on the reclaimed land. The climatic record of the western US suggests that droughts could occur periodically during the life of the mine. Such droughts would severely hamper revegetation efforts, since lack of sufficient moisture would reduce germination and could damage newly established plants. Same-aged vegetation would be more susceptible to disease than would plants of various ages. Severe thunderstorms could also adversely affect newly seeded areas. Once a stable vegetative cover is established, these events would have similar impacts as would occur on native vegetation. Changes expected in the surface water network as a result of mining and reclamation would affect the reestablishment of vegetation patterns on the reclaimed areas to some extent. The postmining maximum slope would be 20% in accordance with WDEQ policy. The average reclaimed slope will not be known until WDEQ’s technical review of the permit revision application is complete. No significant changes in average slope are predicted. Following reclamation, the LBA tract would be primarily a variety of mixed prairie grasslands with graminoid/forb-dominated areas, shrublands, and haylands. The overall species diversity would be reduced, especially for the shrub component. After reclamation bond release (a minimum of ten years after seeding with the final seed mixture, as discussed above), management of the privately-owned surface would revert to the private surface owner, who would have the right to manipulate the reclaimed vegetation. Jurisdictional wetlands would fall under the jurisdiction of the COE. Detailed wetland mitigation plans would be developed at the permitting stage to ensure no net loss of jurisdictional wetlands on the project area. Functional wetlands may be restored in accordance with the requirements of the surface landowner; there are no public lands included in the West Hay Creek LBA tract. The decrease in plant diversity would not seriously affect productivity of the reclaimed areas regardless of the alternative selected. The proposed postmining land use (wildlife habitat and rangeland) would be achieved even with the changes in vegetative species composition and diversity. Threatened, Endangered and Candidate Plant Species Appendix G contains a thorough discussion of threatened, endangered and candidate plant species.

4-27

Wildlife Local wildlife populations are directly and indirectly impacted by mining. These impacts are both short-term (until successful reclamation is achieved) and long-term (persisting beyond successful completion of reclamation). The direct impacts of surface coal mining on wildlife occur during mining and are therefore short-term. They include road kills by mine-related traffic, restrictions on wildlife movement created by fences, spoil piles and pits, and displacement of wildlife from active mining areas. Displaced animals may find equally suitable habitat that is not occupied by other animals, occupy suitable habitat that is already being used by other individuals, or occupy poorer quality habitat than that from which they were displaced. In the second and third situations, the animals may suffer from increased competition with other animals and are less likely to survive and reproduce. The indirect impacts are longer term and may include a reduction in big game carrying capacity and microhabitats on reclaimed land due to flatter topography, less diverse vegetative cover, and reduction in sagebrush density. These impacts are currently occurring on the existing Buckskin leases as mining occurs. If the LBA tract is leased under the proposed action or the action alternatives, the area of mining disturbance would be extended onto the LBA tract and mining would be extended by five to six years at the Buckskin Mine. Under the proposed action or the action alternatives, big game would be displaced from portions of the LBA tract to adjacent ranges during mining. Pronghorn would be most affected; but none of the area within 2 miles of the LBA tract has been classified as crucial or critical pronghorn habitat. Mule deer would not be substantially impacted, given their infrequent use of these lands and the availability of suitable habitat in adjacent areas. Big game displacement would be incremental, occurring over several years and allowing for gradual changes in distribution patterns. Big game residing in the adjacent areas could be impacted by increased competition with displaced animals. Noise, dust, and associated human presence would cause some localized avoidance of foraging areas adjacent to mining activities. On the existing leases, big game have continued to occupy areas adjacent to and within active mine operations, suggesting that some animals may become habituated to such disturbances. Big game animals are highly mobile and can move to undisturbed areas. Big game movement would be more restricted due to additional fences, spoil piles, and pits related to mining. During winter storms, pronghorn may not be able to negotiate these barriers. WDEQ guidelines require fencing to be designed to permit pronghorn passage to the extent possible. In 1999, the WGFD reviewed monitoring data collected on mine sites for big game species and the monitoring requirements for big game species on those mine sites. Their findings concluded that the monitoring had demonstrated the lack of impacts to big game on existing mine sites. No severe mine-caused mortalities have occurred, and no long-lasting impacts on big game have been noted on existing mine sites. The

4-28


WGFD recommended that big game monitoring be discontinued on all existing mine sites. New mines will be required to conduct big game monitoring if located in crucial winter range or in significant migration corridors, neither of which apply to the LBA tract. Road kills related to mine traffic would be extended in the area by five to six years. If the LBA tract is leased, mined, and reclaimed, alterations in the topography and vegetative cover, particularly the reduction in sagebrush density, would cause a decrease in carrying capacity and diversity. Sagebrush would gradually become reestablished on the reclaimed land, but the topographic changes would be permanent. Medium-sized mammals (such as rabbits, coyotes, and foxes) would be temporarily displaced to other habitats by mining, potentially resulting in increased competition and mortality. However, these animals would rebound on reclaimed areas, as forage develops and small mammal prey species recolonize. Direct losses of small mammals would be higher than for other wildlife, since the mobility of small mammals is limited and many retreat into burrows when disturbed. Therefore, populations of such prey animals as voles and mice would decline during mining. However, these animals have a high reproductive potential and tend to re-invade and adapt to reclaimed areas quickly. A research project on habitat reclamation for small mammals and birds concluded that reclamation objectives to encourage the recolonization of small mammal communities are being achieved on mined lands within the PRB (Shelley 1992). The study evaluated sites at five mines. Upland game birds known to occur within the analysis area include sage grouse, sharptailed grouse, and gray partridge As discussed in Chapter 3, the FWS has received several petitions to list the greater sage grouse under the Endangered Species Act because of range-wide population declines and, in a press release issued on April 15, 2004, the agency announced that it has determined that enough biological information exists to warrant a more in-depth examination of the status of the greater sage grouse. According to the press release, this decision, known as a “90-day Finding,” triggers a more thorough review of the available biological information. The causes for the sage grouse range-wide decline are not completely understood and may be influenced by local conditions. However, habitat loss and degradation, as well as loss of population connectivity are important factors (Braun 1998, Wisdom et al. 2002). Areas of suitable habitat for nesting and strutting grounds are needed to sustain sage grouse populations. Greater sage grouse are dependent on sagebrush for food and protection from predators. Sage grouse have been found on lands within and adjacent to the LBA tract and are yearlong residents in this area. No leks have been recorded on the LBA tract during baseline surveys or annual mine surveys and there are currently no active leks in the area of the tract (Figure 3-13). No broods were recorded during formal brood surveys but breeding and brood-rearing habitat is present in the analysis area. Wintering habitat, which may be as limiting as mating and breeding habitat, is limited in

4-29


the analysis area; no sage grouse or sage grouse sign was found during the winter baseline surveys. Should sage grouse establish a lek on the proposed lease area prior to initiation of mining operations, the lessee would be required to take mitigative steps prior to disturbing that lek. If mining activities disturb a lek, sage grouse may use an alternate lek site for breeding activities, but they may experience lower productivity on these alternate lek sites. The Buckskin Mine will continue to implement mitigation measures during reclamation such as reestablishing shrubs, including sagebrush, on reclaimed lands and grading reclaimed lands to create swales and depressions; the mine will also continue to monitor sage grouse activity in the area before, during, and after mining. These and other measures specific to the West Hay Creek LBA Tract would be further developed in the WDEQ/LQD mining and reclamation permit approval process, if the tract is leased. However, reclamation may not restore populations to pre-activity levels. Estimates for the time it would take to restore shrubs, including sagebrush, to premining density levels range from 20 to 100 years, which may delay sage grouse repopulation in the reclaimed areas. There is some evidence that grouse do repopulate areas after reclamation for the species, but there is no evidence that populations attain their previous levels. Reestablishment of sage grouse populations in reclaimed areas my take 20 to 30 years, or longer (Braun 1998). There are two active sharp-tailed grouse leks, identified in 2002, on lands adjacent to the West Hay Creek LBA tract which could be affected by mining operations on the tract. As shown on figure 3-13, one lek is within ¼ mile of the analyses area (Triton 2002). Mining the LBA tract would not impact regional raptor populations; however, individual birds or pairs may be impacted. There is limited suitable nesting habitat (cliffs and tall trees) in this area but, during mining, nesting habitat is created by the excavation process (highwalls), as well as through enhancement efforts (nest platforms and boxes). Very few raptor species have been observed nesting on or near the proposed lease area (Figure 3-13). A total of five raptor species (the burrowing owl, great horned owl, ferruginous hawk, red-tailed hawk and golden eagle) have been identified nesting within 2 miles of the LBA tract. In 2002, three nest sites in this area were occupied by redtailed hawks. Mining activity could cause raptors to abandon nests near the disturbance. The FWS recommends a species-specific buffer around all raptor nests. The FWS and the WDEQ/LQD approval would be required before mining could occur within buffer zones for future or adjacent active raptor nests. The Buckskin Mine annually monitors territorial occupancy and nest productivity. Raptor nesting activity has frequently occurred in active mining and construction areas, and Buckskin Mine has successfully executed state-of-the-art mitigation techniques to protect nest productivity. There is an approved raptor mitigation plan for the existing Buckskin Mine. This monitoring and mitigation plan, as required by the FWS and WDEQ/LQD, would be amended to include the West Hay Creek LBA tract if it is leased. The amended raptor

4-30


mitigation plans would be subject to review and approval by FWS before the amended mining plan is approved. Any nests that would be impacted by mining operations would have to be relocated in accordance with that plan. Prior to the disturbance of any raptor nest, special purpose permits would have to be secured from the FWS and WGFD. All active raptor nests within the mine permit area are protected further by buffer zones. Mine-related disturbances are not allowed to encroach in the vicinity of any active raptor nest from March until hatching, and disturbances near raptor nests containing nestlings is strictly limited to prevent danger to, or abandonment of, the young. These required mitigation measures are included in the existing mining and reclamation permit and would be included in the amended mining and reclamation plans, if the West Hay Creek LBA tract is leased. Mining near raptor territories would impact availability of raptor forage species but at the Buckskin Ranch Mine, lack of nesting habitat, not a lack of forage area, has been determined to be the most important factor limiting raptor density. After mining, the reclamation plan would reestablish the ground cover necessary for the return of a suitable prey base. As indicated in table 3-9 in chapter 3, 17 of the migratory birds of management concern in Wyoming have historically been observed on or within ½ mile of the West Hay Creek LBA tract. Of these, one Level 1 species (those commonly identified as needing conservation action), the Brewer’s sparrow, has regularly been observed breeding in the area. Level 1 species that have occasionally to rarely been observed breeding in the area include sage grouse, Swainson’s hawk, and burrowing owl. Bald eagles are frequently observed in winter but do not nest in the area. Potential impacts to mountain plover, greater sage grouse and raptors, including bald eagles, as well as measures in place to mitigate impacts to these species, are included in the preceding discussions or in appendix G. The Buckskin Mine’s current reclamation practices are designed to provide a mosaic of upland grass and sagebrush habitats that would potentially host most of these species. Impacts of habitat loss would be short-term for grassland species but would last longer for tree- and shrub-dependent species. Other habitat enhancement practices include restoring diverse land forms, direct topsoil replacement, and constructing brush piles, snags, and rock piles. A research project on habitat reclamation on mined lands within the PRB for small mammals and birds concluded that the diversity of song birds on reclaimed areas was slightly less than on adjacent undisturbed areas, although their overall numbers were greater (Shelley 1992). The Buckskin Mine would continue to conduct annual surveys for migratory bird species of management concern on and near the permit area. If these species are documented nesting or using the area regularly, a mitigation plan would be developed in cooperation with FWS to protect those birds and their habitat. Waterfowl and shorebird habitat on the LBA tract is minimal, and production of these species is limited. Mining the LBA tract would have a negligible effect on migrating and breeding waterfowl. Sedimentation ponds created during mining would provide interim habitat for these fauna. WDEQ and the COE would also require mitigation of any disturbed wetlands during reclamation, which would minimize impacts. If the replaced wetlands on the West Hay Creek LBA tract do not duplicate the exact function and/or landscape features of the premine wetlands, waterfowl and shorebirds could be

4-31


beneficially or adversely affected as a result. Under natural conditions, habitat for aquatic species is limited on the West Hay Creek LBA tract. Mining would affect a limited section of Hay Creek, an ephemeral to intermittent stream which flows from west to east through the tract. Few reptiles or amphibians have been observed during wildlife surveys at the Buckskin Mine. Habitat for the fat-head minnows and green sunfish that have been observed in McGee Reservoir would be lost during mining and reclamation. Following reclamation, aquatic habitat in the reconstructed drainage channel may not duplicate the pre-mining habitat. The impacts discussed above would apply to all alternatives. If the West Hay Creek LBA tract is leased, the assessment of impacts to wildlife that would be caused by mining the LBA tract would be addressed as part of the review of the mine permit application by the WGFD and the WDEQ/LQD as part of the WDEQ/LQD’s mining and reclamation permit approval process. Threatened, Endangered, and Proposed Wildlife Species These are discussed in appendix G. Land Use and Recreation The major environmental consequences of leasing and mining the West Hay Creek LBA tract on land use would be reduction of livestock grazing, loss of wildlife habitat, loss of agricultural cropland, hayland, and pastureland, and curtailment of oil and gas development on about 830 additional acres (proposed action and alternative 3) up to about 897 acres (preferred alternative) during mining. Wildlife (particularly big game) and livestock (cattle and sheep) use would be displaced while the tract is being mined and reclaimed. Federal oil and gas ownership and federal oil and gas lessee information are presented in figure 3-15 and table 3-10 in chapter 3. If a coal lease is issued for the West Hay Creek LBA tract, all of the oil and gas production and transportation facilities on the lease would have to be removed from the surface to the base on the coal prior to mining. There are currently no wells completed in producing zones below the coal; if such wells are drilled prior to mining operations, they would be capped in accordance with the requirements for abandoning wells. The LBA tract would not be accessible for development of subcoal oil and gas resources during active mining and prior to reclamation. BLM has issued a policy statement on conflicts between CBM and coal development (BLM 2003). That policy advocates optimizing the recovery of both coal and CBM resources to ensure that the public receives a reasonable return for the publicly owned resources. As discussed in the section on Geology and Mineral Resources, several CBM wells are currently reported as productive on the West Hay Creek LBA tract. If a coal lease is issued, Triton would have to negotiate with the oil and gas lessees on how

4-32


to resolve the conflict. Royalties would be lost to both the state and federal governments if the CBM is not recovered before mining occurs, or if coal is not recovered due to conflicts. State and federal governments can also lose bonus money when the costs of the agreements between the lessees are factored into the fair market value determinations. All of the surface estate included in the LBA tract under any of the alternatives is privately owned, so no federal land would be removed from public access if the tract is leased. Hunting on the LBA tract would be eliminated during mining and reclamation. Pronghorn and mule deer occur on and adjacent to the tract. Sage grouse, mourning dove, waterfowl, rabbit, and coyote also inhabit the tract. Following reclamation, the land would be suitable for grazing, wildlife, and agricultural uses, which are the historic land uses. The reclamation standards required by SMCRA and Wyoming state law meet the standards and guidelines for healthy rangelands for public lands administered by the BLM in Wyoming. Following reclamation bond release, management of the surface estate, which is privately owned, would revert to the private surface owner. Cultural Resources All portions of the proposed action, the preferred alternative and alternative 3 areas and buffer zone were subjected to a Class III inventory and assessment in 1999. Table 3-11 summarizes the distribution of cultural sites by type. Data recovery plans are required for those sites recommended eligible to the NRHP following testing and consultation with the SHPO. Until consultation with SHPO has occurred and agreement regarding NRHP eligibility has been reached, all sites should be protected from disturbance. Full consultation with SHPO must be completed before the MLA mining plan can be approved. At that time, those sites determined to be unevaluated or eligible for the NRHP through consultation would receive further protection or treatment. Impacts to eligible or unevaluated cultural resources cannot be permitted. If unevaluated sites cannot be avoided, they must be evaluated before mining occurs. If eligible sites cannot be avoided, a data recovery plan must be implemented prior to disturbance. Ineligible properties may be destroyed without further work. The Class III inventory and assessment results covering the West Hay Creek LBA Tract have been reviewed and approved by WDEQ, OSM, and Wyoming SHPO. A data recovery plan has been developed for the one site found on the LBA tract which met the eligibility criteria for the NRHP. This data recovery plan will be carried forward in the mining and reclamation plan and implemented before the site is disturbed. The lead

4-33


federal and state agencies consult with Wyoming SHPO on the development of such plans and the manner in which they are carried out. Cultural resources adjacent to the mine areas may be impacted as a result of increased access to the areas. There may be increased vandalism and unauthorized collecting associated with recreational activity and other pursuits outside of and adjacent to mine permit areas. Native American Concerns No sites of Native American religious or cultural importance have been identified on the LBA tract. If such sites or localities are identified at a later date, appropriate action must be taken to address concerns related to those sites. As indicated in chapter 3, OSM completed Native American consultation on the lands within the analysis area in 2000. No comments were received. Paleontological Resources No unique or significant paleontological resources have been identified on the LBA tract, and the likelihood of encountering those resources is small. Potential impacts to paleontological resources as a result of surface-disturbing activities include losses of plant, invertebrate, and vertebrate fossil material, unauthorized collection and vandalism. A beneficial impact of surface disturbance can be the exposure of fossil materials for scientific examination and collection, which might never occur except as a result of overburden removal, exposure of rock strata, and mineral excavation. Lease and permit conditions require that should previously unknown, potentially significant paleontological sites be discovered, work in that area shall stop and measures be taken to assess and protect the site (appendix D).

Visual Resources Mining activities on most of the West Hay Creek LBA tract would not be visible from any major travel routes and would be partly concealed by surrounding terrain. Mining of some parts of the LBA tract may be visible from US 14-16. Mining would affect landscapes classified by BLM as Class IV. This classification would not be altered by leasing and subsequent mining of the West Hay Creek LBA tract. Landscape character would not be significantly changed following reclamation. No unique visual resources have been identified on or near the West Hay Creek LBA tract. Reclaimed terrain would be almost indistinguishable from the surrounding undisturbed terrain. Slopes might appear smoother (less intricately dissected) than undisturbed terrain to the north and west, and sagebrush would not be as abundant for several years. Within a few years after reclamation, the mined land would not be

4-34

distinguishable from the surrounding undisturbed terrain except by someone very familiar with landforms and vegetation. Noise Noise levels on the LBA tract would be increased considerably by mining activities (blasting, loading, hauling, and possibly in-pit crushing). Since the LBA tract would be mined as an extension of existing operations under the action alternatives, no rail car loading would take place. The Noise Control Act of 1972 indicates that a 24-hour equivalent level of less than 70 dBA prevents hearing loss and that a level below 55 dBA, in general, does not constitute an adverse impact. OSM prepared a noise impact report for the Caballo Rojo Mine (OSM 1980) which determined that the noise level from crushers and a conveyor would not exceed 45 dBA at a distance of 1,500 feet. Explosives would be used during mining to fragment the overburden and coal and facilitate their excavation. The air overpressure created by such blasting is estimated to be 123 dBA at the location of the blast. At a distance of about 2,500 feet (about 0.47 miles), the intensity of this blast would be reduced to 55 dBA. The nearest occupied dwelling is just over ½ mile from the LBA tract, which is about the same distance as the nearest occupied dwelling to the existing Buckskin Mine permit boundary. Because of the remoteness of the site and because mining is already ongoing in the area, noise would have little off-site effect. Wildlife in the immediate vicinity of mining may be adversely affected. However, observations at other surface coal mines in the area indicate that wildlife generally adapt to increased noise associated with surface coal mining. After mining and reclamation are completed, noise would return to premining levels. Transportation Facilities No new or reconstructed transportation facilities would be required under the proposed action or alternatives. Essentially all of the coal mined on the LBA tract would be transported by rail. Vehicular traffic to and from the mine would continue at existing or slightly higher levels for an additional 5 to 6 years, depending on which alternative is selected. One active pipeline currently crosses the northwest corner of the LBA tract analysis area. Any relocation of pipelines would be handled according to specific agreements between the coal lessee and the pipeline owners. The Wyoming Department of Transportation routinely monitors traffic volumes on area highways, and if traffic exceeds design standards, improvements are made. Burlington Northern-Santa Fe has upgraded and will continue to upgrade their rail capacities to handle the increasing coal volume projected from the PRB with or without leasing the proposed LBA tract.

4-35


Socioeconomics Leasing and subsequent mining of the LBA tract would extend the life of the already permitted Buckskin Mine by 5 to 6 years, depending on which alternative is selected. Prices for PRB coal increased in 2001 and 2002, and are projected to remain stable or decrease slightly from 2004 through 2008 (WGS 2003). Conservatively assuming a price of $4.00 per ton, the total revenue from the sale of the recoverable coal from the LBA tract would total $520 million for the proposed action (130 million tons of coal), up to $560 million for the preferred alternative (140 million tons of coal), or $520 million for alternative 3 (130 million tons of coal). Some of this money from the sale of this federal coal would be paid to federal, state, and local governments in the form of taxes and federal production royalties. If the tract is leased, the federal government would collect a royalty at the time the coal is sold. This royalty is 12.5% of the sale price of the coal. At a coal price of $4.00 per ton, this would amount to approximately $98 million under the proposed action, up to $106 million under the preferred alternative, or $98 million under alternative 3. This money would be split equally between the state and federal governments. The federal government would also collect black lung and reclamation taxes based on the sale of the coal. According to a study done by the University of Wyoming (UW 1994), the state of Wyoming received about $1.10 per ton from the sale of PRB coal produced in 1991. The taxes and royalties included in this calculation were severance taxes, ad valorem taxes, sales and use taxes, and the state’s share of federal royalty payments on production. Under this scenario, the estimated total direct return to the state of Wyoming from the production of this federal coal, in current dollars, would be $143 million under the proposed action, $154 million under the preferred alternative, or $143 million under alternative 3. Projected state and federal revenues from the proposed action and alternatives are presented in table 2-1 in chapter 2. The federal government also receives a bonus payment at the time the federal coal is leased. Bonus payments on the federal coal leases issued in the PRB since 1990 have ranged from 11.1¢ per ton to 70.6¢ per ton. This range of bonus payments would represent a potential bonus payment range of $14.4 million to $98.89 million for the estimated federal coal tonnage in the West Hay Creek LBA tract. The actual amount the federal government would receive would depend on the alternative selected and the actual bonus bid if the tract is leased. The bonus payment would be payable over five years and would be divided equally with the state of Wyoming. If the LBA tract is leased and annual coal production is increased to 25 million tons as projected, Triton anticipates that the average number of employees at the Buckskin Mine would remain 225 over the 5 to 6 years the tract is being mined. These 225 persons represent about 1% percent of the 22,360 persons in the 2001 labor force in Campbell County (Wyoming Department of Employment, Employment Resources

4-36


Division 2002). No additional demands on the existing county or city infrastructure or services would be expected because no influx of new residents would be needed to fill new jobs. The economic stability of the community of Gillette would benefit by having the Buckskin Mine active for an additional 5 to 6 years. Issues relating to the social, cultural, and economic well-being and health of minorities and low-income groups, including Native American tribes, are termed environmental justice issues. In reviewing the impacts of the proposed action and the action alternatives on socioeconomic resources, surface water and groundwater quality, air quality, hazardous materials, or other elements of the human environment in this chapter, it was determined that potentially adverse impacts would not disproportionately affect Native American tribes, minority groups, or low-income groups. The analysis area includes no tribal lands or Native American communities. No treaty rights or Native American trust resources are known to exist for this area. Hazardous and Solid Waste If Triton acquires the West Hay Creek LBA tract, the wastes that would be generated in the course of mining the tract would be similar to the wastes that are currently being generated by the existing mining operation. The procedures that are used for handling hazardous and solid waste at the existing Buckskin Mine are described in chapter 2. Wastes generated by mining the LBA tract would be handled in accordance with the existing regulations using the procedures currently in use at the Buckskin Mine. DIRECT AND INDIRECT IMPACTS OF THE NO ACTION ALTERNATIVE Under the No Action Alternative, the coal lease application would be rejected; the area contained in the application would not be offered for lease at this time. The tract could be nominated for lease in the future but, for the purposes of this analysis, the no action alternative assumes that these lands would never be mined. However, the approved mining operations for the existing Buckskin Mine would not be changed if this alternative is chosen. The impacts to topography and physiography, geology and minerals, soils, air quality, water resources, alluvial valley floors, wetlands, vegetation, wildlife, threatened, endangered and candidate species, land use and recreation, cultural resources, Native American concerns, paleontological resources, visual resources, noise, transportation, and socioeconomics described on the preceding pages and in table 2-2 would occur when coal is removed from the existing Buckskin coal leases under the No Action Alternative. These impacts would not be extended onto those portions of the LBA tract that will not be affected under the current plan. The general nature and magnitude of cumulative impacts as summarized in table 2-3 that would occur from implementation of the proposed action or the action alternatives, would not be substantially different under the No Action Alternative. Coal removal and the associated disturbance and impacts would not occur on the 830, 897 or 830 additional acres disturbed in the proposed action, the preferred alternative, or alternative 3, respectively. Portions of the West Hay Creek LBA tract adjacent to the

4-37


existing Buckskin Mine would be disturbed to recover the coal in the existing leases. The economic benefits that would be derived from mining the LBA tract during an additional five to six years of mining would be lost. If a decision is made not to lease this tract at this time, it could be leased and mined as a maintenance lease in the future while the existing adjacent mine is in operation. If it is not leased while the existing adjacent mine is in operation, it may or may not be leased in the future. The tract being evaluated in this EIS does not include enough coal reserves to economically justify mining by a new operation; however, the coal reserves included in the tract could potentially be combined with unleased federal coal to the north and west to create a larger tract which could be mined by a new operation in the future. REGULATORY COMPLIANCE, MITIGATION, AND MONITORING In the case of surface coal mining, various federal and state law require mitigation and monitoring designed to ensure that reclamation standards are met following mining. The major mitigation measures and monitoring measures that are required by state or federal regulation are summarized in table 4-4. More specific information about some of these mitigation and monitoring measures and their results at the Buckskin Mine has been described in preceding sections of chapter 3 and chapter 4. Measures that are required by regulation are considered to be part of the proposed action and the action alternatives. These requirements, mitigation plans, and monitoring plans are in place as part of the current approved mining and reclamation plan for the existing Buckskin Mine. If the West Hay Creek LBA tract is leased, these requirements, mitigation plans, and monitoring plans would be included in the mining and reclamation plan amendment required for the LBA tract. This mining and reclamation plan would have to be approved before mining could occur on the tract, regardless of who acquires the tract. The major mitigation and monitoring measures that are required by state or federal regulation are summarized in table 4-4. More specific information about some of these mitigation and monitoring measures that are in place for the existing Buckskin Mine and would be extended on the LBA tract, if it is leased, are described in chapter 3 and in earlier sections of this chapter. If impacts are identified during the leasing process that are not mitigated by existing required mitigation measures, BLM can include additional mitigation measures (stipulations) on the new lease within the limits of its regulatory authority. In general, the levels of mitigation and monitoring required for surface coal mining by SMCRA and Wyoming state law are more extensive than those required for other surface disturbing activities; however, concerns are periodically identified that are not monitored or mitigated under existing procedures. An example of this type of issue is the concern about the release of NOx from blasting, and the resulting formation of low-lying orange clouds that can be carried outside the mine permit areas by wind. After this was identified as a potential health concern in the

4-38


area of the Wyoming PRB surface coal mines, a monitoring study designed to measure NO2 concentrations in areas accessible to the public near PRB coal mining operations, which is described in the preceding Existing Air Quality Issues section, was conducted in 1999 . In addition, WDEQ has directed some PRB mines to take steps designed to mitigate the effects of NO2 emissions occurring from overburden blasting. The steps that may be required, which are described in the Air Quality Section of Chapter 3, include: notifying the public via warning signs along public roadways, temporarily closing public roadways near a mine during and after a blast; establishing safe set-back distances from blasting areas; prohibiting blasting when wind direction is toward a neighbor; prohibiting blasting during temperature inversions; establishing monitoring plans; estimating NO2 concentrations; and developing blasting procedures that will protect public safety and health. After reviewing the required mitigation and monitoring in the current Buckskin Mine’s mining and reclamation permit and the historical monitoring results in the mine’s annual reports, the BLM has not identified additional special stipulations that should be added to the BLM lease or areas where additional or increased monitoring measures are recommended. TABLE 4-4 
 REQUIRED MITIGATION AND MONITORING MEASURES REQUIRED FOR ALL 
 ALTERNATIVES

REGULATORY COMPLIANCE OR 
 MITIGATION REQUIRED BY
 STIPULATIONS, STATE, OR FEDERAL
 LAW1 Restoring to approximate original contour or other approved topographic configuration. Identifying and selectively placing or mixing chemically or physically unsuitable overburden materials to minimize adverse effects to vegetation or groundwater. Salvaging soil suitable to support plant growth for use in reclamation; Protecting soil stockpiles from disturbance and erosional influences; Selectively placing at least four feet of suitable overburden on the graded backfill surface below replaced topsoil to meet guidelines for vegetation root zones. Dispersion modeling of mining plans for annual average particulate pollution impacts on ambient air; Using particulate pollution control technologies; Using work practices designed to minimize fugitive particulate emissions;

RESOURCE Topography & Physiography Geology & 	 Minerals	

MONITORING1 LQD checks as-built vs. approved topography with each annual report. LQD requires monitoring in
 advance of mining to detect
 unsuitable overburden.
 Monitoring vegetation growth 
 on reclaimed areas to 
 determine need for soil 
 amendments. Sampling 
 regraded overburden for 
 compliance with root zone
 criteria.
 On-site air quality monitoring
 for PM10 or TSP; 
 Off-site ambient monitoring for 
 PM10 or TSP;
 On-site compliance
 inspections.


Soil	

Air Quality	

4-39


RESOURCE

REGULATORY COMPLIANCE OR 
 MITIGATION REQUIRED BY
 STIPULATIONS, STATE, OR FEDERAL
 LAW1	 Using EPA- or state-mandated BACT, including: Fabric filtration or wet scrubbing of coal storage silo and conveyor vents, Watering or using chemical dust suppression on haul roads and exposed soils, Containment of truck dumps and primary crushers; Covering of conveyors, Prompt revegetation of exposed soils, High efficiency baghouses on the crusher, conveyor transfer, storage bin and train loadout, meeting a standard of 0.01 grains per dry standard cubic foot of exit volume, Watering of active work areas, Reclamation plan to minimize surface disturbances subject to wind erosion, Paving of access roads, Haul truck speed limits, Limited material drop heights for shovels and draglines. Following voluntary and required measures to avoid exposing the public to NO2 from blasting clouds, including: Phone notification of neighbors and workers prior to blasting, Monitoring weather and atmospheric conditions prior to decisions to blast, Timing blasts to avoid temperature inversions and to minimize inconvenience to neighbors, Closing public roads when appropriate to protect the public, Minimizing blast sizes, Posting signs on major public roads. Building and maintaining sediment control ponds or other devices during mining; Restoring approximate original drainage patterns during reclamation; Restoring stock ponds and playas during reclamation. Evaluating cumulative impacts to water quantity and quantity associated with proposed mining; Replacing existing water rights that are interrupted, discontinued, or diminished by mining with water of equivalent quantity quality. Identifying all alluvial valley floors that would

MONITORING1

Surface Water	

Monitoring storage capacity in sediment ponds; monitoring quality of discharges; monitoring stream flows and water quality. Monitoring wells track water levels in overburden, coal, interburden, underburden, and backfill.

Groundwater	

Alluvial Valley	

Monitoring to determine

4-40

RESOURCE	 Floors	

Wetlands	

Vegetation	

Wildlife	

REGULATORY COMPLIANCE OR 
 MITIGATION REQUIRED BY
 STIPULATIONS, STATE, OR FEDERAL
 LAW1 be affected by mining; Determining significance to agriculture of all identified alluvial valley floors affected by mining (WDEQ); Protecting downstream alluvial valley floors during mining; Restoring essential hydrologic function of all alluvial valley floors affected by mining. Identifying all wetlands that would be affected by mining; Identifying jurisdictional wetlands (COE); Replacing all jurisdictional wetlands that would be disturbed by mining Replacing functional wetlands as required by surface managing agency, surface land owner, or WDEQ/LQD. Permanently revegetate reclaimed areas according to a comprehensive revegetation plan using approved permanent reclamation seed mixtures consisting predominantly of species native to the area; Reclaiming 20% of reclaimed area with native shrubs at a density of one per square meter; Controlling erosion on reclaimed lands prior to seeding with final seed mixture using mulching, cover crops, or other approved measures; Chemically and mechanically controlling weed infestation; Direct hauling of topsoil, whenever possible; Selectively planting shrubs in riparian areas; Planting sagebrush; Creating depressions and rock piles; Using special planting procedures around rock piles; Posting reclamation bond covering the cost of reclamation. Restoring premining topography to the maximum extent possible; Planting a diverse mixture of grasses, forbs and shrubs in configurations beneficial to wildlife; Designing fences to permit wildlife passage; Raptor-proofing power transmission poles; Creating artificial raptor nest sites; Increasing habitat diversity by creating rock clusters and shallow depressions on reclaimed land; Cottonwood plantings along reclaimed drainages;

MONITORING1 restoration of essential hydrologic functions of any declared AVF.

Monitoring reclaimed wetlands using same procedures used to identify premining jurisdictional wetlands.

Monitoring revegetation growth and diversity until release of final reclamation bond (minimum 10 years). Monitoring erosion to determine need for corrective action during establishment of vegetation. Using controlled grazing during revegetation evaluation to determine suitability for postmining land uses.

Baseline and annual wildlife monitoring surveys; Monitoring for MBHFI.

4-41


RESOURCE


Threatened, Endangered, & Proposed Species

Cultural Resources

Land Use

REGULATORY COMPLIANCE OR 
 MITIGATION REQUIRED BY
 STIPULATIONS, STATE, OR FEDERAL
 LAW1
 Replacing drainages, wetlands and alluvial
 valley floors disturbed by mining;
 Reducing vehicle speed limits to minimize 
 mortality;
 Instructing employees not to harass or
 disturb wildlife;
 Preparing raptor mitigation plans.
 Avoiding bald eagle disturbance;
 Restoring bald eagle foraging areas
 disturbed by mining;
 Restoring mountain plover habitat disturbed
 by mining; 
 Using raptor safe power lines; 
 Surveying for Ute ladies' tresses;
 Surveying for mountain plover;
 Searching for black-footed ferrets if prairie
 dogs move onto tract.
 Conducting Class I and III surveys to identify 
 cultural properties on all state and federal
 lands and on private lands affected by 
 federal undertakings;
 Consulting with SHPO to evaluate eligibility
 of cultural properties for the NRHP; 
 Avoiding or recovering data from significant
 cultural properties identified by surveys,
 according to an approved plan;
 Notifying appropriate federal personnel if
 historic or prehistoric materials are 
 uncovered during mining operations;
 Instructing employees of the importance of 
 and regulatory obligations to protect cultural
 resources.
 Suitably restoring reclaimed area for historic
 uses (grazing and wildlife).


MONITORING1

Baseline and annual wildlife monitoring surveys.

Monitoring mining activities during topsoil stripping; cessation of activities and notification of authorities if unidentified sites are encountered during topsoil removal.

Native American Concerns

Paleontological Resources Visual Resources

Noise Transportation Facilities

Monitoring controlled grazing prior to bond release evaluation. Notifying Native American tribes with known 
 No specific monitoring interest in this area of leasing action and
 program. request for help in identifying potentially
 significant religious or cultural sites.
 Notifying appropriate federal personnel if
 No specific monitoring potentially significant paleontological sites
 program. are discovered during mining.
 Restoring landscape character during
 No specific monitoring reclamation through return to approximate
 program. original contour and revegetation with native
 species.
 Protecting employees from hearing loss.
 MSHA inspections. Relocating existing pipelines, if necessary,
 in accordance with specific agreement
 between pipeline owner and coal lessee.
 No specific monitoring program.

4-42


RESOURCE Socioeconomics

REGULATORY COMPLIANCE OR MITIGATION REQUIRED BY STIPULATIONS, STATE, OR FEDERAL LAW1 Paying royalty and taxes as required by federal, state, and local regulations. Disposing of solid waste and sewage within permit boundaries according to approved plans; Storing and recycling used oil; Maintaining of files containing Material Safety Data Sheets for all chemicals, compounds, and/or substances used during course of mining; Ensuring that all production, use, storage, transport, and disposal of hazardous waste is in accordance with applicable existing or hereafter promulgated federal, state, and government requirements; Complying with emergency reporting requirements for releases of hazardous materials as established in CERCLA, as amended; Preparing and implementing spill prevention control and countermeasure plans, spill response plans, inventories of hazardous chemical categories pursuant to section 312 of SARA, as amended; Preparing emergency response plans.

Hazardous & Solid Waste

MONITORING1 Surveying and reporting to document volume of coal removed. No specific monitoring other than required by these other regulations and response plans.

RESIDUAL IMPACTS Residual impacts are unavoidable impacts that cannot be mitigated and would therefore remain following mining and reclamation. Topography and Physiography Topographic moderation is a permanent consequence of mining. The indirect impacts on wildlife habitat diversity would also be considered permanent. Geology and Minerals Geology from the base of the coal to the surface would be subject to significant, permanent change. CBM resources not recovered prior to mining would be permanently lost. Soils Existing soils would be mixed and redistributed, and soil-forming processes would be disturbed by mining. This would result in long-term alteration of soil characteristics. 4-43


Air Quality No residual impacts to air quality would occur following mining. Water Resources The area where groundwater drawdowns and replacement of coal and overburden with backfill occur would be increased under the alternatives compared to what would occur without the addition of the LBA tract. The postmining backfill may take in excess of 100 years to reach equilibrium water levels and water quality. Less time would be required near the mining boundaries. Water level and water quality in the backfill would be suitable to provide water to wells for livestock use, but it would be different from premining conditions. Alluvial Valley Floors No residual impacts to alluvial valley floors would occur following mining. Wetlands Replaced wetlands (jurisdictional or functional) may not duplicate the exact function and landscape features of the premining wetland, but all wetland replacement plans would be approved by COE. Vegetation Reclaimed vegetative communities may never completely match the surrounding native plant community. Wildlife Although the LBA tract would be reclaimed to be as near original condition as possible, there would be some residual wildlife impacts. The topographic moderation would result in a permanent loss of habitat diversity and a potential decrease in slopedependent shrub communities. This would reduce the carrying capacity of the land for shrub-dependent species. Reclamation standards may limit replacement of habitat for some species such as mountain plover. Some species, such as sage grouse, may repopulate reclaimed areas, but populations may not attain premining levels. Threatened, Endangered, and Proposed Wildlife Species No direct residual impacts are expected to T&E, proposed, or candidate species or to BLM sensitive species. If habitats are not restored for listed, proposed, candidate, or sensitive species, such as black-tailed prairie dogs, future repopulation of reclaimed areas by those species could be delayed or potential future population levels of those

4-44


species in reclaimed areas could be affected. Land Use and Recreation No residual impacts to land use and recreation are expected. Cultural Resources Cultural sites that are determined to be eligible for the NRHP and that cannot be avoided would be destroyed by surface coal mining after data from those sites is recovered. Sites not eligible for the NRHP would be lost. Native American Concerns No residual impacts to Native American concerns have been identified. Paleontological Resources No residual impacts to significant paleontological resources are expected. Visual Resources No residual impacts to visual resources are expected. Noise No residual impacts to noise are expected. Transportation Facilities No residual impacts to transportation facilities are expected. Socioeconomics No residual impacts to socioeconomics are expected. CUMULATIVE IMPACTS Cumulative impacts result from the incremental impacts of an action added to other past, present, and reasonably foreseeable future actions, regardless of who is responsible for such actions. Cumulative impacts can result from individually minor, but collectively significant, actions occurring over time. This section briefly summarizes the cumulative impacts that are occurring as a result of existing development in the area being mined and considers how those impacts would change if the West Hay Creek LBA tract is leased and mined and if other proposed

4-45


development in the area occurs. Projects that have proceeded beyond preliminary planning phases include: 1) construction and operation of the Two Elk power plant, which has been proposed east of the Black Thunder Mine; construction of Wygen II power plant which has been proposed at the Wyodak Mine site; construction of the proposed DM&E Railroad line; and ongoing development of CBM resources north and west of the area of surface coal mining in this area.

2)

3) 4)

Since decertification of the Powder River Federal Coal Region in 1990, the BLM’s Wyoming State Office has held 15 competitive coal lease sales and issued 11 new federal coal leases containing approximately 3.178 billion tons of coal using the LBA process (table 1-1 in chapter 1). This leasing process has undergone the scrutiny of two appeals to the Interior Board of Land Appeals and one audit by the General Accounting Office. The Wyoming BLM has pending applications for eight additional maintenance tracts for existing mines containing about 2.1 billion tons of coal (table 1-2). All of the pending applications have been reviewed and recommended for processing by the PRRCT. BLM completed one exchange in the Wyoming portion of the PRB in 2000, authorized by Public Law 95-554. EOG Resources (formerly Belco) received a federal lease for a 106-million ton portion of the Hay Creek tract adjacent to the Buckskin Mine in exchange for the rights to a 170-million ton coal lease near Buffalo, Wyoming that is unmineable due to construction of Interstate 90 (BLM 1999b). Triton acquired this lease, which is southeast of and adjacent to the West Hay Creek LBA tract, from EOG Resources and has amended their mining and reclamation permit to include mining the federal coal included in this lease. A coal exchange proposed by Pittsburg and Midway Coal Mining Company is also currently being evaluated. Under this exchange, federal coal in Sheridan County, Wyoming would be exchanged for privately owned lands and minerals in Lincoln, Carbon, and Sheridan counties, Wyoming. Three regional EISs evaluating surface coal development in the PRB in Wyoming were previously prepared. They are: Final Environmental Impact Statement, Eastern Powder River Basin of Wyoming, BLM, October 1974; Final Environmental Impact Statement, Proposed Development of Coal Resources in the Eastern Powder River Basin of Wyoming, BLM, March 1979;

4-46

Final Powder River Regional Coal Environmental Impact Statement, BLM, December, 1981. A draft document for a fourth regional EIS, the Draft Environmental Impact Statement for Round II Coal Lease Sale in the Powder River Region, was prepared by BLM and released in January 1984, but a final document was not prepared and the actions considered in that EIS were not implemented. Since 1989, coal production in the Powder River Basin has increased by an average of 6.8% per year. The increasing state production is primarily due to increasing sales of low-sulfur, low-cost PRB coal to electric utilities who must comply with phase I requirements of Title III of the 1990 Clean Air Act Amendments. Electric utilities account for 97% of Wyoming's coal sales. In 2002, approximately 33% of the coal mined in the United States came from the PRB. The currently operational surface coal mines in the Wyoming PRB are shown in figure 1-1 in chapter 1. Recently active surface coal mines in Sheridan County, (the Big Horn Coal Mine, which has relinquished all federal coal leases) and southern Converse County (the Dave Johnston Mine) have ended mining operations and have reclaimed or are reclaiming areas of disturbance. The current status and ownership of the mines shown in figure 1-1 are shown in table 4-5. There have been numerous changes in mine ownership during the last decade, and this has resulted in mine consolidations and mine closings within the basin. The mines are located just west of the outcrop of the Wyodak coal, where the coal is at the shallowest depth. The mines in Campbell and Converse counties currently produce over 96% of the coal produced in Wyoming each year. Table 4-6 summarizes predicted coal mining activity (from the 1979 and 1981 regional EISs) and actual activity that has occurred since the EISs were prepared. BLM estimates that the surface coal mines shown in figure 1-1 and listed in Table 4-5 currently have approximately 103,615 acres of federal coal leased in Campbell and Converse counties. This represents approximately 3.4% of Campbell County, where the majority of the leases are located. Approximately 4.0% of Campbell County and less than 1.0% of Converse County are included in the mine permit areas for the existing mines. If the West Hay Creek LBA tract is leased under the preferred alternative, approximately 897 additional acres would be leased. The coal operations shown in figure 1-1 had disturbed an estimated 62,200 acres as of 2001. Approximately 16,100 of those acres of disturbance are occupied by “permanent” mine facilities (roads, buildings, and coal handling facilities) and are unavailable for reclamation. Of the remaining 46,100 acres, which represents areas of disturbance available for reclamation, approximately 24,300 acres had been reclaimed. This information is compiled from BLM lease and WDEQ/LQD mining and reclamation permit databases.

4-47

TABLE 4-5 STATUS OF WYOMING POWDER RIVER BASIN COAL MINES
Coal Production 1 1993 1994
Actual 2 Permitted

Coal Production 1 2002 2002 2002 Mine Owner
Actual Permitted
3 4

2000 Mine 11.18 0 3.28 16.70 0.06 9.86 3.03 44.11 15.59 15.42 21.01 0.11 52.13 7.29 34.32 18.39 32.94 0.02 92.96 189.2 131 373.9 8 50 Peabody Vulcan Capital Mgmt.
5

1994 Mine Owner 24.0 4.0 15.0 29.6 9.3 24.0 10.0 115.9 25 40 44 18 127 12 36 25 Kennecott Arch Kennecott Arch Kennecott 38.23 0.00 81.65 26.81 65.12 31.73 74.79 23.88 222.33 359.62 Peabody 25.97 RAG American 17.45 55.64 Wyodak Resources 4.05 12 122.9 45 40 65 18 168 30 100 50 85-105 35 Active Active Active Peabody 3.48 24 Kennecott/Kfx 0.00 9.4 Active Active RAG American 24.89 35 Active Inactive WFA 4.89 15 Active Wyodak Resources 0.00 0 Vulcan Capital Mgmt5. 18.33 27.5

Status/Comments Active Leases relinquished or sold; facilities sold.

Buckskin

SMC (Zeigler)

Clovis Point

Kerr-McGee

Dry Fork

Phillips/WFA

Eagle Butte

Cyprus-Amax

Fort Union

Fort Union Ltd

Rawhide

Carter (Exxon)

Wyodak

Wyodak Resources

NORTHERN MINE GROUP TOTALS

Belle Ayr Caballo/N. Caballo

Active Active/Caballo Mine + former Rocky Butte & West Rocky Butte leases Active/Cordero + Caballo Rojo Mines Inactive

4-48


Cordero Rojo

Coal Creek

Cyprus-Amax Carter (Exxon)/ Western Energy Kennecott/ Drummond ARCO

CENTRAL MINE GROUP TOTALS

Antelope

Kennecott

Black Thunder

ARCO

Kerr-McGee

Jacobs Ranch N. Antelope/ Rochelle

Peabody

Active/North Antelope Mine + Rochelle Mine Active/facilities constructed in 1998-99

N. Rochelle

SMC (Zeigler)

SOUTHERN MINE GROUP TOTALS

TOTALS FOR 3 MINE GROUPS

300-320 590.9­ 610.9

1

2

Actual production (million tons) on left, WDEQ/AQD permitted production (million tons) on right. Source: WGS 1994. 3 Source: Wyoming State Inspector of Mines Annual Report for 2002. 4 Source: WDEQ/AQD, permitted capacity as of October 1, 2000 5 Vulcan Capital Mgmt is being purchased by Arch Coal, Inc..

TABLE 4-6 
 COAL PRODUCTION AND DEVELOPMENT,
 CAMPBELL AND CONVERSE COUNTIES, WYOMING 

Number of Active Coal Mines 15 Number of Existing Power Plants 2 Number of Active Coal Enhancement Facilities 1

Coal Production (mmt) 1979 predictions for 1990 1981 predictions for 1990 Actual 1990 Actual 1995 Actual 2000 Actual 2002 Actual 2003 174.3

Direct Coal Employment 3,889

Average Price-NE Wyoming na

318.4

37

3

1

11,900

na

162.6 246.5 323.1 354.1 363.7

18 19 12 13 13

3 4 4 5 5

1 1 2 0 0

2,862 3,177 3,335 3,829 3,931

$6.86 $5.60 $4.93 $6.28 $6.37

Existing coal-burning power	 plants:	

PP&L Dave Johnson, PP&L and Black Hills Power & Light Wyodak, Black Hills Power & Light Simpson #1 and Simpson #2, Black Hills Corporation Wygen 1 (Black Hills Power & Light also has two natural gas power plants at the Wyodak site)I Reasonably foreseeable: NAPG Two Elk and Black Hills Wygen II Other proposed: NAPG Two Elk Unit Two and NAPG Middle Bear SGI International ENCOAL-Buckskin (inactive), KFx-K-Fuels Coal Pellet Plant (inactive), and Wyodak Earthco (inactive)

Proposed new power plants	

Existing coal enhancement:	

Sources: BLM 1979, 1981; WGS 1996-2003, and Wyoming State Inspector of Mines Annual Reports, 1990-2003.

As of October 2003, there were approximately 15,040 oil and gas wells producing in the Wyoming PRB. Most (approximately 12,530) of those wells were CBM wells. The remaining wells (approximately 2,510) were conventional oil or gas wells (WOGCC 2003). Additional wells have been drilled in the basin but have been abandoned or are not yet producing. Campbell and Converse counties’ oil production decreased about 60.4%, from 32.8 million barrels to 13.0 million barrels, over the ten year period from 1992 through 2002. Oil production throughout Wyoming is expected to continue to decline because exploration and production drilling has been weak, and old oil fields with declining

4-49


production produce most of Wyoming’s oil (WGS 2002). Oil production in the short term may be bolstered by some planned carbon dioxide flood projects in the PRB (WSGS 2003). Natural gas production has been increasing in Wyoming. In the PRB, this is due to the development of shallow CBM resources. CBM exploration and development is currently ongoing throughout the PRB in Wyoming. As discussed above, as of October 2003, there were approximately 12,500 producing CBM wells in the PRB, primarily in Campbell County Since the early 1990s, the Wyoming BLM has completed numerous EAs and two EISs analyzing CBM projects. The most recent of these is the four-volume Final EIS and Proposed Plan Amendment for the Powder River Basin Oil and Gas Project, which was completed in January 2003. The project area for this EIS includes almost eight million acres of mixed federal, state, and private lands within the Wyoming portion of the PRB, and encompasses all or portions of Campbell, Converse, Sheridan and Johnson counties in Wyoming. This EIS analyzes the cumulative impacts of reasonably foreseeable CBM and conventional oil and gas development. It evaluates the impacts of drilling, completing, operating, and reclaiming almost 39,400 new federal, state, and private CBM wells in addition to the roughly 12,100 federal, state, and private CBM wells that had been drilled or permitted when the EIS analysis was conducted. The EIS also analyzes the impacts of developing 3,200 new conventional oil and gas wells, as well as constructing, operating, and reclaiming various ancillary facilities needed to support the new CBM and conventional wells (BLM 2003a). Total projected short term and long term disturbance associated with the development under the Preferred Alternative were estimated at 211,643 acres and 102,658 acres respectively. With the completion of this EIS and the Montana Statewide Final EIS and Proposed Amendment of the Powder River and Billings Resource Management Plant (BLM 2003b), it is likely that the rate of CBM development will increase in the PRB in Wyoming and Montana. CBM wells can be drilled on private and state oil and gas leases after approval by the WOGCC and the Wyoming SEO. BLM must analyze the individual and cumulative environmental impacts of all drilling (federal, state, and private), as required by NEPA, before CBM drilling on the federal oil and gas leases can be authorized. BLM does not authorize drilling on state or private leases but must consider the impacts from those wells in their NEPA analyses. In many areas of the PRB the coal estate is federally owned, but the oil and gas estate is privately owned. A June 7, 1999 Supreme Court decision (98-830) assigned the rights to develop CBM on a piece of land to the owner of the oil and gas estate. In the 1970s, significant uranium development was anticipated in southwest Campbell County and northwest Converse County. This development did not materialize because the price of uranium dropped in the early 1980s. There are currently two in situ uranium operations in Converse and Johnson counties, but no mines and no mills. There were

4-50


three active in situ operations in the PRB in 1999, but one of them, located in southeastern Johnson County, has since ceased operations. The spot market price of uranium has been increasing from $7.10 per pound of yellowcake in December 2000 to $10.90 per pound in the first half of 2003. Scoria (or clinker), which is baked and fused rock formed by spontaneous prehistoric burning of coal seams, is quarried for use as road surfacing material primarily by coal mines but also by a few excavation and construction firms. Bentonite is mined in parts of the Wyoming PRB but not in Campbell or Converse counties. The proposed West Hay Creek LBA tract is situated at the north end of a nearly continuous corridor of six coal mines (Buckskin, Eagle Butte, Rawhide, Dry Fork, Fort Union, and Wyodak) in northern Campbell County, Wyoming (figure 1-1). The Fort Union Mine is currently inactive; the other five mines are active. This northern mine corridor is approximately 15 miles long and 5 miles wide. Production of coal in this northern mine group began in 1977, excluding the Wyodak Mine which has been operation since 1923. The maximum permitted production rate for these six mines is 122.9 million tons per year (table 4-5). As a result of the issuance of one maintenance lease and the completion of one lease exchange (Eagle Butte West Extension LBA and EOG-Belco Lease Exchange, table 1-1), approximately 1,658 acres of federal coal have been leased to mines in this northern group since the decertification of the federal coal region in 1990. There are two pending maintenance leases containing approximately 2,238 acres of federal coal in the northern group of mines (West Hay Creek, West Extension, table 1-2). CBM wells have been drilled around the Buckskin, Rawhide, and Eagle Butte mines. CBM drilling and production is expected to continue in the areas around the coal mines and on the LBAs. Due to the proximity of the coal mining and CBM production operations, cumulative impacts to groundwater, surface water, air quality, and wildlife have occurred and are likely to continue as CBM development continues adjacent to existing surface coal mining operations. These potential impacts are discussed in the following cumulative impact discussions for these resources. In addition to the ongoing coal mining and leasing and the CBM development, other projects planned in the vicinity of the northern mine group include the construction of the Wygen II coal-fired power plant which has been proposed at the Black Hills Corporation energy complex near the Wyodak Mine site. The power plant could be expected to have overlapping impacts with the impacts of mining the West Hay Creek LBA tract. Other projects planned in the PRB are located some distance south of the LBA tract near the middle and southern portion of the basin. These include the construction and operation of the North American Power Group’s Two Elk and Two Elk Unit 2 power plants east of the Black Thunder Mine; construction and operation by North American Power Group of a 500-megawatt coal fired Middle Bear power plant at the Cordero Rojo Complex; and construction and use of the proposed DM&E rail line. The impacts of mining the West Hay Creek LBA tract would not be expected to overlap with the impacts

4-51


of building and operating these projects. Black Hills Energy Capital, Inc., the independent power subsidiary of Black Hills Corporation, initiated the permitting process to build the 500-MW Wygen II power plant in 2002. The proposed plant would adjoin its other generating plant (Wygen I) near Gillette. It would be similar in features to the existing 360-MW Wyodak power plant at the same location. The Surface Transportation Board (STB) preliminarily approved the DM&E Railroad expansion plan (to build 280 miles of new track in the PRB and to rehabilitate approximately 600 miles of track across South Dakota and Minnesota) on December 11, 1998. The approval was made pending the completion of an analysis of the environmental impacts of the project. The Surface Transportation Board released the DEIS for public comment in September 2000; the FEIS for the DM&E expansion project was issued November 19, 2001. On January 30, 2002 the Surface Transportation Board announced its final approval for the DM&E PRB expansion project, subject to a number of environmental mitigation conditions and the requirement that DM&E use an environmentally preferable route that avoids sensitive areas along the Cheyenne River. DM&E’s originally proposed route in Wyoming generally followed along the Cheyenne River valley. DM&E originally proposed to start construction in 1999 and complete the new railroad line in 2001; however, final approval and construction could not take place until after the environmental analysis was completed. As a result of lawsuits that were filed against the project, several issues were remanded to the STB for further review and action. Once the lawsuits and the associated issues are resolved, DM&E must obtain permits or approvals from other federal agencies including the BLM, the USDA-FS and COE prior to commencing any construction activities. The rate of reclamation is one aspect of the surface coal mining operations where the actual levels reached in 1990 and 1995 did not meet the levels predicted for 1990 and 1995 in the regional EISs. In 1997, according to the “Annual Evaluation Summary Report for the Coal Regulatory Program Administered by the Land Quality Division of the Wyoming Department of Environmental Quality for Evaluation Year 2001” (OSM 2002), the OSM’s Casper Field Office and WDEQ/LQD reviewed four mine sites in Wyoming for compliance with contemporaneous reclamation requirements and compared on-the-ground reclamation with the approved reclamation plan in the permits for each of those mines. In that review, OSM and WDEQ/LQD found that the mine permits they reviewed did not set clear and concise time schedules and requirements for contemporaneous reclamation. In response to those findings, WDEQ/LQD agreed to review required reclamation schedules in all permits and to revise the annual reporting format to include information about contemporaneous reclamation progress. In 2001, contemporaneous reclamation was evaluated at four randomly assigned mines. According to the report cited above, the 2001 evaluation of contemporaneous reclamation “showed that reclamation was following mining disturbance at a reasonable rate. The reclamation rate at all four mines was at least 90% for the areas disturbed for

4-52


the previous 12 months. In addition, the standards for measuring reclamation contained in the four permits were reasonably clear and concise.” In the annual evaluation report for 2002, the OSM Casper Field Office indicated it is concerned that the rate at which lands are being reclaimed in Wyoming is decreasing when compared to the rate of disturbance. A similar concern is expressed in OSM’s 2003 Evaluation Report (OSM 2003). OSM tracks the ratio of acres of permanent reclamation each year to acres of net disturbance available for reclamation each year. Areas not available for reclamation include things such as stockpiles, active pits, access roads, haul roads, railroad rightsof-way, coal preparation and loading sites, offices, shops, sediment ponds, and other long-term approved uses. The ratio of reclamation to net disturbance was 1.43 for the 2001 evaluation year, 1.68 for the 2002 evaluation year, and 0.98 for the 2003 evaluation year. Since 1990, the ratio of reclamation to net disturbance has ranged from a low of 0.40 in 1997 to a high of 1.68 in 2002 (OSM 2002 and 2003). Some of the factors that affect achievement of contemporaneous reclamation standards include changing strip ratios which create material surpluses or deficits, using stockpiles to provide material to fill final pit voids or to store new pit boxcut material, changing the direction of mining pits to conform to lease configuration, changing plans to accommodate production growth, and changes in technology or mining method. Currently, WDEQ/LQD suggests to operators that only large, contiguous areas such as drainage basins be considered for bond release, with the assurance that the area will not be disturbed in the future. Because many mine plans cross a drainage basin several times during the life of mine, final reclamation of some drainage basins may not occur until late in the life of mine. For the northern group of mines, approximately 24% of the area of disturbance has been backfilled and graded. The Buckskin Mine was one of the nine operations reviewed by the OSM’s Casper Field Office, and they found a ratio of backfilled, graded and seeded land to disturbed land of 0.32 for the mine. Topography and Physiography Following surface coal mining and reclamation, topography will be modified in three groups of mines that lie within an elongated corridor which extends for about 75 miles from the Buckskin Mine, north of Gillette, to the Antelope Mine, south of Wright (Figure 1-1). The topography in the PRB is characterized by relatively flat or rolling topography. After reclamation, these characteristics will be emphasized in the reclaimed area. In general, in the mining corridor, premining features that were more topographically unique (steeper hills and gullies, and rock outcrops) will generally be smoothed. The overall reduction in topographic diversity in the mining corridor may lower the carrying capacity for big game in the reclaimed areas; however, big game ranges are generally very large and mining activities are not usually located in habitats defined as crucial. The general flattening and smoothing of the topography would result in increased

4-53


infiltration of surface water and reduced peak flows from the drainages. These changes would not be significant because the streams typically flow from west to east across the area rather than north to south along the entire corridor. Therefore, only a small part of each stream’s drainage area would be disturbed. There would be no substantial cumulative impacts to topography and physiography due to the proximity of CBM development, and the proposed railroad line power plants to the coal mining operations in this area because the construction and operation of those projects would cause minimal topographic and/or physiographic changes. Geology and Minerals The PRB coalfield encompasses an area of about 12,000 square miles. Finley and Goolsby (2000) estimate that approximately 587 billion tons of coal in beds thicker than 20 feet and deeper than 200 feet are found in the basin. The remaining strippable Wyodak coal reserves (with 200 feet or less of overburden) are estimated at 15.5 billion short tons (WGS 2002a). In the PRB, the currently leased coal reserves represent a small percentage of the total coal reserves but a large percentage of the shallowest, strippable coal reserves, which are the most economical to recover by surface mining. Within the five operating mines and one inactive mine (the Fort Union Mine) in the northern mine group, approximately 24,715 acres of federal coal are currently leased. This is about a 10% increase over the 22,483 acres of federal coal that were leased in the northern group of mines in 1990, before decertification of the Powder River Federal Coal Region. Actual coal production from 1993 to 2001 for the northern group increased about 17%, compared to a production increase of 58% for the middle group of mines and 137% for the southern group of mines over the same time period. If maintenance leases are issued for the Buckskin Mine West Hay Creek and the Eagle Butte Mine West Extension LBA tracts as applied for, approximately 2,238 additional acres of federal coal would be leased, which would represent a 9% increase in the area of leased federal coal in the northern group of mines. Under the preferred alternative for the West Hay Creek LBA tract, approximately 921 additional acres would be leased, which would represent a 3.7% increase in the area of leased coal in the northern mine group. The area of disturbance associated with mining these leases is generally greater than the leases themselves, as discussed in other parts of this document. In the case of the preferred alternative and alternative 3 for the West Hay Creek LBA tract, Triton assumes that no coal would be recovered from the approximately 31.16 acres added to the southeast corner of the tract under those alternatives. As a result the estimated area of additional disturbance, for the preferred alternative and alternative 3 is smaller than the area added by the lease. Portions of all the action alternatives are located in the area that will be disturbed by Buckskin Mine to mine the existing leases. Therefore, the additional disturbance area for the action alternatives is less than the additional lease area. Coal and CBM are nonrenewable resources which form as organic matter decays and undergo chemical changes over geologic time. The CBM and coal resources that are removed to generate heat and power would not be available for use in the future. No

4-54


potential damages to the coal resulting from removal of the CBM and water prior to mining have been identified. The CBM operators generally do not completely dewater the coal beds to produce the CBM because that could damage fractures in the coal and limit CBM production. Construction of the proposed railroad line and power plants would not impact the geology or mineral resources in the area, so there would be no overlapping impacts related to these projects. Soils The five operating northern mines would disturb approximately 25,300 acres throughout their combined lives. (Together they would disturb about 350 to 500 acres annually during active mining at the currently planned mining rates.) If the West Hay Creek LBA tract is leased and mined under the proposed action or Preferred Alternative, the disturbance area in the northern group of mines would increase to approximately 26,300 acres. This would represent an additional 4% increase in disturbance. Assuming ten years from initial disturbance to use of a parcel of reclaimed land by domestic livestock, approximately 3,500 to 5,000 acres would be unavailable for such use at any given time during active mining. The replaced topsoil would support a stable and productive native vegetation community adequate in quantity and quality to support planned postmining land uses (rangeland and wildlife habitat). More widespread, although less intensive, soil disturbance would be associated with proposed CBM development in the PRB. Soil disturbance associated with the construction of the proposed power plants and railroad line, which would be located south of the West Hay Creek LBA tract, would also be less intensive, if they are constructed as proposed. Air Quality The EPA CALPUFF dispersion model was used with meteorological data generated by the MM5 (mesoscale model) and CALMET models to perform air pollutant dispersion modeling to quantify potential PM10 and SO2 impacts related to proposed oil and gas development, including CBM development, in the PRB in northeastern Wyoming and southeastern Montana. The modeling was conducted by Argonne National Laboratory at the request of the Wyoming and Montana BLM to analyze potential air quality impacts from the oil and gas development alternatives being considered in the Wyoming Final EIS and Proposed Plan Amendment for the Powder River Basin Oil and Gas Project (BLM2003a) and the Montana Final Statewide Oil and Gas Environmental Impact Statement and Proposed Amendment of the Powder River and Billings Resource Management Plans (BLM2003b). These documents will be referred to as the “Wyoming PRB Oil and Gas Project EIS” and the “Montana Statewide EIS,” respectively, in the following discussion. The Wyoming project area for this air quality analysis includes Campbell, Sheridan, Johnson, and northern Converse counties. The Montana project area for this air quality analysis includes all of Carter, Powder River, Big Horn, Yellowstone, Carbon, Stillwater, Sweetgrass, Wheatland, Golden Valley, Musselshell, and Treasure counties and portions of Rosebud and Custer counties. The West Hay

4-55


Creek LBA tract analysis area is located in northern Campbell County, Wyoming, which lies in the eastern part of the Wyoming project area. Surface coal mining operations in Montana and Wyoming were included in the air quality impact assessment as nonproject emission sources (other reasonably foreseeable emission sources). Potential emissions from coal mining activities at each mine within the modeling domain were estimated for 2006, the projected peak emission year for CBM development. The coal mining emissions estimated were based on projected 2006 annual coal production estimates and mining locations provided by the Wyoming and Montana BLM. The reported emission rates per unit of coal production at each mine was provided by the WDEQ/AQD and the Montana Department of Environmental Quality/Air and Waste Management Bureau (MDEQ/AWM) The Argonne air quality impact analysis was prepared solely under the requirements of NEPA to assess and disclose reasonably foreseeable impacts to the public and BLM and FS decision makers. The air quality impact assessment was based on the best available engineering data and assumptions, meteorology data, and dispersion modeling procedures, as well as professional and scientific judgment. However, where specific data or procedures were not available, reasonable assumptions were incorporated. For example, the air quality impact assessment for Alternative 1 of the Wyoming PRB Oil and Gas Project EIS assumed that all CBM wells would go into production (no dry holes), then operate at full production levels (no shut-ins) for about 7 years, with an overall 20 year life of project (LOP). Potential direct project, indirect, and cumulative air quality impacts were analyzed to predict maximum potential near-field ambient air pollutant concentrations and potential hazardous air pollutant (HAP) impacts, as well as to determine maximum far-field ambient air pollutant concentrations, visibility, and atmospheric deposition (acid rain) impacts. The methodologies used to predict and interpret potential air quality impacts are described in the appendix E. There are several differences between the cumulative air quality impact analysis conducted for the Wyoming PRB Oil and Gas Project EIS and the Montana statewide EIS by Argonne National Laboratory and the WDEQ/AQD air quality permit analyses described earlier in this chapter. The Argonne analysis focuses on oil and gas and CBM development in the Wyoming and Montana PRB and includes other sources in the area, including surface coal mining, in a broad cumulative analysis. Each WDEQ/AQD permit analysis focuses on near-field coal mining impacts based on detailed information from surface coal mines in a specific area. The two analyses use different models (ISCLT for the WDEQ/AQD permit analyses versus CALPUFF for the Argonne analysis); different emission inventories (entire mine production for WDEQ/AQD permit versus projected production increases for the Argonne analysis); different mine boundary representations (Lands Necessary to Conduct Mining for the WDEQ/AQD analyses versus representative rectangular area for the Argonne analysis); and different background concentrations and sources. The WDEQ/AQD permit analyses use background concentrations of 15µg/m3 for PM10 and 20 µg/m3 for NO2 to represent

4-56


background concentration in the air prior to any coal mining activity and then models all sources in the area regardless of when they were built. The Argonne analysis uses 17 µg/m3 for PM10 and 16.5 µg/m3 for NOx, which represents the ambient air concentrations as of a specified date. Only sources that were constructed or permitted after that date are used in the model. As a result of the differences in the scope and nature of these two analyses, there are differences in the results produced by each analysis. Air pollution impacts are limited by state, tribal and federal regulations, standards, and implementation plans established under the CAA and administered by the applicable air quality regulatory agencies (including WDEQ/AQD, MDEQ/AWM, or the EPA). The Departments of Environmental Quality for adjacent states have similar jurisdiction over potential air pollutant emission sources in their respective states, which can have a cumulative impact with WDEQ/AQD and MDEQ/AWM approved sources. Air quality regulations require proposed new, or modified existing air pollutant emission sources (including CBM compression facilities) undergo a permitting review before their construction can begin. Therefore, the applicable state air quality regulatory agencies have the primary authority and responsibility to review permit applications and to require emission permits, fees, and control devices, prior to construction and/or operations of new projects. The U.S. Congress (through the CAA section 116) also authorized local, state, and tribal air quality regulatory agencies to establish air pollution control requirements more (but not less) stringent than federal requirements. As discussed in chapter 1, BLM would not authorize mining by issuing leases for the West Hay Creek LBA tract, but the impacts of mining the coal are considered because it is a logical consequence of issuing a lease. The West Hay Creek LBA tract was applied for by an existing mine with an air quality permit approved by WDEQ/AQD. If the LBA tract is leased as a maintenance tract to the Buckskin Mine, the mine would have to modify its existing approved air quality permit. That modified permit would have to be approved before the LBA tract could be mined. Additional site-specific air quality analysis would be performed, and additional emission control measures (including a BACT analysis and determination) could be required by the applicable air quality regulatory agencies to ensure protection of air quality. The significance criteria for potential air quality impacts include state, tribal, and federally enforced legal requirements to ensure air pollutant concentrations will remain within specific allowable levels. These requirements include the NAAQS and WAAQS which set maximum limits for several air pollutants, and PSD increments which limit the incremental increase of certain air pollutants (including NO2, PM10, and SO2) above legally defined baseline concentration levels. These legal limits were presented in table 4-3. Where legal limits have not been established, BLM uses the best available scientific information to identify thresholds of significant impacts. Thresholds have been identified for HAP exposure, incremental cancer risks, potential atmospheric deposition impacts to sensitive lakes, and a “just noticeable change” in potential visibility impacts.

4-57

Emission Sources The air quality impact analysis uses market demand predictions in order to estimate levels of coal production in the PRB for modeling purposes. There is enough coal leased to the existing mines in the PRB to supply this market demand during the time of maximum CBM development activity in the PRB, which is the time when the maximum overlapping impacts to air quality would occur. The air quality impact assessment considered production from existing surface coal mines in Wyoming and Montana, including the Buckskin Mine, at levels that would supply anticipated market demand for the years considered in the analysis. As a result, the cumulative impacts predicted by the PRB air quality impact assessment would be the same under the proposed action and all of the alternatives for leasing or not leasing the federal coal in the West Hay Creek LBA tract. As discussed in chapter 3, the major air pollutants emitted from surface coal mining activities are fugitive dust and tailpipe emissions from large mining equipment. Activities such as blasting, loading, and hauling overburden and coal and the large areas of disturbed land all produce dust. Stationary or point sources are associated with coal crushing, storage, and handling facilities. In general, particulate matter (PM10) is the major significant pollutant from coal mine point sources. The measures that are being used to control air pollutant emissions from existing approved mining operations, which are also described in chapter 3, include baghouse dust collection systems, PECs, or atomizers/foggers, paving mine access roads, applying water and chemical dust suppressants on all haul roads used by trucks and/or scrapers, limiting haul truck speeds, limiting material drop heights for shovels and draglines (bucket to truck bed or backfill), using permanent and temporary revegetation of disturbed areas to minimize wind erosion, and using stilling sheds at coal truck dumps. In addition, some of the mines are participating in the control of fugitive emissions from some nearby unpaved county roads by applying dust suppressants. These measures would be applied under all of the alternatives being considered in this EIS. Air quality impacts related to oil and gas development would occur during construction (due to potential surface disturbance by earth-moving equipment, vehicle traffic fugitive dust, well pad construction, well drilling, well completion testing, as well as drilling rig and vehicle engine exhaust) and production (including non-CBM well production equipment, booster (field) and pipeline (sales) compression engine exhausts). The amount of air pollutant emissions during construction would be controlled by watering disturbed soils, and by air pollutant emission limitations imposed by applicable air quality regulatory agencies. Maximum construction impacts from fugitive dust (24-hour PM10) are estimated to be 55 µg/m3, about one third of the applicable WAAQS. Actual air quality impacts depend on the amount, duration, location, and emission characteristics of potential emissions sources, as well as meteorological conditions (wind speed and direction, precipitation, and relative humidity). For additional information about the assumptions used in the cumulative air quality impact assessment and how it was conducted, please refer to the Wyoming Oil and Gas Project EIS (BLM2003a), the Montana Statewide EIS ((BLM 2003b) and the Air Quality Impact

4-58


Assessment Technical Support Document (Argonne 2002.) Predicted Air Quality Impacts The Wyoming PRB Oil and Gas Project EIS evaluates four alternatives. Alternative 1 is the Proposed Action, which assumes that there would be 39,400 new CBM wells in the Wyoming PRB by 2012 in addition to the 12,000 existing wells. The proposed action also assumes drilling of an estimated 3,200 conventional oil and gas wells in the same time period. Alternatives 2a and 2b evaluate alternate emission levels and water handling scenarios. The preferred alternative is a combination of Alternative 1 and Alternative 2a. Under Alternative 3 (the No Action Alternative), drilling would not occur on federal oil and gas leases but would continue on state and private oil and gas leases. BLM estimates that approximately 15,500 new CBM wells would be developed on state and private lands by 2012 under this alternative, in addition to the 12,000 existing wells. For the purposes of this EIS, the range of potential near-field impacts predicted by the cumulative air quality analysis for all the three oil and gas action alternatives are shown in the following tables, as well as the potential impacts predicted under the No Action Alternative. Please refer to the Wyoming PRB Oil and Gas Project EIS (BLM 2003a) to see the individual results for each oil and gas alternative. Wyoming PRB Oil and Gas EIS Alternatives 1, 2a, and 2b Under all three oil and gas action alternatives, potential direct project air quality impacts would not violate any local, state, tribal, or federal air quality standards. Based on extensive air quality modeling of potential direct project air quality impacts (Argonne 2002), localized short-term increases in CO, NOx, PM10, and SO2 concentrations would occur, but all maximum concentrations are expected to be below applicable NAAQS and WAAQS. All maximum near-field direct project NO2, PM10 and SO2 concentrations are expected to be below applicable PSD Class II increments (table 4-7), and all maximum far-field direct project concentrations are expected to be below applicable PSD Class I increments (appendix E). Although potential direct project impacts to even the most sensitive far-field lakes would not be significant, a “just noticeable change” in visibility was predicted to occur at from nine to eleven mandatory federal Class I areas, ranging up to five days at the Washakie Wilderness Area. The maximum potential direct project visibility impacts were predicted to occur on 14 to 20 days per year on the Crow Indian Reservation. A more detailed description of the Argonne National Laboratory air quality impact analysis is presented in the air quality appendix (appendix E).

4-59


TABLE 4-7 


RANGE OF PREDICTED MAXIMUM POTENTIAL NEAR-FIELD IMPACTS UNDER 
 ALTERNATIVE 1, 2A, AND 2B OF THE WYOMING PRB OIL AND GAS PROJECT EIS

(with Montana Alternative E) Project (Pg/m3) 6 to 8 <1 2 3 3 15 to 20 1 to 2 11 to 16 77 to 156 157 to 223 142 170 to 224 124 132 to 156 1500 3500 1 9 2 12 to 24 8 19 1 9 4 25 to 31 17 30 17 42 21 67to 73 10 38 to 43 <1 2 5 1 3 5 20 91 512 3 8 8 4 11 13 3 9 to 10 25 17 26 to 28 100 60 260 1,300 50 150 15 65 10,000 40,000 Nonproject (Pg/m3)2 Cumulative (Pg/m3) PSD Class II (Pg/m3) Background (Pg/m3) Total (Pg/m3)1 WAAQS (Pg/m3) NAAQS (Pg/m3) 100 80 365 1,300 50 150 15 65 10,000 40,000

Pollutant

Averaging Time

NO2	

Annual

SO2	

Annual 24 hour	 3 hour	

PM10	

Annual 24 hour

PM2.5	

Annual 24 hour

4-60


CO

8 hour

1 hour

1624 to 1656 3670 to 3724

The contributions from each source represent maxima and do not necessarily occur at the same location. Therefore, the total concentrations will not always equal the sum of the monitored background, project, and nonproject concentrations.

1

2

Nonproject sources include CBM sources in Montana and surface coal mining operations in Wyoming and Montana.

TABLE 4-8 


PREDICTED MAXIMUM POTENTIAL NEAR-FIELD IMPACTS UNDER ALTERNATIVE 3 
 OF THE WYOMING PRB OIL AND GAS PROJECT EIS

(with Montana Alternative E) Project (Pg/m3) 3 <1 1 1 1 7 <1 6 183 261 124 142 183 261 0.7 9 1 13 8 19 1500 3500 1 9 2 16 17 30 17 42 19 58 9 32 1683 3761 <1 2 5 <1 2 5 20 91 512 3 8 8 3 10 13 3 6 25 17 23 100 60 260 1300 50 150 15 65 10,000 40,000 Nonproject (Pg/m3)2 Cumulative (Pg/m3) PSD Class II (Pg/m3) Background (Pg/m3) Total (Pg/m3)1 WAAQS (Pg/m3) NAAQS (Pg/m3) 100 80 365 1300 50 150 15 65 10,000 40,000

Pollutant

Averaging Time

NO2	

Annual

SO2	

Annual 24 hour 3 hour

PM10	

Annual 24 hour

PM2.5	

Annual 24 hour

4-61


CO	

8 hour 1 hour

The contributions from each source represent maxima and do not necessarily occur at the same location. Therefore, the Total concentrations will not always equal the sum of the monitored background, project, and nonproject concentrations.

1

2

Nonproject sources include CBM sources in Montana and surface coal mines in Wyoming and Montana.

Wyoming PRB Oil and Gas EIS Alternative 3 Potential direct project air quality impacts would not violate any local, state, tribal, or federal air quality standards under Alternative 3 (No Action) of the Wyoming PRB Oil and Gas Project EIS. Based on extensive air quality modeling of potential direct project air quality impacts (Argonne 2002), localized short-term increases in CO, NOx, PM10, and SO2 concentrations would occur, but all maximum concentrations are expected to be below applicable NAAQS and WAAQS. All maximum near-field direct project NO2, PM10 and SO2 concentrations are expected to be below applicable PSD Class II increments (table 4-8), and all maximum far-field direct project concentrations are expected to be below applicable PSD Class I increments (appendix E). Although potential direct project impacts to even the most sensitive far-field lakes would not be significant, a “just noticeable change” in visibility was predicted to occur one day per year at the mandatory federal Class I Bridger, Fitzpatrick, and Washakie wilderness areas. The maximum potential direct project visibility impacts were predicted to occur on 10 days per year on the Crow Indian Reservation. A more detailed description of the Argonne National Laboratory cumulative air quality impact analysis is presented in the air quality appendix. Cumulative Impacts The EPA CALMET/CALPUFF dispersion model system was used to predict maximum potential air quality impacts at downwind mandatory federal PSD Class I areas, and other sensitive receptors. This was done 1) to determine if the WAAQS, NAAQS, or PSD Class I increments might be exceeded; 2) to calculate potential nitrate and sulfate atmospheric deposition (and their related impacts) in sensitive lakes; and 3) to predict potential impacts to visibility (regional haze). Argonne National Laboratory also conducted this analysis at the request of the Wyoming and Montana BLM. Meteorological information was assembled to characterize atmospheric transport and dispersion from several data sources, including: 1) 4 km gridded wind field values derived from the MM5 (mesoscale model) with continuous four-dimensional data assimilation; and 2) hourly surface observations (wind speed, wind direction, temperature, cloud cover, ceiling height, surface pressure, relative humidity, and precipitation). Wyoming PRB Oil and Gas Project EIS and Montana Statewide Oil and Gas EIS potential project sources were combined with nonproject sources to determine the total potential cumulative air quality impacts. Coal mining operations in Wyoming and Montana were included as nonproject sources. Potential CO and NOx emissions were analyzed to predict potential maximum near-field PSD Class II impacts, as well as potential far-field impacts at 29 mandatory federal PSD Class I and other sensitive areas located in Wyoming, Montana, North and South Dakota, and Nebraska (Argonne 2002). Total concentrations are expected to be in

4-62


compliance with applicable WAAQS and NAAQS (appendix E). Table 4-9 presents the maximum predicted air pollutant concentrations at specified PSD Class I areas. Under the alternatives considered in the Wyoming PRB Oil and Gas Project EIS, potential nonproject and cumulative annual NO2 concentrations and potential project, and cumulative 24-hour PM10 concentrations were predicted to be above the PSD Class I increment within the Northern Cheyenne Reservation. Under the Wyoming PRB Oil TABLE 4-9 
 MAXIMUM PREDICTED PSD CLASS I AREA
 CUMULATIVE FAR-FIELD IMPACTS (in µg/m3
 GAS PROJECT EIS ALTERNATIVE 1 (PROPOSED ACTION) AND ALL WEST HAY 
 CREEK LEASE APPLICATION EIS ALTERNATIVES

Maximum Modeled PSD Concentration Class I (Cumulative) Increment 4.2 12.8 2.5 8

Pollutant

Averaging Period

Class I Area Northern Cheyenne Reservation Northern Cheyenne Reservation

Nitrogen dioxide Annual PM10 24-hour

Annual

Northern Cheyenne Reservation Northern Cheyenne Reservation Absaroka-Beartooth Wilderness Northern Cheyenne Reservation

1.7

4

Sulfur dioxide

3-hour

5.1

25

24-hour

2.4

5

Annual Source: Argonne 2002

0.3

2

and Gas Project EIS Preferred Alternative, cumulative 24-hour PM10 concentrations were also predicted to be above the PSD Class I increment (8 µg/m3) within the Washakie Wilderness Area. These impacts would be the same under all of the coal leasing alternatives considered in this EIS. As described in the air quality appendix (appendix E), other PSD Class I areas had predicted far-field impacts below applicable increments. All PSD Class II areas had predicted far-field impacts below applicable PSD increments. This NEPA analysis compares potential air quality impacts from the proposed Wyoming PRB Oil and Gas Project EIS alternatives to applicable ambient air quality standards and PSD increments, but these comparisons to PSD Class I and II 4-63


increments do not represent a regulatory PSD increment consumption analysis. Even though most of the development activities would occur within areas designated PSD Class II, the potential impacts on regional Class I areas are to be evaluated. For a new source review air quality permit application for a major source, the applicable air quality regulatory agencies may require a regulatory PSD increment analysis. More stringent emission controls beyond BACT may be stipulated in the air quality permits if impacts are predicted to be greater than the PSD Class I or Class II increments. As discussed previously, existing surface coal mining operations in the PRB, including the Buckskin Mine, are not currently affected by the PSD regulations. Several lakes within four FS-designated wilderness areas for which the most recent and complete data have been collected were identified as being sensitive to atmospheric deposition. The FS has also identified the following limit of acceptable change regarding potential changes in lake chemistry: no more than a 10% change in ANC for those water bodies where the existing ANC is at or above 25 µeq/L; and no more than a one µeq/L change for those extremely sensitive water bodies where the existing ANC is below 25 µeq/L. Based on a Rocky Mountain Region FS screening method (FS 2000), table 4-10 demonstrates that potential impacts to most sensitive lakes would be below applicable significance thresholds. However, under the Wyoming PRB Oil and Gas Project EIS alternatives, potential nonproject ANC impacts were predicted to exceed the 1.0 µeq/L impact threshold at the very sensitive Upper Frozen Lake within the PSD Class I Bridger Wilderness Area. Cumulative ANC impacts ranged from 1.6 to 1.8 µeq/L. Up to 27% of these impacts would be due to direct contributions from the Wyoming PRB Oil and Gas Project EIS alternatives alone. In addition, under Wyoming PRB Oil and Gas Project EIS Alternative 1 and 2A, cumulative ANC impacts (up to 10.4%) were predicted to exceed the 10% impact threshold at Florence Lake within the PSD Class II Cloud Peak Wilderness Area. Nearly 30% of these impacts would be due to direct contributions from the alternatives evaluated in the Wyoming PRB Oil and Gas Project EIS. Potential impacts at all other sensitive lakes (and under all Wyoming PRB Oil and Gas Project EIS alternatives) were below the ANC threshold levels. No sensitive lakes were identified by either the NPS or FWS. Since the development of the project and nonproject air pollutant emission sources included in the cumulative air quality impact analysis constitute many small sources spread out over a very large area, discrete visible plumes are not likely to affect the mandatory federal PSD Class I areas, but the potential for cumulative visibility impacts (increased regional haze) is a concern. Regional haze degradation is caused by fine particles and gases scattering and absorbing light. Potential changes to regional haze are calculated in terms of a perceptible “just noticeable change” (1.0 dv) in visibility when compared to background conditions.

4-64


TABLE 4-10 
 PREDICTED TOTAL CUMULATIVE CHANGE IN ACID NEUTRALIZING CAPACITY 
 AT SENSITIVE AREA LAKES
(percent change) Background ANC (µeq/L) 69 61 68 5.8a 61.4 27 36 55.3 32.7 55.5 Area (hectares) 890 205 293 65 4,455 26 45 293 417 155 Change (percent) 2.2 to 2.1 2.5 to 3.0 1.3 to 1.5 1.6 to 1.9b 1.8 to 2.1 2.3 to 2.5 1.6 to 1.8 5.0 to 6.0 8.9 to 10.7 3.2 to 3.8 Thresholds (percent) 10 10 10 1b 10 10 10 10 10 10

Wilderness Area Bridger

Lake Black Joe Deep Hobbs Upper Frozen Ross Stepping Stone Twin Island Emerald Florence Lower Saddlebag

Fitzpatrick Absaroka-Beartooth

Cloud Peak

Popo Agie

The background concentration is based on only six samples taken on four days between 1997 and 
 2001.
 b Since the background ANC value is less than 25 µeq/L, the potential ANC change is expressed in 
 µeq/L, and the applicable threshold is one µeq/L.
 Source: Argonne 2002

a

A 1.0 dv change is considered a small but noticeable change in haziness as described in the preamble to the EPA regional haze regulations (Federal Register, Vol. 64 No. 126, dated July 1, 1999). A 1.0 dv change is defined as about a 10% change in the extinction coefficient (corresponding to a 2% to 5% change in contrast, for a black target against a uniform sky, at the most optically sensitive distance from an observer), which is a small but noticeable change in haziness under most circumstances when viewing scenes within mandatory federal Class I areas. It should be noted that a 1.0 dv change is not a “just noticeable change” in all cases for all scenes. Visibility changes less than 1.0 dv are likely to be perceptible in some cases, especially where the scene being viewed is highly sensitive to small amounts of pollution, such as due to preferential forward light scattering. Under other view-specific conditions, such as where the sight path to a scenic feature is less than the maximum visual range, a change greater than 1.0 dv might be required to be a “just noticeable change.”

4-65

This NEPA analysis is not designed to predict specific visibility impacts for specific views in specific mandatory federal Class I areas based on specific project designs. It is to characterize reasonably foreseeable visibility conditions that are representative of a fairly broad geographic region based on reasonable emission source assumptions. This approach is consistent with both the nature of regional haze and the requirements of NEPA. At the time of a preconstruction air quality PSD permit application, the applicable air quality regulatory agency may require a much more detailed visibility impact analysis. Factors such as the magnitude of dv change, frequency, time of the year, and the meteorological conditions during times when predicted visibility impacts are above the 1.0 dv threshold (as well as the modeling analyses assumptions) should all be considered when assessing the significance of predicted impacts. The FS, NPS, and FWS have published their final FLAG Phase I report (Federal Register, Vol. 66 No. 2, dated January 3, 2001), providing “a consistent and predictable process for assessing the impacts of new and existing sources on AQRVs” including visibility. For example, the FLAG report states “A cumulative effects analysis of new growth (defined as all PSD increment-consuming sources) on visibility impairment should be performed,” and further, “If the visibility impairment from the proposed action, in combination with cumulative new source growth, is less than a change in extinction of 10 percent [1.0 dv] for all time periods, the FLMs will not likely object to the proposed action.” Although the FLAG procedures were primarily designed to provide analysis guidance to PSD permit applicants, the following analysis uses the Final FLAG Phase I report procedures for this NEPA analysis. Based on multiple iterations of the nonsteady state CALPUFF dispersion modeling system, including the CALMET meteorological model, for four different development alternatives, potential cumulative visibility impacts estimated by the seasonal FLAG screening method exceeded the impact thresholds (including the use of FLAG and WDEQ/AQD provided background extinction values) at all 29 sensitive areas analyzed. Therefore, potential maximum visibility impacts were estimated using the daily FLAG refined method (based on hourly optical extinction and relative humidity values measured at two IMPROVE monitoring locations) for each Class I and Class II sensitive area. Although the potential modeled impacts for each sensitive area were based on 1996 MM5 regional meteorology, these values were compared to hourly optical extinction and relative humidity data collected at two locations in the analysis area between 1989 and 1999. For example, since the 1.0 dv threshold was predicted to be reached within the mandatory federal PSD Class I Washakie Wilderness Area based on the seasonal FLAG screening methodology, the maximum modeled cumulative impacts at that area were also compared to representative hourly optical and relative humidity values measured at Bridger Wilderness Area between 1989 and 1999 using the daily FLAG refined method (table 4-11). The range of impacts was then summarized as the annual average number of days over the 11-year periods predicted to equal or exceed a 1.0 dv “just noticeable change” (table 4-12).

4-66

The prediction of potential visibility impacts based on the daily FLAG refined methodology using measured optical extinction conditions is intended to disclose potential air quality impacts on the affected environment to the public and decision maker before an action is taken. It is not intended to be an air quality regulatory analysis. Such analysis would be conducted by the applicable air quality regulatory agencies before actual development would occur. The applicable air quality regulatory agencies (including the state, tribe, or EPA) would review specific air pollutant emissions preconstruction permit applications that examine source-specific air quality impacts. As part of these permits (depending on source size), the air quality regulatory agencies could require additional air quality impacts analyses or mitigation measures. Thus, before development occurs, additional site-specific air quality analyses would be performed to ensure protection of air quality. For further mitigation information see the “Regulatory Compliance, Mitigation, and Monitoring” section of this chapter and appendix E. TABLE 4-11 
 PREDICTED VISIBILITY IMPACTS IN THE MANDATORY FEDERAL PSD CLASS I 
 WASHAKIE WILDERNESS AREA FROM DIRECT WYOMING PRB OIL AND GAS 
 PROJECT EIS ALTERNATIVE SOURCES – DAILY FLAG-REFINED METHOD

(average number of days per year predicted to equal or exceed a 1.0 dv “just noticeable change”) Alternative 1 2A 2B 3 1989 4 2 1 1 1990 2 2 2 0 1991 7 6 6 4 1992 6 5 5 3 1993 4 4 3 1 1994 7 6 6 1 1995 4 4 4 2 1996 6 5 4 2 1997 7 5 5 2 1998 2 1 1 0 1999 6 4 3 0

Note: Potential cumulative visibility impacts were predicted using daily background optical and relative humidity conditions for each of the years listed above. Source: Argonne 2002

Coal mines develop predictive models to assess the potential air quality impacts of their mining operations. Based on these predictive models conducted for PRB mines, mining operations do not have significant off-site particulate pollution impacts, even when production and pollution from neighboring mines are considered. However, this prediction has been based on the assumptions that mining activities are sufficiently removed from the permit boundaries and that neighboring mines are not actively mining in the immediate vicinity (within 0.6-2.5 miles). Previous modeling (BLM 1992a) has shown that incremental particulate pollution impacts decrease to insignificant levels (<1 µg/m3 PM10 annual average) within 6 miles of active mining. In cases where mines are within 2 miles, WDEQ follows a modeling protocol which accounts for all mine-generated particulate air pollutants from all nearby mines to determine impacts to ambient air quality. Known as the Mine A/Mine B modeling

4-67


TABLE 4-12 
 PREDICTED VISIBILITY IMPACTS IN CLASS I AREAS – DAILY FLAG-REFINED
 METHOD

(average number of days per year predicted to equal or exceed a 1.0 dv “just noticeable change”) Nonproject Sources 13 to 17 7 to 9 6 to 9 3 to 4 3 to 5 9 to 13 0 to 1 2 to 2 6 to 9 1 to 1 1 to 3 4 to 5 10 to 14 17 to 21 8 to 11 27 to 82 Cumulative Sources 18 to 28 8 to 12 8 to 12 3 to 4 4 to 8 11 to 15 0 to 3 2 to 3 7 to 11 1 to 3 2 to 7 5 to 8 12 to 18 22 to 28 9 to 13 33 to 92

Class I Area Badlands Wilderness Area1 Bridger Wilderness Area Fitzpatrick Wilderness Area Gates of the Mtns Wilderness Area Grand Teton National Park North Absaroka Wilderness Area Red Rock Lakes Wilderness Area Scapegoat Wilderness Area Teton Wilderness Area Theodore Roosevelt NMP2 (North Unit) Theodore Roosevelt NMP2 (South Unit) U.L. Bend Wilderness Area Washakie Wilderness Area Wind Cave National Park Yellowstone National Park Northern Cheyenne Reservation3

Alt 1

Alt 2A

Alt 2B

Alt 3

3 4 4 0 1 4 0 0 3 0 1 1 5 4 3 17

3 4 3 0 1 3 0 0 3 0 0 1 4 3 2 16

1 3 3 0 0 2 0 0 2 0 0 1 4 2 1 14

0 1 1 0 0 0 0 0 0 0 0 0 1 0 0 7

Note: Results shown are the predicted impacts under Wyoming PRB Oil and Gas Project alternatives 1, 2A, 2B, and 3; impacts related to coal mining under all West Hay Creek lease application EIS (alternatives are included Under “Nonproject Sources”)
1

2 3

Congress designated the wilderness area portion of Badlands National Park as a mandatory federal PSD Class I area. The remainder of Badlands National Park is a PSD Class II area. NMP - National memorial park. Although the Northern Cheyenne Reservation is a tribal designated PSD Class I area, it is not a mandatory federal PSD Class I area subject to EPA’s regional haze regulations.

Nonproject Sources – The impact of all air pollutant emission sources not included in Wyoming PRB Oil and Gas Project EIS Alt 1, Alt 2A, Alt 2B or Alt 3, including existing surface coal mines in Wyoming and Montana and the Montana Statewide EIS sources. The range of potential annual average days above a 1.0 dv “just noticeable change” in visibility corresponds to including Montana Alternative A (low) to Montana Alternative B/C/E (high). Cumulative Sources – The impact of all cumulative air pollutant emission sources combined, including Wyoming PRB Oil and Gas Project EIS Alt 1, Alt 2A, Alt 2B, Alt 3, and nonproject sources (which include the West Hay Creek Lease Application EIS proposed action and alternatives and Montana Statewide EIS sources). The range of potential annual average days above a 1.0 dv “just noticeable change” in visibility corresponds to: including nonproject, Wyoming Alternative 3 and Montana Alternative A sources (low); up to including nonproject, Wyoming Alternative 1 and Montana Alternative B/C/E sources (high). Source: Argonne 2002

4-68


procedure, this model evaluates the total impacts of a given mining operation, including those impacts from and on neighboring mines. The Rawhide Mine is located within two miles of the Buckskin Mine. Gaseous orange clouds, some containing concentrations of NOx, have been produced by overburden blasting at surface coal mines in the PRB. In 1995, 1998, and 1999, OSM received citizen complaints concerning NOx gases generated from blasting operations drifting off mine permit areas (OSM 2000). No citizen complaints were received by OSM or WDEQ during the 2001 evaluation year, which ended on September 30, 2001 (OSM 2002) or the 2002 evaluation year, which ended on September 30, 2002 (OSM 2002). These gaseous orange clouds generally do not overlap due to the distances between mines and the variation in blasting schedules. The nature of these blasting clouds and human health consequences resulting from short-term exposures to NOx are discussed earlier in this chapter. There is no shortterm ambient air standard for NO2 in Wyoming. In response to the public concern about these clouds and the potential consequences to human health, WDEQ and the mines have developed required and voluntary measures to protect the public from exposure to the clouds as described in chapter 3. The mines in the eastern PRB have also been cooperating in a research and development effort aimed at reducing blasting clouds, which are also discussed in chapter 3. This research has led to changes in blasting agents and the size of blasting shots that have reduced NOx emissions during blasting. As indicated above, no citizen complaints were received by OSM or WDEQ/LQD during the 2001 or 2002 evaluation years. Another air quality concern is the venting of methane that occurs when coal is mined. Methane is generated from coal beds. When coal is mined, either by surface or underground methods, the methane that is present in the coal is vented to the atmosphere. Methane is a greenhouse gas that contributes to global warming. According to the “EIA/DOE, U.S. anthropogenic methane emissions totaled 28.0 million metric tons in 2001 (DOE 2002). US 2001 methane emissions from coal mining were estimated at 2.78 million metric tons (10% of the US total anthropogenic methane emissions in 2001). The EIA/DOE estimates that surface coal mining was responsible for about 0.5e million metric tons of methane emissions in 2001. This represents about 1.89% of the estimated US anthropogenic methane emissions in 2001, and about 19.06% of the estimated methane emissions attributed to coal mining of all types. Based on the 2001 coal production figures, it is estimated that Wyoming and Montana PRB surface coal mines were responsible for approximately 0.98% of the estimated US anthropogenic methane emissions in 2001. In many areas, including the PRB, CBM is being recovered from coal and sold. On a large scale, recovery of CBM from the coal before mining by both surface and underground methods could potentially gradually reduce US emissions of CBM to the atmosphere. In the PRB, CBM is being produced from the coal areas adjacent to and 4-69


generally downdip of the mines. CBM is currently being produced from the same coal seams that would be mined in West Hay Creek LBA tract included in this EIS. As discussed earlier in this chapter, BLM estimates that a large portion of the CBM reserves could be recovered prior to initiation of mining activity on the LBA tract under the proposed action or action alternatives. CBM reserves that are not recovered prior to mining would be vented to the atmosphere. Water Resources Groundwater As a result of statutory requirements and concerns, several studies and a number of modeling analyses have been conducted to help predict the impacts of surface coal mining on groundwater resources in the Wyoming portion of the PRB. Some of these studies and modeling analyses are discussed below. In 1987, the USGS, in cooperation with the WDEQ and OSM, conducted a study of the hydrology of the eastern PRB. The resulting description of the cumulative hydrologic effects of all current and anticipated surface coal mining (as of 1987) was published in 1988 in the USGS Water-Resources Investigation Report entitled “Cumulative Potential Hydrologic Impacts of Surface Coal Mining in the Eastern Powder River Structural Basin, Northeastern Wyoming”, also known as the “CHIA” (Martin, et al. 1988). This report evaluates the potential cumulative groundwater impacts of surface coal mining in the area and is incorporated by reference into this EIS. The CHIA analysis included the proposed mining of all the leases at all of the existing PRB mines as of 1987, including the Buckskin Mine. It did not evaluate groundwater impacts related to potential coal leasing in this area subsequent to 1987 and it did not consider the potential for overlapping groundwater impacts from coal mining and CBM development. Each mine must assess the probable hydrologic consequences of mining as part of the mine permitting process. The WDEQ/LQD must evaluate the cumulative hydrologic impacts associated with each proposed mining operation before approving the mining and reclamation plan for each mine, and they must find that the cumulative hydrologic impacts of all anticipated mining would not cause material damage to the hydrologic balance outside of the permit area for each mine. As a result of these requirements, each existing approved mining permit includes an analysis of the hydrologic impacts of the surface coal mining proposed at that mine. If revisions to mining and reclamation permits are proposed, then the potential cumulative hydrologic impacts of the revised mining operations must also be evaluated. If the West Hay Creek LBA tract is leased to the applicant, the existing mining and reclamation permit for the Buckskin Mine must be revised and approved before the tract can be mined. Additional groundwater impact analyses have also been conducted to evaluate the potential cumulative impacts of coal mining and CBM development. One example of these analyses is the report entitled A Study of Techniques to Assess Surface and Groundwater Impacts Associated with Coal Bed Methane and Surface Coal Mining,

4-70


Little Thunder Creek Drainage, Wyoming (Wyoming Water Resources Center 1997). This study was prepared as part of a cooperative agreement involving WDEQ/LQD, the Wyoming State Engineer’s Office, the WSGS, BLM, OSM, and the University of Wyoming. The Wyodak CBM draft and final EIS (BLM 1999a and 1999c) presented the results of a modeling analysis of the potential cumulative impacts of coal mining and CBM development on groundwater in the coal and overlying aquifers as a result of coal mining and CBM development. The results of these previously prepared analyses are incorporated by reference into this EIS. The Wyoming PRB Oil and Gas Project EIS includes an updated modeling analysis of the groundwater impacts if 39,000 new CBM wells are drilled in the PRB by the end of 2011. The project area for this EIS covers all of Campbell, Sheridan, and Johnson counties, as well as the northern portion of Converse County. Another source of data on the impacts of surface coal mining on groundwater is the monitoring that is required by WDEQ/LQD and administered by the mining operators. Each mine is required to monitor groundwater levels and quality in the coal and in the shallower aquifers in the area surrounding their operations. Monitoring wells are also required to record water levels and water quality in reclaimed areas. The coal mine groundwater monitoring data is published each year by the GAGMO, a voluntary group formed in 1980. Members of GAGMO include most of the companies with operating or proposed mines in the Wyoming PRB, WDEQ, the Wyoming SEO, BLM, USGS, and OSM. GAGMO contracts with an independent firm each year to publish the annual monitoring results. In 1991, GAGMO published a report summarizing the water monitoring data collected from 1980 to 1990 in the Wyoming PRB (Hydro-Engineering 1991b). In 1996, they published a report summarizing the data collected from 1980 to 1995 (Hydro-Engineering 1996a). In 2001, GAGMO published a report summarizing the water monitoring data collected from 1980 to 2000 (Hydro-Engineering 2001). The northern group of mines uses several hundred acre-feet of water per year for drinking, sanitation, washing equipment, and dust control. Sources of this water include seepage into the mine pits, sediment- and flood-control impoundments, as well as production from the aquifers below the coal. The major groundwater issues related to surface coal mining that have been identified are: x	 the effect of the removal of the coal aquifer and any overburden aquifers within the mine area and replacement of these aquifers with backfill material; x	 the extent of the temporary lowering of static water levels in the aquifers around the mine due to dewatering associated with removal of these aquifers within the mine boundaries;

4-71

x	 the effects of the use of water from the subcoal Fort Union Formation by the surface coal mines; x	 changes in water quality as a result of surface coal mining; and x	 potential overlapping drawdown in the coal due to proximity of coal mining and CBM development. The impacts of large scale surface coal mining on a cumulative basis for each of these issues are discussed in the following paragraphs. The effects of replacing the coal aquifer and overburden with a backfill aquifer is the first major groundwater concern. The following discussion of recharge, movement, and discharge of water in the backfill aquifer is excerpted from the CHIA (Martin et al. 1988): “Postmining recharge, movement, and discharge of groundwater in the Wasatch aquifer and Wyodak coal aquifer will probably not be substantially different from premining conditions. Recharge rates and mechanisms will not change substantially. Hydraulic conductivity of the spoil aquifer will be approximately the same as in the Wyodak coal aquifer allowing groundwater to move from recharge areas where clinker is present east of mine areas through the spoil aquifer to the undisturbed Wasatch aquifer and Wyodak coal aquifer to the west.” GAGMO data from 1990 to 2000 verify that recharge has occurred and is continuing in the backfill (Hydro-Engineering 1991a, 1992, 1993, 1994, 1995, 1996b, 1997, 1998, 1999, 2000, 2001). The water monitoring summary reports prepared each year by GAGMO list current water levels in the monitoring wells completed in the backfill and compare them with the 1980 water levels, as estimated from the 1980 coal water-level contour maps. In the 1991 GAGMO 10-year report, some recharge had occurred in 88% of the 51 backfill wells reported for that year. In the GAGMO 20-year report, 79 of the 82 backfill wells (96%) measured contained water. The cumulative size of the backfill area in the PRB and the duration of mining activity would be increased by mining of the recently issued leases and the currently proposed LBA tracts including the West Hay Creek LBA tract. However, since reclamation is occurring in mined-out areas and the monitoring data demonstrate that recharge of the backfill is occurring, it is not anticipated that additional substantial impacts would occur as a result of any of the pending coal leasing actions. As previously discussed, through December, 2001, about 41% of the area disturbed at the Buckskin Mine had been reclaimed, and backfill monitoring wells indicate that recharge is occurring in the backfill at the Buckskin Mine. Clinker, also called scoria, the baked and fused rock formed by spontaneous prehistoric burning of the Wyodak-Anderson coal seam, occurs all along the coal outcrop area (figure 4-3) and is believed to be the major recharge source for the backfill aquifer, just as it is for the coal. However, not all clinker is saturated. Some clinker is mined for

4-72


road-surfacing material, but saturated clinker is not generally mined because it is difficult to manage the water in the clinker. Therefore, the major recharge source for the backfill aquifer is not being disturbed by current mining. Clinker does not occur in significant amounts within the Buckskin Mine or within the LBA tract. Some surficial clinker is exposed along the northern portion of the LBA tract analysis area, primarily in the SE¼NE¼ of section 17. The second major groundwater issue is the extent of water level drawdown in the coal and shallower aquifers in the area surrounding the mines. In this EIS, assessment of cumulative groundwater impacts is based on impact predictions made by Triton for mine-related drawdown at the Buckskin Mine and extrapolating those drawdowns to consider mining of the West Hay Creek LBA tract, along with previous drawdown predictions made within the northern mine group that includes the Buckskin Mine. Figure 4-3 depicts the predicted extent of the five-foot drawdown contour within the coal aquifer from the various mining scenarios. The extent of the five-foot drawdown contour is used by WDEQ/LQD to assess the cumulative extent of impact to the groundwater system caused by mining operations. In figure 4-3, these predictions are compared to the predictions in the CHIA and monitoring information gathered since 1980. Figure 4-3 shows the predicted drawdowns in the coal aquifer due to mining; it does not show the predicted drawdown in the overburden because of the discontinuous nature of the saturated sand aquifers in the Wasatch Formation overburden in the northern group of mines. Most of the monitoring wells included in the GAGMO 15-year report (542 wells out of 600 total) are completed in the coal beds, in the overlying sediments, or in sand channels or interburden between the coal beds. The changes in water levels in the coal seams after 15 years of monitoring are shown on figure 4-3. This map shows the area where the actual drawdown in the coal seam was greater than 5 feet after 15 years of surface coal mining in comparison with the predicted worst-case 5-foot drawdown derived from groundwater modeling done by the mines. WDEQ/LQD policy is to have the mining companies determine the extent of the 5-foot drawdown contour as a method of determining off-site impacts from the various mining operations. The GAGMO 20­ year report shows how much more extensive the area of groundwater drawdown surrounding the mines and to the west has become since CBM has been actively developed in this area. Figure 4-3 indicates that the actual drawdowns observed after 15 years of mining were still generally within the total cumulative drawdown predicted in the 1988 CHIA. The addition of the pending LBA tracts, including the West Hay Creek tract, would extend the predicted cumulative extent of the 5-foot drawdown caused by coal mining beyond the cumulative drawdown prediction in the 1988 CHIA. As stated above, data from the GAGMO 15 year report (Hydro-Engineering 1996a) are presented in figure 4-3 instead of the more recent data available in the GAGMO 20 year report (Hydro-Engineering 2001) because the earlier data more accurately represent drawdown as a result of coal mining alone, which make that data more comparable to the original assumptions made in the 1988 CHIA. The much more extensive area of groundwater drawdown in the coal

4-73


LEGEND
WEST HAY CREEK LBA TRACT ANALYSIS AREA EXTENT OF WORST-CASE MODELED LIFE OF MINE CANYON COAL DRAWDOWN WITH WEST HAY CREEK LBA TRACT, AS APPLIED FOR EXTENT OF WORST-CASE EXTRAPOLATED LIFE OF MINE CANYON COAL DRAWDOWN WITH WEST HAY CREEK LBA TRACT, AS APPLIED FOR APPROXIMATE COAL OUTCROP LINE CLINKER (SCORIA) AREA OF GREATER THAN 5 ft. MEASURED DRAWDOWN IN COAL FROM 15 YEARS OF MINING 1980-1995 (GAGMO 10-1995) EXTENT OF DRAWDOWN DUE TO ALL ANTICIPATED MINING (USGS CHIA Study, Martin et al. 1998)

Figure 4-3.

Modeled and Extrapolated Worst-Case Coal Aquifer Drawdown Scenarios Showing Extent of Actual 15-yr Drawdowns and USGS Predicted Cumulative Drawdowns.

4-74


identified in the GAGMO 20 year report reflects the impacts of nearby CBM activities as well as surface coal mining. The GAGMO 20-year monitoring data do not represent a valid comparison to the CHIA predictions, but they do demonstrate the cumulative impact of surface coal mining and CBM development on the groundwater resource. The CHIA predicted the approximate area of 5 feet or more water level decline in the Wyodak coal aquifer which would result from "all anticipated coal mining". "All anticipated coal mining" at that time included 16 surface coal mines operating at the time the report was prepared and six additional mines proposed at that time. All of the currently producing mines, including the Buckskin Mine, were considered in the CHIA analysis (Martin et al. 1988). The study predicted that water supply wells completed in the coal may be affected as far away as eight miles from mine pits, although the effects at that distance were predicted to be minimal. Since the depth to coal increases to the west, most stock and domestic wells are completed in the overburden aquifers in the areas west of the mines. Of the 1,200 water supply wells within the maximum impact area defined in the CHIA study in 1987, about 100 were completed in the Wyodak coal aquifer as compared to 580 completed in Wasatch aquifers and about 280 in strata below the coal. There are no completion data available for the remainder of these wells (about 240). Coal companies are required by state and federal law to mitigate any water rights that are interrupted, discontinued, or diminished by mining. The predicted cumulative effects of mining the LBA tract are depicted on figure 4-3. Based on the 1995 data, groundwater drawdown in the coal had coalesced into a nearly contiguous cone of depression around the Buckskin, Rawhide, Eagle Butte, and Dry Fork mines. Mining within the proposed West Hay Creek tract and the proposed Eagle Butte West Extension tract would expand this area of drawdown if these tracts are leased. Wells in the Wasatch Formation overburden were predicted to be impacted by drawdown only if they were within 2,000 ft of a mine pit in the CHIA (Martin et al. 1988). Drawdowns occur farther from the mine pits in the coal than in the shallower aquifers because the coal is a confined aquifer that is areally extensive. The area in which the shallower aquifers (Wasatch Formation, alluvium, and clinker) experience a 5-foot drawdown would be much smaller than the area of drawdown in the coal because the shallower aquifers are generally discontinuous, of limited areal extent, and may be confined or unconfined. If a maintenance lease is issued for the West Hay Creek LBA tract, prior to amending the tract into an existing WDEQ mine permit, the lessee would be required to conduct more detailed groundwater modeling to predict the extent of drawdown in the coal and overburden aquifers caused by mining the LBA tract. WDEQ/LQD would then use the drawdown predictions to update the CHIA for this portion of the PRB. The applicant has installed monitoring wells that would be used to confirm or refute drawdowns predicted by modeling. This modeling would be required as part of the WDEQ mine permitting procedure discussed in chapter 2.

4-75

Potential water-level decline in the subcoal Fort Union Formation is the third major groundwater issue. According to the Wyoming State Engineer's records as of July 1999, 14 mines held permits for 42 wells between 400 feet and 10,000 feet deep. The zone of completion of these wells was not specified, and not all of the wells were producing (for example, three of the permits were held by an inactive mine, and one of the wells permitted by the Black Thunder Mine has not been used since 1984). Water level declines in the subcoal Tullock Aquifer have been documented in the Gillette area. According to Crist (1991), these declines are most likely attributable to pumpage for municipal use by Gillette and for use at subdivisions and trailer parks in and near the city of Gillette. Most of the water-level declines in the subcoal Fort Union aquifers occur within 1 mile of pumped wells (Crist 1991; Martin et al. 1988). The mine facilities in the PRB are separated by a distance of 1 mile or more, so little overlapping drawdown between mine supply wells would be expected. In response to concerns voiced by regulatory personnel, several mines have conducted impact studies of the subcoal Fort Union Formation. The OSM commissioned a cumulative impact study of the subcoal Fort Union Formation to study the effects of mine facility wells on this aquifer unit (OSM 1984). Conclusions from all these studies are similar and may be summarized as follows: Because of the discontinuous nature of the sands in this formation and because most large-yield wells are completed in several different sands, it is difficult to correlate completion intervals between wells. In the Gillette area, water levels in this aquifer are probably declining because the city of Gillette and several subdivisions are using water from the formation (Crist 1991). (Note: Gillette mixes this water with water from wells completed in the deeper Madison Formation. Also, because drawdowns have occurred, some operators are able to dispose of CBM water by injecting it into the subcoal Fort Union Formation near the City of Gillette.) Because of the large saturated thicknesses available in this aquifer unit, generally 500 feet or more, a drawdown of 100 to 200 feet in the vicinity of a pumped well would not dewater the aquifer. The Buckskin Mine adjacent to the West Hay Creek LBA tract has a permit from the state engineer for two deeper Fort Union Formation water supply wells. If the LBA tract is leased and mined as proposed, additional water would be withdrawn from the Tullock Aquifer in the area of the Buckskin Mine. The withdrawal of additional water would not be expected to extend the area of water level drawdown over a significantly larger area due to the discontinuous nature of the sands in the Tullock Aquifer and the fact that drawdown and yield reach equilibrium in a well due to recharge effects. The nearest nonindustrial Fort Union well to the Buckskin Mine facilities is over 4 miles away. Due to the distance involved, these wells have not experienced overlapping

4-76


drawdown and are not likely to in the future. The two Buckskin Mine facility wells would be in use for roughly 5 to 6 additional years if the West Hay Creek LBA tract is leased depending on which alternative is selected. Their annual water production would probably not increase. According to the Wyoming SEO records, most of the permitted wells drilled below 1,000 feet in a 100 mi2 area surrounding the LBA tract are either for mining, CBM, or oil and gas development. There are approximately nine wells serving subdivisions and local ranches, and there is one county well within this area The Buckskin Mine does not anticipate drilling additional sub-coal water-supply wells if they acquire the LBA tract. Since, as discussed above, water-level declines in the subcoal Fort Union wells typically do not extend beyond 1 mile of pumped wells and the nearest nonindustrial well completed in the subcoal Fort union is over 4 miles away, no overlapping impacts to nonindustrial sub-coal water supply wells would be expected if the West Hay Creek LBA tract is leased and mined as proposed. The fourth issue of concern with groundwater is the effect of mining on water quality. Specifically, what effect does mining have on the groundwater quality in the coal and overburden in the surrounding area, and what are the potential water quality problems in the backfill aquifer following mining? In a regional study of the cumulative impacts of coal mining, the median concentrations of dissolved solids and sulfates were found to be larger in water from backfill aquifers than in water from either the Wasatch overburden or the coal aquifer (Martin et al. 1988). This is expected because blasting and movement of the overburden materials exposes more surface area to water, increasing dissolution of soluble materials, particularly when the overburden materials were situated above the saturated zone in the premining environment. Using data compiled from ten surface coal mines in the eastern PRB, Martin et al. (1988) also concluded that backfill groundwater quality improves markedly after the backfill is leached with one pore volume of water. The same conclusions were reached by Van Voast and Reiten (1988) after analyzing data from the Decker and Colstrip Mine areas in the Montana portion of the PRB. In general, the mine backfill groundwater TDS can be expected to range from 3,000 to 6,000 mg/L, similar to the premining Wasatch Formation aquifer, and meet Wyoming Class III standards for use as stock water. One pore volume of water is the volume of water which would be required to saturate the backfill following reclamation. The time required for one pore volume of water to pass through the backfill aquifer is greater than the time required for the postmining groundwater system to reestablish equilibrium. According to the CHIA, estimates of the time required to reestablish equilibrium range from tens to hundreds of years (Martin et al. 1988). Chemical analyses of 336 samples collected between 1981 and 1986 from 45 wells completed in backfill aquifers at ten mines indicated that the quality of water in the backfill will, in general, meet state standards for livestock use when recharge occurs

4-77


(Martin et al. 1988). The major current use of water from the aquifers being replaced by the backfill (the Wasatch and Wyodak Coal aquifers) is for livestock because these aquifers are typically high in dissolved solids in their premining state (Martin et al. 1988). According to monitoring data published by GAGMO (Hydro-Engineering 1991a, 1991b, 1992, 1993, 1994, 1995, 1996b, 1997, 1998, 1999 and 2000), TDS values in backfill wells have ranged from 400 to 25,000 mg/L. Of the 48 backfill wells sampled in 1999 and reported in the 2000 annual GAGMO report (Hydro Engineering 2000), TDS in 75% were less than 5,000 mg/L, TDS in 23% were between 5,000 and 10,000 mg/L, and TDS in one well was above 10,000 mg/L. These data support the conclusion that water from the backfill will generally be acceptable for its current use, which is livestock watering, before and after equilibrium is established. The incremental effect on groundwater quality due to leasing and mining of the LBA tract would be to increase the total volume of backfill and, thus, the time for equilibrium to reestablish. The fifth area of concern is the potential for cumulative impacts to groundwater resources in the coal due to the proximity of coal mining and CBM development. The Wyodak coal is being developed for both coal and CBM in the same general area. As discussed above, dewatering activities associated with existing CBM development have begun to overlap with and expand the area of groundwater drawdown in the coal aquifer in the PRB over what would occur due to coal mining alone. Numerical groundwater flow modeling was used to predict the cumulative drawdown in the coal aquifer in the Wyodak CBM Project Final EIS (BLM 1999c), the Draft EIS and Draft Planning Amendment for the Powder River Basin Oil and Gas Project (BLM 2002), and the Final EIS and Proposed Plan Amendment for the Powder River Basin Oil and Gas Project (BLM 2003a). The modeling considered coal mining and CBM development in order to assess cumulative impacts. Modeling was done to simulate mining with and without CBM development in order to differentiate the impacts of the two types of activities. Information from earlier studies was incorporated into the more recent modeling analyses. As expected, the modeling showed that the groundwater impacts that would result from the proposed CBM development and surface coal mining would be additive in nature and would extend the area experiencing a loss in hydraulic head to the west of the mining area. The area between the CBM fields and the mines would be subject to cumulative drawdown from the two activities. The 20-year GAGMO report stated that drawdowns in all areas have greatly increased in the last few years due to the water production from the Wyodak coal aquifer by coal bed methane producers (HydroEngineering 2001). Figure 4-4 shows the Buckskin Mine life-of-mine drawdown map with the maximum modeled drawdowns for year 2009 from the Wyoming PRB Oil and Gas Project EIS superimposed. These are modeled drawdowns for the upper Fort Union coal and are for the proposed action of drilling and operating 39,400 new CBM wells in addition to the 12,000 CBM wells that had been drilled when the analysis was prepared. The

4-78


LEGEND
WEST HAY CREEK LBA TRACT ANALYSIS AREA EXTENT OF WORST-CASE MODELED LIFE OF MINE CANYON COAL DRAWDOWN WITH WEST HAY CREEK LBA TRACT, AS APPLIED FOR EXTENT OF WORST-CASE EXTRAPOLATED LIFE OF MINE CANYON COAL DRAWDOWN WITH WEST HAY CREEK LBA TRACT, AS APPLIED FOR CLINKER (SCORIA)

APPROXIMATE COAL OUTCROP LINE MODELED COMPOSITE DRAWDOWN IN FORT UNION COALS - YEAR 2009 (From Figure 4-1, Draft EIS and draft planning amendment, Powder River Basin Oil and Gas Project, (WY-070-02-065), Buffalo Field Office, BLM, January 2002)

Figure 4-4.

Life of Mine Drawdown Map with Maximum Modeled CBM Drawdown Contours Superimposed.

4-79


groundwater modeling study done for the Wyoming PRB Oil and Gas Project EIS (BLM 2003a) considered the impacts of coal mining and CBM development on groundwater in the coal and overlying aquifers within the project area, which included almost 8,000,000 acres within all or parts Campbell, Converse, Johnson, and Sheridan counties. This analysis considered existing coal mines and existing and predicted CBM well locations. Figure 4-4 also shows that the projected drawdown in the coal caused by CBM production would exceed the projected drawdown due to mining at the Buckskin Mine. To the south and west of the Buckskin, the projected drawdown in the coal aquifer due to CBM production would greatly exceed drawdown due to mining. Drawdowns from CBM development would be projected to exceed drawdowns from coal mining at a distance of less than 1 mile from the mine. As noted in the GAGMO 20-year report, substantial drawdowns in excess of 240 feet have already occurred to the west due as a result of mining and coal bed methane dewatering. Drawdowns in the coal caused by CBM development would be expected to reduce the need for dewatering in advance of mining, which would be beneficial for mining. Wells completed in the coal may also experience increased methane emissions in areas of significant aquifer depressurization. There would be a potential for conflicts to occur over who (coal mining or CBM operators) is responsible for replacing or repairing private wells that are adversely affected by the drawdowns; however, the number of potentially affected wells completed in the coal is not large. As discussed previously, coal companies are required by state and federal law to mitigate any water rights that are interrupted, discontinued, or diminished by coal mining. In response to concerns about the potential impacts of CBM development on water rights, a group of CBM operators and local landowners developed a standard water well monitoring and mitigation agreement that can be used on a case-by-case basis as development proceeds. All CBM operators on federal oil and gas leases are required to offer this water wells agreement to the surface landowners (BLM 2003a). According to WDEQ/LQD, when water wells have been impacted by both coal mining operations and CBM development, their approach is to try and determine the amount of impact caused by each operation. The mine’s responsibility for replacement of the well would depend on the amount of impact caused by the mine. There have been cases where both the mine and the CBM operator have shared in the cost of replacing a water supply well. The Wyodak CBM Project FEIS (BLM 1999c) established requirements for federal CBM lessees to install monitoring wells at specific locations throughout the Wyodak EIS study area. According to the PRB Oil and Gas Project EIS (BLM 2003a), the CBM companies propose to continue this program. The BLM is currently requiring monitoring wells for exploratory CBM development projects outside of the Wyodak EIS study area. The overlapping dewatering or depressuring of the coal seam caused by CBM development and mining together will also increase the time required for water-level recovery to occur after the CBM and mining projects are completed.

4-80

Surface Water Streamflows may be reduced during surface coal mining because SMCRA and Wyoming state regulations require capture and treatment of all runoff from disturbed areas in sedimentation ponds before it is allowed to flow off the mine permit areas. Also, the surface coal mine pits in the PRB are large, and these pits, together with ponds and diversions built to keep water out of the pits, can intercept the runoff from large drainage areas. Changes in drainage patterns and surface disturbance are decreasing and will continue to decrease flows in most of the ephemeral and intermittent drainages existing at the mine sites. Development of CBM resources in the area west of the mines could potentially increase surface flow in some drainages. Currently, there is methane production occurring in the area of the Buckskin Mine. The amount of CBM produced water that ultimately reaches the major channels is reduced by evaporation, infiltration into the ground, and surface landowners, who sometimes divert the produced water into reservoirs for livestock use because it is of relatively good quality in this area. For the purposes of analysis, the PRB Oil and Gas Project EIS (BLM 2003) assumed that discharged CBM produced water conveyance losses would be 20%,due to infiltration and evapotranspiration. The CHIA predicted that, after reclamation, major streams in the PRB would exhibit increased runoff ranging from 0.4% in the Cheyenne River to 4.3% in Coal Creek due to cumulative disturbance as a result of surface coal mining (Martin et al. 1988). This was based on the assumption that unit runoff rates would be increased after reclamation due to soil compaction; these predicted percentage changes in runoff were based on permitted mine acreages in 1981. The leases issued since that time have increased the permitted acreage by about 40% and would, under the same assumptions, increase the USGS’s estimates of runoff increase by the same incremental amount. This level of increase in runoff is small compared to seasonal and annual variability of runoff in the PRB. With the exception of the Wyodak Mine, all drainage from the northern mines contributes to the northward flowing Little Powder River. The drainage area of the Little Powder River below Corral Creek is approximately 204 mi2. The drainage area of Hay Creek at its confluence with the Little Powder River is approximately 15 mi2; thus the drainage area of the Little Powder River below Hay Creek is approximately 219 mi2. The entire area of disturbance from the four operating mines as currently permitted would impact approximately 7% of the drainage basin of the Little Powder River at this point, and this disturbance would occur over about 50 years. The two LBAs currently proposed in the northern mine group would raise this disturbance acreage to roughly 8% of the Little Powder River drainage basin below Hay Creek. Sediment concentrations should not increase significantly in area streams as a result of

4-81


surface coal mining operations even with the addition of mining the pending Buckskin Mine West Hay Creek and Eagle Butte Mine West Extension LBA tracts because state and federal regulations require that all surface runoff from mined lands pass through sedimentation ponds. The final PRB Oil and Gas Project EIS estimates that the peak year of CBM water production in the Little Powder River sub-watershed would occur in 2005 (BLM 2003). In that year, under the Final PRB Oil and Gas Project EIS preferred alternative (Alternative 2-A), an estimated 2,543 CBM wells would be producing at an average rate of 6.2 gpm per well. The amount of produced water projected to reach the main stem of the Little Powder River sub-watershed during the peak year of CBM water production would be about 19 cfs (13,757 acre-feet /year) based on the modeling done for that EIS. The confluence of Hay Creek, which flows through the West Hay Creek LBA tract, with the Little Powder River is located about 3 miles east of the LBA tract, and some of this CBM produced water would be expected to move through Hay Creek. These CBM water discharges would be expected to be more constant than the naturally occurring flows, which fluctuate widely on a seasonal and annual basis. The CBM discharges could result in erosion and degradation of small drainages, which could affect water quality and channel hydraulic characteristics. From a surface water standpoint, the increased flows due to CBM discharges and the reduced flows due to surface coal mining tend to offset each other. The CBM development is taking place upstream from the mines. Provisions the mines have taken to prevent water from entering the pits (storage ponds or diversions) could be adversely affected by having to deal with flows that were not included in designs or that change conditions for future designs. Alluvial Valley Floors No cumulative impacts to alluvial valley floors are expected to occur as a result of surface coal mining in this area. Surface coal mining operations are not permitted to impact designated AVFs if the AVF is determined to be significant to agriculture. AVFs that are not significant to agriculture can be disturbed during mining but they must be restored as part of the reclamation process. Impacts during mining, before the AVF is restored, would be expected to be incremental, not additive. Wetlands Wetlands are discrete features that are delineated on the basis of specific soil, vegetation, and hydrologic characteristics. Wetlands within areas of coal mining disturbance are impacted; wetlands outside the area of disturbance are generally not affected unless their drainage areas (hence, water supplies) are changed by mining. Therefore, the impacts to wetlands as a result of surface coal mining are mostly incremental, not additive as are impacts to groundwater and air quality. Increasing the area to be mined would increase the number of wetlands that would be impacted.

4-82


COE requires replacement of all jurisdictional wetlands impacted by surface coal mining operations in accordance with section 404 of the Clean Water Act and determines the number of acres to be restored. COE considers the type and function of each jurisdictional wetland that will be impacted and may require restoration of additional acres if the type and function of the restored wetland will not completely replace the type and function of the original wetland. As part of the mining and reclamation plans for each mine, COE approves the plan to restore the wetlands and the number of acres of wetlands to be restored. WDEQ/LQD allows and sometimes requires mitigation of nonjurisdictional wetlands affected by mining, depending on the values associated with the wetland features. Replacement of functional wetlands may occur in accordance with agreements with the surface managing agency (on public land) or by the private landowners. No public lands are included in the West Hay Creek LBA tract. During mining and before replacement of wetlands, all wetland functions would be lost. The replaced wetlands may not function in the same way as the premine wetlands did; however, all wetlands would be replaced in accordance with COE requirements. Vegetation Most of the land that is being or would be disturbed is sandy prairie grassland, big sagebrush shrubland or agricultural pasturelands and croplands. These vegetation types account for 86% of the LBA analysis area lands. The primarily land use in this area is grazing and wildlife habitat. Rangeland is, by far, the predominant land use in the PRB, comprising 92% of the land use in Converse and Campbell counties. At the completion of surface coal mining operations, it is anticipated that all disturbed land would be reclaimed to a condition equal to or greater the highest previous use. Reclamation is being and would be conducted to restore the previous grazing, wildlife, cropland pastureland and other miscellaneous uses. Reclaimed vegetation types would be mostly in the form of upland grasslands, big sagebrush shrublands, and silver sagebrush shrublands. Where appropriate, cropland, pastureland, and riparian types would be established in approximate relationship to their premining components. Some of the minor vegetation community types, such as those occurring on rough breaks, would not be restored to premining conditions but may be replaced to a higher level due to use of better quality soils. Based on annual reports prepared by mining companies and submitted to WDEQ, in any given year approximately 8,000 acres of land disturbed by mining activities at the five active northern surface coal mines would not be reclaimed to the point of planting with permanent seed mixtures. Over the life of the five active northern mines, a total of about 25,000 acres would be disturbed. This disturbed area includes all existing federal, state, and private coal leases. Most all of this acreage is native rangeland and would be returned to that state by planting WDEQ/LQD-approved revegetation seed mixtures as required. The 26% that is either agricultural cropland or pastureland and could be reclaimed as such. Several impacts to vegetation would occur as a result of operations at the five northern mines. Most of the surface disturbance would occur in two vegetation types: upland

4-83


grassland (various types) and Wyoming big sagebrush. All five northern mines, including the Buckskin Mine plan to restore these two types as required by law. It is estimated that it would take from 20 to 100 years for big sagebrush density to reach premining levels. The big sagebrush component provides important wildlife habitat (particularly for mule deer, pronghorn, and sage grouse). A reduction in acreage of big sagebrush vegetation type reduces the carrying capacity of the reclaimed lands for pronghorn and sage grouse populations. Mule deer should not be affected since they are not as abundant in this area. Although some of the less extensive native vegetation types such as riparian bottomland would be restored during reclamation, the treated grazing lands would not. Following reclamation and release of the reclamation bond, privately owned surface lands would be returned to agricultural management. The areas with reestablished native vegetation could again be subject to sagebrush management practices. Community and species diversities would initially be lower on reclaimed lands. The shrub components would take the longest to be restored to premining conditions. Shrub cover and forage values would gradually increase in the years following reclamation. Over longer periods of time, species re-invasion and shrub establishment on reclaimed lands should largely restore the species and community diversity on these lands to premining levels. Over the long term, the net effect of the cumulative mine reclamation plans may be the restoration, at least in part, of all vegetation types originally found in the area. However, the shrub component may be substantially reduced in aerial extent. Shrubs are relatively unproductive for livestock but very important for wildlife. All of the vegetation types found in the analysis area are fairly typical for this region of eastern Wyoming. Vegetation disturbance associated with the proposed CBM development would be more widespread but less intensive and would also be reclaimed. Areas of vegetation disturbance would also be associated with the proposed power plants and railroad line. The importation and spread of noxious weeds is of concern throughout Wyoming, including the PRB. Noxious weed introduction may be facilitated by energy development as well as by recreational and agricultural activities. Infestation by species of noxious weeds has the potential to alter distribution of vegetation types and, accordingly, alter wildlife habitat distribution and affect wildlife populations in the PRB. The distribution and spread of many plant species of concern are currently being monitored by the Wyoming Cooperative Agricultural Pest Survey in association with county weed and pest districts and the Wyoming Department of Agriculture. As discussed previously, the approved mining and reclamation plans for the existing mines include plans to control invasion by weedy (invasive nonnative) plant species. The amended mining and reclamation plans for the West Hay Creek LBA tract would also include steps to control invasion from such species. Oil and gas operators are being required to submit Integrated Pest Management Plans addressing control of weedy

4-84


plant species as part of their applications to drill on federal oil and gas leases (BLM 2003c). Wildlife The direct impacts of surface coal mining on wildlife occur during mining and are therefore short-term. They include road kills by mine-related traffic, restrictions on wildlife movement created by fences, spoil piles and pits, and displacement of wildlife from active mining areas. The indirect impacts last longer and include loss of carrying capacity and microhabitats on reclaimed land due to flatter topography, less diverse vegetative cover, and reduction in sagebrush density. After mining and reclamation, alterations in the topography and vegetative cover, particularly the reduction in sagebrush density, cause a decrease in carrying capacity and diversity on reclaimed lands. Sagebrush would gradually become reestablished on the reclaimed land, but the topographic changes would be permanent. Cumulative impacts to most wildlife would increase as additional habitat is disturbed but would moderate as more land is reclaimed. Raptor and grouse breeding areas have been diminishing statewide for at least the last 30 years partly due to surface-disturbing activities. Coal mining and oil and gas exploration and development, including CBM, have been identified as potential contributors to the decline in their breeding habitat. Therefore, surface occupancy and disturbance restrictions, as well as seasonal restriction stipulations, have been applied to operations occurring on or near these crucial areas on public lands. These restrictions have helped protect important raptor and grouse habitat on public lands, but the success of yearlong restrictions on activities near areas critical to grouse has been limited in the PRB where most of the surface is privately owned. Erection of nesting structures and planting of trees on reclaimed land will gradually replace raptor nesting and perching sites; restoration of sagebrush helps replace sagebrush habitat. There is no crucial habitat for waterfowl or fish on the mine sites. Small- and medium-sized animals would move back into the areas once reclamation is completed. Numerous grazing management projects (fencing, reservoir development, spring development, well construction, vegetative treatments) have also impacted wildlife habitat in the area. The consequences of these developments have proven beneficial to some species and detrimental to others. Fencing has aided in segregation and distribution of livestock grazing, but sheep-tight woven wire fence has restricted pronghorn movement. Water developments are used by wildlife, but without proper livestock management, many of these areas can become overgrazed. The developed reservoirs provide waterfowl, fish, and amphibian habitat. Vegetation manipulations have included the removal or reduction of native grass-shrublands and replacement with cultivated crops (mainly alfalfa/grass hay), as well as a general reduction of shrubs (mainly sagebrush) in favor of grass. These changes have increased spring and summer habitat for grazing animals but have also reduced the important shrub component that is critical for winter range, thus reducing over winter survival for big

4-85


game and sage grouse. The reduction in sagebrush has been directly blamed for the downward trend in the sage grouse populations. The regional EISs (BLM 1974, 1979, and 1981) predicted significant cumulative impacts to pronghorn from existing concentrated mining and related disturbance as a result of habitat disturbance and creation of barriers to seasonal and daily movements. Significant cumulative indirect impacts were also predicted because of increased human population and access resulting in more poaching, increased vehicle/pronghorn collisions, and increased disturbance in general. However, the WGFD recently reviewed monitoring data collected on mine sites for big game species and the monitoring requirements for big game species on those mine sites. Their findings concluded that the monitoring had demonstrated the lack of impacts to big game on existing mine sites. No severe mine-caused mortalities have occurred, and no longlasting impacts on big game have been noted on existing mine sites. The WGFD recommended that big game monitoring be discontinued on all existing mine sites. New mines will be required to conduct big game monitoring if located in crucial winter range or in significant migration corridors. Leasing the West Hay Creek LBA tract would increase the area of habitat disturbance in the northern group of mines by approximately four percent and would enlarge the area where daily movement is restricted. The West Hay Creek LBA tract is within the Gillette Antelope Herd Unit, which is located north of Interstate 90 between Wyoming 59 and the Powder River. The mining operations within the Gillette antelope herd unit are the Buckskin Mine, Eagle Butte Mine, and the Rawhide Mine. These mines will cumulatively disturb approximately 18,000 acres based on existing leases. If the West Hay Creek LBA tract is leased, the estimated mining disturbance to yearlong pronghorn range within the Gillette antelope herd unit would increase by about to 900 acres to about 18,900 acres. The area of active mining in the northern group of mines contains substantial numbers of raptor nests. The largest concentration of nesting activity in the area is associated with the rough breaks country and areas where trees have become established. Raptor mitigation plans are included in the approved mining and reclamation plans of each mine. The raptor mitigation plan for each mine is subject to FWS review and approval before the mining and reclamation plan is approved. Any nests that will be impacted by mining operations must be relocated in accordance with these plans after special use permits are secured from FWS and WGFD. The creation of artificial raptor nest sites and raptor perches may ultimately enhance raptor populations in the mined area. On the other hand, where power poles border roads, perched raptors may continue to be illegally shot, and continued road kills of scavenging eagles may occur. Any influx of people into previously undisturbed land may also result in increased disturbance of nesting and fledgling raptors. There may be cumulative impacts to raptors as a result of CBM development on and adjacent to the existing coal mining operations. Under the proposed action and the

4-86


preferred alternative, the West Hay Creek LBA tract would be leased as a maintenance tract to the Buckskin Mine. As a result, construction of power lines and increases in vehicular traffic related to removing coal from the LBA tract would be limited. However, CBM development on and adjacent to the LBA tract has and will continue to result in construction of new power lines in the area of the existing mines in this area. Where power poles border roads, perched raptors may be illegally shot. The regulations require that surface coal mine operators use the best technology currently available to ensure that electric power lines are designed and constructed to minimize electrocution hazards to raptors. Many of the power lines for CBM development are being constructed underground. CBM development has also resulted in increases in vehicular traffic in and around the existing mining operations. Increases in vehicular traffic may result in increased road kill and associated increases in collisions with bald eagles or other raptors feeding on carrion. In the biological and conference opinion for the Powder River Basin Oil and Gas Project, the FWS states that they believe that “as a direct result of the construction of approximately 7,136 miles of new improved roads and 5,311 miles of overhead distribution lines, there will be direct loss of bald eagles” in the PRB (FWS 2002). Cumulative impacts to waterfowl from already approved mining, as well as the proposed LBA tract, would be negligible because most of these birds are transient and most of the ponds are ephemeral. In addition, the more permanent impoundments and reservoirs that are impacted by mining would be restored. Sedimentation ponds and wetland mitigation sites would provide areas for waterfowl during mining. Few vital sage grouse wintering areas or leks have been, or are planned to be, disturbed as a result of already approved mining in this area. No active leks would be disturbed if the West Hay Creek LBA tract is leased and mined. One sage grouse lek has been identified and monitored in the currently approved Buckskin Mine mining and reclamation permit area (in section 16; figure 3-13), but this lek has been inactive for all but one year in surveys conducted since 1995. Wintering habitat is limited in the analysis area. The addition of the LBA tract to the area to be disturbed by the currently approved mining operations at the Buckskin Mine would affect sage grouse nesting habitat during mining. Noise related to the mining activity could indirectly impact sage grouse reproductive success. Sage grouse leks close to active mining could be abandoned if mining-related noise elevates the existing ambient noise levels. Surface coal mining activity is known to contribute to a drop in male sage grouse attendance at leks close to active mining. Over time this can alter the distribution of breeding grouse (Remington and Braun 1991). The direct and indirect impacts of mining encroachment on the grouse population are not clear at this time. An independent research project is underway to investigate how sage grouse use the landscape in the vicinity of active coal mines and how lands can be reclaimed to benefit those populations. Grouse in the North Antelope/Rochelle Complex area are the focus of this study, which is being conducted by Thunderbird Wildlife Consulting and is being funded by Powder River Coal Company, Thunder Basin Coal Company, Triton Coal Company, LLC, AML Research, and WGFD.

4-87

Currently approved and proposed surface coal mining and other existing and proposed future activities such oil and gas development (including conventional and CBM development), agricultural activities (including sagebrush treatment), industrial development (including existing and proposed power plants) and urban development (including construction associated with increasing population), may cumulatively result in increases in sage grouse mortality; sage grouse displacement and harassment, physical degradation or destruction of sage grouse leks and nesting and brooding areas, and sagebrush habitat fragmentation. Some of the disturbance areas would be in the process of being reclaimed as new disturbances are initiated. Sage grouse population levels in reclaimed areas may not reach predisturbance levels. The existing and proposed mines in the northern PRB would cumulatively cause a reduction in habitat for other mammal and bird species. Many of these species are highly mobile, have access to adjacent habitats, and possess a high reproductive potential. Habitat adjacent to existing and proposed mines include sagebrush shrublands, upland grasslands, bottomland grasslands, improved pastures, haylands, croplands, wetlands, riparian areas, and ponderosa pine woodlands. As a result, these species should respond quickly and invade suitable reclaimed lands as reclamation proceeds. A research project on habitat reclamation on mined lands within the PRB for small mammals and birds concluded that the diversity of song birds on reclaimed areas was slightly less than on adjacent undisturbed areas, although their overall numbers were greater (Shelley 1992). Local drainages are generally characterized by intermittent or ephemeral flows and have limited value for aquatic species under natural conditions. Flows in some of these drainages, including Hay Creek, has increased or can be expected to increase and become more constant as a result of the influx of CBM-produced waters and this would be expected to continue. This habitat change may alter the existing habitats for aquatic species in these streams and disrupt fish species distribution in the ephemeral creeks in this area, including Hay Creek, and downstream to the Little Powder River. The entire area of disturbance from the five operating mines in this area, as currently permitted, would impact approximately 7% of the drainage basin of the Little Powder River, and this disturbance would occur over about 50 years. Other current, proposed, and future activities in the area include oil and gas development and agriculture. The combined effects of these activities on the area’s waterways could include fluctuations in natural streamflow and changes in water quality, including increases in sedimentation, salt concentrations, and other contaminants. Cumulative impacts may include changes in species’ habitats and diversity. The Dry Fork of the Little Powder River has historically supported a small trout population in its upper reach. Some of the permanent pools along the intermittent and ephemeral drainages, like McGee Reservoir on the LBA tract, support minnows and other nongame fish. The larger impoundments and streams in the area which have fish populations would be restored following mining. Additional discussions of cumulative impacts to wildlife from coal development and industrialization of the eastern PRB are included in BLM regional EISs for the area

4-88


(BLM 1974, 1979, and 1981), and these documents are incorporated by reference into this EIS. The impacts predicted in these documents have generally not been exceeded. Recent findings by the WGFD have revealed that impacts of mining on big game have been minimal. No severe mine-caused mortalities have occurred and no long-lasting impacts on big game have been noted on existing mine sites. The WGFD recommended that big game monitoring be discontinued on all existing mine sites. New mines will be required to conduct big game monitoring if located in crucial winter range or in significant migration corridors, neither of which apply to the LBA tract. The cumulative impacts of mining the LBA tract would be assessed within the WGFD’s and the WDEQ/LQD’s review of the mine permit application and the WDEQ/LQD’s permit approval process. Threatened, Endangered, and Proposed Wildlife Species These are discussed in appendix G. Land Use and Recreation Surface coal mining reduces livestock grazing and wildlife habitat, limits access to public lands that are included in the mining areas, and disrupts oil and gas development. In addition, when oil and gas production facilities, such as pipelines and pumping equipment are present on coal leases, these associated facilities and equipment must be removed prior to mining. If the coal is mined before all of the CBM resources are recovered, the CBM resource are released into the atmosphere. The potential impacts of conflicts between CBM and coal development are discussed in the “Geology and Minerals” section in this chapter. Cumulative impacts resulting from energy extraction in the PRB include a reduction of livestock grazing and subsequent revenues, a reduction in habitat for some species of wildlife (particularly pronghorn, sage grouse and mule deer), and loss of recreational access to public lands (particularly for hunters). There are no recreation areas, wilderness areas, etc. in the immediate vicinity of the existing northern group of mines, and the majority of the land is seldom used by the public except for dispersed recreation (hunting), off-road vehicles, and sightseeing. Hunting and other public access is generally limited inside of the mine permit areas for safety reasons. The majority of the land surface in the Powder River Basin in general, and in the northern group of mines specifically, is private and access is controlled by the landowner. Energy development has been the primary cause of human influx into the eastern PRB and energy-development-related indirect impacts to wildlife have and will continue to result from human population growth. The increased human presence associated with the cumulative energy development in the PRB has likely increased levels of legal and illegal hunting. Conversely, the surface coal mines in Converse and Campbell Counties

4-89


have become refuges for big game animals during hunting seasons since they are often closed to hunting. As discussed in chapter 3, the major historical management problem with the Gillette antelope herd unit, which includes the West Hay Creek LBA tract, and the Buckskin, Eagle Butte, and Rawhide mines, is the ability to achieve an adequate harvest, according to WGFD. Reclaimed areas provide attractive forage areas for big game. The demand for outdoor recreational activities, including hunting and fishing, has increased proportionately as population has increased. However, at the same time as these demands have been increasing, wildlife habitat and populations have been reduced. This conflict between decreased habitat availability and increased recreational demand has had (or may have) several impacts: demand for hunting licenses may increase to the point that a lower success in drawing particular licenses will occur, hunting and fishing may become less enjoyable due to limited success and overcrowding; poaching may increase; and the increase in people and traffic has and may continue to result in shooting of nongame species and road kills. Increased offroad activities have and will continue to result in disturbance of wildlife during sensitive wintering or reproductive periods. Campbell County’s public recreation facilities are some of the most extensively developed in the Rocky Mountain region, and use by young, recreation-oriented residents is high. The relatively strong financial position of the county recreation program appears to assure future recreation opportunities for residents regardless of the development of the LBA tract or other specific mining or energy-related development. Cultural Resources In most cases, treatment of eligible cultural sites is confined to those that would be directly impacted, while those that may be indirectly impacted receive little or no consideration unless a direct development-associated effect can be established. The higher population levels associated with coal and oil and gas development coupled with increased access to remote areas can result in increased vandalism both on and off mine property. Development of lands in which coal is strip-mineable (shallow overburden) may contribute to the permanent unintentional destruction of segments of the archeological record. A majority of the recorded cultural resource sites in the PRB are known because of studies at existing and proposed coal mines. An average density estimate of 8.5 sites per mi2 (640 acres) can be made based on inventories at existing mines in the area, and approximately 25% of these sites are typically eligible for the NRHP. Approximately 580 cultural resource sites will be impacted by already-approved mines, with an estimated 86 of these sites being eligible for nomination to the NRHP. Clearly, a number of sites eligible for nomination to the NRHP have been or will be impacted by coal mining operations within the PRB. Ground disturbance, the major impact, can affect the integrity of or destroy a site. Changes in setting or context greatly impact

4-90


historical properties. Mitigation measures such as stabilization, restoration, or moving of buildings may cause adverse impacts to context, in-place values, and overall integrity. Additionally, loss of sites through mitigation can constitute an adverse impact by eliminating the site from the regional database and/or affecting its future research potential. Beneficial results or impacts can also occur from coal development. Valuable data are collected during cultural resource surveys. Data that would otherwise not be collected until some time in the future, or lost in the interim, are made available for study. Mitigation also results in the collection and preservation of data that would otherwise be lost. The data that have been and will be collected provide opportunities for regional and local archeological research projects. Native American Concerns No cumulative impacts to Native American traditional values or religious sites have been identified as a result of the leasing and subsequent mining of federal coal in the PRB. Paleontological Resources Impacts to paleontological resources as a result of the already-approved cumulative energy development occurring in the PRB consist of losses of plant, invertebrate, and vertebrate fossil material for scientific research, public education (interpretive programs), and other values. Losses have resulted and will result from the destruction, disturbance, or removal of fossil materials as a result of energy-related surfacedisturbing activities, including surface coal mining, as well as unauthorized collection and vandalism. A beneficial impact of energy-related surface disturbance can be the exposure of fossil materials for scientific examination and collection, which might never occur except as a result of overburden removal, exposure of rock strata, and mineral excavation. Visual Resources A principal visual impact in this area is the visibility of mine pits and facility areas. People most likely to see these facilities would either be passing through the area or visiting it on mine-related business. Except for the loading facilities, the pits and facilities are not visible from more than a few miles away. Although oil and gas drilling and production facilities are less visually intrusive, they are also visible in the area. After mining, the reclaimed slopes might appear somewhat smoother than premining slopes; there would be fewer gullies than at present. Even so, the landscape of the reclaimed mines would look very much like undisturbed landscape in the area.

4-91


Noise Existing land uses within the PRB (mining, livestock grazing, oil and gas production, transportation, and recreation) contribute to noise levels, but wind is generally the primary noise source. Mining-related noise is generally masked by the wind at short distances, so cumulative overlap of noise impacts between mines is not likely. Recreational users and grazing lessees using lands surrounding active mining areas do hear mining-related noise; but this has not been reported to cause a significant impact. As stated above, wildlife in the immediate vicinity of mining may be adversely affected by noise; however, observations at other surface coal mines in the area indicate that wildlife do adapt to noise conditions associated with active coal mining. Cumulative increases in noise from trains serving the PRB mines have caused substantial increases (more than five dBA) in noise levels along segments of the rail lines over which the coal is transported to markets. However, no significant adverse impacts have been reported as a result Transportation Facilities New or enhanced transportation facilities (roads, railroads, and pipelines) are expected to occur as a result of energy development in the Powder River Basin. The transportation facilities for the existing mines are already in place. Construction of new rail facilities for transporting coal out of the PRB, such as the proposed DM&E railroad, would add another route of coal transportation out of the basin but would not be expected to increase the number of coal trains without an increase in market demand for the coal. Traffic levels from the mines would be maintained for a longer periods when new coal leases are issued to existing mines. Oil and gas pipelines on federal coal tracts that are leased would have to be relocated or removed prior to mining. Socioeconomics Because of all the energy-related development that has occurred in and around Campbell County during the past 30 years, socioeconomic impacts are a major concern. Wyoming's economy has been structured around the basic industries of extractive minerals, agriculture, tourism, timber, and manufacturing. Each of these basic industries is important, and the extractive mineral industry has long been a vital part of Wyoming's economy. Many Wyoming communities depend on the mineral industry for much of their economic well-being. The minerals industry is by far the largest single contributor to the economy of Wyoming. For example, the 2002 valuation on minerals produced in 2001 was $6,738,726,062 or 60% of the state’s total valuation (Wyoming Department of Revenue 2002). Wyoming ranks among the top ten mineral producing states in the nation. Because most minerals are taxed as a percentage of their assessed valuation, the mineral industry is a significant revenue base for both local and state government in Wyoming.

4-92

Between1990 and 2002, coal production in the Powder River Basin increased by an average of 7.1% per year. WGS is currently projecting that coal production in Campbell County will increase by about 1% per year for the years 2004 through 2007 (WGS 2003-Geo-Notes 78). In 2002, Wyoming coal supplied approximately 37% of the United States’ steam coal needs (DOE 2003). In 2002, PRB coal was used to generate electricity for public consumption in 35 states and Canada (DOE 2003). Electricity consumers in those states benefit from low prices for PRB coal, from cleaner air due to the low sulfur content of the coal, and from the royalties and bonus payments that the federal government receives from the coal. Locally, continued sale of PRB coal helps stabilize municipal, county, and state economies. By 2005, annual coal production is projected to generate about $2.6 billion of total economic activity, including $351 million of personal income, and support the equivalent of nearly 15,885 full-time positions (BLM 1996a). In addition to the West Hay Creek LBA tract a number of mineral and related developments have occurred, are in progress, or are anticipated in Campbell County and the surrounding area. The 90 MW Wygen I coal-fired power plant was recently constructed near the Wyodak Mine east of Gillette. The Black Hills Corporation is currently permitting a second coal-fired plant, the 500-MW Wygen II coal-fired power plant, also to be located near the Wyodak Mine. (Black Hills Corporation 2001). NAPG has proposed the construction of three coal-fired power plants in Campbell County: the 300-MW Two Elk and the 500-MW Two Elk Two plants near the Black Thunder Mine, and the 500-MW Middle Bear plant near the Cordero-Rojo Mining Complex. In addition, NAPG has proposed the construction of a power line that would link its proposed 500­ MW power plants with interstate transmission lines in the front range of Colorado. According to Pedersen Planning Consultants (2001), power plant development between 2001 and 2010 could bring over 6,000 temporary and 450 permanent jobs to Campbell County alone. The DM&E Railroad Corporation has proposed the construction of a rail line connecting its existing facilities in South Dakota and Minnesota with PRB coal mines. The lead regulatory agency for the expansion project, the Surface Transportation Board, granted final approval in January 2002 but must address several issues that were remanded back to the agency for further review as a result of lawsuits that were filed against the proposal. DM&E must still obtain permits or approvals from other agencies including the BLM, USFS, and COE. For Wyoming, the estimated direct-construction workforce is 700 persons for the estimated $1.5 billion project. Recently, Gillette experienced a population increase as a result of CBM development in the area. In the past several years, Gillette’s population has increased, unemployment has decreased, housing has become increasingly tight, and traffic and criminal activity have increased. Coal mining employment has been gradually increasing, but has just reached the level predicted for 1990 in the 1979 regional EIS (see Table 4-6). Under the proposed action for the Wyoming Oil and Gas Project FEIS (BLM 2003), it is estimated that the anticipated CBM development would require 2,047 workers (1,974

4-93


direct and 67 indirect) for a 20-year project life. The increasing population in Gillette has increased the demand for housing which has resulted in a very low housing vacancy rate in the city. If all of the new projects are undertaken, it is likely that the population in northeastern Wyoming would continue to grow, and there would be increasing demands on housing, schools, roads, and law enforcement in the communities in this area. The population increase would be expected to be somewhat dispersed among all of the communities in the area, including Douglas, Wright, and Newcastle as well as Gillette. The extent of the impacts to the local communities would depend on the amount of overlap between the construction periods on the proposed projects. In a 2001 study of future housing needs in Campbell County (Pederson Planning Consultants 2001), it was estimated that increases in CBM development and surface coal mine employment, coupled with the construction of currently proposed power plants, could increase housing demand in Campbell County by over 5,000 housing units, with the peak occurring in about 2005, however, delays in power plant and railroad permitting and construction have altered past predictions of the timing and magnitude of population and housing demand in Campbell County. None of the proposed power plants is currently under construction. Although the timing of their construction and operation has been delayed in the past few years, based on the status of their planning and permitting efforts, the Black Hills Corporation, Inc. Wygen II coal-fired power plant, the NAPG Two Elk coal-fired power plant, and the proposed DM&E rail line are considered reasonably foreseeable developments based on the status of their planning and permitting efforts. Construction of other proposed plants would be dependent on completion of permitting requirements and availability of financing. Construction of the proposed DM&E railroad also depends on completion of permitting requirements and availability of financing as well as resolution of legal issues. Increases in mining employment have been gradual and would potentially occur gradually as new coal leases are issued to existing mines and are permitted for mining. The construction of coal-fired power plants and the DM&E railroad expansion and continued CBM development would result in direct fiscal benefits to city, county, and state governments. Equipment and facilities would be subject to excise (sales and use) and ad valorem (property) taxes. Counties that have a major construction project of $50 million or larger also receive extra revenues in the form of impact assistance. For example, according to an article in the Gillette News-Record, if the three NAPG power plants are constructed as proposed, Campbell, Converse, Weston, and Crook counties could receive as much as $11 million in impact assistance (Gillette News-Record 2001). SHORT-TERM USE OF THE ENVIRONMENT VS. LONG-TERM PRODUCTIVITY From 2004 on, the Buckskin Mine plans to produce coal at an average production level of 25 million tons per year for 12.4 years under the No Action Alternative, for 17.6 years under the proposed action, up to 18.0 years under the preferred alternative, or for 17.6 years under alternative 3 (table 2-1). As the coal is mined, almost all components of the present ecological system, which have developed over a long period of time, would be

4-94


modified. In partial consequence, the reclaimed land would be topographically lower and, although it would reclaimed to resemble the premining topographic contours, it would lack some of the original diversity of geometric form. The forage and associated grazing and wildlife habitat that the LBA tract provides would be temporarily lost during mining and reclamation. During mining there would be a combined loss of vegetation on 830 acres (proposed action), 897 acres (preferred alternative), or 830 acres (alternative 3) with an accompanying disturbance of wildlife habitat, grazing land, cropland and pastureland. This disturbance would occur incrementally over a period of years. The mine site would be returned to equivalent or better forage production capacity for domestic livestock before the performance bond is released. Long-term productivity would depend largely on postmining rangemanagement practices, which to a large extent, would be controlled by private landowners. Mining would disturb pronghorn habitat, but the LBA tract would be suitable for pronghorn following successful reclamation. No sage grouse leks would be directly disturbed by mining, but some nesting and brood-rearing habitat would be disturbed and grouse populations may not attain premining levels on reclaimed lands. Despite loss and displacement of wildlife during mining, it is anticipated that reclaimed habitat would support a diversity of wildlife species similar to premining conditions. The diversity of species found in undisturbed rangeland would not be completely restored on the leased lands for an estimated 50 years after the initiation of disturbance. Re-establishment of mature sagebrush habitat--which is crucial for pronghorn and sage grouse--could take even longer. CBM development is taking place on the tract and on adjacent lands. BLM’s analysis suggests that a large portion of the CBM resources on the tract can be recovered prior to mining. CBM that is not recovered prior to mining would be vented to the atmosphere during the mining process. Methane is a greenhouse gas which contributes to global warming. According to the EIA/DOE, US anthropogenic methane emissions totaled 28.0 million metric tons in 2001. U.S. 2001 methane emissions from coal mining were estimated at 2.78 million metric tons (10% of the US total anthropogenic methane emissions in 2001). EIA/DOE estimates that surface coal mining was responsible for about 0.53 million metric tons of methane emissions in 2001. This represents about 1.89% of the estimated US anthropogenic methane emissions in 2001, and about 19.06% of the estimated methane emissions attributed to coal mining of all types. Based on the 2001 coal production figure, the Wyoming and Montana PRB coal mines were responsible for approximately 0.98% of the estimated US 2001 anthropogenic methane emission. Total US methane emissions attributable to coal mining would not be likely to be reduced if the West Hay Creek LBA tract is not leased at this time because total US coal production would not decrease if a lease for this tract is not issued. However, the methane on this LBA tract could potentially be more completely recovered if leasing is delayed.

4-95

Coal is a major source of electricity generation in the US. Emissions from coal-fired power plants are sources of pollution and may contribute to global warming. The Buckskin Mine plans to produce the coal included in the LBA tract at currently permitted levels using existing production and transportation facilities. As a result, leasing the West Hay Creek LBA tract under the proposed action or preferred alternativewould not be expected to result in increased or new emissions from coal-fired power plants. There would be a deterioration of the groundwater quality in the lease area following mining and reclamation, but the water quality would still be adequate for livestock and wildlife. The deterioration would probably persist over a long period of time. During mining, depth to groundwater would increase in the coal aquifer for a distance away from the pits. The water levels in the coal aquifer should return to premining levels at some time (probably less than 100 years) after mining has ceased. Mining operations and associated activities would degrade the air quality and visual resources of the area on a short-term basis. Following coal removal, removal of surface facilities, and completion of reclamation, there would be no long-term impact on air quality. The long-term impact on visual resources would be negligible. Short-term impacts to recreation values may occur from reduction in big game populations due to habitat disturbance. These changes would primarily impact hunting in the lease area. However, because reclamation would result in a wildlife habitat similar to that which presently exists, there should be no long-term adverse impacts on recreation. The proposed action, the preferred alternative, and alternative 3 would extend the life of Buckskin Mine by about 5.2, up to 5.6, and 5.2 years, respectively, thereby enhancing the long-term economy of the region. IRREVERSIBLE AND IRRETRIEVABLE COMMITMENTS OF RESOURCES The major commitment of resources would be the mining and consumption of 130 million tons (proposed action), 140 million tons (preferred alternative), or 130 millions tons (alternative 3) of coal to be used for electrical power generation. CBM that is not recovered before mining would also be irreversibly and irretrievably lost (see additional discussion of the impacts of venting CBM to the atmosphere in the previous section). It is estimated that one to two percent of the energy produced would be required to mine the coal, and this energy would also be irretrievably lost. The quality of topsoil on approximately 830 acres (proposed action), 897 acres (preferred alternative), or 830 acres (alternative 3) would be irreversibly changed. Soil formation processes, although continuing, would be irreversibly altered during miningrelated activities. Newly formed soil material would be unlike that in the natural landscape.

4-96

Wildlife deaths caused directly or indirectly by mining operations would be an irreversible loss. Loss of life may conceivably occur due to the mining operation and vehicular and train traffic. On the basis of surface coal mine accident rates in Wyoming as determined by the Mine Safety and Health Administration (1997) for the 10-year period 1987-1996, fatal accidents (excluding contractors) occur at the rate of 0.003 per 200,000 man-hours worked. Disabling (lost-time) injuries occur at the rate of 1.46 per 200,000 man-hours worked. Any injury or loss of life would be an irretrievable commitment of human resources. Disturbance of all known historic and prehistoric sites on the mine area would be mitigated to the maximum extent possible. However, accidental destruction of presently unknown archeological or paleontological values would be irreversible and irretrievable.

4-97


CHAPTER 5: CONSULTATION AND COORDINATION
INTRODUCTION In addition to this EIS, other factors and consultations are considered and play a major role in determining the decision on this proposed lease application. These include the following. Regional Coal Team Consultation The West Hay Creek coal lease application was reviewed and discussed at the October 25, 2000 PRRCT public meeting in Cheyenne, Wyoming. Triton Coal Company presented information about their existing mine and pending lease application at that meeting. Voting and nonvoting members of the PRRCT include the governors of Wyoming and Montana, the Northern Cheyenne Tribe, the Crow Tribal Council, the USFS, OSM, FWS, National Park Service, and USGS. The PRRCT determined that the lands in the application met the qualifications for processing as production maintenance tracts. The PRRCT recommended that the BLM continue to process the WHC lease application. Governor's Consultation The BLM Wyoming State Director notified the Governor of Wyoming on October 3, 2000 that Triton had filed a lease application with BLM for the West Hay Creek LBA tract. Public Notice A notice announcing the receipt of the TCC coal lease application was published in the Federal Register on September 12, 2000. BLM published a Notice of Intent to Prepare an Environmental Impact Statement and Notice of Scoping in the Federal Register on June 25, 2002. A press release announcing the public scoping meeting was mailed on June 4, 2002 to various media contacts. A letter describing the LBA tract and announcing the public scoping meeting was mailed to the public on June 14, 2002. The public scoping meeting was held on June 26, 2002 in Gillette, Wyoming. At the public meeting, Triton personnel orally presented information about their mine and their need for the coal. The presentation was followed by a question and answer period, during which one oral comment was received. The scoping period extended from June 1 through July 31, 2002 during which time BLM received six written comments. A press release announcing the release of the draft EIS and notice of the formal public hearing was mailed to various media contacts on March 25, 2003.

5-1

The EPA published a Notice of Availability for the DEIS in the Federal Register on March 28, 2003. The BLM published a Notice of Availability and Notice of Public Hearing for the DEIS in the Federal Register on March 21, 2003. A 60-day comment period on the DEIS ran through May 30, 2003. A formal public hearing was held on April 16, 2003 to solicit public comments on the DEIS, the fair market value, the maximum economic recovery, and the proposed competitive sale of coal from the LBA tract. Following the comment period on the DEIS, the FEIS was prepared. Comments received from the public, state, and federal agencies on the DEIS are included in Appendix H of this FEIS. Parties on the distribution list will be sent copies of the FEIS, and the EPA and BLM each will publish a Notice of Availability for the FEIS in the Federal Register. After a 30-day availability period, BLM will make a separate decision to hold or not to hold a competitive lease sale for this tract. Copies of the ROD will be mailed to parties on the mailing list and others who commented on this LBA during the NEPA process. . Department of Justice Consultation After a competitive coal lease sale, but before a lease is issued, BLM will solicit the opinion of the DOJ on whether the planned lease issuance creates a situation inconsistent with federal anti-trust laws. The Department of Justice is allowed 30 days to make this determination. If the DOJ has not responded in writing within the 30 days, BLM can proceed with issuance of the lease. Other Consultations Other federal, state, and local governmental agencies that were directly consulted in preparation of this EIS are listed in Table 5-1. List of Preparers Environmental Solutions, Inc. (ESI), a third party contractor under the direction of the BLM prepared this EIS. Representatives from BLM and OSM contributed to and participated in the preparation of the EIS. Tables 5-2 and 5-3 provide listings of the BLM, OSM, and the third-party consultant personnel who participated in the preparation and review of this EIS. Distribution List This EIS was distributed to numerous Congressional offices, federal agencies, state governments, local governments, industry representatives, interest groups, and individuals for their review and comment (table 5-4).

5-2


TABLE 5-1 
 OTHER FEDERAL, STATE, AND LOCAL GOVERNMENTAL AGENCIES
 CONSULTED IN EIS PREPARATION


Agency or Organization Powder River Regional Coal Team

Individual 5 Voting Members and 21 Nonvoting Members Lynn Jahnke

Position

Wyoming Game and Fish Department Wyoming Department of Environmental Quality Air Quality Division

Wildlife & Fish Supervisor

Bernard Daily

Program Manager for New Source Review Program Sr. Analyst District III Supervisor Engineer Division of Economic Analysis, Senior Economist Ad Valorem Tax Division, Administrator Mineral Tax Division, Administrator Analyst Soil Scientist

Judy Shamley Land Quality Division Donald McKenzie Doug Emme Wyoming Department of Administration and Information Wyoming Department of Revenue Wayne Liu

Allen Black

Randy Bolles

Wyoming Employment Center USDA/Natural Resources Conservation Service

Betsy Hockert Randy White

5-3


TABLE 5-2 
 CONTRIBUTORS AND REVIEWERS

Name Project Responsibility BLM Casper Field Office Mike Karbs Nancy Doelger Pat Karbs Project Supervisor Project Leader Writer-Editor

Susan Caplan Jeff Carroll Bob Janssen Janet Kurman Julie Weaver

BLM Wyoming State Office Air Quality and Climate Botany/Forestry Coal Program Coordination NEPA Coordination Land Adjudication BLM Buffalo Field Office

Tom Bills

Wildlife Resources

BLM National Science and Technology Center Scott Archer Air Quality and Climate Office of Surface Mining Reclamation and Enforcement Western Regional Coordinating Center Floyd McMullen EIS Project Coordinator

5-4


TABLE 5-3 
 PREPARERS

Name Education/Experience BLM Casper Field Office M.S., B.S. Geology, 25 years professional experience BLM Wyoming State Office Reservoir Management Group B.S. Graduate Study, Geology, 24 Years professional experience B.S. Petroleum Engineering, 6 years professional experience Responsibility

Nancy Doelger

EIS Project Leader/Editor

Dwain McGarry Lee Almasy

CBM Geology CBM Reservoir Engineering

Tom Peterson

Environmental Solutions, Inc. – Third Party Contractor
 Project Management B.S. Environmental Engineering, 25 years Report Preparation professional experience (Licensed Professional Document Review Engineer) B.S. Biology, 26 years professional experience B.S. Civil Engineering, 13 years professional experience (Licensed Professional Engineer) Knight Technologies, Inc. - Subcontractor B.S. Electrical Engineering, 10 years professional experience (Licensed Professional Engineer – Mining) A.S. Engineering Technology, 10 years experience, CAD/GIS Specialist CAD/GIS Specialist, 5 years experience Report Preparation Document Review Report Preparation

Dennis McGirr Ann Dickey

Naomi Morton Knight

Map and Document Preparation

Craig Knight Doug Ninas

Kort Clayton Kimberly Brown Gwyn McKee Bonnie Postovit Howard Postovit William Winland

Map and Document Preparation Map and Document Preparation Thunderbird Wildlife Consulting, Inc.-Subcontractor
 M.S. Biology, Wildlife Baseline 8 years professional experience M.S. Biology, Wildlife Baseline 10 years professional experience M.S. Wildlife Ecology, Wildlife Baseline 15 years professional experience M.S. Zoology, Wildlife Baseline 25 years professional experience M.S. Wildlife Ecology, Wildlife Baseline 25 years professional experience B.S. Biology, Wildlife Baseline 15 years professional experience

5-5


TABLE 5-3 (continued)

Name

Education/Experience Argonne National Laboratories PhD. Environmental Health Engineering 30 years professional experience PhD. Chemical Engineering 20 years professional experience

Responsibility

Kyong C. Chun

Air Quality Impact Assessment Air Quality Impact Modeling

Young-soo Chang

5-6


TABLE 5-4 
 BLM DISTRIBUTION LIST FOR COAL LEASING 

Powder River Regional Coal Team 
 Voting Members
 Governor of Wyoming Dave Freudenthal Governor of Montana Judy Martz BLM Wyoming State Director Bob Bennett BLM Montana State Director BLM Wyoming Deputy State Director Alan Rabinoff Powder River Regional Coal Team Non-Voting Member Agencies and Organizations OSM, Western Regional Coordinating Center USDA Forest Service, Med. Bow Nat. Forest Devils Tower National Monument BLM Montana State Office USGS, Denver Federal Ctr. BLM Wyoming State Office Bureau of Indian Affairs, Billings Montana BLM Washington Office Crow Tribal Council Northern Cheyenne Tribal Council Big Horn County, Montana, Planning Board Powder River County, Montana Rosebud County, Montana Campbell County, Wyoming USDI Rocky Mountain Regional Solicitor’s City of Gillette, Department of Community Office Development USFWS, Cheyenne, WY Federal & State Officials U.S. Senator Mike Enzi U.S. Representative Barbara Cubin U.S. Senator Craig Thomas Wyoming Representative Deborah Alden Wyoming Senator Jim Anderson Wyoming Senator Dick Erb Wyoming Representative Dave Edwards Wyoming Representative Jene Jansen Wyoming Senator John Hines Wyoming Representative George McMurtry Wyoming Representative Frank Latta Wyoming Rep. Jeff Wasserburger Wyoming Representative Fred Parady Federal Agencies BLM Washington Office BLM Casper Field Office BLM Buffalo Field Office BLM Powder River Field Office Bureau of Indian Affairs Department of Energy Bureau of Reclamation Federal Highway Administration EPA Region VIII Mineral Management Service HQ-USAF/CEVP National Park Service, Air Resources Div. National Park Service, Washington Office Office of Surface Mining, Washington D.C. USFWS, Washington, D.C. OSM, Casper Field Office U.S. Geological Survey, Reston, Virginia U.S. Army Corps of Engineers USGS, Water Resource Div. USDA Forest Service, Douglas Ranger District USDA Forest Service Rocky Mountain Region USDI Natural Resources Library USDI Denver, Colorado State Agencies Montana Office of the Governor Wyoming Clearinghouse Coordinator WY Employment/Research/Planning Dept. Wyoming Dept. of Environmental Quality-­ Land Quality & Air Quality Divisions Wyoming Office of Federal Land Policy Wyoming Div. of Economic Analysis Wyoming Parks & Cultural Res. Dept. Wyoming Oil and Gas Cons. Comm. Wyoming Department of Transportation Wyoming State Engineer's Office Wyoming Department of Education Wyoming State Historic Preservation Office Wyoming Game & Fish Department Wyoming Business Council Wyoming Department of Agriculture Wyoming Industrial Siting Division Wyoming Public Service Commission Wyoming State Geological Survey Wyoming State Inspector of Mines Wyoming Water Development Commission Wyoming Office of the State Treasurer Wyoming State Planning Coordinator

5-7


TABLE 5-4 (continued)
Campbell County, Wyoming School Superintendent City of Gillette, Wyoming Local Agencies and Government
 Campbell County, Wyoming Commission Weston County, Wyoming Commission

Tribal Organizations and Individuals Crow Creek Sioux Tribe Cheyenne River Sioux Tribe Eastern. Shoshone Business Council Cheyenne River Sioux Historic Preservation Officer Crow Tribal Cultural Coordinator Crow Tribe Eastern Shoshone Cultural Coordinator Eastern Shoshone Tribal Attorney Flandreau Santee Sioux Tribe Long Sioux, Clifford Northern Arapahoe Business Council Northern Arapaho Historian Lower Brule Sioux Tribe Northern Cheyenne Tribe Northern Cheyenne Traditional Spokesperson Northern Cheyenne Historic Preservation Officer Oglala Lakota Tribe Rosebud Sioux Cult. Resource Coordinator S. Cheyenne/S. Arapaho Tribes Rosebud Sioux Tribe Santee Sioux Tribe Sicangu Lakota Treaty Council Standing Rock Sioux Historic Preservation Standing Rock Sioux Tribe Officer Organizations Advisory Council on Historic Preservation Campbell County Economic Dev. Corp. Cheyenne Audubon Society Foundation for N. American Wild Sheep Biodiversity Conservation Alliance. Izaak Walton League of America Medicine Wheel Coalition Murie Audubon Society National Mining Association National Wildlife Federation Natural Resources Defense Council Petroleum Association of Wyoming Powder River Basin Resource Council Sierra Club (Sheridan, Wyoming) The Fund for Animals The Nature Conservancy Wildlife Management Institute WY Assoc of Professional Archeologists Wyoming Bankers Association Wyoming Business Alliance Wyoming Geological Association Wyoming Mining Association Wyoming Outdoor Council Wyoming Stock Growers Association Wyoming Wildlife Federation Wyoming Wool Growers Association Companies/Businesses American Colloid Company Antelope Coal Company Ark Land Company Arnjac Belle Ayr Mine Bjork, Lindley, Danielson & Baker, P.C. Bridgeview Coal Company Buckskin Mine Burlington Northern Railroad Company Burns & McDonnell CH2M Hill C.H. Snyder Company Consol, Inc., Exploration & Land Dept CE&MT, Incorporated Decker Coal Company Cordero-Rojo Mine Complex Ducker, Montgomery, Lewis, & Aronstein Dry Fork Coal Company ECC Eagle Butte Mine Environmental Solutions, Incorporated Evergreen Enterprises Foster-Wheeler Environmental Glenrock Coal Company Greystone Jacobs Ranch Coal Corporation Independent Consultants Network Kenneth R. Paulsen Consultants Intermountain Resources Kiewit Mining Company

5-8

TABLE 5-4 (continued)
Companies/Businesses (continued)
 Kennecott Energy Company L.E. Peabody & Associates KN Energy Majestic Petroleum Operations, LLC Marquiss Minerals Inc. Marston & Marston M&K Oil Company, Incorporated McVehil-Monnett Associates, Inc. McGraw-Hill Meineadair Consultants Mine Engineers, Incorporated Nerco Coal Company Mining Associates of Wyoming Norwest Mine Services North Rochelle Mine Pacificorp/Interwest Mining P&M Coal Company Poudre Environmental Consulting PIC Technologies RAG Coal West, Incorporated Powder River Coal Company Riverside Technology, Incorporated Powder River Energy Corporation San Juan Coal Company Redstone Resources The Rim Companies Royal Gold Incorporated Thunder Basin Coalition Shea & Gardner Thunderbird Wildlife Consulting Thunder Basin Coal Company TRC Environmental Torch Energy Triton Coal Company URS Greiner Woodward Clyde U.S. West Communications Western Energy Company Western Fuels Association Western Gas Resources Williams Production RMT Company WWC Engineering Wyodak Resources Dev. Corporation Yates Petroleum Company Press Casper Journal Associated Press Cheyenne-Wyoming Eagle Casper Star Tribune Gillette News-Record Douglas Budget Western Coal Newsletter Rocky Mountain Oil Journal Educational Institutions CSU, The Libraries Northwestern Univ. Policy Research Inst. UW Libraries, Coe Reference Department Individuals Barbero, Ralph Bierman, Sheldon Barbour, Steve & Georgia Cook, Cecle & Lavern Trust Daub, Jerry Jordan, Christine Sorhage Mader, Richard and Ena Natta, F.L Oedekoven, John Gilbert Robertson, C.J Saulcy, Bill Varney, Lena H. Tharp Winland, Mark

Antelope, Sr., Howard Benson, Scott Barbour, Lorene Trust Carter, Wilma McGee Cundy, Cecil Dragoo, Denise Jacob, Gerald Mader, Kelly F. Mader, Troy Oedekoven, Byron & Marjorie Oedekoven, Olin O. Rourke, Paul & Jane Offut Varney, Lena H. Williams, John

5-9


REFERENCES CITED

Air Resource Specialists, Inc. (ARS). 2002 “Thunder Basin National Grasslands Monitoring Site Quarterly Reports, Spring 2001 – Winter 2002.” Prepared for the Wyoming Department of Environmental Quality, August 2002. 2003 “Thunder Basin National Grasslands Monitoring Site Quarterly Reports, First Quarter 2003.” Prepared for the Wyoming Department of Environmental Quality, July 2003.

Applied Hydrology & Associates (AHA). 1999 Technical Report on Groundwater Modeling of CBM Development, Powder River Basin, Wyoming. Prepared by AHA for the BLM, Buffalo, Wyoming. Argonne National Laboratory. Environmental Assessment Division. 2002 “Air Quality Impact Assessment for the Montana Final Statewide Oil and Gas EIS and Proposed Amendment of the Powder River and Billings Resource Management Plans and the Wyoming Final EIS and Draft Planning Amendment for the Powder River Basin Oil and Gas Project.“ Argonne, Illinois. Billings Gazette. 2001 “Group Finds Partner to Build Wright Power Plant.” October 18. Black Hills Corporation. 2001 “Black Hills Corporation Announces Plans for 500 MW Independent Power Plant in Wyoming,” February 26, 2001. Obtained from website on the internet: http://www.blackhillscorp.com, click on “Investor Relations,” then “Press Releases.” Braun, C.E. 1987 “Current Issues in Sage Grouse Management.” Proceedings of the Western Association of Fish and Wildlife Agencies 67:134-144. 1998 “Sage Grouse Declines in Western North America: What Are the Problems?” Proceedings of the Western Association of Fish and Wildlife Agencies 78:139-156. Buehler, D. A., T. J. Mersmann, J. D. Fraser, and J. K. D. Seegar. 1991 “Non-breeding Bald Eagle Communal and Solitary Roosting Behavior and Roost Habitat on the Northern Chesapeake Bay.” Journal of Wildlife Management 55(3): 273-281.

REF-1

Campbell County Economic Development Council. 2002 Information acquired from website on the internet: http://www.ccedc.net. Casper Star Tribune. 2001 “A Coal-fired Power Plant Sought near Gillette” April 9. Acquired from website at http://www.trib.com/HOMENEWS/WYO. 2003 “Eagle Butte Wins on EQC Ruling”, by Brodie Farquhar, January 18.

Chancellor, Rick. 2003 Personal communication with Nancy Doelger, BLM Environmental Protection Specialist, at a meeting held in Cheyenne at the BLM state office on June 16, 2003. The purpose of the meeting was to discuss the WDEQ's permitting procedures. A handout, “NOx Summary” was provided at that meeting. Chancellor is the head of the Wyoming Department of Environmental Quality, Land Quality Division. City of Gillette. 1978 City of Gillette/ Campbell County Comprehensive Planning Program. Gillette, Wyoming. 2004	 “2003-2004 Housing and Demographic Report.” Planning Division, Department of Community Development, City of Gillette, Wyoming. February 2004. Clark, D.W. 1995 “Geotechnical Processes in Ground Water Resulting from Surface Mining of Coal at the Big Sky and West Decker Mine Area, Southeastern Montana.” US Geological Survey Water-Resources Investigations Report 95-4097. Clark, T. W., and M. R. Stromberg. 1987 Mammals in Wyoming. University of Kansas, Museum of Natural History. Crist, M.A. 1991 “Evaluation of Groundwater-level Changes near Gillette, Northeastern Wyoming.” US Geological Survey, Water Resources Investigations Report 88-4196. DeBruin, R.H. 1996 Oil and Gas Map of Wyoming: Wyoming State Geological Survey Map Series MS48, scale 1:500,000. DeBruin, R.H., and Jones, R.W. 1989 “Coalbed Methane in Wyoming.” Guidebook on Gas Resources of Wyoming, pp. 97-104.

REF-2

Dechant, J. A., M. L. Sondreal, D. H. Johnson, L. D. Igl, D. M. Goldade, M. P. Nennman, and B. R. Euliss. 2001 “Effects of Management Practices on Grassland Birds: Mountain Plover.” U. S. Geological Survey, Northern Prairie Wildlife Research Center. Jamestown, North Dakota. Dinsmore, J. J. 1983 “Mountain Plover (Charadrius montanus).” In J.S. Armbruster, editor. Impact of Coal Surface Mining on 25 Migratory Bird Species of High Federal Interest. US Fish and Wildlife Service FWS/OBS-83/35. 348 pages.

Ehrlich, P. R., D. S. Dobkin, and D. Wheye. 1988 The Birder’s Handbook: A Field Guide to the Natural History of North American Birds. Simon and Schuster, New York.

Fertig, W., and G. Beauvais. 1999 “Wyoming Plant and Animal Species of Special Concern.” Unpublished report. Wyoming Natural Diversity Database, Laramie, Wyoming. Finley, A., and Goolsby, J. 2000 “Estimates of Coal Volumes and Coalbed Methane in Place, Powder River Basin, Wyoming.” Wyoming State Geological Survey, Wyoming Geo-Notes No. 68, Laramie, Wyoming. Fitzgerald, J. P., C. A. Meaney, and D. M. Armstrong. 1994 Mammals of Colorado. Denver Museum of Natural History, Denver, Colorado. Fox, Douglas G; Ann M. Bartuska, James G. Byrne; and others. 1989 “A Screening Procedure to Evaluate Air Pollution Effects on Class I Wilderness Areas.” General Technical Report RM-168. Rocky Mountain Forest and Range Experiment Station. Fort Collins, Colorado. Gillette News Record. 2001 “Company Considers 3 Power Plants.” Acquired from website at: http://www.gillettenewsrecord.com/archivesrecord.com/archives 2002 New Wygen Power Plant Is Up and Running.” February 20, 2003. Obtained from wesite at http://www.gillettenewsrecord.com/archives

REF-3

Good, R. E., D. P. Young Jr., and J. Eddy. 2002 Distribution of Mountain Plovers in the Powder River Basin, Wyoming. Western EcoSystems Technology, Inc. Cheyenne, Wyoming. Hansen, A. J., M. V. Stalmaster, and J. R. Newman. 1981 “Habitat Characteristics, Function, and Destruction of Bald Eagle Communal Roosts in Western Washington. In R. L. Knight, G. T. Allen, M.V. Stalmaster and C. W. Servheen, eds. Proceedings of the Washington Bald Eagle Symposium. The Nature Conservancy, Seattle, Washington. Hodson, W.G., R.H. Pearl, and S.A. Druse. 1973 “Water Resources of the Powder River Basin and Adjacent Areas, Northeastern Wyoming.” USGS Hydrologic Investigations Atlas HA-465. Hydro-Engineering. 1991a Gillette Area Groundwater Monitoring Organization (GAGMO) 1991 Annual Report. Prepared for the Gillette Area Groundwater Monitoring Organization. 1991b Gillette Area Groundwater Monitoring Organization 10-year Report. 	 Prepared for Gillette Area Groundwater Monitoring Organization. 1992 Gillette Area Groundwater Monitoring Organization 1992 Annual Report. . Prepared for the Gillette Area Groundwater Monitoring Organization. Gillette Area Groundwater Monitoring Organization 1993 Annual Report. 	 Prepared for the Gillette Area Groundwater Monitoring Organization. Gillette Area Groundwater Monitoring Organization 1994 Annual Report. . 	 Prepared for the Gillette Area Groundwater Monitoring Organization. Gillette Area Groundwater Monitoring Organization 1995 Annual Report. . 	 Prepared for the Gillette Area Groundwater Monitoring Organization.

1993

1994

1995

1996a Gillette Area Groundwater Monitoring Organization 15-year Report. . 	 Prepared for Gillette Area Groundwater Monitoring Organization. 1996b Gillette Area Groundwater Monitoring Organization 1996 Annual Report. . 	 Prepared for Gillette Area Groundwater Monitoring Organization. 1997 Gillette Area Groundwater Monitoring Organization 1997 Annual Report. 	 Prepared for the Gillette Area Groundwater Monitoring Organization.

REF-4

1998

Gillette Area Groundwater Monitoring Organization 1998 Annual Report. 	 Prepared for the Gillette Area Groundwater Monitoring Organization. Gillette Area Groundwater Monitoring Organization 1999 Annual Report. 	 Prepared for the Gillette Area Groundwater Monitoring Organization. Gillette Area Groundwater Monitoring Organization 2000 Annual Report. 	 Prepared for the Gillette Area Groundwater Monitoring Organization. Gillette Area Groundwater Monitoring Organization 20-year Report. 	 Prepared for the Gillette Area Groundwater Monitoring Organization.

1999

2000

2001

IMPROVE. 1995 Visibility report from 1992-1995 acquired from the EPA’s Ambient Monitoring Technology Information Center (AMTIC) website, http://www.epa.gov/ttn/amtic/visdata.html. 2002	 Visibility report from 1996-1999 acquired from the Colorado State University website, http://vista.cira.colostate.edu/improve/Publications/Reports/2000/PDF/Exec utivesumfinal00.pdf. Keinath, D. A. and D. Ehle. 2001	 “Survey for Mountain Plover (Charadrius montanus) on Federal Lands in the Powder River Basin.” Wyoming Natural Diversity Database, University of Wyoming. Laramie, Wyoming. Keister, G. P. 1981	 “Characteristics of Winter Roosts and Populations of the Bald Eagles in Klamath Basin.” M. S. Thesis, Oregon State University, Corvalles. Knopf, F. L. 1996. “Mountain Plover (Charadrius montanus).” The Birds of North America, No. 211 (A. Poole and F. Gill, eds.). The Academy of Natural Sciences, Philadelphia, PA, and The American Ornithologists’ Union, Washington, D.C. Law, B.E. 1976

“Large-scale Compaction Structures in the Coal/bearing Fort Union and Wasatch Formations, Northeast Powder River Basin, Wyoming.” In Wyoming Geological Association: Guidebook on Geology and Energy Resources of the Powder River Basin, pp. 221-229.

REF-5

Law, B.E., D.D. Rice, and R.M. Flores. 1991 “Coalbed Gas Accumulations in the Paleocene Fort Union Formation. Powder River Basin, Wyoming” in Coalbed Methane of Western North America: Guidebook for the Rocky Mountain Association of Geologists Fall Conference and Field Trip, September 17-20, 1991, Glenwood Springs, Colorado. Stephen D. Schwochow, ed., Denver, CO. Lewis, B.D. and W.R. Hotchkiss. 1981 “Thickness, Percent Sand, and Configuration of Shallow Hydrogeological Units in the Powder River Basin, Montana and Wyoming.” US Geological Survey Miscellaneous Investigation Series Map I-1317. Luce, B., A. Cerovski, B. Oakleaf, J. Priday, and L. Van Fleet. 1999 Atlas of Birds, Mammals, Reptiles, and Amphibians in Wyoming. Wyoming Game and Fish Department, Wildlife Division, Cheyenne, Wyoming. Lyon, A. G. 2000 “The Potential Effects of Natural Gas Development on Sage Grouse (Centrocercus urophasianus) Near Pinedale, Wyoming.” Thesis, University of Wyoming, Laramie. Martin, L.J., D.L. Naftz, H.W. Lowham, and J.G. Rankl. 1988 Cumulative Potential Hydrologic Impacts of Surface Coal Mining in the Eastern Powder River Structural Basin, Northeastern Wyoming. US Geological Survey, Water Resources Investigations Report 88-4046. Prepared in cooperation with Wyoming Department of Environmental Quality and US Office of Surface Mining, Cheyenne, Wyoming. Martner, B.E. 1986 Wyoming Climate Atlas. Prepared in cooperation with the University of Wyoming, Wyoming Water Research Center. University of Nebraska Press: Lincoln and London. McGarigal, K., R. G. Anthony, F. B. Isaacs. 1991 “Interactions of Humans and Bald Eagles on the Columbia River Estuary.” Wildlife Monograph 115: 1-47. McVehil-Monnett Associates, Inc. 1997 “NO2 Concentrations in Northeast Wyoming: Historical Data and Projections.” Report prepared and submitted to WDEQ-AQD July 1997 Mine Safety and Health Administration. 1997 645 Database, Wyoming Summary Employment and Injury Information.

REF-6


Oakleaf, B., B. Luce, S. Ritter, and A. Cerovski. 1992 “Wyoming Bird and Mammal Atlas.” Wyoming Game and Fish Department, Cheyenne, Wyoming. 170 pp. Oedekoven, O.O. 2002 Draft 2002 Herd Unit Report. Wyoming Game and Fish Department. Office of Surface Mining Reclamation and Enforcement. 1980 Noise Impact Assessment for the Caballo Rojo Mine. Unpublished report prepared by James M. Montgomery, Consulting Engineers, Inc. Aurora, Colorado. 1982 Assessment of Impacts on Bald Eagles. Denver, Colorado. 	

1984	 “Correlation and Effect of Mine Facility Wells on the Tullock Aquifer in the Gillette, Wyoming, Vicinity.” Prepared by G.E. McIntosh, C.A. Harrison, and J.V. Wilcox. 2000 Annual Evaluation Summary Report for the Coal Regulatory Program 	 Administered by the Land Quality Division of the Wyoming Department of Environmental Quality for Evaluation Year 2000. Annual Evaluation Summary Report for the Coal Regulatory Program 	 Administered by the Land Quality Division of the Wyoming Department of Environmental Quality for Evaluation Year 2001. Annual Evaluation Summary Report for the Coal Regulatory Program 	 Administered by the Land Quality Division of the Wyoming Department of Environmental Quality for Evaluation Year 2003.

2002

2003

Olive, W.W. 1957 The Spotted Horse Coalfield, Sheridan and Campbell Counties, Wyoming. US Geological Survey Bulletin 1050. Payton, R. 2002 Personal communication September 9, 2002, with Scott Archer, Senior Air Resource Specialist, BLM, regarding Campbell County (Wyoming) PM10 monitoring data. Pedersen Planning Consultants. 2001 	 “Campbell County Housing Needs Assessment.” Pitchford, M.L., and W.C. Malm. 1994 “Development and Applications of a Standard Visual Index.” Atmospheric Environment 28(5):1,049-54.

REF-7

Rehm, B.W., G.H. Groenewold, and K.A. Morin. 1980 “Hydraulic Properties of Coal and Related Materials.” Plains: Groundwater, v. 18, no. 6, pp. 551-561.

Northern Great

Remington, T.E., and C.E. Braun. 1991	 "How Surface Coal Mining Affects Sage Grouse, North Park, Colorado." In Proceedings V: Issues and Technology in the Management of Impacted Wildlife, R. D. Comer, P. R. Davis, S. Q. Foster, C. V. Grant, S. Rush, O. Thorne, and J. Todd, eds. Thorne Ecological Institute. Boulder, CO. Shelley, Kevin. 1992 “Habitat Reclamation for Birds and Small Mammals on Surface Mined Lands in the Powder River Basin, Wyoming.” M.S. Thesis. Department of Zoology and Physiology, University of Wyoming. Sheridan Press. 2002 “Arch Coal’s Blasting Study Goes to DEQ.” Associated Press, July 26. Steenhof, K. 1976	 “The Ecology of Wintering Bald Eagles in Southeastern South Dakota.” M. S. Thesis. University of Missouri, Columbia. Steenhof, K., S. S. Berlinger, and L. H. Fredrickson. 1980 “Habitat Use by Wintering Bald Eagles in South Dakota.” Journal of Wildlife Management 44 (4): 798-805. Thorne, Kaye H. 1994 Wyoming Rare Plant Field Guide. The Wyoming Rare Plant Technical Committee. Thunder Basin Coal Company (TBCC). 2002 Black Thunder Mine Report for Development of Safe Setback Distances for Blasting Activities at the Black Thunder Mine. July 2002. Triton Coal Company, LLC. 2000 - Buckskin Mine Annual Reports to WDEQ/LQD on file in Sheridan and 2001 Cheyenne, Wyoming. 	 2002	 Buckskin Mine Permit Application 500-T6 on file with WDEQ/LQD, 
 Cheyenne, Wyoming. 
 United States. Army Corps of Engineers. 1987 Wetlands Delineation Manual. The Environmental Laboratory, Department of the Army, Waterways Experiment Station.

REF-8

United States. Bureau of Reclamation. 1981 “A Survey of Wintering Bald Eagles and Their Habitat in the Lower Missouri Region.” Denver, Colorado.

United States. Bureau of the Census (USBC). 2002	 Census 2000 Data for the State of Wyoming. Information obtained from website: http://www.census.gov/census2000/states/wy.html. United States. Department of Agriculture. Forest Service. 1999	 Personal communication, Tamara Blett, (FS Air Quality Specialist, Rocky Mountain Region, Denver, CO) to W. Konkel regarding air quality guidance. 2000 Screening Methodology for Calculating ANC Change to High Elevation 	 Lakes. Lakewood, CO.

U.S. Department of Commerce. 1990	 Economics and Statistics Administration, Bureau of the Census, 1990 Census of Population and Housing. 2000	 Economics and Statistics Administration, Bureau of the Census, 2000 Census of Population and Housing. 2003	 Economics and Statistics Administration, Bureau of Census, July 2002 population and housing estimates, available from website on the Internet as of August 2003: http://www.census.gov. United States. Department of Energy. Energy Information Administration. 2000	 Emissions of Greenhouse Gases in the United States 1999 - Methane Emissions. Available from the website at http://www.eia.doe.gov/oiaf/1605/ggrpt/tbles1.html 2000 Annual Energy Overview 1999. Information obtained from website: http:\\www.eia.doe.gov.

2002	 Coal Quick Stats. Information obtained from website: http://www.eia.doe.gov/fuelcoal.html United States. Department of the Interior. Bureau of Land Management 1974	 Final Environmental Impact Statement, Eastern Powder River Basin of Wyoming. 1979 Final Environmental Impact Statement, Proposed Development of Coal 	 Resources in the Eastern Powder River Basin of Wyoming, Washington, D.C.

REF-9

1981

Final Powder River Regional Coal Environmental Impact Statement. 	 Casper District Office. Casper, WY. Final Environmental Impact Statement on the Riley Ridge Natural Gas 	 Project, Sublette, Lincoln, and Sweetwater Counties, Wyoming. Prepared by Environmental Research and Technology, Inc, Draft Environmental Impact Statement for Round II Coal Lease Sale in the 	 Powder River Region. Cheyenne, Wyoming. Buffalo Resource Management Plan Environmental Impact Statement. 	 Buffalo, Wyoming.

1983

1984

1985

1988 	 National Environmental Policy Act Handbook H-1790-1. 1989	 Manual 3420, Competitive Coal Leasing. US Department of the Interior, Bureau of Land Management. 1991	 Powder River Regional Coal Team Operational Guidelines for Coal LeaseBy-Applications. 1992a Final Environmental Assessment for the West Black Thunder Coal Lease Application. EA no. WY061-2-004. Prepared for the Casper District Office by Western Water Consultants, Inc. Sheridan, WY. 1992b Final West Rocky Butte Coal Lease Application Environmental Impact 	 Statement, FES 92-1. Prepared for the Casper District Office by Western Water Consultants, Inc., Mariah Associates, Inc., and Bortz & Coddington, Inc. 1996a “Draft Economic Summary for the Buffalo Resource Area.” Casper Field Office, Buffalo, Wyoming. 1996b “Draft Natural Systems Paper for the Buffalo Resource Area.” Casper Field Office, Buffalo, Wyoming. 1996c “Draft Environmental Consequences of Existing Management for the Buffalo Resource Area.” Casper Field Office, Buffalo, Wyoming. 1996d “Draft Existing Management of the Buffalo Resource Area.” Casper Field Office, Buffalo, Wyoming. 1996e “Southern Powder River Basin Coal Leasing Study.” Report is on file at the Casper Field Office, Casper, Wyoming.

REF-10

1996f Coal Development Status Check Powder River Federal Coal Region 	 Montana & Wyoming. Casper Field Office. Casper, Wyoming. 1996g “Draft Energy Resources Booklet for the Buffalo Resource Area.” Casper Field Office, Buffalo, Wyoming. 1997 Draft and Final Gillette South CBM Project Environmental Impact 	 Statement. Buffalo Resource Area. Buffalo, Wyoming.

1999a Wyodak Coal Bed Methane Project Draft Environmental Impact Statement. 	 Buffalo Field Office. Buffalo, Wyoming. 1999b Final Environmental Assessment WY-070-EA-9-191 for the Proposed 	 Enron (Belco) BLM Coal Lease Exchange. Casper Field Office. Casper, Wyoming. 1999c	 Wyodak Coal Bed Methane Project Final Environmental Impact Statement. Buffalo Field Office. Buffalo, Wyoming. 2000	 Instruction Memorandum No. 2000-081, “Policy on Conflicts between CBM and Coal Development.” February 2000. On file at the Casper Field Office, Casper, Wyoming. 2000a Final Environmental Impact Statement for the Horse Creek Lease 	 Application (WYW141435). Casper Field Office. Casper, Wyoming. 2001 Final Environmental Impact Statement for the North Jacobs Ranch Coal 	 Lease Application. Casper Field Office. Casper, Wyoming.

2001a Approved Resource Management Plan for Public Lands Administered by 	 the Bureau of Land Management Buffalo Field Office. Casper Field Office. Buffalo, Wyoming. 2002 Draft Environmental Impact Statement and Draft Planning Amendment for 	 the Powder River Basin Oil and Gas Project. Buffalo Field Office. Buffalo, Wyoming.

2003a Final Environmental Impact Statement and Proposed Plan Amendment for 	 the Powder River Basin Oil and Gas Project. Buffalo Field Office. Buffalo, Wyoming. 2003b	 Final Statewide Oil and Gas Environmental Impact Statement and Proposed Amendment of the Powder River and Billings Resource Management Plans. Montana State Office, Billings, Montana.

REF-11

2003c Record of Decision and Resource Management Plan Amendments for the Powder River Basin Oil and Gas Project. Buffalo Field Office. Buffalo, Wyoming. United States. Environmental Protection Agency. 1997a National Air Toxics Information Clearinghouse (NATICH) Database. Office of Air Quality Planning and Standards. Research Triangle Park, North Carolina. 1997b Integrated Risk Information System (IRIS) Database. Office of Air Quality Planning and Standards. Research Triangle Park, North Carolina. 1998	 Interagency Workgroup on Air Quality Modeling (IWAQM) Phase 2. Summary Report: “Recommendations for Modeling Long Range Transport Impacts Research Triangle Park, North Carolina.” (EPA-454/R-98-09). 2001	 Comment letter to Nancy Doelger, BLM, regarding the North Jacobs Ranch Coal lease application DEIS, dated March 1. WMA report “PRB Short-term Exposure NO2 Study,” April 2000. 2002	 Information acquired from website (AirData) on the internet: http://www.epa.gov/air/data/monvals.html?st~WY~Wyoming accessed August14, 2002. 2002a Memorandum in response to Dr. Edward Faeder’s December 11, 2001 report, “Short Term Exposures to Nitrogen Dioxide,” from Suzanne Wuerthele and Robert Benson, EPA regional toxicologists, to Richard Long, EPA Director Air and Radiation Program, US Environmental Protection, Region 8, Denver, Colorado. United States. Fish and Wildlife Service. 1978 Management of Wintering Bald Eagles. FWS/OBS-78/79. Washington, D. C. 1986 Recovery Plan for the Pacific Bald Eagle. Portland, Oregon. 	

1989	 Black Footed Ferret Survey Guidelines for Compliance with the Endangered Species Act. Denver, Colorado and Albuquerque, New Mexico. 1995	 “Final Rule to Reclassify the Bald Eagle from Endangered to Threatened in All of the Lower 48 States.” Federal Register 60(133):36000-36010. 1995	 “Ute ladies’-tresses Draft Recovery Plan.” U. S. Fish and Wildlife Service, Denver, Colorado.

REF-12

1999a “Proposed Threatened Status for the Mountain Plover.” Federal Register 64 (30):7587-7601. 1999b “Extension of Comment Period and Announcement of Public Hearings on Proposal to List the Mountain Plover as a Threatened Species.” Federal Register 64(74):19108. 2000a 12-month administrative finding for a petition to list the black-tailed prairie dog from the National Wildlife Federation dated July 30, 1998. Web Page located at http://www.r6.fws.gov/btprairiedog/, and accessed August 22, 2000. 2000b “Twelve-month Finding for a Petition to List the Black-tailed Prairie Dog as Threatened.” Federal Register 65 (24):5476-5488. 2001a “Annual Notice of Findings on Recycled Petitions.” Federal Register 66 (5):1295-1300. 2001b August 20, 2001 Memorandum from Mike Long, Field Supervisor, USFWS Wyoming Field Office to Dennis Stenger, Field Office Manager, BLM Buffalo Field Office. 2002	 August 20, 2002 Memorandum from Mike Long, Field Supervisor, FWS Wyoming Field Office to Pat Karbs, Writer-Editor, BLM Casper Field Office. 2002 “Biological and Conference Opinion for the Powder River Basin Oil and Gas Project, Campbell, Converse, Johnson, and Sheridan Counties, Wyoming.” Cheyenne, Wyoming. 2003 “Endangered and Threatened Wildlife and Plants: Withdrawal of the Proposed Rule to List the Mountain Plover as Threatened.” Federal Register 68(174): 53083-53101. 2004	 February 3, 2004 Memorandum from Brian Kelly, Field Supervisor, FWS Wyoming Field Office to Robert Bennett, State Director, BLM Wyoming State Office. United States. Geological Survey. 1995 National Assessment of United States Oil and Gas Resources. Circular 1118. 2000	 “The Minerals Industry of Wyoming,” in Minerals Yearbook 2000. Available at http://minerals.usgs.gov/minerals/pubs/state/985601.pdf

REF-13

University of Wyoming. 1994 “Economic Impact of Coal on Wyoming's Economy.” Cooperative Extension Service, Department of Agricultural Economics, College of Agriculture. B-987. Van Voast, W.A and Reiten, J.C. 1988 Hydrogeologic Response Twenty Years of Surface Coal Mining in Southeastern Montana: Montana Bureau of Mines and Geology. Memoir 62. Western Regional Climate Center. 2002 Historical climatological data summaries obtained for the Gillette 9ESE station. Information obtained from website: http://www.wrcc.dri.edu/cgi­ bin/cliMAIN.pl?wygill. Wisdom, M. J., B. C. Wales, M. M. Rowland, M. G. Raphael, R. S. Holthausen, T. D. Rich, and V. A. Saab. 2002	 “Performance of Greater Sage-grouse Models for Conservation Assessment in the Interior Columbia Basin, USA.” Conservation Biology 16:1232-1242. Wyoming Housing Database Partnership. 2003	 “A Profile of Wyoming Demographics, Economics, and Housing.”
 Semiannual Report, ending June 30, 2003. 
 Wyoming Mining Association. 2002 Tax and Royalty for Campbell County Coal Mines for 2001, June 2002, email correspondence with Marion Loomis. Wyoming Mining Association. Air Quality Subcommittee. 2000	 Powder River Basin Short Term Exposure NO2 Study. Wyoming Oil and Gas Conservation Commission. 2000	 Information acquired from website http://wogcc.state.wy.us/. June. 2003 Personal communication between Nancy Doelger, BLM Casper Field Office, and Rick Marvel and Dave Hutton, Wyoming Oil and Gas Conservation Commission, October 22, 2003. Wyoming. Department of Administration and Information. Division of Economic Analysis. 1999	 Wyoming Economic Forecast Report, 8th edition.

REF-14

2000	 Outlook 2000: Joint Economic and Demographic Forecast to 2008. Prepared with Wyoming Department of Employment, Research and Planning. 2003a Wyoming economic and demographic data, available from website on the Internet as of November 2003: . Wyoming. Department of Employment, Research and Planning. 2000 Table 66: Campbell County, Northeast Region, Wyoming - Average Employing Units, Average Monthly Employment, Total Payroll, and Average Annual Wage by Major Industry & 2-Digit SIC, All Ownerships, 1995 B 2000. June. Information acquired from website: http://wydoe.state.wy.us/. 2001 	 2001 Wyoming benchmark labor force estimates. Information obtained from website on the internet: http://doe.state.wy.us/lmi/laus/01bmk.htm 2002	 Current Employment Statistics: June. Information acquired from website on the internet: http://wydoe.state.wy.us/ Wyoming. Department of Environmental Quality. Air Quality Division. 1989 Report on Air Quality Monitoring in Wyoming’s Powder River Basin, 1980­ 1988. 1989-	 Air Quality Monitoring Data. Cheyenne, Wyoming. 1997 2000 Air	 Quality Rules and Regulations.

Wyoming. Department of Environmental Quality. Land Quality Division. 2002 “Cumulative Hydrologic Impact Assessment, Coal Mining, Little Powder River Area.” Prepared for the Hay Creek Amendment to the Buckskin Mine Permit. February 2002. Wyoming. Department of Revenue. 2000 1999 Annual Report. Information acquired from website: http://revenue.state.wy.us. November. 2002 2001 Annual Report. 	

Wyoming. Game and Fish Department. 1996 Wildlife Observation System, Wyoming Game and Fish Dept. Publ., Cheyenne, Wyoming. 1998	 Casper and Sheridan Region Big Game Herd Unit Reports.

REF-15

1999	 Correspondence from Deputy Director Bill Wichers to Rick Chancellor of the Wyoming Department of Environmental Quality, Land Quality Division. May 21, 1999. Wyoming. Geological Survey. 2002 Wyoming Geo-notes. No. 73.

2002a Wyoming Geo-notes. No. 74. 2002b Wyoming Geo-notes. No. 75. 2003 Wyoming Geo-notes. No. 78.

Wyoming Water Resources Center. 1997 A Study of Techniques to Assess Surface and Groundwater Impacts Associated with Coal Bed Methane and Surface Coal Mining, Little Thunder Creek Drainage, Wyoming. Prepared in conjunction with WDEQ/LQD, SEO, WSGS, BLM and OSM.

REF-16


APPENDIX A
FEDERAL AND STATE AGENCIES AND PERMITTING REQUIREMENTS

Agency
FEDERAL
Bureau of Land Management

Lease/Permit/Action
Coal lease Resource Recovery & Protection Plan Scoria sales contract Exploration drilling permit Preparation of mining plan approval document SMCRA oversight Approval of mining plan Safety permit and legal ID Ground control plan Major impoundments Explosives use and storage permit Explosive=s manufacturer=s license Explosives use and storage permit Radio Permit: ambulance Mobile relay system radio license Radioactive by-products material license Authorization of impacts to wetlands and other US waters Hazardous waste shipment notification Radio tower permits

Office of Surface Mining Reclamation and Enforcement Office of the Secretary of the Interior Mine Safety and Health Administration

Bureau of Alcohol, Tobacco, and Firearms Federal Communication Commission Nuclear Regulatory Commission Army Corps of Engineers Department of Transportation Federal Aviation Administration

STATE
State Land Commission Department of Environmental Quality-Land Quality Division Department of Environmental Quality-Air Quality Division Coal lease Scoria lease Permit and license to mine Air quality permit to operate Air quality permit to construct

Department of Environmental Quality-Water Quality 	 National Pollutant Discharge Elimination System water discharge permit Division	 Permit to construct sedimentation pond Authorization to construct septic tank and leach field Authorization to construct and install a public water supply and sewage treatment system Department of Environmental Quality-Solid Waste Management Program State Engineer=s Office 	 Industrial Siting Council 	 Department of Health 	 Solid waste disposal permit-permanent and construction Appropriation of surface water permits Appropriation of groundwater permits Industrial Siting Certificate of Non-Jurisdiction Radioactive material Certificate of Registration

A-1


APPENDIX B
UNSUITABILITY CRITERIA FOR THE WEST HAY CREEK LBA TRACT
GENERAL RECOMMENDATIONS FOR BUFFALO RESOURCE AREA (BLM 1985, 2001), PLATTE RIVER RESOURCE AREA (BLM1985B), AND THE THUNDER BASIN NATIONAL GRASSLAND (USFS 1985, 2002) There are Federal lands located around Gillette, Sheridan, and Wright that were determined to be unsuitable under this criterion. No TBNG lands are included in the West Hay Creek LBA Tract.

FINDINGS FOR THE WEST HAY CREEK TRACT None of the federal lands determined to be unsuitable under Criterion 1 are present on the LBA tract; therefore there are no unsuitable findings.

UNSUITABILITY CRITERIA 1. Federal Land Systems. With certain exceptions that do not apply to this tract, all federal lands included in the following systems are unsuitable for mining: National Parks, National Wildlife Refuges, National System of Trails, National Wilderness Preservation System, National Wild and Scenic Rivers, National Recreation Areas, Lands acquired through the Land and Water Conservation Fund, National Forests and Federal lands in incorporated cities, towns and villages. Rights-of-Way and Easements. Federal lands that are within ROWs or easements or within surface leases for residential, commercial, industrial or other public purposes, on federally owned surface, are unsuitable for mining.

2.

Portions of the BNSF&UP railroad, the TriCounty 230-Kv transmission line, and State Highway 450 were found to be unsuitable under this criterion within the general review area.

The portions of the Tri-County 230-Kv transmission line, the BNSF&UP ROW, and Highway 450 that were found to be unsuitable are not located on the West Hay Creek LBA Tract. There are no unsuitable findings under Criterion 2 for the West Hay Creek LBA Tract. Wyoming Highway 450, I-90, and the cemetary are not located on the West Hay Creek LBA Tract. No occupied dwellings, other highways/roads, or schools are located on the tract. Therefore, there are no unsuitable findings under Criterion 3 for the West Hay Creek LBA Tract. There are no unsuitable findings under Criterion 4 for the LBA tract. There are no unsuitable findings under Criterion 5 for the LBA tract.

3.

Dwellings, Roads, Cemeteries, and Public Buildings. Federal lands within 100 feet of a ROW of a public road or a cemetery; or within 300 feet of any public building, school, church, community or institutional building or public park; or within 300 feet of an occupied dwelling are unsuitable for mining. Wilderness Study Areas. Federal lands designated as wilderness study areas (WSAs) are unsuitable for mining while under review for possible wilderness designation. Lands with Outstanding Scenic Quality. Scenic federal lands designated by visual resource management analysis as Class I (outstanding visual quality or high visual sensitivity) but not currently on National Register of Natural Landmarks are unsuitable. Lands Used for Scientific Study. Federal lands under permit by the surface management agency and being used for scientific studies involving food or fiber production, natural resources, or technology demonstrations and experiments are unsuitable for the duration of the study except where mining would not jeopardize the purpose of the study. Cultural Resources. All publicly or privately owned places which are included in or are eligible for inclusion in the NRHP and an appropriate buffer zone are unsuitable.

Portions of Wyoming Highway 450, Interstate Highway I-90, and one cemetery were found to be unsuitable under this criterion. Decisions were deferred on other highways/roads, occupied dwellings, and one school. No lands in the general review area are within a wilderness study area. No lands in the general review area meet the scenic criteria as outlined.

4.

5.

6.

No lands in the general review area are being used for scientific study.

There are no unsuitable findings under Criterion 6 for the LBA tract.

7.

On the basis of consultation with SHPO, there were no unsuitable findings under this criterion in the general review area. Continue using the AStandard Archeological Stipulation for Cultural Resources.@ No lands in the general review area are designated as natural areas or as National Natural Landmarks. There is no federally designated critical habitat for threatened or endangered plant or animal species within the general review area. Wyoming does not maintain a state list of threatened or endangered species of plants or animals. Therefore, this criterion does not apply.

There are no unsuitable findings under Criterion 7 for the LBA tract. The AStandard Archeological Stipulation for Cultural Resources@ should be applied if this tract is leased. There are no unsuitable findings under Criterion 8 for the LBA tract. There are no unsuitable findings under Criterion 9 for the West Hay Creek LBA Tract.

8.

Natural Areas. Federal lands designated as natural areas or National Natural Landmarks are unsuitable. Critical Habitat for Threatened or Endangered Plant and Animal Species. Federally designated critical habitat for threatened or endangered plant and animal species, and scientifically documented essential habitat for threatened or endangered species are unsuitable.

9.

10. State Listed Species. Federal lands containing habitat determined to be critical or essential for plant or animal species listed by a state pursuant to state law as threatened or endangered shall be considered unsuitable.

There are no unsuitable findings under Criterion 10 for the LBA tract.

B-1


APPENDIX B
UNSUITABILITY CRITERIA FOR THE WEST HAY CREEK LBA TRACT
GENERAL RECOMMENDATIONS FOR BUFFALO RESOURCE AREA (BLM 1985, 2001), PLATTE RIVER RESOURCE AREA (BLM1985B), AND THE THUNDER BASIN NATIONAL GRASSLAND (USFS 1985, 2002) Defer suitability decisions and evaluate bald and golden eagle nests on a case by case basis prior to lease issuance. Establish buffer zones around nests after consultation with USFWS. Defer suitability decisions and evaluate bald and golden eagle roost areas case by case before lease issuance. Establish buffer zones after consultation with USFWS. Defer suitability decisions on falcon nesting sites and evaluate case by case basis before lease issuance. Establish buffer zones around nesting sites after consultation with USFWS. Defer suitability decisions on migratory bird habitat and evaluate case by case before lease issuance. Establish buffer zones around nesting sites after consultation with USFWS. Defer suitability decisions on grouse leks and evaluate case by case before lease issuance. Establish buffer zones after consultation with USFWS.

FINDINGS FOR THE WEST HAY CREEK TRACT There are currently no active bald or golden eagle nests or established buffer zones located on the West Hay Creek LBA Tract. There are no unsuitable findings under Criterion 11 for the West Hay Creek LBA Tract. There are currently no bald or golden eagle roosts or established buffer zones located on the LBA tract. There are no unsuitable findings under Criterion 12. There are no falcon nesting sites on the LBA tract; therefore, there are no unsuitable findings under Criterion 13.

UNSUITABILITY CRITERIA 11. Bald or Golden Eagle Nests. An active bald or golden eagle nest and appropriate buffer zone are unsuitable unless the lease can be conditioned so that eagles will not be disturbed during breeding season or unless golden eagle nests will be moved.

12.

Bald and Golden Eagle Roost and Concentration Areas. Bald and golden eagle roost and concentration areas on federal lands used during migration and wintering are unsuitable unless mining can be conducted in such a way as to ensure that eagles shall not be adversely disturbed. Falcon Nesting Sites and Buffer Zones. Federal lands containing active falcon (excluding kestrel) cliff nesting sites and a suitable buffer zone shall be considered unsuitable unless mining can be conducted in such a way as to ensure the falcons will not be adversely affected. Habitat for Migratory Bird Species. Federal lands which are high priority habitat for migratory bird species of high federal interest shall be considered unsuitable unless mining can be conducted in such a way as to ensure that migratory bird habitat will not be adversely affected during the period it is in use. Fish and Wildlife Habitat for Resident Species. Federal lands which the surface management agency and state jointly agree are fish, wildlife and plant habitat of resident species of high interest to the state, and which are essential for maintaining these priority wildlife species, shall be considered unsuitable unless mining can be conducted in such a way as to ensure no long-term impact on the species will occur. Floodplains. Federal lands in riverine, coastal, and special floodplains shall be considered unsuitable where it is determined that mining could not be undertaken without substantial threat of loss of life or property. Municipal Watersheds. Federal lands which have been committed by the surface management agency to use as municipal watersheds shall be considered unsuitable. National Resource Waters. Federal lands with national resource waters, as identified by states in their water quality management plans, and ¼-mile buffer zones shall be unsuitable. Alluvial Valley Floors. Federal lands identified by the surface management agency, in consultation with the state, as AVFs where mining would interrupt, discontinue, or preclude farming, are unsuitable. Additionally, when mining federal lands outside an AVF would materially damage the quality or quantity of water in surface or underground water systems that would supply AVFs, the land shall be considered unsuitable. State or Indian Tribe Criteria. Federal lands to which is applicable a criterion proposed by the state or Indian tribe located in the planning area and adopted by rulemaking by the Secretary are unsuitable.

13.

14.

No high priority habitat for migratory bird species of high federal interest has been identified on the LBA tract and adjacent areas. There are no unsuitable findings under Criterion 14. There are no active or inactive sage grouse leks on the LBA tract. Two active sharp-tailed grouse leks were identified on lands adjacent to the LBA tract, one within ½ mile. There are no unsuitable findings under Criterion 15. Site-specific stipulations and resource protection safeguards will be applied if necessary during mining and reclamation planning. There are no unsuitable findings under Criterion 16 for the LBA tract. There are no unsuitable findings under Criterion 17 for the LBA tract. There are no unsuitable findings under Criterion 18 for the LBA tract.

15.

16.

The BLM and USFS have determined that the identified floodplains could potentially be mined. Therefore, all lands within the general review area are considered suitable. There are no designated municipal watersheds in the general review area. There are no designated national resource waters within the TBNG review area.

17.

18.

19.

Consider areas determined to contain alluvial valley floors significant to farming as unsuitable. Defer decisions on other AVFs and analyze on a case-by-case basis at the time a lease action is evaluated.

There are no unsuitable findings under Criterion 19 for the LBA tract.

20.

There are no criterion proposed by state or Indian tribes that have been approved by the Secretary of the Interior. No tribal lands are located in or near the review area.

There are no unsuitability findings for this criterion on the LBA tract.

B-2


APPENDIX C
COAL LEASE-BY-APPLICATION FLOW CHART

BLM State Office Receives Application FM holds public hearing
Adjudicator evaluates applicant’s qualifications Confirms emergency (if applicable)

Applicant submits/adjudicator reviews surface owner consent agreement(s) if necessary
State Director notifies Governor and regional Coal Team of application

Field Manager (FM) ensures that application is in conformance with land use plan (LUP) Minerals staff receives application and prepares report on maximum economic recovery

SD consults with surface management agrncy, Governor, attorney genera;l and Indian tribes

FM recommends amendment of LUP and/or modification of application area

SD makes decision

FM prepares sitespecific environmental analysis

To hold sale

To reject the application

FM prepares environmental analysis of LUP amendment and application

C-1


APPENDIX D
BUREAU OF LAND MANAGEMENT SPECIAL COAL LEASE STIPULATIONS AND FORM 3400-12 COAL LEASE

BLM will attach the following special stipulations to the West Hay Creek LBA tract if it is leased: SPECIAL STIPULATIONS In addition to observing the general obligations and standards of performance set out in the current regulations, the lessee shall comply with and be bound by the following special stipulations. These stipulations are also imposed upon the lessee’s agents and employees. The failure or refusal of any of these persons to comply with these stipulations shall be deemed a failure of the lessee to comply with the terms of the lease. The lessee shall require his agents, contractors and subcontractors involved in activities concerning this lease to include these stipulations in the contracts between and among them. These stipulations may be revised or amended, in writing, by the mutual consent of the lessor and the lessee at any time to adjust to changed conditions or to correct an oversight. (a) CULTURAL RESOURCES
(1) Before undertaking any activities that may disturb the surface of the leased lands, the lessee shall conduct a cultural resource intensive field inventory in a manner specified by the Authorized Officer of the BLM or of the surface managing agency, if different, on portions of the mine plan area and adjacent areas, or exploration plan area, that may be adversely affected by leaserelated activities and which were not previously inventoried at such a level of intensity. The inventory shall be conducted by a qualified professional cultural resource specialist (i.e., archeologist, historian, historical architect, as appropriate), approved by the Authorized Officer of the surface managing agency (BLM, if the surface is privately owned), and a report of the inventory and recommendations for protecting any cultural resources identified shall be submitted to the Assistant Director of the Western Support Center of the Office of Surface Mining, the Authorized Office of the BLM, if activities are associated with coal exploration outside an approved mining permit area (hereinafter called Authorized Officer), and the Authorized Officer of the surface managing agency, if different. The lessee shall undertake measures, in accordance with instructions from the Assistant Director, or Authorized Officer, to protect cultural resources on the leased lands. The lessee shall not commence the surface disturbing activities until permission to proceed is given by the Assistant Director or Authorized Officer. (2) The lessee shall protect all cultural properties that have been determined eligible to the National Register of Historic Places within the lease area from lease-related activities until the cultural resource mitigation measures can be implemented as part of an approved mining and reclamation or exploration plan unless modified by mutual agreement in consultation with the State Historic Preservation Officer.

D-1 


(3) The cost of conducting the inventory, preparing reports, and carrying out mitigation measures shall be borne by the lessee. (4) If cultural resources are discovered during operations under this lease, the lessee shall immediately bring them to the attention of the Assistant Director or Authorized Officer, or the Authorized Officer of the surface managing agency, if the Assistant Director is not available. The lessee shall not disturb such resources except as may be subsequently authorized by the Assistant Director or Authorized Officer. Within two (2) working days of notification, the Assistant Director or Authorized Officer will evaluate or have evaluated any cultural resources discovered and will determine if any action may be required to protect or preserve such discoveries. The cost of data recovery for cultural resources discovered during lease operations shall be borne by the lessee unless otherwise specified by the Authorized Officer of the BLM or of the surface managing agency, if different. (5) All cultural resources shall remain under the jurisdiction of the United States until ownership is determined under applicable law.

(b) 	PALEONTOLOGICAL RESOURCES
If paleontological resources, either large and conspicuous, and/or of significant scientific value are discovered during mining operations, the find will be reported to the Authorized Officer immediately. Mining operations will be suspended within 250 feet of said find. An evaluation of the paleontological discovery will be made by a BLM approved professional paleontologist within five (5) working days, weather permitting, to determine the appropriate action(s) to prevent the potential loss of any significant paleontological value. Operations within 250 feet of such discovery will not be resumed until written authorization to proceed is issued by the Authorized Officer. The lessee will bear the cost of any required paleontological appraisals, surface collection of fossils, or salvage of any large conspicuous fossils or significant scientific interest discovered during the operations.

(c)	 THREATENED, ENDANGERED, CANDIDATE, or OTHER SPECIAL STATUS PLANT and ANIMAL SPECIES
The lease area may now or hereafter contain plants, animals, or their habitats determined to be threatened or endangered under the Endangered Species Act of 1973, as amended, 16 U.S.C. 1531 et seq., or that have other special status. The Authorized Officer may recommend modifications to exploration and development proposals to further conservation and management objectives or to avoid activity that will contribute to a need to list such species or their habitat or to comply with any biological opinion issued by the Fish and Wildlife Service for the proposed action. The Authorized Officer will not approve any ground-disturbing activity that may affect any such species or critical habitat until it completes its obligations under applicable requirements of the Endangered Species Act. The Authorized Officer may require modifications to, or disapprove a proposed activity that is likely to result in jeopardy to the continued existence of a proposed or listed threatened or endangered species, or result in the destruction or adverse modification of designated or proposed critical habitat. The lessee shall comply with instructions from the Authorized Officer of the surface managing agency (BLM, if the surface is private) for ground disturbing activities associated with coal exploration on federal coal leases prior to approval of a mining and reclamation permit or outside an approved mining and reclamation permit area. The lessee shall comply with instructions from the Authorized Officer of the Office of Surface Mining Reclamation and Enforcement, or his designated representative, for all ground disturbing activities taking place within an approved mining and reclamation permit area or associated with such a permit.

D-2 


(d) MULTIPLE MINERAL DEVELOPMENT
Operations will not be approved which, in the opinion of the Authorized Officer, would unreasonably interfere with the orderly development and/or production from a valid existing mineral lease issued prior to this one for the same lands.

(e) OIL AND GAS/COAL RESOURCES The BLM realizes that coal mining operations conducted on Federal coal leases issued within
producing oil and gas fields may interfere with the economic recovery of oil and gas; just as Federal oil and gas leases issued in a Federal coal lease area may inhibit coal recovery. BLM retains the authority to alter and/or modify the resource recovery and protection plans for coal operations and/or oil and gas operations on those lands covered by Federal mineral leases so as to obtain maximum resource recovery.

(f) RESOURCE RECOVERY AND PROTECTION
Notwithstanding the approval of a resource recovery and protection plan (R2P2) by the BLM, lessor reserves the right to seek damages against the operator/lessee in the event (i) the operator/lessee fails to achieve maximum economic recovery (MER) (as defined at 43 CFR 3480.0-5(21)) of the recoverable coal reserves or (ii) the operator/lessee is determined to have caused a wasting of recoverable coal reserves. Damages shall be measured on the basis of the royalty that would have been payable on the wasted or unrecoverable coal. The parties recognize that under an approved R2P2, conditions may require a modification by the operator/lessee of that plan. In the event a coal bed or portion thereof is not to be mined or is rendered unmineable by the operation, the operator/lessee shall submit appropriate justification to obtain approval by the Authorized Officer to lease such reserves unmined. Upon approval by the Authorized Officer, such coal beds or portions thereof shall not be subject to damages as described above. Further, nothing in this section shall prevent the operator/lessee from exercising its right to relinquish all or portion of the lease as authorized by statute and regulation. In the event the Authorized Officer determines that the R2P2, as approved, will not attain MER as the result of changed conditions, the Authorized Officer will give proper notice to the operator/lessee as required under applicable regulations. The Authorized Office will order a modification if necessary, identifying additional reserves to be mined in order to attain MER. Upon a final administrative or judicial ruling upholding such an ordered modification, any reserves left unmined (wasted) under that plan will be subject to damages as described in the first paragraph under this section. Subject to the right to appeal hereinafter set forth, payment of the value of the royalty on such unmined recoverable coal reserves shall become due and payable upon determination by the Authorized Officer that the coal reserves have been rendered unmineable or at such time that the operator/lessee had demonstrated an unwillingness to extract the coal. The BLM may enforce this provision either by issuing a written decision requiring payment of the MMS demand for such royalties, or by issuing a notice of non-compliance. A decision or notice of non-compliance issued by the lessor that payment is due under this stipulation is appealable as allowed by law.

D-3 


(g) PUBLIC LAND SURVEY PROTECTION
The lessee will protect all survey monuments, witness corners, reference monuments, and bearing trees against destruction, obliteration, or damage during operations on the lease areas. If any monuments, corners or accessories are destroyed, obliterated, or damaged by this operation, the lessee will hire an appropriate county surveyor or registered land surveyor to reestablish or restore the monuments, corners, or accessories at the same locations, using the surveying procedures in accordance with the Manual of Surveying Instructions for the Survey of the Public Lands of the United States. The survey will be recorded in the appropriate county records, with a copy sent to the Authorized Officer.

D-4 


APPENDIX E
CUMULATIVE AIR QUALITY IMPACT TECHNICAL SUPPORT DOCUMENTATION

As discussed in chapter 4, an air quality impact assessment was conducted during preparation of the Wyoming Final EIS and Proposed Plan for the PRB Oil and Gas Project (BLM 2003a) and the Montana Statewide Final Oil and Gas EIS and Proposed Amendment of the Powder River and Billings RMPs (BLM 2003b). These documents will be referred to as the “Wyoming PRB Oil and Gas EIS” and the “Montana Statewide EIS” in the following discussion. The air quality impact analysis was prepared to evaluate the impacts of proposed oil and gas development in northeastern Wyoming and southeastern Montana on air quality in the region. This air quality impact assessment included projected coal mining operations in the Wyoming and Montana PRB, and the results are included in the cumulative impact section of this EIS and this appendix. The following technical support document describes the processes used to conduct the air quality impact assessment and provides summaries of relevant analysis data: Argonne National Laboratory. Environmental Assessment Division. 2002. Technical Support Document - Air Quality Impact Assessment for the Montana Final Statewide Oil and Gas EIS and Proposed Amendment of the Powder River and Billings Resource Management Plans and the Wyoming Final EIS and Planning Amendment for the Powder River Basin Oil and Gas Development Project. Argonne, Illinois. Copies of this technical support document are available upon request from: Scott Archer, Senior Air Resource Specialist National Science and Technology Center (ST-133) Denver Federal Center, Building 50 P.O. Box 25047 Denver, Colorado 80225-0047 303.236.6400 Voice 303.236.3508 Telefax scott_archer@blm.gov

E-1


INTRODUCTION Air pollution impacts are limited by local, state, tribal and federal air quality regulations, standards, and implementation plans established under the Clean Air Act (CAA) and administered by the WDEQ/AQD and the EPA. Although not applicable to the Alternatives analyzed in the Wyoming PRB Oil and Gas EIS or this EIS, the Montana Department of Environmental Quality, Air and Waste Management Bureau (MTDEQ­ AWM) has similar jurisdiction over potential air pollutant emission sources in Montana, which can have a cumulative impact with WDEQ/AQD approved sources. Fugitive dust and exhaust from construction activities, along with air pollutants emitted during operation (i.e., well operations, booster [field] and pipeline [sales] compressor engines, etc.), are potential causes of air quality impacts. These issues are more likely to generate public concern where natural gas development activities occur near residential areas. The Forest Service (FS), National Park Service (NPS), and the Fish and Wildlife Service (FWS) have also expressed concerns regarding potential atmospheric deposition (acid rain) and visibility impacts within distant downwind PSD (prevention of significant deterioration) Class I and PSD Class II sensitive areas under their administration, located throughout Wyoming, Montana, southwestern North Dakota, western South Dakota, and northwestern Nebraska. EXISTING AIR QUALITY The project area for the Wyoming PRB Oil and Gas EIS includes Campbell, Sheridan, Johnson, and northern Converse counties. The project area for the Montana Statewide EIS includes all of Carter, Powder River, Big Horn, Yellowstone, Carbon, Stillwater, Sweetgrass, Wheatland, Golden Valley, Musselshell, and Treasure counties, and portions of Rosebud and Custer counties. The analysis area for the West Hay Creek LBA tract is located in northern Campbell County, Wyoming, which lies in the eastern part of the project area for the Wyoming and PRB Oil and Gas EIS. As described in chapter 3, specific air quality monitoring is not conducted throughout most of the project area for the Wyoming PRB Oil and Gas Project EIS and the Montana Statewide EIS. Air quality conditions are likely to be very good, as characterized by limited air pollution emission sources (few industrial facilities and residential emissions in the relatively small communities and isolated ranches) and good atmospheric dispersion conditions, resulting in relatively low air pollutant concentrations. As part of the air quality impact assessment prepared by Argonne National Laboratory (Argonne 2002), monitoring data measured throughout northeastern Wyoming and southeastern Montana were assembled and reviewed. Although monitoring is primarily conducted in urban or industrial areas, the data selected are considered to be the best available representation of background air pollutant concentrations throughout the project area. Specific values presented in Table AQ-1 were used to define background conditions in the air quality impact analysis. The assumed background pollutant concentrations are below applicable ambient air quality E-2


standards for all pollutants and averaging times. These National and Wyoming standards, and PSD increment values, are also presented in table AQ-1. REGULATORY FRAMEWORK The NAAQS and WAAQS set the absolute upper limits for specific air pollutant concentrations at all locations where the public has access. The analysis of the proposed alternatives must demonstrate continued compliance with all applicable local, state, tribal, and federal air quality standards. Existing air quality throughout most of the project area for the Wyoming PRB Oil and Gas Project EIS and Montana Statewide EIS is in attainment with all ambient air quality standards, as demonstrated by the relatively low concentration levels presented in table AQ-1. However, four areas have been designated as federal nonattainment areas where the applicable standards have been violated in the past: Sheridan, Wyoming (PM10 - moderate); and Billings (CO), Lame Deer (PM10 - moderate) and Laurel (SO2 - primary), Montana. EPA Region 8 staff are concerned that PM10 monitoring data collected near and south of Gillette, Wyoming, have also exceeded both the NAAQS and the available PSD Class II increment. Specific monitoring data are presented in tables AQ-2 and AQ-3. Air quality regulations require certain proposed new, or modified existing, air pollutant emission sources (including CBM compression facilities) undergo a permitting review before their construction can begin. Therefore, the applicable air quality regulatory agencies have the primary authority and responsibility to review permit applications and to require emission permits, fees and control devices, prior to construction and/or operation. In addition, Congress (through the CAA Section 116) authorized local, state, and tribal air quality regulatory agencies to establish air pollution control requirements more (but not less) stringent than federal requirements. Also, under both FLPMA and the CAA, BLM can not authorize any activity which would not conform to all applicable local, state, tribal, and federal air quality laws, regulations, standards, and implementation plans. Given the current attainment status for most of the Project Area for the Wyoming PRB Oil and Gas Project EIS and Montana Statewide EIS, future development projects which have the potential to emit more than 250 tons per year of any criteria pollutant (or certain listed sources that have the potential to emit more than 100 tons per year) would be required to undergo a site-specific regulatory PSD increment consumption analysis under the federal new source review permitting regulations. Development projects subject to the PSD regulations may also be required by the applicable air quality regulatory agencies to incorporate additional emission control measures (including a BACT analysis and determination) to ensure protection of air quality resources, and demonstrate that the combined impacts of all PSD sources will not exceed the allowable incremental air quality impacts for NO2, PM10, and SO2.

E-3


TABLE AQ-1 
 ASSUMED BACKGROUND CONCENTRATIONS, APPLICABLE AMBIENT 
 AIR QUALITY STANDARDS, AND PSD INCREMENT VALUES 

(in µg/m3) National Ambient Air Quality Standards 40,000 10,000 1.5 100 235 157 65 15 150 50 1,300 365 80 Wyoming Ambient Air Quality Standards 40,000 10,000 1.5 100 235 157 65 15 150 50 1,300 260 60 PSD Class I Increment PSD Class II Increment

Pollutant

Averaging Time a

Background Concentration

1-hour carbon monoxide 8-hours Lead Nitrogen dioxide Ozone 8-hours 24-hours PM 2.5 Annual 24-hours PM 10 Annual 3-hours sulfur dioxide 24-hours Annual Quarterly Annual 1-hour

3,500b 1,500b n/a 16.5c 82d 130d 19f 7.6f 42f 17 8 8 3
f

------2.5 --------8 4 25 5 2

------25 --------30 17 512 91 20

e e e

Notes: Annual standards are not to be exceeded; short-term standards are not to be exceeded more than once per year.
 b Amoco Ryckman Creek collected for an 8-month period during 1978-1979, summarized in the Riley Ridge 
 EIS (BLM 1983).
 c Data collected in Gillette, Wyoming (1996 – 1997. 
 d Data collected in Pinedale, Wyoming (1992 – 1994). 
 e Data collected at Devil’s Tower (1983). 
 f Data collected in Gillette, Wyoming (1999). 

a

Source: Argonne (2002) 
 n/a - data not available 


E-4


TABLE AQ-2 
 ANNUAL AVERAGE PM10 MONITORING DATA COLLECTED 
 NEAR AND SOUTH OF GILLETTE, WYOMING 

(in µg/m3) Station Number 869 874 877 881 884 885 889 890 891 892 894 896 899 900 905 907 915 1002

Location Rochelle R0-1 North Rochelle E Black Thunder BTM 26-2 Antelope Site 4 Triton Coal / Buckskin Mine Cordero Hv-2 Cordero Hv-3 Coal Creek Ccm 26 Thunder Basin Coal / BTM Belle Ayr Ba-4, 5n, 5s Jacob Ranch Site 4 Dry Fork Coal Co Triton Coal / Gillette AMAX Eagle Butte Eb-5 Jacob Ranch Site 5 North Rochelle 1 Black Thunder BTM 36-1 Gillette, Wyoming

1996 n/a n/a 21.0 n/a 11.5 14.3 11.9 9.0 13.8 15.5 28.3 13.8 21.5 12.5 15.0 n/a n/a 16.1

1997 n/a n/a 17.7 14.5 12.6 15.3 10.9 7.9 12.0 14.6 24.3* 13.0 22.7 10.6 14.6 20.6 n/a 16.7

1998 [15.3] n/a 23.2 13.4 12.1 15.1 10.4 8.6 14.4 14.2 25.1* 10.5 15.3 11.6 15.1 18.4 n/a 17.6*

1999 24.2 [40] b 33.4 16.2 12.0 14.5 9.7 8.5 17 b 15.0 35.4* 9.3 17.2 11.7 20.5 38.6 n/a 19.1*

2000 20.2 [51] b 30.9 16.7 17.6* 26.0* 17.1 8.3 24.5 20.1 35.9* 10.8 19.0* 15.0 21.3 46.8 [18] b 20.7*

2001 22.6 [50] b 25.6 19.8 18.3 24.3* 19.8 [2.0] 37 b 25 b 19.6* 13.2 21.0 15 b 29.2 c 50.8*,c 26 b 19.9*

2002 a [25] b 33.5 b [30] b [12] b [16] b [30] b [14] b n/a [57] b [20] b 30.2 c [13] b [18] b [15] b 25.6 c 37.8 d [16] b [17] b

Notes: a Incomplete data year; values reported through July 1, 2002. 
 b Supplemental data provided by (Payton 2002). 
 c Data provided by Jacobs Ranch Coal Compan y (2003). 
 d WDEQ/AQD does not agree with EPA’s calculated value. Refer to appendix H, comment letter 7 and comment 
 response 1 for an explanation. 
 µg/m3 - micrograms per cubic meter. 
 n/a - data not available. 
 [data] - data in brackets are not reliable due to the small number of samples collected. 
 data* - starred data are combined from two or more samplers operating at the same location during the same year.
 Source: EPA (2002b)

E-5


TABLE AQ-3 SECOND MAXIMUM 24-HOUR AVERAGE PM10 MONITORING DATA COLLECTED NEAR AND SOUTH OF GILLETTE, WYOMING
(in µg/m3) Station Number 869 874 877 881 884 885 889 890 891 892 894 896 899 900 905 907 915 1002

Location Rochelle R0-1 North Rochelle E Black Thunder BTM 26-2 Antelope Site 4 Triton Coal / Buckskin Mine Cordero Hv-2 Cordero Hv-3 Coal Creek Ccm 26 Thunder Basin Coal / BTM Belle Ayr Ba-4, 5n, 5s Jacob Ranch Site 4 Dry Fork Coal Co Triton Coal / Gillette AMAX Eagle Butte Eb-5 Jacob Ranch Site 5 North Rochelle 1 Black Thunder BTM 36-1 Gillette, Wyoming

1996 n/a n/a 66 n/a 31 32 30 20 34 39 101 34 85 30 44 b n/a n/a 46 b

1997 n/a n/a 44 32 34 36 22 16 26 34 62* 39 65 37 39 39 n/a 29

1998 [23]

1999 62 122

2000 46 143 123 50 53* 73* 46 31 80 48 88* 32 54* 48 50 125 [24] 60*

2001 63 156 b 101 54 73 b 65* 47 n/a 97
b

2002 a [55] b [124] b [62] b [25] b [43] b [55] b [40] b n/a [155] b [35] b n/a [34] b [73] b [36] b n/a

55 32 36 42 25 23 39 53 54* 35 37 37 43 49 n/a 36*

125 35 36 36 26 25 43
b

56 103* 22 45 51 47 100 n/a 42*

70 b 119 b 42 80 b 61 97 268
b

[211] b [31] b [35] b

76 b 43 b

Notes: a Incomplete data year; values reported through July 1, 2002. 
 b Supplemental data provided by (Payton 2002). 
 µg/m3 - micrograms per cubic meter. 
 n/a - data not available. 
 [data] - data in brackets are not reliable due to the small number of samples collected. 
 data* - starred data are combined from two or more samplers operating at the same location during the same year. 
 Source: EPA 2000

A regulatory PSD increment consumption analysis may be conducted as part of a new source review, or independently. The determination of PSD increment consumption is a legal responsibility of the applicable air quality regulatory agencies, with EPA oversight. E-6

In addition, an analysis of cumulative impacts due to all existing sources and the permit applicant’s sources is also required during new source review to demonstrate that applicable ambient air quality standards will be met during the operational lifetime of the permit applicant’s operations. Coal mining in the vicinity of the West Hay Creek LBA tract is not currently affected by the PSD regulations for two reasons: surface coal mines are not on the EPA list of 28 major emitting facilities for PSD regulation, and point-source emissions from individual mines do not exceed the PSD emissions threshold of 250 tons per year. Sources subject to the PSD permit review procedure are also required to demonstrate potential impacts to AQRVs. These include visibility impacts, degradation of mountain lakes from atmospheric deposition (acid rain), and effects on sensitive flora and fauna in the Class I areas. The CAA also provides specific visibility protection procedures for the mandatory federal Class I areas designated by Congress on August 7, 1977, which included wilderness areas greater than 5,000 acres in size, as well as national parks and national memorial parks greater than 6,000 acres in size as of that date. The Fort Peck and Northern Cheyenne tribes have also designated their lands as PSD Class I, although the national visibility regulations do not apply in these areas. The allowable incremental impacts for NO2, PM10, and SO2 within these PSD Class I areas are very limited. The remainder of the project area for the Wyoming PRB Oil and Gas Project EIS and Montana Statewide EIS is designated PSD Class II with less stringent requirements. AGENCY ROLES AND AUTHORITIES EPA The EPA administers the federal Clean Air Act (42 U.S.C. 7401 et seq.) to maintain the National Ambient Air Quality Standards (NAAQS) that protect human health and to preserve the rural air quality in the region by assuring the PSD Class I and Class II increments for SO2, NO2, and PM10, are not exceeded. EPA has delegated this CAA authority to the states of Montana and Wyoming. Until the tribes have an EPA-approved tribal program, EPA will administer air quality requirements within Indian country. EPA is responsible for assuring that NAAQS are attained and that the tribally-designated Northern Cheyenne Class I sensitive airshed is protected, as well as the Class II increment limits that apply on the Crow Reservation. EPA will implement an air permitting program for major sources within Indian country, including BACT analysis, where appropriate. At this time, there is no federal minor source permitting program. Therefore, EPA cannot regulate minor sources in Indian country directly unless EPA, based on the results of a PSD increment consumption model, decides to implement a federal implementation plan (FIP). Based on future regulatory modeling in cooperation with MDEQ, EPA and the Bureau of Indian Affairs (BIA) may require either tribe to apply BACM to unimproved roads in Indian country or E-7


other control measures sufficient to avoid exceeding the Class I and Class II increment limits for PM10. Wyoming DEQ Wyoming regulates pollutants emitted into the air through the Wyoming Environmental Quality Act (W.S. 35-11-101 et. seq.). Wyoming is also authorized by an approved state implementation plan (SIP) to administer all requirements of the PSD permit program under the CAA. Additionally, the approved Wyoming SIP contains a number of programs which provide for the implementation, maintenance, and enforcement of the NAAQS, including a new source review program for minor source permitting which requires, among other things, application of BACT for all new or modified sources regardless of size or source category. Included as well are authorities for the control of particulate emissions, including fugitive particulate emissions from haul roads, access roads, or general facility boundaries. Wyoming is also delegated responsibility to operate an approved ambient air quality monitoring network for the purpose of demonstrating compliance with the National and Wyoming ambient air quality standards. Bureau of Land Management NEPA requires that federal agencies consider mitigation of direct and cumulative impacts during their preparation of an EIS (BLM Land Use Planning Manual 1601). Under the CAA, federal agencies are to comply with SIPs regarding the control and abatement of air pollution. Before an RMP or an amendments to an RMP is approved, the state director is to submit any known inconsistencies with SIPs to the Governor of that state. If the Governor of the state recommends changes in the proposed RMP or amendment to meet SIP requirements, the state director shall provide the public an opportunity to comment on those recommendations (BLM Land Use Planning Manual at Section 1610.3-2). Forest Service The FS administers nine wilderness areas (WAs) that could be affected by direct effects associated with the proposed development considered in the Wyoming PRB Oil and Gas Project EIS and Montana Statewide EIS: Bridger; Fitzpatrick; North Absaroka, Absaroka-Beartooth, and Washakie WAs, next to Yellowstone National Park; Teton WA; U.L. Bend WA; Cloud Peak WA; and Popo Agie WA with mandatory Class I designation. As federal land mangers, the FS could act in a consultative role to stipulate that the BLM modeling results, or any future EPA or state-administered PSD refined modeling results (if justified), triggers adverse impairment status. Should the FS determine impairment of WAs, then BLM, the state, and/or EPA may need to mitigate this predicted adverse air quality effect.

E-8

National Park Service Three areas administered by the NPS--Yellowstone National Park, Devils Tower National Monument, and Bighorn Canyon National Recreation Area--could be affected by direct effects associated with the proposed development considered in the Wyoming PRB Oil and Gas Project EIS and Montana Statewide EIS. As federal land managers, the NPS could act in a consultative role to stipulate that the BLM modeling results, or any future EPA or state-administered PSD refined modeling results (if justified), triggers adverse impairment status. Should the Park Service determine impairment of NPSadministered Class I areas, then BLM, the state, and/or EPA may need to mitigate this predicted adverse air quality effect. AIR QUALITY IMPACT ASSESSMENT Chapter 4 of this EIS discusses the air quality impact modeling results for the Buckskin Mine and the cumulative air quality impact assessment that was conducted for the Wyoming PRB Oil and Gas Project EIS and the Montana Statewide EIS. An extensive air quality impact assessment technical support document was also prepared by Argonne National Laboratory (Argonne 2002) and is available for review. Argonne analyzed potential impacts from: individual proposed Alternatives 1, 2A, 2B, and 3 of the Wyoming PRB Oil and Gas EIS; “Other” (non-alternative) emission sources, including surface coal mining in the Wyoming and Montana PRB; and all sources cumulatively by alternative. Alternatives 1, 2A and 2B of the Wyoming PRB Oil and Gas EIS have similar emission inventories, except half of the booster (field) compressors would be electrified under Alternative 2A, and all of the booster (field) compressors would be electrified under Alternative 2B. The air quality impact assessment conducted for the Wyoming PRB Oil and Gas Project EIS and Montana Statewide EIS was based on the best available engineering data and assumptions, meteorology data, and dispersion modeling procedures, as well as professional and scientific judgment. However, where specific data or procedures were not available, reasonable assumptions were incorporated. For example, the air quality impact assessment assumed that the maximum CBM, conventional oil, coal and other development would occur simultaneously, whereas actual development would occur under different time schedules. Potential air pollutant emissions from the emission sources under the Proposed Alternative for the Wyoming PRB Oil and Gas Project EIS were combined with other (non-alternative) sources to determine the total potential cumulative air quality impacts. These other (non-alternative) sources included development associated with emission sources permitted: 1) by the WDEQ/AQD; 2) by the MTDEQ-AWM; and 3) within the states of North Dakota, South Dakota and Nebraska; plus 4) the Montana Statewide EIS Alternative sources (BLM 2002).

E-9

Potential direct, indirect, and cumulative air quality impacts from the Proposed Action and Alternatives for the Wyoming PRB Oil and Gas Project EIS, and other (non­ alternative) sources, including surface coal mining in the Wyoming and Montana PRB, were analyzed and reported solely under the requirements of the National Environmental Policy Act (NEPA), in order to assess and disclose reasonably foreseeable impacts to both the public and the BLM decision maker. Due to the preliminary nature of this NEPA analysis, it should be considered an estimate of predicted impacts. Actual impacts at the time of development (subject to air pollutant emission source permitting) are likely to be different. Given the lack of representative wind measurements throughout the CBM emphasis area, the EPA CALPUFF dispersion model was used with regional wind speed and direction values derived from the 1996 MM5 (mesoscale model) and CALMET meteorological models (Argonne 2002). Meteorological information was assembled to characterize atmospheric transport and dispersion from several 1996 data sources, including: 36 km gridded MM5 (mesoscale model) values with continuous fourdimensional data assimilation; and hourly surface observations (wind speed, wind direction, temperature, cloud cover, ceiling height, surface pressure, relative humidity, and precipitation.) Potential air quality impacts were predicted using the EPA CALPUFF dispersion model. The meteorology data and air pollutant emission values were combined to predict maximum potential direct, indirect, and cumulative near-field air quality impacts in the vicinity of assumed CBM well and CBM pipeline compressor engine emission sources for comparison with applicable air quality standards and PSD Class II increments. Maximum potential near-field particulate matter emissions from traffic on unpaved roads and during well pad construction were used to predict the maximum annual and 24-hour average PM2.5, PM10, and SO2 impacts. Maximum air pollutant emissions from each CBM well would be temporary (i.e., occurring during a 12-day construction period) and would occur in isolation, without significantly interacting with adjacent well locations. Particulate matter emissions from well pad and resource road construction would be minimized by application of water and/or chemical dust suppressants. The control efficiency of these dust suppressants was computed at 50% during construction. During well completion testing, natural gas could be burned (flared) up to 24 hours. Air pollutant dispersion modeling was also performed to quantify CO, NO2, PM2.5, PM10, and hazardous air pollutant (HAP) impacts during operation. Operation emissions would primarily occur due to increased CBM pipeline compression requirements, including booster (field) and pipeline (sales) compressor stations. Since produced natural gas is nearly pure methane, with little or no liquid hydrocarbons or sulfur compounds, direct VOC emissions or objectionable odors are not likely to occur. HAP impacts were predicted based on an assumed 9,900 horsepower, six-unit, reciprocating compressor engine station operating at full load with emissions generated by a single stack. E-10

The significance criteria for potential air quality impacts include local, state, tribal, and federally enforced legal requirements to ensure air pollutant concentrations will remain within specific allowable levels. These requirements and legal limits were presented in table AQ-1. Where legal limits have not been established, BLM uses the best available scientific information to identify thresholds of significant adverse impacts. Thresholds have been identified for HAP exposure, potential ANC changes to sensitive lake water chemistry, and a 1.0 dv “just noticeable change” in potential visibility impacts. Since neither the WDEQ/AQD nor EPA have established HAP standards, predicted 8­ hour HAP concentrations were compared to a range of 8-hour state maximum acceptable ambient concentration levels (EPA 1997a). Pollutants which were predicted to exceed these state threshold levels were also analyzed to determine the possible incremental cancer-risk for a most likely exposure (MLE) to residents, and to a maximally exposed individual (MEI), such as compressor station workers. These cancer risks were calculated based on the maximum predicted annual concentrations, EPA’s unit risk factors for carcinogenic compounds (EPA 1997b), and an adjustment for time spent at home or on the job. The EPA CALPUFF dispersion model was also used to determine maximum far-field ambient air quality impacts at downwind mandatory federal PSD Class I areas, and other sensitive receptors, to: 1) determine if the PSD Class I increments might be exceeded; 2) calculate potential total sulfur and nitrogen deposition, and their related impacts to in sensitive lakes; and 3) predict potential visibility impacts (regional haze) within distant sensitive receptors. Several lakes within five FS-designated wilderness areas were identified as being sensitive to atmospheric deposition and for which the most recent and complete data have been collected. The FS (Fox et al. 1989) has identified the following total deposition (wet plus dry) thresholds below which no adverse impacts are likely: five kg/ha-yr for sulfur, and three kg/ha-yr for nitrogen. The FS (2000) has also developed a screening method which identifies the following limit of acceptable change regarding potential changes in lake chemistry: no more than a 10% change in ANC for those water bodies where the existing ANC is at or above 25 µeq/l and no more than a one µeq/l change for those extremely sensitive water bodies where the existing ANC is below 25 µeq/l. No sensitive lakes were identified by either the NPS or FWS. Since the potential air pollutant emission sources constitute many small sources spread out over a very large area, discrete visible plumes are not likely to impact the distant sensitive areas, but the potential for cumulative visibility impacts (increased regional haze) is a concern. Regional haze degradation is caused by fine particles and gases scattering and absorbing light. Potential changes to regional haze are calculated in terms of a perceptible “just noticeable change” (1.0 dv) in visibility when compared to background conditions. A 1.0 dv change is considered potentially significant in E-11

mandatory federal PSD Class I areas as described in the EPA regional haze regulations (40 CFR 51.300 et seq.), and as originally presented in Pitchford and Malm (1994). A 1.0 dv change is defined as about a 10% change in the extinction coefficient (corresponding to a 2% to 5% change in contrast, for a black target against a clear sky, at the most optically sensitive distance from an observer), which is a small but noticeable change in haziness under most circumstances when viewing scenes in mandatory federal Class I areas. It should be noted that a 1.0 dv change is not a “just noticeable change” in all cases for all scenes. Visibility changes less than 1.0 dv are likely to be perceptible in some cases, especially where the scene being viewed is highly sensitive to small amounts of pollution, such as due to preferential forward light scattering. Under other view-specific conditions, such as where the sight path to a scenic feature is less than the maximum visual range, a change greater than 1.0 dv might be required to be a “just noticeable change.” However, this NEPA analysis is not designed to predict specific visibility impacts for specific views in specific mandatory federal Class I areas based on specific project designs, but to characterize reasonably foreseeable visibility conditions that are representative of a fairly broad geographic region, based on emission source assumptions. This approach is consistent with both the nature of regional haze and the requirements of NEPA. At the time of a pre-construction air quality PSD permit review, the applicable air quality regulatory agency may require a much more detailed visibility impact analysis. Factors such as the magnitude of change, frequency, time of the year, and the meteorological conditions during times when predicted visibility impacts are above the 1.0 dv threshold (as well as inherent conservatism in the modeling analyses) should all be considered when assessing the significance of predicted impacts. The FS, NPS, and FWS have published their “Final FLAG Phase I Report” (Federal Register, Vol. 66 No. 2, dated January 3, 2001), providing “a consistent and predictable process for assessing the impacts of new and existing sources on AQRVs” including visibility. For example, the FLAG report states “A cumulative effects analysis of new growth (defined as all PSD increment-consuming sources) on visibility impairment should be performed,” and further, “If the visibility impairment from the proposed action, in combination with cumulative new source growth, is less than a change in extinction of 10% [1.0 dv] for all time periods, the FLMs will not likely object to the proposed action.” The FLAG report also recommends a two-step analysis process to evaluate potential visibility impacts from either a single proposed air pollutant emission source (the seasonal FLAG screening method) or potential cumulative visibility impacts from a group of air pollutant emission sources (the daily FLAG refined method). As described in Argonne (2002), this NEPA analysis first used the seasonal FLAG “natural background” screening method (based on both the FLAG and WDEQ/AQD reference levels) to exclude those sensitive areas where visibility impacts were not likely to occur. Since no areas were excluded using the seasonal FLAG screening method, this NEPA E-12


analysis then applied the daily FLAG refined method (based on hourly background optical extinction and relative humidity values measured in both the Badlands and Bridger wilderness areas between 1989 and 1999) to determine the average number of days a 1.0 dv “just noticeable change” would be reached annually in each sensitive area. Although the use of observed hourly optical extinction and relative humidity values is appropriate in this NEPA analysis (where the potential visibility impacts are predicted to occur based on the reasonably foreseeable background conditions), EPA’s regional haze regulations are based on optical conditions reconstructed from PM2.5 and PM10 data collected every third day under the IMPROVE program. Estimation of Emission Factors: AP-42 Air quality impacts for various air pollutants are determined by the use of air dispersion models using specific source emission rates. For natural gas compressors, the emissions of nitrogen oxides are determined by the assumed permitted emission rate allowed by the state. For fugitive dust impacts, emission rates are obtained from EPA’s AP-42 document that is titled ”Compilation of Air Pollutant Emission Factors.” An AP-42 emission factor is a representative value that attempts to relate the quantity of a pollutant released to the atmosphere with an activity associated with the release of that pollutant. Emission factors may be appropriate to use in a number of situations such as making source-specific emission estimates for areawide inventories. These inventories have many purposes including ambient dispersion modeling and analysis, control strategy development, and in screening sources for compliance investigations. In most cases, these factors are simply averages of all available data of acceptable quality, and are generally assumed to be representative of long-term averages for all sources in a specific category. Modeling Assumptions When reviewing the predicted near- and far-field air quality impacts, it is important to understand that assumptions were made regarding development, emissions, meteorology, atmospheric transport and chemistry, and atmospheric deposition. For example, there is uncertainty regarding ultimate development of CBM in the Wyoming and Montana PRB (i.e., number of wells, equipment to be used, specific locations of wells, etc.). The following assumptions were used in the analysis: x	 Total predicted short-term air pollutant impact concentrations were assumed to be the sum of the assumed background concentration, plus the predicted maximum cumulative modeled concentrations, which may occur under different meteorological conditions.

E-13

x	 Assumed background air pollution concentrations were assumed to occur throughout the 20-year LOP at all locations in the region, even though monitoring is primarily conducted in urban or industrial areas, rather than rural areas. The uniform background PM10 levels for each state are assumed to be representative of the background conditions for the entire modeled area of the PRB, based on monitoring data gathered throughout northeastern Wyoming and southeastern Montana. x	 The maximum predicted air quality impacts occur only in the vicinity of the anticipated emission sources. Actual impacts would likely be less at distances beyond the predicted points of maximum impact. x	 All emission sources were assumed to operate at their reasonably foreseeable maximum emission rates simultaneously throughout the LOP. Given the number of sources included in this analysis, the co-probability of such a scenario actually occurring over an entire year (or even 24-hours) is small. x	 In developing the emissions inventory and model, there is uncertainty regarding ultimate oil and gas development (i.e., number of wells, equipment to be used, specific locations, etc.) Most (90%) proposed CBM wells and 30% of conventional wells were assumed to be fully operational and remain operating (no shut ins) throughout the LOP. x	 The total proposed booster (field) and pipeline (sales) compression engines were assumed to operate at their rated capacities continuously throughout the LOP (no phased increases or reductions). In reality, compression equipment would be added or removed incrementally as required by the well field operation, compressor engines would operate below full horsepower ratings, and it is unlikely all compressor stations would operate at maximum levels simultaneously. x	 The HAP analyses assumed a 9,900 horsepower, six-unit, reciprocating compressor engine station would operate at full load and at maximum emission levels continuously throughout the LOP. x	 The emissions inventory and model use peak years of construction and peak years of operations, which would not occur throughout the entire development region at the same time. However, it is possible that conditions close to this could occur in some isolated areas. x	 The emissions inventory and model assumed a NOx emission rate for compressor engines of 1.5 g/hp-hr in Montana and 1.0 g/hp-hr in Wyoming. Since BACT is decided on a case-by-case basis, actual emission rates could be decided to be less or more than this level by the Wyoming or Montana DEQ, and E-14

on Indian lands by EPA, for field and sales compressor engines. Actual NOx emission rates may range from 0.7 to 2 g/hp-hr. x	 There are no applicable local, state, tribal, or federal acid deposition standards. In the absence of applicable standards, the acid deposition analysis assumed that a “limit of acceptable change” is: a 10% change in ANC for lakes with a background ANC greater than 25 µeq/l; or a 1 µeq/l change in ANC for lakes with a background ANC less than 25 µeq/l, and would be a reasonably foreseeable significant adverse impact. Further, the atmospheric deposition impact analysis assumed no other ecosystem components would affect lake chemistry for a full year (assuming no chemical buffering due to interaction with vegetation or soil materials). x	 The visibility impact analysis assumed that a 1.0 dv “just noticeable change” would be a reasonably foreseeable significant adverse impact, although there are no applicable local, state, tribal, or federal regulatory visibility standards. However, some FLMs are using 0.5 dv as a screening threshold for significance. x	 Mitigation measures are included in the emissions inventory and model that may not be achievable in all circumstances. However, actual mitigation decided by the developers and local and state authorities may be greater or less than those assumed in the analysis. For example, maintaining a construction road speed limit of 15 mph may be reasonable in a construction zone but difficult to enforce elsewhere. Full (100%) mitigation of fugitive dust from disturbed lands may not be achievable. Further, 50% reduction in fugitive emissions is assumed based on construction road wetting on the unimproved access road to the pad and at the pad, but this level of effectiveness is characterized as the maximum possible. Wetting was assumed for maintenance traffic, which is not likely to occur, but this is considered to be a small effect because of limited traffic. x	 Induced or secondary growth related to increases in vehicle miles traveled (VMT) (believed to be on the order of 10% overall) is not included in the emissions inventory and model. Not all fugitive dust emissions (including county and other collector roads) have been included in the emissions inventory and model. x	 Fugitive dust emissions from roads are treated as area sources rather than line sources in the model, which may thereby reduce or increase the predicted ambient concentrations at maximum concentration receptor points near the source, depending on the inputs to the model (meteorology, terrain, etc.) By not placing modeled receptors close to emission sources (e.g. wells and roads), the model may not capture higher ambient concentrations near these sources. A more refined, regulatory model may yield higher concentrations at locations near fugitive dust sources.

E-15

x	 For comparisons to the PSD Class I and II increments, the emissions inventory and model included only CBM and RFFD sources. Other existing increment consuming sources such as Campbell County coal mines were not included in this comparison, as the air quality analysis does not represent a regulatory PSD increment consumption analysis. A regulatory PSD increment consumption analysis needs to identify and consider all PSD increment consuming sources to determine the level of PSD Class II increment consumption. Monitoring data in Wyoming has indicated an upward trend in PM concentrations in Campbell County since 1999, which coincides with CBM development but is also exacerbated by prolonged drought in the region. It is important to note that before actual development could occur, the applicable air quality regulatory agencies (including the state, tribe, or EPA) would review specific air pollutant emissions preconstruction permit applications that examine potential projectspecific air quality impacts. As part of these permit reviews (depending on source size), the air quality regulatory agencies could require additional air quality impact analyses or mitigation measures. Thus, before development occurs, additional site-specific air quality analyses would be performed to ensure protection of air quality. Modeling Results The following tables present the detailed atmospheric dispersion modeling results for the alternatives considered in the Wyoming PRB Oil and Gas Project EIS. These results are summarized in chapter 4, “Cumulative Environmental Consequences” (Air Quality). As discussed in chapter 4, the cumulative impacts predicted by the PRB air quality impact assessment would be the same under the Proposed Action and the alternatives for leasing or not leasing federal coal considered in this EIS. This is because the air quality impact analysis used market demand predictions in order to estimate levels of coal production in the PRB for modeling purposes. There is enough coal leased to the existing mines in the PRB to supply this market demand during the time of maximum CBM development activity in the PRB, which is the time when the maximum overlapping impacts to air quality would occur.

E-16


TABLE AQ-4 
 PREDICTED HAZARDOUS AIR POLLUTANT IMPACTS AND SIGNIFICANCE
 THRESHOLDS

(in µg/m3) Direct Modeled Impact 11.9 0.6 0.7 4.6 < 0.1 0.2

Pollutant formaldehyde n-hexane benzene toluene Ethyl benzene xylene
1

Averaging Time 8-hours 8-hours 8-hours 8-hours 8-hours 8-hours

Range of State Acceptable Ambient Concentration Levels1 4.5 (FL07) 71 (NV01)

1,800 (FL07) - 36,000 (CT01) 30 (FL04) 714 (NV01)

1,870 (IN03) - 8,930 (NV01) 4,340 (ND01) - 43,500 (VT01) 2,170 (IN01) - 10,400 (NV01)

Agencies: CT01 - Connecticut Department of Environmental Protection; Air Compliance Unit FL04 - Broward County Department of Natural Resource Protection (Florida) FL07 - Pinellas County Air Pollution Control Board (Florida) IN01 - Indiana Department of Environmental Management IN03 - Indianapolis Air Pollution Control Division (Indiana) ND01 - North Dakota Dept. of Health; Division of Environmental Engineering NV01 - Nevada Division of Environmental Protection; Air Quality Control VT01 - Vermont Dept of Environmental Conservation; Air Pollution Control Division Source: Argonne (2002)

E-17


TABLE AQ-5 
 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 1 - PREDICTED CRITERIA POLLUTANT IMPACTS AND 
 APPLICABLE SIGNIFICANCE THRESHOLDS
(in µg/m3)

Pollutant

Avg Time a 1-hour Increment --------25 25

Carbon monoxide

8-hours

Annual

nitrogen dioxide

24-hours

PM2.5

Annual

2.5-------30 30

24-hours

PM10 8 8 17 17 512 512 91 91 20 20

Annual

3-hours

sulfur dioxide

24-hours

Annual

Location near-field far-field 1 near-field far-field 2 near-field far-field 3 far-field 2 near-field far-field 3 near-field far-field 3 near-field far-field 4 far-field 2 far-field 5 near-field far-field 4 near-field far-field 3 near-field far-field 3 near-field far-field 3

Alt 1 223 5 156 19 8.0 0.4 0.3 16.0 5.1 1.7 0.2 20.2 0.5 3.9 2.2 3.3 <0.1 3.3 0.7 1.7 0.3 0.5 <0.1

Other 142 100 124 70 3.3 5.1 3.9 b 8.6 9.7 0.7 1.1 9.3 29.7 9.4 b 7.0 0.9 2.7 4.5 17.1 1.8 5.3 0.2 0.4

Cum 224 100 156 78 10.5 5.4 4.2 b 24.4 14.7 2.3 1.2 30.8 b 29.7 12.8 b 9.2 b 4.1 2.7 4.6 17.1 3.2 5.3 0.6 0.4

Background 3,500 3,500 1,500 1,500 17 17 17 19 19 8 8 42 42 42 42 17 17 8 8 8 8 3 3

Total 3,724 3,600 1,656 1,578 27 22 21 43 34 10 9 73 72 55 51 21 20 13 25 11 13 4 3

National 40,000 40,000 10,000 10,000 100 100 100 65 65 15 15 150 150 150 150 50 50 1,300 1,300 365 365 80 80

Wyoming 40,000 40,000 10,000 10,000 100 100 100 65 65 15 15 150 150 150 150 50 50 1,300 1,300 260 260 60 60

E-18


TABLE AQ-5: FOOTNOTES

a

b

Annual impacts are the first maximum value; short-term impacts are the second maximum value.
 It is possible that Other and Cum emission sources could exceed the PSD Class I increment on the Northern Cheyenne Indian Reservation, and that Cum
 emission sources could exceed the PSD Class I increment in the Washakie Wilderness Area, and the PSD Class II increment near the maximum potential
 development. A regulatory “PSD Increment Consumption Analysis” should be conducted during permitting by the appropriate air quality regulatory agency.


Notes:
 Alt 1 - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 1 impacts.
 Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in Alt 1,
 including projected surface coal mining in the Wyoming and Montana PRB and the Montana Statewide EIS Alternative B/C/E sources. Potential impacts 
 from Montana Alternatives A and D would be less. 
 Cum - Cumulative modeled impacts. Since these values represent the maximum cumulative impact location, they may not be a simple sum of the 
 maximum direct Alt 1 and Other impacts, which can occur at different locations.
 Total - The sum of the cumulative modeled impact and the assumed background concentration.
 National - Applicable National Ambient Air Quality Standard.
 Wyoming - Applicable Wyoming Ambient Air Quality Standard. 


Locations: 1 Absaroka-Beartooth Wilderness Area 
 2 Northern Cheyenne Indian Reservation
 3 Crow Indian Reservation
 4 Fort Belknap Indian Reservation 
 5 Washakie Wilderness Area 


Source: Argonne (2002)

E-19


TABLE AQ-6 
 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 1 - PREDICTED ATMOSPHERIC DEPOSITION IMPACTS AND 
 APPLICABLE SIGNIFICANCE THRESHOLDS

Total Sulfur Deposition (kg/ha-yr)
Lake Alt 1 Other Cum Thld Alt 1 Other Cum Thld Alt 1 Other

Total Nitrogen Deposition (kg/ha-yr)

Acid Neutralizing Capacity (percent)
Cum Thld

Location

PSD Class

Bridger WA

I
a

Black Joe Deep Hobbs Upper Frozen <0.01 <0.01 <0.01 0.02 0.02 0.02 0.02 5 5 0.01 0.01 0.03 0.03 0.03 0.03 3 3 0.01 0.01 5 0.01 0.02 0.02 3 5.8 61.4 27.0 36.0 0.5 0.3 0.2

<0.01 <0.01 <0.01 <0.01 0.7 0.8 0.4 0.5 a

0.01 0.01 0.01 0.01

0.01 0.01 0.01 0.01

5 5 5 5

0.01 0.01 0.01 0.01

0.02 0.02 0.01 0.02

0.03 0.03 0.02 0.03

3 3 3 3

Bkgd (µeq/l) 69.0 61.0 68.0 1.9 2.1 1.1 1.3 a 1.6 2.2 1.6

2.6 2.9 1.5 1.8 a 2.1

10 10 10 1a 10 10 10 10 10 b
b

Fitzpatrick WA

I

Ross

AbsarokaBeartooth WA <0.01 <0.01 <0.01 0.01 0.01 5 0.01 0.02 0.04 0.03 0.03 0.03 0.03 5 5 0.04 0.04 0.07 0.07 0.10 0.11 3 3 3

II

Stepping Stone Twin Island

Cloud Peak WA

II

Emerald Florence

53.3 32.7 55.5

1.7 3.1 1.0

4.2 7.2 2.6

2.5 1.8 5.9 10.4 3.6

Popo Agie WA

II

Lower Saddlebag

10

Notes: a Since the background acid neutralizing capacity at Upper Frozen Lake is less than 25 µeq/l, the applicable significance threshold is less than a 1 µeq/l change. This threshold is exceeded by Other and Cum emission sources. However, the background concentration is based on only six samples taken on four days between 1997 and 2001. b Potential changes in acid neutralizing capacity is predicted to exceed the applicable significance level by less than one percent due to Cum emission sources Alt 1 - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 1 impacts. Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in Alt 1, including projected surface coal mining in the Wyoming and Montana PRB the Montana Statewide EIS Alternative B/C/E sources. Potential impacts from Montana Alternatives A and D would be less. Cum - Cumulative modeled impacts. Since these values represent the maximum cumulative impact at a specific location, they are the sum of the maximum direct Alt 1 and Other impacts. Thld - Impact threshold. Total sulfur and nitrogen thresholds from Fox, et al. (1989); acid neutralizing capacity thresholds from USFS (2000). WA - Wilderness Area. Source: Argonne (2002)

E-20


TABLE AQ-7 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 1 - DAILY FLAG REFINED METHOD - VISIBILITY IMPACT ANALYSIS
(number of days •1.0 dv per year) Sensitive Location
Badlands WA Bridger WA Fitzpatrick WA Gates of the Mountains WA Grand Teton NP North Absaroka WA Red Rock Lakes WA Scapegoat WA Teton WA Theodore Roosevelt NMP (North) Theodore Roosevelt NMP (South) U.L. Bend WA Washakie WA Wind Cave NP Yellowstone NP Fort Peck IR Northern Cheyenne IR Absaroka-Beartooth WA Agate Fossil Beds NM Bighorn Canyon NRA Black Elk WA Cloud Peak WA Crow IR Devils Tower NM Fort Belknap IR Fort Laramie NHS Jewel Cave NM Mount Rushmore NMem Popo Agie WA Soldier Creek WA

PSD Classification
mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I Tribal designated Class I Tribal designated Class I federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II

Alt 1
3 4 4 0 1 4 0 0 3 0 1 1 5 4 3 0 17 4 2 9 4 13 20 9 1 2 4 3 4 2

Other
13 to 17 7 to 9 6 to 9 3 to 4 3 to 5 9 to 13 0 to 1 2 to 2 6 to 9 0 to 1 1 to 3 4 to 5 10 to 14 17 to 21 8 to 11 1 to 3 27 to 82 28 to 32 8 to 11 17 to 30 17 to 20 17 to 30 59 to 108 17 to 25 60 to 61 10 to 14 19 to 23 13 to 17 7 to 9 10 to 13

Cum
24 to 28 10 to 12 10 to 12 4 to 4 6 to 8 12 to 15 1 to 3 3 to 3 10 to 11 2 to 3 4 to 7 6 to 8 15 to 18 28 to 32 11 to 13 2 to 5 42 to 92 30 to 33 15 to 19 23 to 34 26 to 31 30 to 39 69 to 116 39 to 47 61 to 62 17 to 20 32 to 36 22 to 26 10 to 13 18 to 21

Alt 1 - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 1 impacts. 
 Other- Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in Alt 1,
 including projected surface coal mining operations in the Montana and Wyoming PRB and the Montana Statewide EIS sources. The range of 
 values corresponds to including Montana Alternative A (low) to Montana Alternative B/C/E (high). 
 Cum - Cumulative modeled impacts. Since these values represent the maximum visibility impact anywhere within the sensitive location, they may
 not be a simple sum of the maximum direct Alt 1 and Other impacts, which can occur at different locations. 
 Locations: IR-Indian Reservation; NHS-National Historic Site; NM-National Monument; NMP-National Memorial Park; NMem-National
 Memorial;NP-National Park; NRA-National Recreation Area; WA-Wilderness Area. 
 Source: Argonne (2002).


E-21

TABLE AQ-8 
 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 2A - PREDICTED CRITERIA POLLUTANT IMPACTS AND APPLICABLE SIGNIFICANCE THRESHOLDS
(in µg/m3)

Pollutant

Avg Time a Location Increment Alt 2A Other Cum Total National

Wyoming

1-hour

carbon monoxide 25 25

8-hours

---------

Annual

nitrogen dioxide

24-hours

PM2.5

Annual

2.5-------30 30

24-hours

PM10 8 8 17 17 512 512 91 91 20 20

Annual

3-hours

sulfur dioxide

24-hours

Annual

near-field far-field 1 near-field far-field 2 near-field far-field 3 far-field 2 near-field far-field 3 near-field far-field 3 near-field far-field 4 far-field 2 far-field 5 near-field far-field 4 near-field far-field 3 near-field far-field 3 near-field far-field 3

158 4 93 14 7.2 0.4 0.2 13.0 4.5 1.5 0.2 17.5 0.4 3.4 1.8 3.1 <0.1 3.3 0.7 1.7 0.3 0.5 <0.1

142 100 124 70 3.3 5.1 3.9 b 8.6 9.7 0.7 1.1 9.3 29.7 9.4 b 7.0 0.9 2.7 4.5 17.1 1.8 5.3 0.2 0.4

197 100 132 76 9.6 5.4 4.1 b 21.3 14.0 2.1 1.2 27.7 29.7 12.4 b 8.8 b 3.9 2.7 4.6 17.1 3.2 5.3 0.6 0.4

Back­ ground 3,500 3,500 1,500 1,500 17 17 17 19 19 8 8 42 42 42 42 17 17 8 8 8 8 3 3 3,697 3,600 1,632 1,576 27 22 21 40 33 10 9 70 72 54 51 21 20 13 25 11 13 4 3

40,000 40,000 10,000 10,000 100 100 100 65 65 15 15 150 150 150 150 50 50 1,300 1,300 365 365 80 80

40,000 40,000 10,000 10,000 100 100 100 65 65 15 15 150 150 150 150 50 50 1,300 1,300 260 260 60 60

E-22


TABLE AQ-8: FOOTNOTES 


Notes:

a

b

Annual impacts are the first maximum value; short-term impacts are the second maximum value.
 It is possible that Other and Cum emission sources could exceed the PSD Class I increment on the Northern Cheyenne Indian Reservation, and 
 that Cum emission sources could exceed the PSD Class I increment in the Washakie Wilderness Area; a regulatory “PSD Increment Consumption
 Analysis” should be conducted during permitting by the appropriate air quality regulatory agency.
 Alt 2A - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 2A impacts.
 Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in 
 Alt 2A, including projected surface coal mining operations in the Montana and Wyoming PRB and the Montana Statewide EIS Alternative 
 B/C/E sources. Potential impacts from Montana Alternatives A and D would be less.
 Cum - Cumulative modeled impacts. Since these values represent the maximum cumulative impact location, they may not be a simple sum of 
 the maximum direct Alt 2A and Other impacts, which can occur at different locations. 
 Total - The sum of the cumulative modeled impact and the assumed background concentration.
 National - Applicable National Ambient Air Quality Standard.
 Wyoming - Applicable Wyoming Ambient Air Quality Standard. 


Locations: 1 Absaroka-Beartooth Wilderness Area 2 Northern Cheyenne Indian Reservation 3 Crow Indian Reservation 4 Fort Belknap Indian Reservation 5 Washakie Wilderness Area

Source: Argonne (2002)

E-23


TABLE AQ-9 
 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 2A - PREDICTED ATMOSPHERIC DEPOSITION 
 IMPACTS AND APPLICABLE SIGNIFICANCE THRESHOLDS

Total Sulfur Deposition (kg/ha-yr) Lake Alt 2A Other Cum Other Cum Thl d Alt 2A Thl d Total Nitrogen Deposition (kg/ha-yr)

Location

PSD Class

Acid Neutralizing Capacity (percent) Bkgd Alt (µeq/l Other Cum Thld 2A )

Bridger WA

I

69.0 61.0 68.0
a

Black Joe Deep Hobbs Upper Frozen 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 5 5 5 5 0.01 0.01 0.01 0.01 0.02 0.02 0.01 0.02 0.03 0.03 0.02 0.03 3 3 3 3 5.8

0.6 0.7 0.3 0.5 a

1.9 2.1 1.1 1.3 a

2.5 2.8 1.5 1.8 a

10 10 10 1a

Fitzpatrick WA Ross 0.01 0.01 5 0.01 0.02

I

0.02

3

61.4

0.5

1.6

2.0

10

AbsarokaBeartooth WA Stepping Stone Twin Island 0.02 0.02 0.02 0.02 5 5

II

<0.0 1 <0.0 1 0.03 0.03

0.03 0.03

0.03 0.03

3 3

27.0 36.0

0.3 0.2

2.2 1.6

2.5 1.8

10 10

Cloud Peak WA Emerald Florence Lower Saddlebag 0.01 0.01 5 0.03 0.03 0.03 0.03 5 5

II

0.07 0.07 0.01 0.02

0.10 0.10 0.03

3 3 3

53.3 32.7 55.5

1.5 2.8 0.9

4.2 7.2 2.6

5.7 10.0 3.5

10 10 10

Popo Agie WA

II

<0.0 1 <0.0 1 <0.0 1 <0.0 1 <0.0 1 <0.0 1 <0.0 1 <0.0 1 <0.0 1 <0.0 1

E-24


TABLE AQ-9: FOOTNOTES 


Notes:

Since the background acid neutralizing capacity at Upper Frozen Lake is less than 25 µeq/l, the applicable significance threshold is less than a 1 
 µeq/l change. This threshold is exceeded by Other and Cum emission sources. However, the background concentration is based on only six 
 samples taken on four days between 1997 and 2001.


a

Alt 2A - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 2A impacts.
 Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in Alt 2A,
 including projected surface coal mining operations in the Wyoming and Montana PRB and the Montana Statewide EIS Alternative B/C/E sources.
 Potential impacts from Montana Alternatives A and D would be less. 
 Cum - Cumulative modeled impacts. Since these values represent the maximum cumulative impact at a specific location, they are the sum of the 
 maximum direct Alt 2A and Other impacts.
 Thld - Impact threshold. Total sulfur and nitrogen thresholds from Fox, et al. (1989); acid neutralizing capacity thresholds from USFS (2000).
 WA - Wilderness Area. 


Source: Argonne (2002)


E-25


TABLE AQ-10 
 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 2A – 
 DAILY FLAG REFINED METHOD - VISIBILITY IMPACT ANALYSIS 

(number of days •1.0 dv per year)

Sensitive Location
Badlands WA Bridger WA Fitzpatrick WA Gates of the Mountains WA Grand Teton NP North Absaroka WA Red Rock Lakes WA Scapegoat WA Teton WA Theodore Roosevelt NMP (North) Theodore Roosevelt NMP (South) U.L. Bend WA Washakie WA Wind Cave NP Yellowstone NP Fort Peck IR Northern Cheyenne IR Absaroka-Beartooth WA Agate Fossil Beds NM Bighorn Canyon NRA Black Elk WA Cloud Peak WA Crow IR Devils Tower NM Fort Belknap IR Fort Laramie NHS Jewel Cave NM Mount Rushmore NMem Popo Agie WA Soldier Creek WA

PSD Classification
mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I Tribal designated Class I Tribal designated Class I federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II

Alt 2A
3 4 3 0 1 3 0 0 3 0 0 1 4 3 2 0 16 3 1 8 3 12 16 6 1 2 3 2 3 1

Other
13 to 17 7 to 9 6 to 9 3 to 4 3 to 5 9 to 13 0 to 1 2 to 2 6 to 9 0 to 1 1 to 3 4 to 5 10 to 14 17 to 21 8 to 11 1 to 3 27 to 82 28 to 32 8 to 11 17 to 30 17 to 20 17 to 30 59 to 108 17 to 25 60 to 61 10 to 14 19 to 23 13 to 17 7 to 9 10 to 13

Cum
24 to 27 10 to 12 9 to 12 4 to 4 6 to 7 12 to 14 1 to 3 2 to 3 9 to 11 2 to 3 4 to 6 5 to 8 14 to 18 27 to 30 11 to 13 2 to 5 39 to 91 29 to 33 14 to 17 22 to 34 25 to 29 28 to 38 69 to 115 36 to 44 61 to 61 17 to 19 30 to 35 21 to 25 10 to 12 17 to 21

E-26


TABLE AQ-10: FOOTNOTES 

Notes: Alt 2A - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 2A impacts. Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in Wyoming PRB Oil and Gas Project EIS Alt 2A, including projected surface coal mining operations in the Wyoming and Montana PRB and the Montana Statewide EIS sources. The range of values corresponds to including Montana Alternative A (low) to Montana Alternative B/C/E (high). Cum - Cumulative modeled impacts. Since these values represent the maximum visibility impact anywhere within the sensitive location, they may not be a simple sum of the maximum direct Alt 2A and Other impacts, which can occur at different locations. Locations: IR-Indian Reservation; NHS-National Historic Site; NM-National Monument; NMP-National Memorial Park; NMem-National Memorial; NP-National Park; NRA-National Recreation Area; WAWilderness Area. Source: Argonne (2002)

E-27


TABLE AQ-11 
 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 2B - PREDICTED CRITERIA POLLUTANT IMPACTS AND APPLICABLE SIGNIFICANCE THRESHOLDS
(in µg/m3)

Pollutant

Avg Time a 1-hour Increment --------25 25

carbon monoxide

8-hours

Annual

nitrogen dioxide

24-hours

PM2.5

Annual

Location near-field far-field 1 near-field far-field 2 near-field far-field 3 far-field 2 near-field far-field 3 near-field far-field 3 2.5-------30 30
b b

Alt 2B 157 3 77 9 6.3 0.3 0.2 10.7 3.8 1.3 0.1

Other 142 100 124 70 3.3 5.1 3.9 b 8.6 9.7 0.7 1.1

Background 3,500 3,500 1,500 1,500 17 17 17 19 19 8 8

Total 3,670 3,600 1,624 1,574 26 22 21 38 32 10 9

National 40,000 40,000 10,000 10,000 100 100 100 65 65 15 15

Wyoming 40,000 40,000 10,000 10,000 100 100 100 65 65 15 15

24-hours

Cum 170 100 124 74 8.8 5.3 4.1 b 19.0 13.4 2.0 1.2 25.5 29.7 12.1

PM10 8 8 17 17 512 512 91 91 20 20

Annual

near-field far-field 4 far-field 2 far-field 5 near-field far-field 4 15.2 0.4 3.0 1.5 2.9 <0.1

9.3 29.7 9.4 b 7.0 0.9 2.7

42 42 42 42 17 17

67 72 54 50 21 20

150 150 150 150 50 50

150 150 150 150 50 50

3-hours

sulfur dioxide

24-hours

Annual

near-field far-field 3 near-field far-field 3 near-field far-field 3

3.3 0.7 1.7 0.3 0.5 <0.1

4.5 17.1 1.8 5.3 0.2 0.4

8.5 b 3.7 2.7 4.6 17.1 3.2 5.3 0.6 0.4

8 8 8 8 3 3

13 25 11 13 4 3

1,300 1,300 365 365 80 80

1,300 1,300 260 260 60 60

E-28


TABLE AQ-11: FOOTNOTES 


Notes: a Annual impacts are the first maximum value; short-term impacts are the second maximum value.
 b It is possible that Other and Cum emission sources could exceed the PSD Class I increment on the Northern Cheyenne Indian Reservation, and
 that Cum emission sources could exceed the PSD Class I increment in the Washakie Wilderness Area; a regulatory “PSD Increment Consumption
 Analysis” should be conducted during permitting by the appropriate Air Quality Regulatory Agency.
 Alt 2B - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 2B impacts.
 Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in 
 Alt 2B, including projected surface coal mining operations in the Wyoming and Montana PRB and the Montana Statewide EIS Alternative 
 B/C/E sources. Potential impacts from Montana Alternatives A and D would be less.
 Cum - Cumulative modeled impacts. Since these values represent the maximum cumulative impact location, they may not be a simple sum of 
 the maximum direct Alt 2B and Other impacts, which can occur a different locations.
 Total - The sum of the cumulative modeled impact and the assumed background concentration.
 National - Applicable National Ambient Air Quality Standard.
 Wyoming - Applicable Wyoming Ambient Air Quality Standard. 


Locations: 1 Absaroka-Beartooth Wilderness Area 2 Northern Cheyenne Indian Reservation 3 Crow Indian Reservation 4 Fort Belknap Indian Reservation 5 Washakie Wilderness Area

Source: Argonne (2002)

E-29


TABLE AQ-12 
 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 2B - PREDICTED ATMOSPHERIC DEPOSITION IMPACTS 
 AND APPLICABLE SIGNIFICANCE THRESHOLDS 


Location Bridger WA

PSD Class

I
Ross <0.01 0.01 0.01 5 0.01 0.02 0.02 3

Lake Black Joe Deep Hobbs Upper Frozen

Total Sulfur Deposition (kg/ha-yr) Alt 2B Other Cum Thld 5 0.01 <0.01 0.01 5 0.01 <0.01 0.01 5 0.01 <0.01 0.01 5 0.01 <0.01 0.01

Total Nitrogen Deposition (kg/ha-yr) Alt 2B Other Cum Thld 3 0.03 0.02 0.01 3 0.03 0.02 0.01 3 0.02 <0.01 0.01 3 0.03 0.02 0.01

Fitzpatrick WA

I

Acid Neutralizing Capacity (percent) Bkgd Alt (µeq/l) 2B Other Cum Thld 69.0 0.6 1.9 2.4 10 61.0 0.6 2.1 2.7 10 68.0 0.3 1.1 1.4 10 a 0.4 a 1.3 a 1.7 a 1a 5.8 61.4 0.4 1.6 2.0 10

AbsarokaBeartooth WA

II

Cloud Peak WA
Lower Saddlebag

II
<0.01 0.01 0.01 5 0.01 0.02

Stepping Stone Twin Island Emerald Florence 0.03

<0.01 <0.01 <0.01 <0.01

0.02 0.02 0.03 0.03

0.02 0.02 0.03 0.03

5 5 5 5

<0.01 <0.01 0.03 0.03

0.03 0.03 0.07 0.07

0.03 0.03 0.10 0.10

3 3 3 3 3

27.0 36.0 53.3 32.7 55.5

0.2 0.2 1.3 2.5 0.8

2.2 1.6 4.2 7.2 2.6

2.5 1.8 5.5 9.7 3.4

10 10 10 10 10

Popo Agie WA

II

Notes: a Since the background acid neutralizing capacity at Upper Frozen Lake is less than 25 �eq/l, the applicable significance threshold is less than a 1 µeq/l 
 change. This threshold is exceeded by Other sources alone, as well Cum sources. However, the background concentration is based on only six 
 samples taken on four days between 1997 and 2001.
 Alt 2B - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 2B impacts. 
 Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in Alt 2B,
 including projected surface coal mining operations in the Wyoming and Montana PRB and the Montana Statewide EIS Alternative B/C/E sources. 
 Potential impacts from Montana Alternatives A and D would be less. 
 Cum - Cumulative modeled impacts. Since these values represent the maximum cumulative impact at a specific location, they are the sum of the 
 maximum direct Alt 2B and Other impacts. 
 Thld - Impact threshold. Total sulfur and nitrogen thresholds from Fox, et al. (1989); acid neutralizing capacity thresholds from USFS (2000). 
 WA - Wilderness Area. 


Source: Argonne (2002) 


E-30


TABLE AQ-13 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 2B - DAILY FLAG REFINED METHOD - VISIBILITY IMPACT ANALYSIS
(number of days •1.0 dv per year) Sensitive Location
Badlands WA Bridger WA Fitzpatrick WA Gates of the Mountains WA Grand Teton NP North Absaroka WA Red Rock Lakes WA Scapegoat WA Teton WA Theodore Roosevelt NMP (North) Theodore Roosevelt NMP (South) U.L. Bend WA Washakie WA Wind Cave NP Yellowstone NP Fort Peck IR Northern Cheyenne IR Absaroka-Beartooth WA Agate Fossil Beds NM Bighorn Canyon NRA Black Elk WA Cloud Peak WA Crow IR Devils Tower NM Fort Belknap IR Fort Laramie NHS Jewel Cave NM Mount Rushmore NMem Popo Agie WA Soldier Creek WA

PSD Classification
mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I Tribal designated Class I Tribal designated Class I federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II

Alt 2B
1 3 3 0 0 2 0 0 2 0 0 1 4 2 1 0 14 3 0 7 2 9 14 5 1 1 2 1 3 1

Other
13 to 17 7 to 9 6 to 9 3 to 4 3 to 5 9 to 13 0 to 1 2 to 2 6 to 9 0 to 1 1 to 3 4 to 5 10 to 14 17 to 21 8 to 11 1 to 3 27 to 82 28 to 32 8 to 11 17 to 30 17 to 20 17 to 30 59 to 108 17 to 25 60 to 61 10 to 14 19 to 23 13 to 17 7 to 9 10 to 13

Cum
22 to 26 9 to 11 9 to 11 4 to 4 5 to 7 12 to 14 1 to 2 2 to 3 9 to 11 1 to 3 3 to 6 5 to 7 14 to 17 25 to 28 11 to 13 2 to 4 38 to 90 29 to 33 13 to 16 21 to 33 24 to 28 27 to 37 68 to 115 34 to 42 61 to 61 16 to 19 29 to 33 21 to 24 10 to 12 16 to 20

E-31


TABLE AQ-13: FOOTNOTES 

Notes:
 Alt 2B - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 2B impacts. 
 Other- Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air 
 pollutant emission sources not included in Alt 2B, including projected surface coal mining operations in 
 the Wyoming and Montana PRB and the Montana Statewide EIS “sources. The range of values 
 corresponds to including Montana Alternative A (low) to Montana Alternative B/C/E (high). 
 Cum - Cumulative modeled impacts. Since these values represent the maximum visibility impact 
 anywhere within the sensitive location, they may not be a simple sum of the maximum direct Alt 2B and 
 Other impacts, which can occur at different locations.
 Locations: IR-Indian Reservation, NHS-National Historic Site; NM-National Monument; NMP-National 
 Memorial Park; NMem-National Memorial; NP-National Park; NRA-National Recreation Area; WA-
 Wilderness Area. 
 Source: Argonne (2002) 


E-32


TABLE AQ-14 
 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 3 - PREDICTED CRITERIA POLLUTANT IMPACTS AND APPLICABLE SIGNIFICANCE THRESHOLDS
(in µg/m3)

Pollutant

Avg Time a 1-hour Increment --------25 25

carbon monoxide

8-hours

Annual

nitrogen dioxide

24-hours

PM2.5

Annual

2.5-------30 30 88 17 17 512 512 91 91 20 20

24-hours

PM10

Annual

3-hours

sulfur dioxide

24-hours

Annual

Location near-field far-field 1 near-field far-field 2 near-field far-field 3 far-field 2 near-field far-field 4 near-field far-field 4 near-field far-field 4 far-field 2 far-field 5 near-field far-field 4 near-field far-field 3 near-field far-field 3 near-field far-field 3

Alt 3 261 2 183 8 3.0 0.3 0.1 5.7 0.2 0.7 0.0 7.1 0.2 1.5 0.9 1.2 <0.1 1.2 0.3 0.6 0.1 0.2 <0.1

Other 142 100 124 70 3.3 5.1 3.9 b 8.6 12.7 0.7 1.2 9.3 29.7 9.4 b 7.0 0.9 2.7 4.5 17.1 1.8 5.3 0.2 0.4

Cum 261 100 183 75 5.8 5.3 4.1 b 13.5 12.7 1.3 1.2 15.6 29.7 10.7 b 7.8 1.9 2.7 4.6 17.1 2.2 5.3 0.3 0.4

Background 3,500 3,500 1,500 1,500 17 17 17 19 19 8 8 42 42 42 42 17 17 8 8 8 8 3 3

Total 3,761 3,600 1,683 1,575 23 22 21 32 32 9 9 58 72 53 50 19 20 13 25 10 13 3 3

National 40,000 40,000 10,000 10,000 100 100 100 65 65 15 15 150 150 150 150 50 50 1,300 1,300 365 365 80 80

Wyoming 40,000 40,000 10,000 10,000 100 100 100 65 65 15 15 150 150 150 150 50 50 1,300 1,300 260 260 60 60

E-33


TABLE AQ-14: FOOTNOTES 


Notes: a Annual impacts are the first maximum value; short-term impacts are the second maximum value.
 b It is possible that Other and Cum emission sources could exceed the PSD Class I increment on the Northern Cheyenne Indian Reservation; a 
 regulatory “PSD Increment Consumption Analysis” should be conducted during permitting by the appropriate Air Quality Regulatory Agency. 
 Alt 3 - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 3 impacts.
 Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in Alt 3,
 including projected surface coal mining operations in the Wyoming and Montana PRB and the Montana Statewide EIS Alternative B/C/E sources.
 Potential impacts from Montana Alternatives A and D would be less. 
 Cum - Cumulative modeled impacts. Since these values represent the maximum cumulative impact location, they may not be a simple sum of 
 the maximum direct Alt 3 and Other impacts, which can occur a different locations.
 Total - The sum of the cumulative modeled impact and the assumed background concentration.
 National - Applicable National Ambient Air Quality Standard.
 Wyoming - Applicable Wyoming Ambient Air Quality Standard. 


Locations: 1 Absaroka-Beartooth Wilderness Area 
 2 Northern Cheyenne Indian Reservation
 3 Crow Indian Reservation
 4 Fort Belknap Indian Reservation 
 5 Washakie Wilderness Area 


Source: Argonne (2002)

E-34


TABLE AQ-15 
 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 3 - PREDICTED ATMOSPHERIC DEPOSITION IMPACTS 
 AND APPLICABLE SIGNIFICANCE THRESHOLDS

Total Sulfur Deposition (kg/ha-yr)
Lake Alt 3 Other Cum Thld Alt 3 Other Cum Thld Alt 3 Other

Total Nitrogen Deposition (kg/ha-yr)

Acid Neutralizing Capacity (percent)
Cum Thld

Location

PSD Class

Bridger WA

I	
a

Black Joe Deep Hobbs Upper Frozen Ross <0.01 <0.01 <0.01 <0.01 <0.01 0.01 0.01 5 <0.01 0.02 0.03 0.03 0.03 0.03 5 5 0.01 0.02 0.07 0.07 0.08 0.08 0.03 0.02 0.02 0.02 0.02 5 5 <0.01 <0.01 0.03 0.03 0.03 0.03 3 3 3 3 3 <0.01 0.01 0.01 5 <0.01 0.02 0.02 3 5.8 61.4 27.0 36.0 53.3 32.7 55.5

<0.01 <0.01 <0.01 <0.01

0.01 0.01 0.01 0.01

0.01 0.01 0.01 0.01

5 5 5 5

<0.01 <0.01 <0.01 <0.01

0.02 0.02 0.01 0.02

0.03 0.02 0.02 0.02

3 3 3 3

Bkgd (µeq/l) 69.0 61.0 68.0 0.3 0.3 0.2 0.2 a 0.2 0.1 0.1 0.7 1.3 0.4

1.9 2.1 1.1 1.3 a 1.6 2.2 1.6 4.2 7.2 2.6

2.1 2.4 1.3 1.5 a 1.7 2.4 1.7 4.9 8.5 3.0

10 10 10 1a 10 10 10 10 10 10

Fitzpatrick WA

I

AbsarokaBeartooth WA

II

Cloud Peak WA
Lower Saddlebag

II

Stepping Stone Twin Island Emerald Florence

Popo Agie WA

II	

Notes: a Since the background acid neutralizing capacity at Upper Frozen Lake is less than 25 µeq/l, the applicable significance threshold is less than a 1 
 µeq/l change. This threshold is exceeded by Other sources alone, as well Cum sources. However, the background concentration is based on only
 six samples taken on four days between 1997 and 2001
 Alt 3 - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 3 impacts. 
 Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant emission sources not included in Alt 3,
 including projected surface coal mining operations in the Wyoming and Montana PRB and the Montana Statewide EIS Alternative B/C/E sources.
 Potential impacts from Montana Alternatives A and D would be less. 
 Cum - Cumulative modeled impacts. Since these values represent the maximum cumulative impact at a specific location, they are the sum of the 
 maximum direct Alt 3 and Other impacts.
 Thld - Impact threshold. Total sulfur and nitrogen thresholds from Fox, et al. (1989); acid neutralizing capacity thresholds from USFS (2000).
 WA - Wilderness Area. 


Source: Argonne (2002).


E-35

TABLE AQ-16 WYOMING PRB OIL AND GAS PROJECT EIS ALTERNATIVE 3 - DAILY FLAG REFINED METHOD - VISIBILITY IMPACT ANALYSIS
(number of days •1.0 dv per year) Sensitive Location
Badlands WA Bridger WA Fitzpatrick WA Gates of the Mountains WA Grand Teton NP North Absaroka WA Red Rock Lakes WA Scapegoat WA Teton WA Theodore Roosevelt NMP (North) Theodore Roosevelt NMP (South) U.L. Bend WA Washakie WA Wind Cave NP Yellowstone NP Fort Peck IR Northern Cheyenne IR Absaroka-Beartooth WA Agate Fossil Beds NM Bighorn Canyon NRA Black Elk WA Cloud Peak WA Crow IR Devils Tower NM Fort Belknap IR Fort Laramie NHS Jewel Cave NM Mount Rushmore NMem Popo Agie WA Soldier Creek WA

PSD Classification
mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I mandatory federal Class I Tribal designated Class I Tribal designated Class I federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II federal Class II

Alternative 3
0 1 1 0 0 0 0 0 0 0 0 0 1 0 0 0 7 0 0 3 0 3 10 1 0 0 0 0 1 0

Other
13 to 17 7 to 9 6 to 9 3 to 4 3 to 5 9 to 13 0 to 1 2 to 2 6 to 9 0 to 1 1 to 3 4 to 5 10 to 14 17 to 21 8 to 11 1 to 3 27 to 82 28 to 32 8 to 11 17 to 30 17 to 20 17 to 30 59 to 108 17 to 25 60 to 61 10 to 14 19 to 23 13 to 17 7 to 9 10 to 13

Cumulative
18 to 21 8 to 10 8 to 10 3 to 4 4 to 6 11 to 13 0 to 2 2 to 3 7 to 10 1 to 2 2 to 4 5 to 6 12 to 16 22 to 25 9 to 12 2 to 4 33 to 87 28 to 32 10 to 14 19 to 32 20 to 24 23 to 35 65 to 113 26 to 34 61 to 61 13 to 16 24 to 28 17 to 20 8 to 11 13 to 16

E-36


TABLE AQ-16: FOOTNOTES 

Notes:
 Alt 3 - Direct modeled Wyoming PRB Oil and Gas Project EIS Alternative 3 impacts. 
 Other - Direct modeled “Reasonably Foreseeable Development” impacts. The impact from all air pollutant
 emission sources not included in Alt 3, including projected surface coal mining operations in the Wyoming and 
 Montana PRB and the Montana Statewide EIS sources. The range of values corresponds to including 
 Montana Alternative A (low) to Montana Alternative B/C/E (high). 
 Cum - Cumulative modeled impacts. Since these values represent the maximum visibility impact anywhere 
 within the sensitive location, they may not be a simple sum of the maximum direct Alt 3 and Other impacts, 
 which can occur at different locations. 
 Locations: IR-Indian Reservation; NHS-National Historic Site; NM-National Monument; NMP-National Memorial 
 Park; NMem-National Memorial; NP-National Park; NRA-National Recreation Area; WA-Wilderness Area. 
 Source: Argonne (2002) 


E-37


Mitigation Options Mitigation may be applied to fugitive dust and nitrogen oxide (NOx) impacts. Fugitive dust refers to any particulate matter that is not deliberately emitted by a well-defined source. Fugitive dust sources typically include windblown dust from unvegetated lands and unpaved roads. Table AQ-17 shows several fugitive dust mitigation options available. Other mitigation measures that are utilized by surface coal mines in Wyoming to control fugitive dust emissions are listed in chapter 3. Nitrogen oxide emissions are associated with combustion. Table AQ-18 shows several options available to mitigate NOx impacts related to production of oil and gas, including CBM. Mitigation measures that the mines have instituted or that WDEQ may require related to coal mining operations are listed in chapter 3.

TABLE AQ17 PREDICTED VISIBILITY IMPACTS IN CLASS I AREAS – DAILY FLAG REFINED METHOD
(maximum cumulative deciview change) Class I area
Badlands Wilderness Area1 Bridger Wilderness Area Fitzpatrick Wilderness Area Gates of the Mtns Wilderness Area Grand Teton National Park North Absaroka Wilderness Area Red Rock Lakes Wilderness Area Scapegoat Wilderness Area Teton Wilderness Area Theodore Roosevelt NMP2 (North Unit) Theodore Roosevelt NMP2 (South Unit) U.L. Bend Wilderness Area Washakie Wilderness Area Wind Cave National Park Yellowstone National Park Northern Cheyenne Reservation3

Alt 1 10.91 13.28 16.57 14.99 6.95 14.89 2.85 9.89 14.59 3.65 4.62 29.05 24.79 9.05 12.79 54.75

Alt 2a 10.67 12.67 15.83 14.61 6.67 14.12 2.75 9.58 13.97 3.46 4.37 27.97 23.82 8.81 12.19 52.8

Alt 2b 10.43 12.21 15.21 14.22 6.44 13.51 2.67 9.35 13.46 3.29 4.14 26.97 22.96 8.59 11.59 50.71

Alt 3 9.46 11.15 14.01 13.17 5.8 12.21 2.37 8.55 12.38 2.75 3.51 24.01 21.48 8.06 10.25 45.02

E-38


TABLE AQ-18 
 FUGITIVE DUST MITIGATION MEASURES (PM10)
 EFFECTIVENESS AND COST 

Dust Sources Disturbed Unpaved Roads1 Areas Mitigation Options Establish plant cover for all disturbed lands by certain time (re­ vegetation) Level proportional to percentage of land cover Water roads to attain certain percent moisture2 Apply soil stabilizer Set and enforce speed limit Gravel roads Pave road

Effectiveness

0 – 50% reduction in uncontrolled dust emissions $4000/mile

33 to 100% control efficiency

Estimated Cost

$2,000 to $4,000/mile per year

80% for 15 mph3 65% for 20 mph3 25% for 30 mph3 Unknown

30% reduction

90% reduction

$9,000/mile

$11,000 to $60,000/mile

Notes: 1 Improved and County roads 2 Wetting of construction roads during the construction period. Wetting of construction roads not required 
 for once a month maintenance trips to well pads.
 3 Reductions assume 40 mile per hour base speed. 


E-39


TABLE AQ19 
 NITROGEN OXIDES (NOX) MITIGATION MEASURES EFFICIENCY 

NOx Emissions Sources Field Compressors Mitigation Options/ Efficiency Implement best available control technology.2 Typically results in a NOx emission rate of about 1 g/bhp-hr. Sales Compressors Implement best available control technology.2 Typically results in a NOx emission rate of about 1 g/bhp-hr. Temporary Diesel Generators1 Register with state; WDEQ regulate as appropriate. Heavy Equipment

Voluntary use of diesel engines.

Notes: 1 Wyoming is currently registering these generators to determine if NOx emissions are significant. 2 BACT could include electric compression.

E-40


APPENDIX F
SURFACE AND GROUNDWATER RIGHTS WITHIN AND ADJACENT TO THE WEST HAY CREEK LBA TRACT 
 SURFACE WATER RIGHTS
Permit
1

T

R S

Qtrqtr Status

2

Supply type ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI

Uses

3

Facility Name

Applicant

Source

Priority

C72/199A P14204D P24338D 31/1/11S P17056D P24874D C34/176A C34/177A P1562R P9149D

52 72 14 SENW PUD 52 72 14 NESE PUD 52 72 14 SENW PUD 52 72 18 NENW UNA 52 72 20 SESE 52 52 52 52 52 72 72 72 72 72 20 SESE 21 SWNW 21 SWNW 21 SWNW 21 SWNW PUD PUD PUO PUD PUO PUD

IRR IRR IRR STO

D. C. Holler and Jane Holler, P.L.R. Spreader System husband and wife Hay Creek Ben Hur Ditch Ben Hur Stock Farm Corrall Creek P.L.R. Spreader System D. C. Holler Hay Creek Franklin #1 Stock Reservoir Redstone Resources, Inc.**Byron F Oedekoven Frank Oedekoven C & K Petroleum, Inc. John J. Grant John J. Grant John Grant John Grant Triton Coal Company** Wy State Lands & Investments Triton Coal Company** Wy State Lands & Investments Triton Coal Company** Wy State Lands & Investments Triton Coal Company Triton Coal Company Triton Coal Company Triton Coal Company, Llc Triton Coal Company, Llc, Buckskin Mine Hay Creek Sed-19 Draw South Prong Hay Creek Hay Creek Sed-31 Draw Hay Spring

5/10/1974 1/13/1916 5/10/1974 12/4/2001 1/2/1926

Hay Springs Water STO, DOM Supply Ditch OIL, TEM, IND, DRI IRR, DOM IRR, DOM IRR, DOM IRR, DOM C & K Petroleum, Inc. Oil Well Pump Point Grant Reservoir Grant Ditch Grant Reservoir Grant Ditch Sedemintation No. 33 Reservoir Hay Creek Blocking Dike Reservoir TCO Sump Reservoir IND, FLO IND, FLO IND, FLO IND, FLO Sedimentation No. 18 Reservoir Sedimentation No. 19 Reservoir Sedimentation No. 25 Reservoir Sedimentation No. 29 Reservoir Sedimentation No. 31 Reservoir Life Of Mine No. 6A Reservoir Lower Triton Stock Reservoir Upper Triton Stock Reservoir

C & K Spring 10/29/1975 Hay Creek 6/12/1909 Hay Creek 6/12/1909 Hay Creek 6/12/1909 Hay Creek 6/12/1909 Main Branch Hay Creek Main Branch Hay Creek 7/21/2003 7/21/2003 7/21/2003 8/2/2000 8/2/2000 5/31/2001 9/21/2001 6/3/2002 3/25/1998 7/22/2003 7/22/2003

31/5/320R 52 72 16 SENW UNA 31/2/320R 52 72 18 SENE UNA

31/3/320R 52 72 20 NWSE UNA P11075R P11076R P11209R P11240R P11294R P10681R 31/1/321S 31/2/321S 52 72 20 SESE UNA

52 72 20 SESW UNA 52 72 20 SWSE UNA 52 72 21 SWNW UNA 52 72 21 NENW UNA 52 72 28 NWNW UNA 52 72 30 SWNE UNA 52 72 30 NWNE UNA

ORI ORI ORI ORI

IND, FLO IND STO STO

Triton Coal Company L.L.C. Hay Creek Triton Coal Company Triton Coal Company Spring Draw Spring Draw

F-1


1, 2

Abbreviations ADJ Adjudicated DEW Dewatering DRI Drilling IRR Irrigation MON Monitoring PU Point of use PUO Point of outlet UNA Unadjudicated

CBM DOM EXP MIS OIL PUD STO

Coal bed methane Domestic Expired Miscellaneous Water haul for oil well drilling Point of diversion Stock

“A”: indicates adjudicated or finalized water rights and unless the right is a territorial appropriation, there will 
 be a match in the reference column from one of the following permit types for the unadjudicated portion of the 
 water right. 
 “D”: signifies a ditch or pipeline permit.
 “E”: signifies an enlargement of a ditch or pipeline permit.
 “S”: signifies a stock reservoir permit.
 “R”: signifies a reservoir permit.
 Note: A double asterisk (**) in the “Applicant” column represents a separator between parties where multiple 
 parties are involved.
 Surface Water Search Area in T52N, R72W Description Section
7 8 9 14 15 16 17 18 19 20 21 28 29 30 SESW, S½SE S½S½ S½SW S½N½, N½S½ S½N½, N½S½ S½NE, NW, SW, N½SE All NE, E½NW, E½SW, SE NE, E½NW, E½SW, SE All N½NW, SWNW, W½SW W½NW N½ NE, W½NW

3

Search conducted 3/21/2004

F-2


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # P128642W P129239W P18183P P110782W P111284W P104713W Priority T R S Q-Q Stat. GST GST GST Uses CBM CBM DOM, STO STO, CBM STO, CBM STO, CBM Applicant Continental Industries Continental Industries Gilbert Oedekoven Devon Energy Corp. Devon Energy Corp. Devon Energy Corp. (Nevada) Facility Name Rawhide 13-5 Rawhide 14-5 John #1 Caballo Fed. TFU 11C612 Caballo TFU 34C-612 Caballo 22C-612 Well Stat Yld Well Chem Depth Depth Act Log 240 210 450 358 264 322 135 100 150 34 97 0 6 No 5 No 10 Yes 25 No 25 No 5 No Yes Yes No Yes Yes Yes

8/22/2000 51 72 9/1/2000 51 72 5/31/1963 51 72 6/29/1998 51 72 7/31/1998 51 72 12/9/1996 51 72

5 SWSW 5 SESW 5 SENE

6 NWNW GST 6 SWSE 6 SENW GST GST

P108927W

2/23/1998 51 72

6 NENW

GST

STO, Devon Energy Corp. MIS, CBM (Nevada) STO, Redstone Resources, MIS, CBM Inc STO, CBM

Caballo 21C-612

378

240

20 No

Yes

P103472W

8/9/1996 51 72

6 NENW

GST

Caballo #21C-612

111

-1

0 No

Yes

P110870W

7/13/1998 51 72

6 NWSW GST

P131325W 11/30/2000 51 73 P110783W P110785W P110786W 6/29/1998 51 73 6/29/1998 51 73 6/29/1998 51 73

1 NWSW GST 1 SENE 1 SESE 1 NWNE GST GST GST

STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM DOM, STO STO, CBM STO, CBM STO, CBM STO, CBM

Wy State Board of Land Commissioners** Caballo State TFU Devon Energy Corp. 13C-612 20 Mile Land Company** Devon Energy Production 20 Mile 23A-1313 Company, L.P. Devon Energy Corp. Devon Energy Corp. Devon Energy Corp. Devon Energy Production Company, L.P. Caballo Fed. TFU 42C113 Caballo Fed. TFU 44C113 Caballo Fed. TFU 31C113 Caballo Federal 44C113

331

44

25 No

Yes

264 422 377 437

139 40 61 63

25 No 25 No 25 No 25 No

Yes Yes Yes Yes

P108420W 12/16/1997 51 73

1 SESE

GST

377

61

25 No

Yes

P120554W 11/17/1999 51 73

1 SESW

GST

John Daly** Devon Energy Production Co. L.P. 20 Mile 24C-113 John Daly** Devon Energy Production Co. L.P. 20 Mile 24A-113 20 Mile TFU 13C-1413 Daly Livestock Inc. & Twenty Mile Land Daly Home Ranch

448

330

25 No

Yes

P120555W 11/17/1999 51 73 P110806W P52307W 6/29/1998 51 73 6/2/1980 51 73

1 SESW

GST

214 5333 800

25 42 375

25 No 25 No 25 No

Yes Yes Yes

1 NWSW GST 2 SWSE GST

P120543W 11/17/1999 51 73

2 SESE

GST

John Daly** Devon Energy Production Co. L.P. 20 Mile 44C-213 John Daly** Devon Energy Production Co. L.P. 20 Mile 44A-213 John Daly** Devon Energy Production Co. L.P. 20 Mile 42C-213 John Daly** Devon Energy Production Co. L.P. 20 Mile 42A-213

537

320

25 No

Yes

P120544W 11/17/1999 51 73

2 SESE

GST

257

54

25 No

Yes

P120545W 11/17/1999 51 73

2 SENE

GST

634

102

25 No

Yes

P120546W 11/17/1999 51 73

2 SENE

GST

290

38

25 No

Yes

F-3


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses Applicant Facility Name Well Stat Yld Well Chem Depth Depth Act Log

P120550W 11/17/1999 51 73

2 NWSE

GST

STO, CBM STO, CBM STO, CBM STO, CBM

John Daly** Devon Energy Production Co. L.P. 20 Mile 33C-213 John Daly** Devon Energy Production Co. L.P. 20 Mile 33A-213 John Daly** Devon Energy Production Co. L.P. 20 Mile 31C-213 John Daly** Devon Energy Production Co. L.P. 20 Mile 31A-213 Texas Co. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Inc. Redstone Inc. Redstone Inc. Redstone Inc. Redstone Inc. Resources, McGee34C-422 Resources, Resources, Resources, Resources, Franklin 12C-422 Franklin 23C-422 Franklin 32C-422 Franklin 34C-422 John #6 John #10 Landeck 32C-622 Adon Water Well #1 McGee 12C-422 McGee 23C-422 McGee32C-422

634

222

25 No

Yes

P120551W 11/17/1999 51 73

2 NWSE

GST

340

14

25 No

Yes

P120552W 11/17/1999 51 73

2 NWNE

GST

679

40

25 No

Yes

P120553W 11/17/1999 51 73 P25G P122762W P122763W P122764W P122765W P135542W P135544W P135546W P135548W P18187P P42484W P123569W 12/31/1947 52 72 1/31/2000 52 72 1/31/2000 52 72 1/31/2000 52 72 1/31/2000 52 72 5/30/2001 52 72 5/30/2001 52 72 5/30/2001 52 72 5/30/2001 52 72 12/31/1936 52 72 3/28/1978 52 72 2/22/2000 52 72

2 NWNE 2 NWNE

GST

420 567

40 445

25 No 7

Yes No No No No No No No No No

UNA IND STO, CBM STO, CBM STO, CBM STO, CBM CBM CBM CBM CBM STO STO STO, CBM

4 SWNW GSI 4 NESW 4 SWNE 4 SWSE GSI GSI GSI

4 SWNW GSI 4 NESW 4 SWNE 4 SWSE 5 NENE 5 NENW 6 SWNE GSI GSI GSI GST GST GST

Gilbert Oedekoven Gilbert Oedekoven Redstone Resources Inc.

140 225 252

60 120 132

7 No 10 No 25 No

No Yes Yes

P106925W P108735W P109849W P109850W P110630W P110963W

7/28/1997 52 72 1/28/1998 52 72 5/4/1998 52 72 5/4/1998 52 72 6/24/1998 52 72 7/21/1998 52 72

6 NWSW GST 6 SESW GST

STO, Redstone Resources, MIS, CBM Inc STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM Redstone Resources, Inc Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc.

Hall 13C-622 Franklin 24C-622 Hall 12C-622 Franklin 23C-622 Franklin 33C-622 Franklin 14C-622

343 339 377 295 333 437

171.5 162.5 189 143 202.5 263.5

15 No 20 No 12 No 25 No 7 No 7 No

Yes Yes Yes Yes Yes Yes

6 SWNW GST 6 NESW 6 NWSE 6 SWSW GST GST GST

P111689W

9/11/1998 52 72

6 SWSE 6 NESE 6 SESE

GST GST GST

STO, Redstone Resources, MIS, CBM Inc. STO, CBM STO, CBM Redstone Resources, Inc. Redstone Resources, Inc.

Franklin 34C-622 Franklin 43C-622 Franklin 44C-622

326 296 317

224 269.5 291.5

25 No 25 No 25 No

Yes Yes Yes

P113421W 12/21/1998 52 72 P115198W 4/14/1999 52 72

F-4


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses Applicant Byron F/Marjorie Oedekoven Byron F/Marjorie Oedekoven Resources Resources, Resources, Resources, Resources, Resources, Resources, Facility Name Well Stat Yld Well Chem Depth Depth Act Log 300 42.1 370 365 299 361 265 326 261.5 284 273 256 75 25.11 347 200.5 126.5 154 75 161.5 134 172.5 212.5 161 10 No 3 No 25 No 20 No 12 No 25 No 15 No 10 No 25 No 25 No 25 No 10 No No No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No No 339 220 279.5 84.7 25 No 10 No Yes Yes No No No No No 240 105 90 70 60 10 5 No 3 5 No Yes No Yes No No

P115510W P115511W

4/16/1999 52 72 4/16/1999 52 72

7 SWSE 7 SESE

GST GST

STO

Perry W #1E Perry E #1W Oedekoven 21C-722 Oedekoven 22C-722 Oedekoven 13C-722 Oedekoven 11C-722 Franklin 24C-722 Oedekoven 33C-722 Franklin 41C-722 Franklin 41C-722 Franklin 14C-722 Taylor 12C-822 McGee32C-822 McGee41C-822

P120886W 11/15/1999 52 72 P107776W P107777W P107778W P108734W P110631W P111690W P111691W P114989W P119414W P122766W P122767W P135547W P135549W P135550W P119224W P103907W P122768W P122769W P122770W P135543W P135545W P20030P P3185P P20031P 10/8/1997 52 72 10/8/1997 52 72 10/8/1997 52 72 1/28/1998 52 72 6/24/1998 52 72 9/11/1998 52 72 9/11/1998 52 72 4/5/1999 52 72 9/30/1999 52 72 1/31/2000 52 72 1/31/2000 52 72 5/30/2001 52 72 5/30/2001 52 72 5/30/2001 52 72 9/20/1999 52 72 9/6/1996 52 72 1/31/2000 52 72 1/31/2000 52 72 1/31/2000 52 72 5/30/2001 52 72 5/30/2001 52 72

STO STO, 7 NENW GST CBM Redstone STO, Redstone 7 SENW GST CBM Inc STO, Redstone 7 NWSW GST MIS, CBM Inc STO, Redstone 7 NWNW GST MIS, CBM Inc STO, Redstone 7 SESW GST CBM Inc STO, Redstone 7 NWSE GST MIS, CBM Inc. STO, Redstone 7 NENE GST MIS, CBM Inc. 7 SENE GST GST STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM CBM CBM CBM STO, CBM STO, CBM STO, CBM STO, CBM CBM CBM DOM, STO STO STO

Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources Redstone Resources, Inc. Redstone Inc. Redstone Inc. Redstone Inc. Redstone Inc. Resources, Resources, Resources, Resources,

7 SWSW

8 SWNW GST 8 SWNE 8 NENE 8 SWNE 8 NENE 8 NESE 8 NENW GSI GSI GSI GSI GSI GST

Franklin 32C-822 Franklin 41C-822 Franklin 43C-822 Taylor 21C-822 912C-C5 McGee 12C-922 McGee 21C-922 McGee 23C-922 Franklin 21C-922 Franklin 23C-922 Offutt #1 60 Bar 1 Rourke #1 Triton 12C-1722 Triton 14C-1722

Redstone Resources, Inc. Carl/Ola Mcgee Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Paul And Jane Rourke 60 Bar Ranch Paul And Jane Rourke Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC

9 SWNW UNA STO 9 SWNW GSI 9 NENW 9 NESW 9 NENW GSI GSI GSI

9 SWNW GSI

12/31/1942 52 72 13 NWNW GST 6/30/1942 52 72 14 SWNE 12/31/1958 52 72 14 NWNE GST GST

35/7/567W 12/10/2003 52 72 17 SWNW UNA CBM 35/8/567W 12/10/2003 52 72 17 SWSW UNA CBM

F-5


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # P128655W P128656W P83206W P141899W P107779W Priority T R S Q-Q Stat. Uses CBM CBM DOM Applicant Redstone Resources, Inc. Redstone Resources, Inc. Facility Name Franklin 12C-1722 Franklin 14C-1722 85 370 372 393 368 329 296 288 270 325 271 180 93 25 100 404 180 434 452 55 298 172 359 159 126.5 109 105 94.5 249 210 30 25 20 10 205 0 197 186.5 6 No 12 No 10 No 25 No 25 No 25 No 5 No 15 No 10 No 25 No 25 No 10 No 10 No 5 No 25 No 20 No 5 No 20 No 10 No Well Stat Yld Well Chem Depth Depth Act Log No No No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes No No

8/22/2000 52 72 17 SWNW GSI 8/22/2000 52 72 17 SWSW 8/3/1990 52 72 18 SWSW 1/16/2002 52 72 18 SESW GSI GST GST

Cecle L. And Laverne L. Cook Laverne #1 Franklin 24Cr-1822 Oedekoven 13C-1822 Franklin 14C-1822 Franklin 24C-1822 Franklin 33C-1822 Franklin 22C-1822 Franklin 11C-1822 Franklin 31C-1822 Franklin 12C-1822 McGee 21C-1822 Oedekoven #31S1922

10/8/1997 52 72 18 NWSW GST GST GST GST GST

STO, Majestic Petroleum CBM Operations, LLC STO, Redstone Resources, MIS, CBM Inc STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO DOM STO STO STO, CBM Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Byron F Oedekoven

P108442W 12/29/1997 52 72 18 SWSW P108444W 12/29/1997 52 72 18 SESW P108446W 12/29/1997 52 72 18 NWSE P108732W P108733W P110632W P115519W P116606W P102546W P21101P P21105P P61486W 1/28/1998 52 72 18 SENW

1/28/1998 52 72 18 NWNW GST 6/24/1998 52 72 18 NWNE GST

4/27/1999 52 72 18 SWNW GST 7/2/1999 52 72 18 NENW GST

6/6/1996 52 72 19 NWSW GST 1/9/1973 52 72 19 SWSW 1/9/1973 52 72 19 SWSW 7/27/1982 52 72 19 SESE GST GST GST GST GST

Charles R. Oedekoven Whiteside #1 Charles R. Oedekoven Frank Oedekoven #1 Odekoven Stock Well Charles R. Oedekoven #1 Redstone Resources, Inc Triton 24C-1922 Triton 14A-1922 Oedekoven 11C-1922 Franklin 31C-1922 Triton 14C-1922 Triton 44C-1922

P104559W 11/15/1996 52 72 19 SESW P104560W 11/15/1996 52 72 19 SWSW P107780W

10/8/1997 52 72 19 NWNW GST GST GSI GSI

STO, Redstone Resources, CBM Inc STO, Redstone Resources, MIS, CBM Inc STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM Redstone Resources, Inc Redstone Resources, Inc. Redstone Resources, Inc. Yates Petroleum Corp.** SMC Mining Company Yates Petroleum Corp.** SMC Mining Company Yates Petroleum Corp.** SMC Mining Company

P108452W 12/29/1997 52 72 19 NWNE P122293W P122294W 12/8/1999 52 72 19 SWSW 12/8/1999 52 72 19 SESE

P112364W

10/5/1998 52 72 19 SENE

GSE

Isora CS #4

436

63

90 No

Yes

P112367W

10/5/1998 52 72 20 SWNW GSE

Olin CS #2

362

89

90 No

Yes

P112368W

10/5/1998 52 72 20 NWSW GSE

Olin CS #3

322

196

90 No

Yes

F-6


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses STO, CBM STO STO, CBM STO, CBM Applicant Yates Petroleum Corp.** SMC Mining Company Mary J. Clark Yates Petroleum Corp.** SMC Mining Company Yates Petroleum Corp.** SMC Mining Company Facility Name Well Stat Yld Well Chem Depth Depth Act Log

P112369W P20029P

10/5/1998 52 72 20 SWSW 11/30/1959 52 72 23 SESE

GSE GST

Olin CS #4 Clark #1

282 55

81 12

90 No 5 No

Yes Yes

P112361W

10/5/1998 52 72 29 NENW

GSE

Isora CS #1

402

50

90 No

Yes

P112365W P21106P P104081W P104082W P104083W P104084W P104092W

10/5/1998 52 72 29 NWNW GSE 1/9/1973 52 72 30 NENE GST

Isora CS #5 Red Spring #1 Triton 12C-3022 Triton 13C-3022 Triton 21C-3022 Triton 24C-3022 Triton #14C-3022 Triton 22C-3022 Triton 23C-3022 Triton 14A-3022 Triton 13A-3022 Triton 12A-3022 Triton 11A-3022 Triton 33A-3022 Oedekoven 32C23022

402 60 404.5 402 436 407 361.5 371 378 124 142 155 142

112 30 -1 -1 207 -1 -1 150 180 0 -1 -1 0

90 No 10 No 20 No 15 No 10 No 20 No 20 No 10 No 20 No 0 No 0 No 0 No 0 No

Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No

9/25/1996 52 72 30 SWNW GST 9/25/1996 52 72 30 NWSW GST 9/25/1996 52 72 30 NENW 8/29/1996 52 72 30 SESW 9/30/1996 52 72 30 SWSW GST GST GST GST GST GST

STO Charles R. Oedekoven STO, Redstone Resources, MIS, CBM Inc STO, Redstone Resources, MIS, CBM Inc STO, Redstone Resources, MIS, CBM Inc STO, Redstone Resources, MIS, CBM Inc STO, Redstone Resources, MIS, CBM Inc STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc

P104562W 11/18/1996 52 72 30 SENW P104563W 11/18/1996 52 72 30 NESW P104564W 11/18/1996 52 72 30 SWSW

P104565W 11/18/1996 52 72 30 NWSW GST P104566W 11/18/1996 52 72 30 SWNW GST

STO, Redstone Resources, P104567W 11/18/1996 52 72 30 NWNW GST CBM Inc STO, Redstone Resources, P104080W 9/25/1996 52 72 30 NWSE UNA MIS, CBM Inc P109588W 4/9/1998 52 72 30 SWNE GST STO, CBM STO, CBM STO, CBM CBM Redstone Resources, Inc. Yates Petroleum Corp.** SMC Mining Company Yates Petroleum Corp.** SMC Mining Company Redstone Resources Inc. Resources, Resources, Resources, Resources, Resources,

363

220.5

20 No

Yes

P112362W

10/5/1998 52 72 30 NENE

GSE

Isora CS #2

449

92

25 No

Yes

P112363W P131330W P103043W P103183W P103485W P103613W P103618W

10/5/1998 52 72 30 SENE

GSE

Isora CS #3 Triton 12D-3122 Marquiss #24A-3122 Oedekoven #12A3122 Triton #11A-3122 Triton #22A-3122 Triton #13A-3122

404 1232 92 126.5 128 137 110.5

134 685 0 -1

90 No 25 No 25 No 0 No

Yes Yes Yes Yes Yes Yes Yes

12/1/2000 52 72 31 SWNW GST 7/17/1996 52 72 31 SESW GST

7/29/1996 52 72 31 SWNW GST 8/19/1996 52 72 31 NWNW GST 8/29/1996 52 72 31 SENW GST

8/29/1996 52 72 31 NWSW GST

STO, Redstone CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc

-1 Unk No -1 -1 0 No 0 No

F-7


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # P104077W P104078W P104079W P104528W P104529W P104558W P103045W Priority T R S Q-Q Stat. GST Uses Applicant Resources, Resources, Resources, Resources, Resources, Resources, Resources, Facility Name Caballo 24C-3122 Triton 22C-3122 Triton #11C-3122 Triton 14C-3122 Triton 21C-3122 Triton 12C-3122 Landeck #13C-223 Triton 11D-3122 Triton 14D-3122 Triton 21D-3122 Triton 31D-3122 Caballo 32D-3122 Caballo 33D-3122 Caballo 34D-3122 Marquiss 24D-3122 Triton 13D-3122 Hall #23C-123 Hall #13C-123 Hall 42C-123 Oedekoven 22C-722 1206 1227 299 370 365 434 160 250 73.5 127 173.5 216 10 No 25 No 25 No 25 No 10 No 25 No Well Stat Yld Well Chem Depth Depth Act Log 1206 345 371 370 356 390 -1 -1 162 0 220 124 25 No 20 No 15 No 5 No 10 No 20 No Yes Yes Yes Yes Yes Yes No No No No No No No No Yes Yes Yes Yes Yes Yes

STO, Redstone MIS, CBM Inc STO, Redstone 9/25/1996 52 72 31 NESW GST MIS, CBM Inc STO, Redstone 9/25/1996 52 72 31 NWNW GST MIS, CBM Inc STO, Redstone 11/25/1996 52 72 31 SWSW GST MIS, CBM Inc STO, Redstone 11/25/1996 52 72 31 NENW GST MIS, CBM Inc STO, Redstone 11/15/1996 52 72 31 SWNW GST CBM Inc STO, Redstone 7/22/1996 52 72 31 SESW UNA MIS, CBM Inc 9/25/1996 52 72 31 SESW STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM

P122273W 11/22/1999 52 72 31 NWNW GSI P122274W 11/22/1999 52 72 31 SWSW P122275W 11/22/1999 52 72 31 NENW P122276W 11/22/1999 52 72 31 NWNE P122277W 11/22/1999 52 72 31 SWNE P122278W 11/22/1999 52 72 31 NWSE P122279W 11/22/1999 52 72 31 SWSE P108964W 3/2/1998 52 72 31 SESW GSI GSI GSI GSI GSI GSI GST

Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc.

STO, Redstone Resources, CBM Inc. STO, Redstone Resources, MIS, CBM Inc. STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM Redstone Resources, Inc. Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc Resources,

P113423W 12/21/1998 52 72 31 NWSW GST P103473W P103474W P107781W P107782W 8/9/1996 52 73 8/9/1996 52 73 10/8/1997 52 73 10/8/1997 52 73 1 NESW GST

1 NWSW GST 1 SENE 1 SESE GST GST

P103487W P135553W P135555W P135556W P135559W P135562W P109040W

8/19/1996 52 73 5/30/2001 52 73 5/30/2001 52 73 5/30/2001 52 73 5/30/2001 52 73 5/30/2001 52 73 3/4/1998 52 73

STO, Redstone 1 SWNW UNA MIS, CBM Inc Redstone 1 SWSW GSI CBM Inc. Redstone 1 NESW GSI CBM Inc. Redstone 1 SWNE GSI CBM Inc. Redstone 1 NENE GSI CBM Inc. Redstone 1 NESE GSI CBM Inc. STO, Redstone 1 SWSW GST MIS, CBM Inc.

Hall #32C-123 Resources, Resources, Resources, Resources, Resources, Resources, Hall 14A-123 Hall 23A-123 Hall 32A-123 Hall 41A-123 Hall 43A-123 Hall 14C-123 456 200 25 No

No No No No No No Yes

F-8


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses Applicant Facility Name Well Stat Yld Well Chem Depth Depth Act Log 351 346 362 331 360 494 153 111 90 131 180 377 3 No 25 No 25 No 15 No 5 No 25 No Yes Yes Yes Yes Yes Yes No No No No No No No No 498 170 295 149 25 No 10 No Yes Yes No No No No No No No No No No No No

P109049W P109050W P109051W P109278W P109851W P116607W P131897W P131898W P131899W P131900W P131901W P131902W P131903W P131904W P118218W P135506W P130154W P103045W P103178W P103179W P103181W P103182W P103184W P103185W P103186W P103475W P135501W P135508W

3/5/1998 52 73 3/5/1998 52 73 3/5/1998 52 73 3/18/1998 52 73 5/4/1998 52 73 7/2/1999 52 73 1/3/2001 52 73 1/3/2001 52 73 1/3/2001 52 73 1/3/2001 52 73 1/3/2001 52 73 1/3/2001 52 73 1/3/2001 52 73 1/3/2001 52 73 8/16/1999 52 73 5/30/2001 52 73 10/9/2000 52 73 7/22/1996 52 73 7/29/1996 52 73 7/29/1996 52 73 7/29/1996 52 73 7/29/1996 52 73 7/29/1996 52 73 7/29/1996 52 73 7/29/1996 52 73 8/9/1996 52 73 5/30/2001 52 73 5/30/2001 52 73

1 NWNE 1 SENW

GST GST

STO, Redstone Resources, CBM Inc. STO, Redstone Resources, MIS, CBM Inc. STO, Redstone Resources, MIS, CBM Inc. STO, CBM STO, CBM STO, CBM CBM CBM CBM CBM CBM CBM CBM CBM STO, CBM CBM Redstone Resources, Inc. Redstone Resources, Inc. Redstone Redstone Inc. Redstone Inc. Redstone Inc. Redstone Inc. Resources Resources Resources Resources Resources

Hall 31C-123 Hall 22C-123 Hall 11C-123 Hall 33C-123 Hall 41C-123 Landeck 23C-223 Hall 43 W - 223 Hall 41 W - 223 Hall 34 W - 223 Hall 32 W - 223 Landeck 14W - 223 Landeck 23W - 223 Landeck 12W - 223 Hall 41C-223 Landeck Fed 21C-223 Landeck 12A-223

1 NWNW GST 1 NWSE 1 NENE 2 NESW 2 NESE 2 NENE 2 SWSE 2 SWNE 2 SWSW 2 NESW GST GST GST GSI GSI GSI GSI GSI GSI

Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc.

2 SWNW GSI 2 NENE 2 NENW GSI GST

2 SWNW GST 2 NESW GSI

2 NWSW UNA 2 SWNE 2 NENE 2 NWNE 2 SESE 2 NWSE 2 SWSE 2 NESE UNA UNA UNA UNA UNA UNA UNA

2 NWNW UNA 2 NESE 2 SWSW GSI GSI

Redstone CBM Wyoming STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc Redstone CBM Inc. Redstone CBM Inc.

Resources of Inc. Cook 23A-1223 Resources, Landeck #13C-223 Resources, Hall #32C-223 Resources, Hall #41C-223 Resources, Hall #31C-223 Resources, Hall #44C-223 Resources, Hall #33C-223 Resources, Hall #34C-223 Resources, Hall #43C-223 Resources, Landeck #11C-223 Resources, Hall 43A-223 Resources, Landeck 14A-223

F-9


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # P135510W P135557W P135558W Priority T R S Q-Q Stat. GSI GSI GSI Uses CBM CBM CBM Applicant Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Facility Name Landeck 23A-223 Hall 32A-223 Hall 34A-223 Well Stat Yld Well Chem Depth Depth Act Log No No No

5/30/2001 52 73 5/30/2001 52 73 5/30/2001 52 73

2 NESW 2 SWNE 2 SWSE

P109041W

3/4/1998 52 73

2 NWNE

GST

STO, Redstone Resources, MIS, CBM Inc. STO, Redstone Resources, MIS, CBM Inc. STO, Redstone Resources, MIS, CBM Inc. STO, CBM Redstone Resources, Inc. William A. Landeck Redstone Resources Inc. Redstone Inc. Redstone Inc. Redstone Inc. Redstone Inc. Redstone Inc. Redstone Inc. Redstone Inc. Resources

Hall 31C-223

409

153

25 No

Yes

P109042W

3/4/1998 52 73

2 SESE

GST

Hall 34C-223

460

190.5

25 No

Yes

P109043W P110633W P79008W P131913W P131914W P131915W P131916W P131917W P131918W P131919W P131920W

3/4/1998 52 73 6/24/1998 52 73 1/30/1989 52 73

2 NESE

GST

Hall 43C-223 Landeck 12C-223 B2 9C Hinkes 12 W - 1123 Hinkes 14 W - 1123

390 489

133 153.5

25 No 25 No

Yes Yes No No No No No No No No No

2 SWNW GST 2 SWSW

UNA STO CBM CBM CBM CBM CBM CBM CBM CBM CBM CBM CBM CBM CBM CBM

1/3/2001 52 73 11 SWNW GSI 1/3/2001 52 73 11 SWSW 1/3/2001 52 73 11 NENW 1/3/2001 52 73 11 NESW 1/3/2001 52 73 11 NESW 1/3/2001 52 73 11 NESW 1/3/2001 52 73 11 SWNE 1/3/2001 52 73 11 SWNE GSI GSI GSI GSI GSI GSI GSI GST

Resources Resources Resources Resources Resources Resources

Hinkes 21A-1123 Hinkes 21W-1123 Hinkes 23A-1123 Hinkes 23W-1123 Hall 32A-1123 Hall 32W-1123 Twenty Mile 43A-1123 Hinkes 12A-1123 Twenty Mile 43 C1123 323 230 538 198 304 340 425 460 152 130 489 124.5 160 178 101 127 12 No 10 No 10 No 5 No 25 No 25 No 12 No 22 No

P130319W 10/12/2000 52 73 11 NESE

P131652W 12/26/2000 52 73 11 SWNW GST P131921W 1/3/2001 52 73 11 NESE GST GST GST GST

Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc.

Yes Yes Yes Yes Yes Yes Yes Yes No No

P131651W 12/26/2000 52 73 11 SWSW P130318W 10/12/2000 52 73 11 NENE P131926W 1/3/2001 52 73 11 SWSE

Redstone Resources of Wyoming Inc. Hinkes 14A-1123 Redstone Resources of Wyoming, Inc Hall 41A-1123 Redstone Resources of Wyoming, Inc Twenty Mile 34A-1123 Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc. Redstone Resources, Inc. Hinkes 12C-1123 Hinkes 14C-1123 Twenty Mile 34W1123 Hall 41W-1123

STO, P108243W 11/26/1997 52 73 11 SWNW GST CBM P108247W 11/26/1997 52 73 11 SWSW P132273W P132274W 1/17/2001 52 73 11 SWSE 1/17/2001 52 73 11 NENE GST GSI GSI STO, CBM CBM CBM

F-10


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses Applicant Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Facility Name Twenty Mile 43W1123 Hinkes 23C-1123 Hinkes 21C-1123 413 456 116 143 10 No 15 No Well Stat Yld Well Chem Depth Depth Act Log No Yes Yes

P132275W P108866W P109044W

1/17/2001 52 73 11 NESW 2/6/1998 52 73 11 NESW 3/4/1998 52 73 11 NENW

GSI GST GST

CBM STO, CBM STO, CBM

P109045W

3/4/1998 52 73 11 SWNE

GST

STO, Redstone Resources, MIS, CBM Inc. STO, Redstone Resources, MIS, CBM Inc. STO, CBM STO, CBM CBM CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM CBM STO, CBM STO, CBM Redstone Resources, Inc. Redstone Resources, Inc. Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC

Hall 32C-1123

488

173.5

25 No

Yes

P109046W P109048W

3/4/1998 52 73 11 NENE 3/5/1998 52 73 11 SESE

GST GST GST

Hall 41C-1123 Twenty Mile 44C-1123 Twenty Mile 34C-1123 Cook 12A-1223 Cook 14A-1223 Cook 14W-1223 Cook 23W-1223 Cook 11C-1223 Cook 12C-1223 Cook 13C-1223 Cook 14C-1223 Cook 21C-1223 Cook 22C-1223 Cook 21A1-1223 Cook 34A-1223 Cook 12W-1223

534 516 508

232 169 385

20 No 15 No 25 No

Yes Yes Yes No No No No

P120894W 11/15/1999 52 73 11 SWSE P130156W

10/9/2000 52 73 12 SWNW GSI GSI GSI GSI

P131321W 11/30/2000 52 73 12 SWSW P142623W P142624W 2/1/2002 52 73 12 SWSW 2/1/2002 52 73 12 NESW

P108423W 12/29/1997 52 73 12 NWNW GST P108424W 12/29/1997 52 73 12 SWNW GST P108425W 12/29/1997 52 73 12 NWSW GST P108426W 12/29/1997 52 73 12 SWSW P108427W 12/29/1997 52 73 12 NENW P108428W 12/29/1997 52 73 12 SENW P141900W P141901W P142354W P130155W 1/16/2002 52 73 12 NENW 1/16/2002 52 73 12 SWSE GST GST GST GST GST

497 539 522 520 429 435 105 154 834

201.5 473 231 472 379 170 71 119 295

12 No 25 No 25 No 25 No 25 No 12 No 1 No 23 No 3 No

Yes Yes Yes Yes Yes Yes Yes Yes Yes No

1/30/2002 52 73 12 SWNW GST 10/9/2000 52 73 12 NENW GSI GST GST

Redstone Resources of Wyoming Inc. Cook 21A-1223 Redstone Resources, Inc Redstone Resources, Inc Cook 24C-1223 Cook 31C-1223 466 373 220.5 136.5 25 No 10 No

P108430W 12/29/1997 52 73 12 SESW P108431W 12/29/1997 52 73 12 NWNE

Yes Yes

P108433W 12/29/1997 52 73 12 NWSE P108434W 12/29/1997 52 73 12 SWSE

GST GST

STO, Redstone Resources, MIS, CBM Inc STO, CBM Redstone Resources, Inc

Cook 33C-1223 Cook 34C-1223

395 380

14 357

2 No 25 No

Yes Yes

F-11


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses STO, CBM STO, CBM CBM DOM, STO DOM DOM CBM STO, CBM STO, CBM CBM STO, CBM CBM CBM CBM CBM Applicant Redstone Resources, Inc Redstone Resources, Inc Redstone Resources, Inc. Cecle L. Cook Darrell Ray Kerry L. Petersen Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Majestic Petroleum Operations, LLC Facility Name Well Stat Yld Well Chem Depth Depth Act Log 390 310 330 12 25 No 25 No Yes Yes No 130 296 250 50 134 85 25 No 25 No 25 No Yes Yes Yes No 393 332 233 604 119 90.5 212 583 15 No 25 No 7 No 25 No Yes Yes Yes Yes No 298 300 190 53 15 No 15 No Yes Yes No 523 290 20 No Yes

P108435W 12/29/1997 52 73 12 NENE P108438W 12/29/1997 52 73 12 SESE P129690W P33812W P67024W P67063W 9/6/2000 52 73 12 NENW 6/21/1976 52 73 13 SENE 4/12/1984 52 73 13 NESW 4/23/1984 52 73 13 NESW

GST GST GSI GST GST GST GSI GST GST GST GST

Cook 41C-1223 Cook 44C-1223 Cook 21C2-1223 Cook #1 Ray #1 Petersen #1 Cook 41A-1323 Cook 42C-1323 Cook 41C-1323 Cook 32A-1323

P131655W 12/26/2000 52 73 13 NENE P107783W P110084W 10/8/1997 52 73 13 SENE 5/19/1998 52 73 13 NENE

P131654W 12/26/2000 52 73 13 SWNE P120603W P131890W 11/5/1999 52 73 13 SENW

1/3/2001 52 73 13 SWNW GSI GST GST GSI GST

Redstone Gas Partners LLC Cook 22C3-1323 Redstone Resources Cook 12A - 1323 Inc. Redstone Resources Inc. Redstone Resources Inc. Oedekoven 34A-1323 Oedekoven 23A-1323

P131649W 12/26/2000 52 73 13 SWSE P131650W 12/26/2000 52 73 13 NESW P131656W 12/26/2000 52 73 13 NENW P107038W 8/18/1997 52 73 13 SESE

Redstone Resources of Wyoming Inc. Cook 21A-1323 Oedekoven 44C-1323

Redstone Resources, MIS, CBM Inc STO, Redstone Resources, MIS, CBM Inc STO, Redstone Resources, MIS, CBM Inc STO, CBM Redstone Resources, Inc

P107600W

9/8/1997 52 73 13 NESW

GST

Oedekoven 23C-1323

539

247

25 No

Yes

P107601W P107670W

9/8/1997 52 73 13 SWSE 9/18/1997 52 73 13 NWNE

GST GST

Oedekoven 34C-1323 Cook 31C-1323

585 389

293 58.5

20 No 5 No

Yes Yes

P107929W 10/22/1997 52 73 13 SESW P132276W P132277W P132278W P132279W P109047W P110083W 1/17/2001 52 73 13 SWSW 1/17/2001 52 73 13 NENW 1/17/2001 52 73 13 NESW

GST GSI GSI GSI

STO, Redstone Resources, MIS, CBM Inc Redstone Resources, CBM Inc. Redstone Resources, CBM Inc. CBM CBM STO, CBM STO, CBM Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc.

Oedekoven 24C-1323 Geiger 14A-1323 Cook 21W-1323 Oedekoven 23W-1323 Twenty Mile 12W1423 Cook 11C-1323 Geiger 13C-1323

525

230

25 No

Yes No No No No

1/17/2001 52 73 13 SWNW GSI 3/5/1998 52 73 13 NWNW GST 5/19/1998 52 73 13 NWSW GST

536 440

257 214

20 No 25 No

Yes Yes

F-12


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses STO, CBM DOM MON STO STO DOM, STO STO STO, CBM CBM CBM CBM STO, CBM Applicant Redstone Resources, Inc. Dave Janish Green Valley Estates Kelly Hardy Maurice Morel Maurice Morel Maurice Morel Redstone Resources Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Facility Name Well Stat Yld Well Chem Depth Depth Act Log 461 790 33 222 84 185 4 592 59 250 22.5 70 10 80 -4 397 25 No 25 No 0 Yes 12 No 4 No 3 No 2 No 6 No Yes Yes Yes Yes Yes No No Yes No No No 536 511 307 379 25 No 24 No Yes Yes No No No No No 370 242 25 No Yes No No No No No 884 102 370 814 37 200 25 No 60 No 5 No Yes Yes Yes No 1260 370 80 Yes Yes

P111695W P103580W P94590W P94853W P8412W P8543P P8545P

9/11/1998 52 73 13 SWSW 8/23/1996 52 73 14 SENW 2/18/1994 52 73 14 SESE 3/25/1994 52 73 14 SWSE 3/18/1971 52 73 14 SENW

GST GST GST GST GST

Geiger 14C-1323 Janish #1 GVE-MW2 Hardy A1 Morel #4 Morel #1 Morel #3 Twenty Mile 23C-1423 Huskinson 34A-1423 Twenty Mile 12A-1423 Twenty Mile 32A-1423 Green Valley 34C1423 Twenty Mile 32C-1423

12/31/1942 52 73 14 NWNW GST 12/31/1915 52 73 14 NENW GST GST GSI

P120895W 11/15/1999 52 73 14 NESW P142658W P142659W P142661W 2/7/2002 52 73 14 SWSE

2/7/2002 52 73 14 SWNW GSI 2/7/2002 52 73 14 SWNE GSI GST

P122288W 11/22/1999 52 73 14 SWSE P122295W 12/8/1999 52 73 14 SWNE

STO, GST CBM GSI GSI GSI CBM CBM CBM CBM CBM CBM CBM CBM CBM CBM CBM CBM STO STO DOM, STO MIS

P131644W 12/26/2000 52 73 14 NESW P131646W 12/26/2000 52 73 14 NENW P131647W 12/26/2000 52 73 14 SWSW

Redstone Resources of Twenty Mile 23 AWyoming Inc. 1423 Redstone Resources of Wyoming Inc. Twenty Mile 21A-1423 Redstone Resources of Wyoming Inc. Twenty Mile 14A-1423 Redstone Resources of Wyoming Inc. Twnety Mile 12A-1423 Redstone Resources of Green Valley 34AWyoming Inc. 1423 Redstone Resources of Wyoming, Inc Twenty Mile 32A-1423 Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Reginald Parnell Twenty Mile 12C-1423 Twenty Mile 31 C1423 Twenty Mile 21W-1423 Twenty Mile 23W-1423 Janisch 43A-1423 Twenty Mile 14W1423 Pitt #1

P131648W 12/26/2000 52 73 14 SWNW GSI P131653W 12/26/2000 52 73 14 SWSE P131643W 12/26/2000 52 73 14 SWNE P127662W P128654W P132281W P132282W P132293W P132280W P15860W P21099P P149408W P91376W GSI GST

7/17/2000 52 73 14 SWNW GSI 8/22/2000 52 73 14 NWNE 1/17/2001 52 73 14 NENW 1/17/2001 52 73 14 NESW 1/17/2001 52 73 14 NESE 1/17/2001 52 73 14 SWSW 10/24/1972 52 73 14 NESE 1/9/1973 52 73 23 SESE 2/19/2003 52 73 23 SENE 4/14/1993 52 73 23 SWNE GSI GSI GSI GSI GST GST GST GSI ADJ

Charles R. Oedekoven Carlson #1 Cody Joslyn Green Valley Estates Cody # 1 Morel #1

F-13


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses Applicant Facility Name Well Stat Yld Well Chem Depth Depth Act Log

P34476W

8/10/1976 52 73 23 SENW

GST GST GSI GSI GSI GSI GST GST GSI

MON STO, CBM CBM CBM CBM CBM STO, CBM CBM CBM CBM STO, CBM STO, CBM STO STO STO DOM, STO DOM, STO CBM CBM CBM CBM CBM

Maurice Morel** S & R Land Company**Robert Morel**Gerald Morel Morel #1 Test Hole Redstone Resources Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Triton 32C-2323 Triton 32 A-2323 Triton 43 A-2323 Triton Fed 32C-2623 Twenty Mile Fed 14C2323 Triton 43C-2323 Twenty Mile 21C-2323

1260 689

370 545

0 No 12 No

Yes Yes No No No No

P120897W 11/15/1999 52 73 23 SWNE P131922W P131923W P137322W P137328W P116611W P127901W 1/3/2001 52 73 23 SWNE 1/3/2001 52 73 23 NESE 7/25/2001 52 73 23 NESW 7/25/2001 52 73 23 SWSW 7/2/1999 52 73 23 NESE 7/31/2000 52 73 23 NENW

657 632

218 327

25 No 25 No

Yes Yes No No

P131645W 12/26/2000 52 73 23 NENW P132292W P108931W P118851W P115504W P115512W P21102P P21104P P92236W P131924W P131925W P131927W P131928W P131929W P131930W P131931W P104886W P104887W P106641W

Redstone Resources of Wyoming Inc. Twenty Mile 21A-2323 Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Byron F/Marjorie Oedekoven Byron F/Marjorie Oedekoven Twenty Mile 12A-2323 Triton 42C-2323 Green Valley 41C2323 Robb E #1E Robb W #1W 576 530 300 43.4 140 210 655 308 55 75 6 70 90 200 25 No 25 No 5 No 3 No 15 No 10 No 20 No

1/17/2001 52 73 23 SWNW GSI 2/23/1998 52 73 23 SENE 8/30/1999 52 73 23 NENE 4/16/1999 52 73 24 NENE 4/16/1999 52 73 24 SENW 1/9/1973 52 73 24 SESE 1/9/1973 52 73 24 SESW 7/13/1993 52 73 24 SENW 1/3/2001 52 73 24 SWSW 1/3/2001 52 73 24 NENW 1/3/2001 52 73 24 NESW 1/3/2001 52 73 24 NENE 1/3/2001 52 73 24 SWNE 1/3/2001 52 73 24 SWSE 1/3/2001 52 73 24 NESE 1/14/1997 52 73 24 SWSE 1/14/1997 52 73 24 SESE 7/8/1997 52 73 24 NENE GST GST GST GST GST GST GST GSI GSI GSI GSI GSI GSI GSI GST GST GST

Yes No No No Yes No Yes No No No No No No No

Charles R. Oedekoven County Road #1 Charles R. Oedekoven Headquarters #1 Gene And Glenda Palmer Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Resources Oedekoven 34A-2423 Resources Resources, Resources, Resources, Oedekoven 43A-2423 Oedekoven 34SA2423 Oedekoven 44SC2423 Oedekoven 41C-2423 Palmer #1 Triton 14A-2423 Oedekoven 21A-2423 Oedekoven 23A-2423 Oedekoven 41A-2423 Oedekoven 32A-2423

Redstone CBM Inc. Redstone CBM Inc. STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc

456 457 466

236 249 223

14 No 20 No 25 No

Yes No Yes

F-14


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # P107599W P107737W Priority T R S Q-Q Stat. GST GST GST GST Uses Applicant Resources, Resources, Resources, Resources, Resources, Resources, Facility Name Oedekoven 21C-2423 Oedekoven 43C-2423 Oedekoven 23C-2423 Oedekoven 31C-2423 Green Valley 12A2423 Oedekoven 33C22423 Morel 11C-2423 Triton 14C-2423 Green Valley 12C2423 Scott Joslyn #1 Briggs #1 Enl Bredthauer #1 755 705 705 820 210 890 665 1200 785 800 660 300 320 350 400 80 432 100 565 300 375 410 25 No 25 No 11 Yes 12 No 10 No 20 No 17 Yes 70 Yes 20 No 25 No 7 No Well Stat Yld Well Chem Depth Depth Act Log 466 452 550 540 197 253.5 285 260.5 25 No 16 No 25 No 20 No Yes Yes Yes Yes No 439 519 622 570 165 314.5 468 102 20 No 25 No 25 No 25 No Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No 330 160 20 No Yes No No No No No

9/8/1997 52 73 24 NENW 9/25/1997 52 73 24 NESE

P107928W 10/22/1997 52 73 24 NESW P108421W 12/16/1997 52 73 24 NWNE P132294W P109591W P110086W P116619W P118850W P149409W P73385W P65773W P41579W P69602W P21103P P150294W P110161W P154536W P56385W P59551W P117223W P137166W P55199W P137323W P143200W P129774W P130126W P130129W

1/17/2001 52 73 24 SWNW GSI 4/9/1998 52 73 24 NWSE GST

STO, Redstone MIS, CBM Inc STO, Redstone CBM Inc STO, Redstone MIS, CBM Inc STO, Redstone MIS, CBM Inc Redstone CBM Inc. STO, Redstone MIS, CBM Inc.

STO, 5/19/1998 52 73 24 NWNW GST CBM 7/2/1999 52 73 24 SWSW GST STO, CBM STO, CBM DOM, STO DOM, STO MIS DOM DOM STO DOM DOM

Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Scott Joslyn Albert L. Briggs Charles E. & Cindy S. Bredthauer

8/30/1999 52 73 24 SWNW GST 2/19/2003 52 73 24 SWNW GSI 9/29/1986 52 73 25 SWSW 9/22/1983 52 73 25 SWNW 1/20/1978 52 73 25 SWNW GST 3/7/1985 52 73 25 NWNW GST 1/9/1973 52 73 25 SESE 4/7/2003 52 73 25 NENW 5/27/1998 52 73 25 SENW GST GST GST GST

Charles E. And Cindy S. Bredthauer Bredthauer #1 Charles P. Sullivan Chris Santistevan Glenda H Matlack Glory Hole Homeowners Assn. Helen Hafling Jack P. & Victoria L. Connolly Kennedy Oil Kennedy Oil Lawrence Bruski Redstone Resources Inc. Redstone Resources Inc. Sullivan #1 Santistevan # 1 Matlack #1 Glory Hole #1 Pineview #2 Connolly #1 North Kitty Fee #4425 North Kitty Fee 4425C Bruski #1 Triton Fed 23C-2523 Triton 11A2-2523 Charles R. Oedekoven Woofter #1

5/2/2003 52 73 25 SWNW GSM MIS 4/8/1981 52 73 25 SWNW GST 2/19/1982 52 73 25 NWSW GST 7/7/1999 52 73 25 SESE 7/17/2001 52 73 25 SESE 1/21/1981 52 73 25 NWSW 7/25/2001 52 73 25 NESW GSI CBM CBM CBM CBM CBM GSE GSI DOM, STO DOM STO, CBM CBM

3/7/2002 52 73 25 NWNW GSI 9/20/2000 52 73 25 SWSE 9/28/2000 52 73 25 SENW 9/28/2000 52 73 25 SWNE GSI GSI GSI

Redstone Resources of Wyoming Inc. Triton 34C-2523 Redstone Resources of Wyoming Inc. Triton 22A-2523 Redstone Resources of Wyoming Inc. Triton 32C2-2523

P103615W

8/29/1996 52 73 25 NWSE

GST

STO, Redstone Resources, MIS, CBM Inc

Triton #33A-2523

163

0

5 No

Yes

F-15


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses Applicant Facility Name Well Stat Yld Well Chem Depth Depth Act Log

P103616W

8/29/1996 52 73 25 SENE

GST

STO, Redstone Resources, MIS, CBM Inc STO, Redstone Resources, MIS, CBM Inc STO, CBM Redstone Resources, Inc

Triton #42A-2523

178.5

-1

0 No

Yes

P103617W

8/29/1996 52 73 25 SESE

GST GST

Triton #44A-2523 Triton 43C-2523

153 335

0 160

0 No 20 No

Yes Yes

P104561W 11/15/1996 52 73 25 NESE

P106510W

6/16/1997 52 73 25 NENE

GST

STO, Redstone Resources, MIS, CBM Inc STO, Redstone Resources, MIS, CBM Inc STO, CBM CBM STO, CBM STO, CBM Redstone Resources, Inc Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Richard Eberlein Roger & Mary Maki**Brook & Lori Bahnson**Mark Thomas

Triton 41C-2523

412

185

25 No

Yes

P106511W P107785W P127661W P114667W P114670W P111067W

6/16/1997 52 73 25 SESE 10/8/1997 52 73 25 NENW

GST GST

Triton 44C-2523 Trition 21C-2523 Coleman 13C-2523 Triton 11C-2523 Holden 14C-2523 Eberlein 1

395 529

-4 255

0 No 14 No

Yes Yes No

7/17/2000 52 73 25 NWSW GSI 3/22/1999 52 73 25 NWNW GST 3/22/1999 52 73 25 SWSW GST

419 516

198 54

25 No 25 No

Yes Yes No

DOM, 7/1/1998 52 73 25 NWSW UNA STO

P72895W P34782W P66876W P51185W

6/20/1986 52 73 25 SWSW 9/9/1976 52 73 25 SWSE 4/2/1984 52 73 25 SWSE 2/15/1980 52 73 25 SENW

GST GST GST GST

DOM, STO DOM, STO DOM DOM STO, CBM DOM MIS

Pineview #4

790 200 717 660

365 120 350 240

25 No 12 No 20 No 20 No

Yes Yes Yes Yes

Steven R. or Georgia L. Barbour S Barbour #1 Steven R. or Georgia L. Barbour S. Barbour #2 Susan M Moore Yates Petroleum Corp.** SMC Mining Company Bob Leroy Johnson H H #1

P112366W P38967W P65774W P21100P P65156W P43866W P123899W P43864W P57369W P36583W P137321W

10/5/1998 52 73 25 NWNE

GSE

Olin CS #1 Johnson Well #1 260 710 141 790 325 200 150 100 475 175 7 No 40 No 10 No 10 No 12 No

No Yes Yes Yes No Yes No 442 625 580 225 170 475 10 Yes 9 No 5 No Yes Yes Yes No

6/29/1977 52 73 26 NWSW GST 9/22/1983 52 73 26 NESE 1/9/1973 52 73 26 NENE 8/22/1983 52 73 26 SWSE 6/19/1978 52 73 26 SWNE 3/13/2000 52 73 26 NWSE 6/16/1978 52 73 26 SWSE 6/29/1981 52 73 26 NWNE 3/14/1977 52 73 26 NESW 7/25/2001 52 73 26 SWNE GST GST GST GSI GST GST GST GSI

Bredthauer-West Home Owerners Association B-West #1 Charles R. Oedekoven Highway #1 Duane Butcher Edward W. & Linda K. Eldridge Elliston Company Horace Ray Collins Orvil L. Holden Raymond Podenski Redstone Resources Inc. Butcher #1 Eldridge #1 Elliston #1 Onetia #1 Holden #1 Rays #2 Eldridge Fed 32C2623

STO DOM DOM, STO DOM, STO DOM, STO DOM, STO DOM, STO CBM

F-16


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses Applicant Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Redstone Resources Inc. Facility Name Well Stat Yld Well Chem Depth Depth Act Log No No No No 573 700 741 639 429 276 240 278 25 No 25 No 25 No 25 No Yes Yes Yes Yes

P137324W P137326W

7/25/2001 52 73 26 NENE

GSI

CBM CBM CBM CBM CBM STO, CBM STO, CBM STO, CBM

Triton Fed 41A-2623 Twenty Mile Fed 12C2623 Moore 43C2-2623 Landeck 34C-2623

7/25/2001 52 73 26 SWNW GSI GSI GSI GST GST GST GST

P141402W 12/12/2001 52 73 26 NESE P142657W 2/7/2002 52 73 26 SWSE

P141398W 12/12/2001 52 73 26 SWSW P109627W P115521W P122771W 4/9/1998 52 73 26 NENW 4/27/1999 52 73 26 SWSW 1/31/2000 52 73 26 NESE

Redstone Resources of Wyoming, Inc Twenty Mile 14A-2623 Redstone Resources, Inc. Redstone Resources, Inc. Redstone Resources, Inc. Triton Federal 21C2623 Twenty Mile 14C-2623 Moore 43C-2623

P109275W P115523W P116612W P67073W

3/18/1998 52 73 35 NENW

GST

STO, Redstone Resources, MIS, CBM Inc. STO, CBM STO, CBM STO Redstone Resources, Inc. Redstone Resources, Inc. Twenty Mile Land Co.

Twenty Mile 21C-3523 Twenty Mile 12C-3523 Twenty Mile 23C-3523 Videta #1

662 687 680 250

242 180 198 84

13 No 25 No 25 No 15 No

Yes Yes Yes Yes

4/27/1999 52 73 35 SWNW GST 7/2/1999 52 73 35 NESW 4/25/1984 52 73 35 NWNE GST GST

P104527W 11/25/1996 52 73 36 SENE P106635W

GST

STO, Redstone Resources, MIS, CBM Inc STO, CBM STO, CBM STO, CBM STO, CBM STO, CBM Redstone Resources, Inc Redstone Resources, Inc.

State 42A-3623 State 11C-3623 State 41D-3623

1283 500

0 203

5 No 12 No

Yes Yes No

6/30/1997 52 73 36 NWNW GST GSI

P122289W 11/22/1999 52 73 36 NENE

P122290W 11/22/1999 52 73 36 NESE

GSI

Redstone Resources, Inc.** Wy State Board of Land Commissioners State 43D-3623 Redstone Resources, Inc.** Wy State Board of Land Commissioners State 44D-3623 Redstone Resources, Inc.** Wy State Board of Land Commissioners State Wy State Board of Land Commissioners** Redstone Resources Inc. State Wy State Board of Land Commissioners** Redstone Resources, State Inc. Wy State Board of Land Commissioners** Redstone Resources, State Inc.

No

P122291W 11/22/1999 52 73 36 SESE

GSI

No

P122296W

12/8/1999 52 73 36 NENE

GSI

41C-3623

No

P131326W

12/1/2000 52 73 36 NENW

GST

CBM

21D-3623

1351

823

25 No

Yes

P131327W

12/1/2000 52 73 36 SWNE

GSI

CBM

32D-3623

No

P131328W

12/1/2000 52 73 36 NESW

GSI

CBM

23D-3623

No

F-17


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses Applicant Facility Name Well Stat Yld Well Chem Depth Depth Act Log

P131329W

12/1/2000 52 73 36 SWSE

GSI

P103612W

8/29/1996 52 73 36 NENE

GST

P105071W

2/21/1997 52 73 36 NWSW GST

P105072W

2/21/1997 52 73 36 SENW

GST

P105073W

2/21/1997 52 73 36 NESE

GST

P105074W

2/21/1997 52 73 36 NWNE

GST

P105076W

2/21/1997 52 73 36 SESE

GST

P106640W

6/30/1997 52 73 36 NWSE

GST

P106780W

7/18/1997 52 73 36 SENE

GST

P107927W 10/22/1997 52 73 36 NENW

GST

P111702W P115508W P77546W P115517W

9/11/1998 52 73 36 SESW 4/16/1999 53 72 31 NWNE 7/7/1988 53 72 31 SWSE 4/26/1999 53 72 31 NENW

GST GST GST GST GST GST GST GST GST

Wy State Board of Land Commissioners** Redstone Resources, Inc. State CBM Wyo Board of Land Commissioners** STO, Redstone Resources, State MIS, CBM Inc Wyo Board of Land Commissioners** STO, Redstone Resources, State CBM Inc Wyo Board of Land Commissioners** STO, Redstone Resources, State CBM Inc Wyo Board of Land Commissioners** STO, Redstone Resources, Inc State CBM Wyo Board of Land Commissioners** STO, Redstone Resources, State CBM Inc Wyo Board of Land Commissioners** STO, Redstone Resources, State MIS, CBM Inc Wyo Board of Land Commissioners** STO, Redstone Resources, State CBM Inc Wyo Board of Land Commissioners** STO, Redstone Resources, State MIS, CBM Inc Wyo Board of Land Commissioners** STO, Redstone Resources, State MIS, CBM Inc Wyo Board of Land Commissioners** STO, Redstone Resources, State CBM Inc. STO STO DOM, STO STO DOM STO STO STO Byron F/Marjorie Oedekoven Frank Landeck Richard M/or Judy K Lynde William A. Landeck Byron F Oedekoven Byron F/Marjorie Oedekoven Byron F/Marjorie Oedekoven Byron F/Marjorie Oedekoven

34D-3623

No

#41A-3623

129.5

0

5 No

Yes

13EA-3623

508

159

16 No

Yes

22EC-3623

459

171

25 No

Yes

43A-3623

516

135

10 No

Yes

31A-3623

426

177

12 No

Yes

44A-3623

422

129

20 No

Yes

33C-3623

428

156

16 No

Yes

42C-3623

408

-1

20 No

Yes

21C-3623

491

216

20 No

Yes

24C-3623

461 210 280 360 564

298 46 80 200 260

25 No 5 No 10 No 25 No 25 No

Yes No Yes Yes Yes No

Steiner NW #2E Landeck #12 House Well #1 Landeck # 8 Oedekoven House Well #1 Steiner Yard #1E Steiner Hand Dug Steiner Yard #1W

P130428W 10/25/2000 53 72 31 SWSE P111927W P115505W P115506W P115509W 10/2/1998 53 72 32 SESW 4/16/1999 53 72 32 SESW 4/16/1999 53 72 32 SESW 4/16/1999 53 72 32 SESW

125 40 65

65 35 35

5 No 5 No 3 No

No No No

F-18


GROUNDWATER RIGHTS WITHIN 3 MILES OF THE WEST HAY CREEK LBA
Permit # Priority T R S Q-Q Stat. Uses DOM, STO STO STO DOM, STO DOM, STO STO STO, CBM STO, CBM Applicant Facility Name Well Stat Yld Well Chem Depth Depth Act Log 220 150 180 315 800 110 358 468 120 80 90 34 320 70 198 217 8 Yes 8 No 3 No 15 No 20 No 2 25 No 8 No No No No Yes Yes No Yes Yes

P18184P P18188P P18185P P27251W P61232W P3262P P111687W P111701W

10/31/1960 53 72 32 SENE 10/31/1959 53 72 32 SWSE 10/31/1964 53 72 33 NENW

GST GST GST

Gilbert Oedekoven Gilbert Oedekoven Gilbert Oedekoven Gilbert Oedekoven Gilbert Oedekoven Dean W. Hall** State of Wyoming Redstone Resources, Inc. Redstone Resources, Inc. Wyo Board of Land Commissioners** Redstone Resources, Inc. Wyo Board of Land Commissioners** Redstone Resources, Inc. Wyo Board of Land Commissioners** Redstone Resources, Inc. Wyo Board of Land Commissioners** Redstone Resources, Inc. Wyo Board of Land Commissioners** Redstone Resources, Inc. Wyo Board of Land Commissioners** Redstone Resources, Inc. Wyo Board of Land Commissioners** Redstone Resources, Inc.

John #3 John #7 John #4 John #8 John #9 #5 Hall State 44C-3633 Reile 34LC-3333

7/11/1974 53 72 33 SWNW GST 6/21/1982 53 72 33 SWNW GST 6/30/1938 53 73 36 SWSW 9/11/1998 53 73 36 SESE 9/11/1998 53 73 36 SWSE GST GST GST

P111703W

9/11/1998 53 73 36 NWNW GST

STO, CBM

State 11C-3633

332

60

25 No

Yes

P111704W

9/11/1998 53 73 36 NWSW GST

STO, CBM

State 13C-3633

377

79

25 No

Yes

P111705W

9/11/1998 53 73 36 SENW

GST

STO, CBM

State 22C-3633

406

202.5

25 No

Yes

P111706W

9/11/1998 53 73 36 SESW

GST

STO, CBM

State 24C-3633

411

188

25 No

Yes

P111707W

9/11/1998 53 73 36 NWNE

GST

STO, CBM

State 31C-3633

305

105

25 No

Yes

P111708W

9/11/1998 53 73 36 NWSE

GST

STO, CBM

State 33C-3633

385

201.5

25 No

Yes

P111709W

9/11/1998 53 73 36 SENE

GST

STO, CBM

State 42C-3633

303

127.5

25 No

Yes

F-19


Notes:	 Wells with a “Status” code of ABA, A&C, or CAN have been eliminated from the listing provided above, as none of
 these well codes represent a valid current right. A double asterisk (**) in the”Applicant” column represents a 
 separator between parties where multiple parties are involved.


Status Codes	
APP ADJ EXP GST GSI GSM GSE GSX UNA *
1

Use Codes
Monitoring Municipal Reservoir Supply Stock Temporary Test Well

Application CBM Coal Bed Methane MON Adjudicated DEW Dewatering MUN Expired DOM Domestic RES Good Standing DRI Drilling STO Good Standing, Incomplete IND Industrial TEM Good Standing, Map Required IRR Irrigation TST Good Standing, Extended MIS Miscellaneous Good Standing, Extension Requested Unadjudicated* Domestic, Stock, Monitor, Coal Bed Methane and some misc. wells are not adjudicated

YldAct= Actual Yield (gpm)

RECORD SUFFIXES ARE DENOTED AS FOLLOWS: "A"	 Indicates adjudicated or finalized water rights and unless the right is a territorial appropriation, there will be a match in the reference column from one of the following permit types for the unadjudicated portion of the water right.
 "C" Permits Are well statements of claim filed from 1947 to 1957 for wells completed prior to April 1, 1947.
 "G" Permits are well registrations filed for wells completed after April 1, 1947.
 "P" Permits are for stock and domestic use wells completed prior to May 24, 1969 and registered with the State
 Engineer's Office prior to December 31, 1972. "W"	 Permits are for wells with a priority date for the date of filing with the State Engineer.
 Lands described in these copies are the water rights of record in our office and may or may not reflect the actual 
 situation of the ground. Failure to exercise a water right for five (5) years, when water is available, may constitute
 grounds for forfeiture. 


Ground Water Search Area

Township 51N 51N 52N 52N 53N 53N Range 72W 73W 72W 73W 72W 73W Sections
 3, 4, 5, 6 
 1, 2
 2-11, 14-23, 26-35
 1-2, 11-14, 23-26, 35-36
 31-34
 36


Search conducted 3/21/2004

F-20


APPENDIX G
BIOLOGICAL ASSESSMENT FOR THE WEST HAY CREEK LBA TRACT AND BLM SENSITIVE SPECIES EVALUATION

G-1


TABLE OF CONTENTS

ABBREVIATIONS AND ACRONYMS ........................................................................ G-3
 INTRODUCTION......................................................................................................... G-4
 DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES..................... G-4
 The Proposed Action ............................................................................................. G-5
 Alternative 1: No Action Alternative....................................................................... G-7
 Alternative 2: Preferred Alternative ....................................................................... G-7
 Alternative 3 ........................................................................................................... G-9
 CONSULTATION TO DATE ..................................................................................... G-10
 SPECIES HABITAT, OCCURRENCE, AND EFFECTS OF THE PROPOSED 
 PROJECT ................................................................................................................. G-12
 Threatened Species............................................................................................. G-14
 Bald Eagle ...................................................................................................... G-14
 Ute ladies'-tresses .......................................................................................... G-16
 Endangered Species............................................................................................ G-18
 Black-footed Ferret ......................................................................................... G-18
 Candidate Species............................................................................................... G-20
 Black-tailed Prairie Dog .................................................................................. G-20
 SUMMARY OF DETERMINATIONS......................................................................... G-21
 REGULATORY REQUIREMENTS AND MITIGATION............................................. G-21
 CUMULATIVE IMPACTS.......................................................................................... G-23
 BLM SENSITIVE SPECIES EVALUATION .............................................................. G-26
 Introduction .......................................................................................................... G-26
 Species Occurrence and Habitat Description ...................................................... G-26
 Mountain Plover.............................................................................................. G-26
 CREDENTIALS OF SURVEY PERSONNEL............................................................ G-31
 Thunderbird Wildlife Consulting, Inc. ................................................................... G-31
 REFERENCES.......................................................................................................... G-32
 FIGURES
 Figure G-1 West Hay Creek LBA Tract Configurations............................................ G-6
 Figure G-2 West Hay Creek LBA Preferred Alternative Tract Configuration............ G-8
 Figure G-3 Buckskin Mine Federal Coal Leases and the West Hay Creek LBA 
 Tract as Applied For.......................................................................... G-11
 Figure G-4 T&E Animal Species Survey Areas for the West Hay Creek LBA
 Tract................................................................................................. G-13
 TABLES Table G-1: Evaluation of Effects on Federal Threatened, Endangered, Proposed,
 and Candidate Species in the Area of the West Hay Creek LBA 
 Tract.................................................................................................. G-21
 Sensitive Species List – Buffalo Resource Area .................................. G-27


Table G-2:

G-2


ABBREVIATIONS AND ACRONYMS 


BLM CBM CFR COE EIS ESA FS FLPMA FWS LBA MLA OSM PRB PRES SMCRA T&E TWC WDEQ WDEQ/LQD

Bureau of Land Management coal bed methane Code of Federal Regulations US Army Corps of Engineers environmental impact statement Endangered Species Act of 1973 Forest Service Federal Land Policy Management Act of 1976 Fish and Wildlife Service lease by application Mineral Leasing Act of 1920 Office of Surface Mining Reclamation & Enforcement Powder River Basin Powder River Eagle Studies Surface Mining Control and Reclamation Act of 1977 threatened and endangered Thunderbird Wildlife Consulting, Inc. Wyoming Department of Environmental Quality Wyoming Department of Environmental Quality/Land Quality Division Wyoming Game and Fish Department

WGFD

G-3


INTRODUCTION On August 31, 2000, Triton Coal Company, LLC (Triton) filed an application with the Bureau of Land Management (BLM) for federal coal reserves in a tract located north of and adjacent to the Buckskin Mine in Campbell County, Wyoming. The environmental impacts of leasing this lease by application (LBA) tract are evaluated in the environmental impact statement (EIS) for the West Hay Creek Lease Application. The purpose of this biological assessment is to provide information about the potential environmental effects that leasing the West Hay Creek LBA tract would have on federally endangered, threatened, proposed, and candidate species. Threatened and endangered (T&E) species are managed under the authority of the Endangered Species Act (ESA) of 1973 (PL 93-205, as amended). The ESA requires federal agencies to ensure that all actions which they authorize, fund, or carry out are not likely to jeopardize the continued existence of any endangered or threatened species, or result in the destruction or adverse modification of their critical habitat. This biological assessment was prepared to display the possible effects to endangered, threatened, experimental, proposed, or candidate wildlife or vegetative species (terrestrial and aquatic) known to occur or that may occur within the area influenced by the Preferred Alternative of the BLM. It was prepared in accordance with section 7 of the ESA. The objectives of this biological assessment are to comply with the requirements of the ESA which states that actions of federal agencies should not jeopardize or adversely modify critical habitat of federally listed species, and to provide a process and standard by which to ensure that threatened, endangered, and proposed species receive full consideration in the decision-making process. The Wyoming BLM has also prepared a list of sensitive species to focus species management efforts towards maintaining habitats under a multiple use mandate. The authority for this policy and guidance comes from the ESA of 1973, as amended; Title II of the Sikes Act, as amended; the Federal Land Policy and Management Act (FLPMA) of 1976; and Department Manual 235.1.1A. DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES The Proposed Action, which is to lease the federal coal in West Hay Creek LBA tract as applied for, and three alternatives to that proposed action are analyzed in the final EIS. Under Alternative 1, which is the No Action alternative, BLM would reject the application to lease the West Hay Creek LBA tract. Alternatives 2 and 3 evaluate leasing a tract that has been modified by BLM. BLM’s Preferred Alternative is Alternative 2, which is to lease a tract that includes the applied-for tract and some federal coal adjacent to that tract.

G-4

Under the Proposed Action and Alternatives 2 and 3 (action alternatives) for the West Hay Creek LBA tract, if a decision is made to hold a competitive lease sale and there is a successful bidder at that sale, a lease would be issued to the successful bidder for the federal coal included in the tract. The Proposed Action and action alternatives considered in this EIS assume that Triton would be the successful bidder if a competitive sale is held, and that the West Hay Creek LBA tract would be mined as a maintenance lease to extend the life of the adjacent existing Buckskin Mine. As a result, under the Proposed Action and the action alternatives, existing facilities and roads would be used to mine the coal included in the tract. Employment would increase from 199 to 225 with or without selection of the Preferred Alternative. BLM does not authorize mining by issuing a lease for federal coal, but the impacts of mining the coal are considered at the leasing stage because it is a logical consequence of issuing a maintenance lease to an existing coal mine. Under the Proposed Action and action alternatives, it is assumed that an area larger than the tract would have to be disturbed in order to recover all of the coal in the tract. The disturbances outside the coal removal area would be due to activities like overstripping, matching undisturbed topography, and constructing flood control and sediment control structures. Under the Proposed Action and action alternatives, the LBA tract lies entirely within the currently approved mine permit area for the Buckskin Mine. The coal mining unsuitability criteria listed in the federal coal management regulations (43 CFR 3461) have been applied to high to moderate coal development potential lands in the Wyoming Powder River Basin (PRB). None of the lands included in the West Hay Creek LBA tract under any of the alternatives considered in this EIS have been determined to be unsuitable for mining. Additional discussion follows in the Consultation to Date section. The Proposed Action Under the Proposed Action, BLM would hold a competitive coal lease sale and issue a maintenance lease to the successful bidder for the West Hay Creek LBA tract as applied for by Triton. The tract as applied for is shown in figure G-1. The legal description of the West Hay Creek LBA tract as applied for is as follows;
T. 52 N., R. 72 W., 6th P.M., Campbell County, Wyoming Section 17: Lot 5 (S2S2) 6 (S2S2) 7 (S2S2) 8 (S2S2) 9-14, inclusive; Lot 13 (E2) 20 (E2) 10.265 10.265 10.3475 10.3475 247.24 21.035 20.75

Section 18:

G-5


R. 73 W.

R. 72 W.

7

8

9

R. 73 W.

R. 72 W.

7

8

9

18

17

16

18

17

16

19

20

21

19

20

21

T. 52 N.

T. 52 N.

WEST HAY CREEK LBA TRACT AS APPLIED FOR (Proposed Action)
R. 73 W. R. 72 W. R. 73 W. R. 72 W.

WEST HAY CREEK LBA TRACT ALTERNATIVE 2

7

8

9

7

8

9

18

17

16

18

17

16

19

20

21

19

20

21

T. 52 N.

T. 52 N.

WEST HAY CREEK LBA TRACT ALTERNATIVE 3

WEST HAY CREEK LBA TRACT ANALYSIS AREA

LEGEND
BUCKSKIN MINE PERMIT BOUNDARY
 WEST HAY CREEK LBA TRACT ANALYSIS AREA
 WEST HAY CREEK LBA TRACT AS APPLIED FOR (Proposed Action)
 AREA ADDED BY BLM UNDER ALTERNATIVE 2
 AREA ADDED BY BLM UNDER ALTERNATIVE 3


Figure G-1.

West Hay Creek LBA Tract Configurations.

G-6


Section 19:

Lot

5 (E2) 12 (E2) 13 (E2) 20 (E2) 2 (W2, W2E2) 3-6, inclusive; 7 (W2, W2 E2) 10 (W2, W2E2) 11-14, inclusive

20.71 20.84 20.935 21.065 31.1175 165.38 31.1325 31.1475 165.52 838.0975 acres

Section 20:

Lot

Total:

The coal estate underlying this tract is owned by the federal government and administered by the BLM. The surface estate on this tract is owned by Triton. Triton estimates that the tract as applied for includes approximately 145 million tons of in-place coal, and that about 130 million tons of that coal would be recoverable. If Triton acquires a lease for the tract, they anticipate mining the coal at a rate of 25 million tons per year, which would extend the life of the existing Buckskin Mine by approximately 5 years; employment would be about 225 persons. Alternative 1: No Action Alternative Alternative 1 is the No Action Alternative. Under the No Action Alternative, the LBA tract would not be leased, but the existing leases at the adjacent Buckskin Mine would be developed according to the existing approved mine plans. Under this alternative, the Buckskin Mine would mine its remaining reserves in approximately 12 years at an average production of 25 million tons per year and average employment would remain at 225 persons. Portions of the surface of the LBA tract will be disturbed due to overstripping to allow coal removal from existing, contiguous Buckskin Mine leases. Selection of this alternative would not preclude leasing and mining of this tract in the future, either as a maintenance tract for an existing operation or as part of a new start mine. Alternative 2: Preferred Alternative In evaluating the West Hay Creek coal lease application, BLM identified a study area, shown in figure G-1 as “West Hay Creek LBA Tract Alternative 2,” which includes unleased federal coal to the north and adjacent to the southeast corner of the tract as applied for. The study area includes approximately 176.2 additional acres and 25 million additional tons of in-place coal. The BLM’s Preferred Alternative would add approximately 83.06 acres to the tract as applied for, including approximately 31.16 acres adjacent to the southeast corner and approximately 51.90 acres to the north (figure G-2). Triton did not include the area to the southeast in their application because their current geologic model does not indicate that any mineable coal is present. BLM is considering adding this area to the lease because, as the model becomes further defined by additional drilling information, there

G-7


12


R. 73 W.

R.
 72
 W.

7


8


9

10 


11
 


13


18


17

16


15


14


24


19


20


21


22


23


25


30


29


28


27


26


36

31


32


33


34

35


T. 52 N. T. 51 N.

T. 52 N. T. 51 N.

1


6


5


4


3

2


12


R. 73 W.

R. 72
 W.

7


8


9


10

11


LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WEST HAY CREEK LBA TRACT AS APPLIED FOR AREA ADDED UNDER BLM'S PREFERRED ALTERNATIVE

Figure G-2.

West Hay Creek LBA Preferred Alternative Tract Configuration.

G-8

may be portions of the area that include mineable coal which would be bypassed if it is not leased with the surrounding coal. BLM’s Preferred Alternative would also add the approximately 51.90 acres north of the tract as applied for in order to allow for more efficient coal recovery and to avoid bypassing potentially mineable federal coal. The legal description of the West Hay Creek LBA tract under the BLM’s Preferred Alternative is: T. 52 N., R. 72 W., 6th P.M., Campbell County, Wyoming
Section 17 Lot 5 (S2) 6 (S2) 7 (S2) 8 (S2) 9-14, inclusive; Lot 12 (SE4) 13 (E2) 20 (E2) Lot 5 (E2) 12 (E2) 13 (E2) 20 (E2) 2 (W2, W2E2) 3-6, inclusive 7 (W/2, W2E2) 10 (W2, W2E2) 11-14, inclusive 15 (W2, W2E2) 20.53 20.53 20.695 20.695 247.24 10.6725 21.035 20.75 20.71 20.84 20.935 21.065 31.1175 165.38 31.1325 31.1475 165.52 31.1625 921.1575 acres

Section 18:

Section 19:

Section 20:

Lot

Total:

The coal estate underlying this tract is owned by the federal government and administered by the BLM. The surface estate on this tract is owned by Triton. Triton estimates that the modified tract includes approximately 160 million tons of inplace coal, and that about 140 million tons of that coal would be recoverable. If Triton acquires a lease for the tract, they anticipate mining the coal at a rate of 25 million tons per year which would extend the life of the existing Buckskin Mine by approximately 6 years; employment would be about 225 persons. Alternative 3 Alternative 3 also considers holding a competitive coal lease sale and issuing a maintenance lease to the successful bidder for a reconfigured tract which would add 31.16 acres to the southeast corner of the tract as applied for (figure G-1). Triton did not include this area in their application because their current geologic model does not indicate that any mineable coal is present. BLM is considering adding this area to the

G-9


lease because, as the model becomes further defined by additional drilling information, there may be portions of the area that include mineable coal which would be bypassed if it is not leased with the surrounding coal. CONSULTATION TO DATE The locations of the existing Buckskin Mine coal leases, the existing approved mine permit area, and the West Hay Creek LBA tracts are shown in figure G-3. The Buckskin Mine and West Hay Creek LBA tract are included in the area evaluated for acceptability for further lease consideration as part of the coal screening process. The coal screening process is a four-part process that includes application of the coal unsuitability criteria, which are defined in 43 CFR 3461.5 and listed in appendix B of this EIS. The coal unsuitability criteria were applied to federal coal lands in Campbell and Converse counties in the early 1980s by the BLM and Forest Service (FS). Consultation with the US Fish and Wildlife Service (FWS) occurred in conjunction with the unsuitability findings under criterion 9 (Critical Habitat for Threatened or Endangered Plant and Animal Species), criterion 11 (Bald or Golden Eagle Nests), criterion 12 (Bald and Golden Eagle Roost and Concentration Areas), criterion 13 (Falcon Nesting Site(s) and Buffer Zone(s), and criterion 14 (Habitat for Migratory Bird Species). In 1993, BLM, FS, and FWS began the process of reapplying these criteria to federal coal lands in Campbell, Converse, and Sheridan Counties. The results of this analysis are included as appendix D in the 2001 Approved Resource Management Plan for Public Lands Administered by the Bureau of Land Management Buffalo Field Office. Appendix B of this EIS summarizes the unsuitability criteria, describes the general findings for the previous screening analyses discussed above, and presents the findings for the West Hay Creek LBA tract based on the current information. Consultation with FWS was previously conducted for the area within the Buckskin Mine’s existing approved mining permit area (figure G-3), including the entire West Hay Creek LBA tract under the Proposed Action and all of the Alternatives as part of the mining and reclamation permit approval process. The Buckskin Mine was initially permitted in 1980. In 2000, Triton acquired a lease for the Belco Exchange tract, adjacent to the Buckskin Mine, and began the process of amending their existing mine permit to include that tract. In 2002, the Buckskin Mine Hay Creek permit amendment was approved. The West Hay Creek LBA tract and anticipated disturbance area lie completely within the Buckskin Mine permit area as amended by the Hay Creek permit amendment action. A letter dated January 23, 2001, from Mike Long, FWS, Cheyenne, Wyoming, to Don Crecelius, Wyoming Department of Environmental Quality/ Land Quality Division (WDEQ/LQD), Sheridan, Wyoming, is included in the March 2002 mining plan decision document for the Buckskin Mine Hay Creek permit amendment. This letter indicates that no impacts to threatened or endangered species, or species proposed for listing, are anticipated from the Hay Creek permit amendment action, as proposed. A second letter from Mike Long, FWS, to Don Crecelius, WDEQ/LQD, indicates that the raptor and migratory birds of high federal interest plans for the Buckskin Mine Hay Creek permit amendment had been approved.

G-10

12

R. 73 W.

R.
 72 W.


7


8


9

10

11 


13

18

17

16

15

14


24


19


20


21

22

23


25

30

29


28


27

26


36

31

32


33


34

35


T. 52 N. T. 51 N.

T. 52 N. T. 51 N.

1

6

5

4

3

2


12

R. 73 W.

R. 72
 W.


7

8


9

10


11


LEGEND

BUCKSKIN MINE PERMIT BOUNDARY
 WEST HAY CREEK LBA TRACT AS APPLIED FOR
 W-0325878
 WYW-129205
 WYW-78634
 WYW-150152


Figure G-3.

Buckskin Mine Federal Coal Leases and the West Hay Creek LBA Tract as Applied For.

G-11


FWS provided BLM the following list of federally-listed threatened and endangered species, species proposed for listing, and candidate species that may be present in the project area in a memorandum dated August 2, 2002 (FWS 2002). Birds Bald eagle (Haliaetus leucocephalus): threatened (proposed for delisting) Mountain plover (Charadrius montanus): proposed threatened Mammals Black-footed ferret (Mustela nigripes): endangered Black-tailed prairie dog (Cynomys ludovicianus): candidate Plants Ute ladies’-tresses (Spiranthes diluvialis): threatened On September 9, 2003, FWS published a withdrawal of the proposed rule to list the mountain plover as threatened (FWS 2003). The FWS has advised BLM that they will no longer be reviewing project impacts to the mountain plover under the ESA; however, they encourage provisions that would provide protection for this species, as it continues to be protected under the Migratory Bird Treaty Act. FWS submitted comments on the draft EIS for the West Hay Creek coal lease application on June 3, 2003 (FWS 2003a). This appendix has been revised in response to those review comments. SPECIES HABITAT, OCCURRENCE, AND EFFECTS OF THE PROPOSED PROJECT The Buckskin Mine, currently operated by Triton, began producing coal in 1983. Wildlife surveys conducted for the Buckskin Mine began in 1977. Thunderbird Wildlife Consulting, Inc. (TWC), formerly Powder River Eagle Studies (PRES) have conducted annual wildlife monitoring surveys at Buckskin Mine from 1984 through 2003. The study area has included most of the LBA analysis area throughout TWC’s monitoring timeframe (Figure G-4). The wildlife monitoring is designed to meet the WDEQ/LQD and federal requirements for annual monitoring and reporting of wildlife activity on coal mining areas. Detailed procedures and site-specific requirements have been carried out as approved by Wyoming Game and Fish Department (WGFD) and FWS. The monitoring program is conducted in accordance with appendix B of WDEQ/LQD Coal Rules and Regulations. Background information on T&E species in the vicinity of the Buckskin LBA tract was drawn from several sources, including WGFD and FWS records and personal contacts with WGFD and FWS biologists. Site-specific data for the proposed lease area was obtained from sources including WDEQ/LQD permit applications and annual reports for the Buckskin Mine. Baseline

G-12


1 2


R. 73 W.

R.
 72
 W.

6

5

4

3


12


7


8

9


10

13


18

17

16

15


24


19


20


21

22


25


30

29

28

27


36

31

32

33

34


T. 52 N. T. 51 N. R. 73 W. R. 72
 W.

T. 52 N. T. 51 N.


LEGEND
BUCKSKIN MINE PERMIT BOUNDARY WILDLIFE MONITORING SEARCH BOUNDARY (INCLUDING T&E SPECIES) WEST HAY CREEK LBA TRACT AS APPLIED FOR AREA ADDED UNDER BLM'S PREFERRED ALTERNATIVE BLACK TAILED PRAIRIE DOG COLONY

Figure G-4.

T&E Animal Species Survey Areas for the West Hay Creek LBA Tract.

G-13


wildlife monitoring was conducted on the analysis area concurrent with the analysis conducted for the Hay Creek permit amendment (February 1999 through February 2000). The objectives of this baseline survey were to collect both qualitative and quantitative data on vertebrate occurrence, abundance and habitat affinity on the study area. The LBA tract and adjacent area consists primarily of uplands. The topography is level to rolling, with some areas sloping to steeply sloping. Sagebrush-grassland and grassland are the principal native habitat types in the south and eastern portions of the analysis area. Agricultural pasturelands and croplands dominate the northwest quarter of the analysis area. Hay Creek, an ephemeral headwater stream in the regional drainage network of the Little Powder River, flows from west to east through the northern portion of the tract. Its confluence with the Little Powder River is about 3 miles east of the LBA tract. There is bottomland habitat along Hay Creek. No designated critical, crucial, or unique habitats are present. Several stockponds and natural pools exist on the analysis area. Within the analysis area, there are 37 cottonwoods in a shelterbelt located near the center of section 20, T. 52 N., R. 72 W. Threatened Species Bald Eagle (Haliaetus leucocephalus) Biology and Habitat Requirements. On February 14, 1978, the bald eagle was listed as endangered in all of the conterminous United States except Minnesota, Wisconsin, Michigan, Oregon, and Washington, where it was classified as threatened (43 F.R. 6233). The FWS reclassified the bald eagle from endangered to threatened throughout its range in the lower 48 states on July 12, 1995 (60 F.R. 36000). The bald eagle was proposed for delisting on July 6, 1999 (64 F.R. 36454). Currently, the proposal has not been finalized or withdrawn. Bald eagles nest primarily in remote areas that are free of disturbance and contain large trees that are within one mile of water bodies containing reliable fisheries. In Wyoming, this species builds large nests in the crowns of large mature trees such as cottonwoods or pines. Typically, there are alternate nests within or in close proximity to the nest stand. Snags and open-canopied trees near the nest site and foraging areas provide favorable perch sites. Old-growth stands with their structural diversity and open canopies are an important habitat for bald eagles. This species is a common breeding resident in some areas of Wyoming. Bald eagles use mixed coniferous and mature cottonwood-riparian areas near large lakes or rivers as nesting habitat (Luce et al. 1999). Food availability is probably the single most important determining factor for bald eagle distribution and abundance (Steenhof 1976). Fish and waterfowl are the primary sources of food. Big game and livestock carrion, as well as larger rodents (prairie dogs) also can be important dietary components where these resources are available (Ehrlich et al. 1988). Bald eagles are opportunistic foragers. They prefer to forage in areas with

G-14


the least human disturbance (FWS 1978, McGarigal et al. 1991). Bald eagles that have open water or alternate food sources near their nesting territories may stay for the winter; other eagles migrate southward to areas with available prey. During migration and in winter, eagles often concentrate on locally abundant food resources and tend to roost communally. Communal roosts usually are located in stands of mature old growth conifers or cottonwoods. Large, live trees in sheltered areas provide a favorable thermal environment and help minimize the energy stress encountered by wintering eagles. Communal roosting also may facilitate food finding (Steenhof 1976) and pair bonding. Freedom from human disturbance is also important in communal roost site selection (Steenhof et al. 1980, U.S. Bureau of Reclamation 1981, FWS 1986, Buehler et al. 1991). Continued human disturbance of a night roost may cause eagles to abandon an area (Hansen et al. 1981, Keister 1981). The proximity of night roosts to the other habitats required by wintering eagles, such as hunting perches and feeding sites, is important (Steenhof et al. 1980). Roosts may be several miles from feeding sites. The absence of a suitable roost may limit the use of otherwise suitable habitat. Existing Environment. Bald eagles are relatively common winter residents and migrants in northeastern Wyoming’s PRB. No suitable roosting habitat, known nest sites, or concentrated prey or carrion sources for bald eagles have been identified during baseline or annual wildlife surveys in the West Hay Creek analysis area. Historically, this species has infrequently been seen foraging in the general vicinity of Buckskin Mine. The 1999-2000 baseline wildlife surveys conducted by PRES in the analysis area and the accessible 2-mile perimeter, which included surveys for bald eagle nests and potential roost sites, identified no nests or roosts. Two bald eagles were recorded during those baseline studies, both in March 1999. PRES has conducted annual wildlife studies at the Buckskin Mine since 1984 and has prepared their raptor mitigation plans for the WDEQ/LQD permit. Effects of the Proposed Project. Mining the federal coal included in the West Hay Creek LBA tract, if the tract is leased under the Proposed Action or one of the action alternatives, including the BLM’s Preferred Alternative, may affect, but is not likely to adversely affect, bald eagles or their habitat. If the federal coal in the West Hay Creek LBA tract is leased, there would be an expansion in the area of human disturbance on the tract that could impact wintering bald eagles in the area. Freedom from disturbance is important in forage, nest, and roost site selection. Disturbance to nesting eagles can cause nest failure, nest abandonment, and unsuccessful fledging of young. There have been and currently are no known nest sites on the West Hay Creek LBA tract or within the anticipated mine permit area under the Proposed Action or action alternatives. No suitable roosting habitat or concentrated prey or carrion sources for bald eagles are present on the West Hay Creek LBA tract analysis area under the Proposed Action or action alternatives, including the Preferred Alternative. Bald eagle foraging habitat would be lost during mining and before reclamation. The loss of any potential prey habitat would be short-term. Foraging habitat lost during mining would be replaced during reclamation. Eagles may alter foraging patterns as they avoid active

G-15


mining areas. The potential for bald eagles to collide with or be electrocuted by electric power lines on the mine site would be minimal due to use of properly designed power lines to avoid electrocution of raptors, which is required by the Wyoming Coal Mining Rules and Regulations. Use of the roads accessing the Buckskin Mine by mine-related traffic would continue when the West Hay Creek tract is mined, which may result in vehicular collisions and roadside carcasses for up to six additional years. The presence of roadside carcasses can result in bald eagle foraging along roads, which creates the potential for road kills of foraging bald eagles to occur. The applicant has not projected an increase in employees if the West Hay Creek tract is leased and therefore an increase in the volume or frequency of traffic on roads accessing Buckskin Mine is not anticipated. Cumulative Effects. Mineral development, including coal bed methane (CBM) development, conventional oil and gas development, and surface coal mining, is a leading cause of habitat loss within the PRB. CBM development has occurred and is proposed in the analysis area. Surface coal mining has been ongoing in the area for more than 25 years. In the Final Biological and Conference Opinion for the Powder River Basin Oil and Gas Project, the FWS states that they believe that “as a direct result of the construction of approximately 7,136 miles of new improved roads and 5,311 miles of overhead distribution lines, there will be direct loss of bald eagles” in the PRB (FWS 2002a). Ute ladies'-tresses (Spiranthes dilavialis) Biology and Habitat Requirements. Ute ladies'-tresses was listed as threatened on January 17, 1992 due to a variety of factors, including habitat loss and modification, and hydrological modifications of existing and potential habitat areas. At the time of listing, Ute ladies'-tresses was only known from Colorado, Utah, and extreme eastern Nevada. It was next discovered in Idaho in September 1996. It is currently known from western Nebraska, southeastern Wyoming, north-central Colorado, northeastern and southern Utah, east-central Idaho, southwestern Montana, and central Washington. Ute ladies'-tresses is a perennial herb with erect, glandular-pubescent stems 12 to 50 centimeters tall arising from tuberous-thickened roots. This species flowers from late July to September. Plants probably do not flower every year and may remain dormant below ground during drought years. The total known population of this species is approximately 25,000 to 30,000 individuals. Occurrences range in size from one plant to a few hundred individuals. Ute ladies'-tresses occurs primarily on moist, subirrigated or seasonally flooded soils in valley bottoms, gravel bars, old oxbows, or floodplains bordering springs, lakes, rivers, or perennial streams at elevations between 1,780 and 6,800 feet (ft) in elevation (Fertig and Beauvais 1999). Suitable soils vary from sandy or coarse cobbley alluvium to calcareous, histic or fine-textured clays and loams. Populations have been documented from alkaline sedge meadows, riverine floodplains, flooded alkaline meadows adjacent to ponderosa pine, Douglas-fir woodlands, sagebrush steppe, and streamside

G-16

floodplains. Some occurrences are also found on agricultural lands managed for winter or early season grazing or hay production. Known sites often have low vegetative cover and may be subjected to periodic disturbances such as flooding or grazing. Populations are often dynamic and "move" within a watershed as disturbances create new habitat or succession eliminates old habitat (Fertig and Beauvais 1999). The orchid is well adapted to disturbances from stream movement and is tolerant of other disturbances (grazing) that are common to grassland riparian habitats (FWS 1995). Ute ladies'-tresses colonize early successional riparian habitats such as point bars, sand bars, and low-lying gravelly, sandy, or cobbley edges, persisting in those areas where the hydrology provides continual dampness in the root zone through the growing season. The orchid establishes in heavily disturbed sites, such as revegetated gravel pits, heavily grazed riparian edges, and along well-traveled foot trails on old berms (FWS 1995). The species occurs primarily in areas where the vegetation is relatively open and not overly dense, overgrown, or overgrazed. Ute ladies'-tresses orchid is commonly associated with horsetail, milkweed, verbena, blue-eyed grass, reedgrass, goldenrod, and arrowgrass. This species is known from four occurrences in Wyoming, within Converse, Goshen, Laramie, and Niobrara counties, all discovered between 1993 and1997 (Fertig and Beauvais 1999). One of these occurrences is recorded from northwestern Converse County, within the Antelope Creek watershed. Existing Environment. Potential habitat for Ute ladies-tresses orchid was surveyed within the Hay Creek amendment baseline study area, which includes the West Hay Creek LBA tract, by Habitat Management, Inc. in 1999. The surveys were managed and conducted by Habitat Management, Inc. personnel who are recognized as being qualified to conduct Ute ladies’-tresses surveys by the FWS Colorado Field Services Office. Habitat Management, Inc. met with FWS personnel in Cheyenne, Wyoming on August 30, 1999, to discuss acceptable survey methods and practices. A total of 17.52 acres of jurisdictional wetlands were identified in the West Hay Creek LBA tract. All wetland areas and nonjurisdictional waters of the US were included in the survey area. All wet meadow wetland and lowland prairie vegetation community types were surveyed. Pedestrian surveys were completed from July 25 through August 4, 1999 and August 31 through September 3, 1999. No Ute ladies’-tresses were observed during this survey, and none have been identified during surveys for other mines in this area. Effects of the Proposed Project. Mining the federal coal included in the West Hay Creek LBA tract, if the tract is leased under the Proposed Action or the action alternatives, may affect, but is not likely to adversely affect, Ute ladies’-tresses. Typical suitable habitat for this species is rare in the LBA tract analysis area. No individuals were located during surveys of potentially suitable habitat on the tract during blooming season in 1999. Ute ladies’-tresses individuals have not been found during surveys conducted for other surface coal mines in this area or other surveys in this area of Wyoming. Because of this plant’s ability to persist below ground or above ground without flowering, single season surveys that meet the current FWS survey guidelines

G-17


may not detect populations. If undetected populations are present, they could be lost to surface-disturbing activities. Cumulative Effects. Alterations of stream morphology and hydrology are believed to have destroyed Ute ladies’-tresses from most of its historical range (FWS 2002b). Disturbance and reclamation of streams by surface coal mining may alter stream morphology and hydrology. Water produced by CBM development and discharged on the surface may also alter stream morphology and hydrology. Jurisdictional wetlands located within the West Hay Creek LBA tract that are destroyed by mining operations would be replaced in accordance with the requirements of section 404 of the Clean Water Act, as determined by the Corps of Engineers (COE). The replaced wetlands may not duplicate the exact function and landscape features of the pre-mine wetlands. COE considers the type and function of each jurisdictional wetland that will be impacted and determines the ratio of restored wetlands to disturbed wetlands. If the COE determines that the restored wetlands will not completely replace the type and function of the original wetlands, they may require restoration of additional acres. WDEQ/LQD allows and sometimes requires mitigation of nonjurisdictional wetlands affected by mining, depending on the values associated with the wetland features. Endangered Species Black-footed Ferret (Mustela nigripes) Biology and Habitat Requirements. The black-footed ferret is a federally-listed endangered species. The black-footed ferret historically occurred throughout Texas, Oklahoma, New Mexico, Arizona, Utah, Kansas, North and South Dakota, Montana, Wyoming, Nebraska, and Colorado. The black-footed ferret, a nocturnally active mammal, is closely associated with prairie dogs, depending almost entirely on the prairie dog for its survival. The decline in ferret populations has been attributed to the reduction in the extensive prairie dog colonies that historically existed in the western US. Ferrets may occur within colonies of white-tailed or black-tailed prairie dogs. The FWS has determined that, at a minimum, potential habitat for the black-footed ferret must include a single white-tailed prairie dog colony greater than 200 acres, or a complex of smaller colonies within a 4.3 mile (7 km) radius circle totaling 200 acres (FWS 1989). Minimum colony size for black-tailed prairie dog is 80 acres (FWS 1989). The last known wild population of black-footed ferrets was discovered in Meeteetse, Wyoming. Individuals from this population were captured and raised in protective captive breeding facilities in an effort to prevent the species' extinction (Clark and Stromberg 1987). Recent survey efforts in the Shirley Basin have identified a population at this former re­ introduction site. This is the only known population in Wyoming. There are no prairie dog towns located within the LBA tract. Existing Environment. The West Hay Creek LBA tract is within the historical range of the black-footed ferret, although no black-footed ferrets are presently known to occur

G-18


within northeastern Wyoming. Surveys to identify any populations of this species within the area administered by the BLM Buffalo Field Office (Campbell, Johnson, and Sheridan counties, Wyoming), including multiple years of wildlife surveys covering the Buckskin Mine and surrounding area, have been unsuccessful. This endangered species is found almost exclusively living in prairie dog colonies. The Bureau of Sport Fisheries and Wildlife estimated that there were approximately 49,000 remaining acres of black-tailed prairie dog colonies in Wyoming in 1961. Strychnine and 1080 poisoning was banned in 1972, but colonies had declined to less than the estimated 1961 levels in Wyoming in the intervening time. Increases in occupied black-tailed prairie dog habitat did occur following the ban of strychnine and 1080, but the black-tailed prairie dog population has been declining recently due to the impacts of sylvatic plague combined with loss of suitable habitat and inadequate regulatory mechanisms (FWS 2000). During the 1980s, the WGFD, in cooperation with other agencies, conducted searches for black-footed ferrets in Wyoming in the places they were most likely to be found, but these searches were not successful, according to Martin Grenier with the WGFD (Martin Grenier, personal communication, 10/14/2003). The FWS has been coordinating with the WGFD about the current and historic status of prairie dog towns throughout Wyoming and reviewing the history of black-footed ferret surveys to determine whether black-footed ferret survey guidelines should continue to be applied across the entire state. Through this process, the FWS has developed a list of blocks of habitat that are not likely to be inhabited by black-footed ferrets and for which surveys for ferrets are no longer recommended. All black-tailed prairie dog towns in Wyoming were cleared from recommendation for ferret surveys through this process (FWS 2004). No prairie dog colonies are currently located on or within ½-half mile of the West Hay Creek LBA tract (figure G-4). No evidence of ferrets has ever been recorded by qualified biologists during general or specific surveys in the Buckskin Mine area. Effects of the Proposed Project. Mining the federal coal included in the West Hay Creek LBA tract, if the tract is leased under the Proposed Action or the action alternatives, will have no effect on black-footed ferrets. Black-tailed prairie dog occupied habitat has declined significantly from historic estimates and the species seems to be scattered throughout its historic range in eastern Wyoming. Prior to 1972, use of strychnine and 1080 to poison black-tailed prairie dogs contributed to declines in their populations in Wyoming. Recent declines are largely attributed to sylvatic plague and are likely to continue (FWS 2000). The reductions in black-tailed prairie dog populations reduced the potential for black-footed ferret survival in northeastern Wyoming. Searches of the best remaining black-footed ferret habitat in Wyoming during the 1980s were unsuccessful in finding any ferrets. Baseline wildlife surveys and annual wildlife surveys conducted for over 25 years by mines in the area have also been unsuccessful in finding any black-footed ferrets or signs of black-footed ferrets. Cumulative Effects. Mineral development within black-tailed prairie dog colonies is a leading cause of ferret habitat loss in the PRB. Surface coal mining tends to have more intense impacts on fairly localized areas, while oil and gas development tends to be less intensive but spread over larger areas. Oil and gas development and mining activities

G-19


have requirements for reclamation of disturbed areas as the resources are depleted. The vegetation cover in reclaimed areas may differ from undisturbed areas. Surface coal mines re-establish species in the reclamation seed mixtures in their approved WDEQ/LQD permit. The majority of the approved species are native to the area; however reclaimed areas may serve different ecosystem functions than those served by the undisturbed vegetation communities and habitats. Natural shifts in habitat composition or distribution over the long term could also increase or decrease potential habitat for prairie dogs in reclaimed areas. Potential black-footed ferret habitat is also affected by other impacts to prairie dog populations. Plague can infect and eliminate entire prairie dog colonies (see blacktailed prairie dog discussion presented below). Poisoning and recreational shooting may locally reduce prairie dog populations, but seldom completely eliminate colonies. Candidate Species Black-tailed Prairie Dog (Cynomys ludovicianus) Biology and Habitat Requirements. The black-tailed prairie dog was added to the list of candidate species for federal listing on February 4, 2000 (FWS 2000). At that time, the FWS concluded that listing the black-tailed prairie dog was warranted but precluded by other higher priority actions to amend the lists of T&E species. No specific date for proposal for listing was given, but the FWS committed to reviewing the status of the species one year after publication of the above-mentioned notice (FWS 2000). In June 2002, FWS found that the listing proposal for the black-tailed prairie dog was still warranted but precluded (FWS 2002c). As of May 2004, FWS had not updated the finding with respect to the black-tailed prairie dog (FWS 2004a) The black-tailed prairie dog is a highly social, diurnally active, burrowing mammal. Aggregations of individual burrows, known as colonies, form the basic unit of prairie dog populations. Found throughout the Great Plains in shortgrass and mixed-grass prairie areas (Fitzgerald et al. 1994), the black-tailed prairie dog has declined in population numbers and extent of colonies in recent years. The three major impacts that have influenced black-tailed prairie dog populations are the initial conversion of prairie grasslands to croplands in the eastern portion of its range from approximately the 1880s to the 1920s; large-scale control efforts conducted from approximately 1918 through 1972, when an executive order was issued banning the use of compound 1080; and the introduction of sylvatic plague into North American ecosystems in 1908 (FWS 2000). In Wyoming, this species is primarily found in isolated populations in the eastern half of the state (Clark and Stromberg 1987). In 2000, the FWS estimated that about 125,000 acres of black-tailed prairie dog occupied habitat exists in Wyoming (FWS 2000). Many other wildlife species, such as the black-footed ferret, swift fox, mountain plover, ferruginous hawk, and burrowing owl are dependent on the black-tailed prairie dog for some portion of their life cycle (FWS 2000). The species is considered a common resident, using shortgrass and mid-grass habitats

G-20


in eastern Wyoming (Luce et al. 1999). Existing Environment. Recent wildlife surveys indicate that no prairie dog colonies are present within the West Hay Creek LBA tract analysis area (Triton 2000). There is one prairie dog colony located approximately 1 mile northeast of the tract (figure G-4). Effects of the Proposed Project. Mining the federal coal included in the West Hay Creek LBA tract, if the tract is leased under the Proposed Action or one of the action alternatives, will not affect the continued existence of prairie dogs. No prairie dog towns are currently located on the tract. Habitat where prairie dogs could establish towns would be lost during mining but would be replaced as reclamation occurs on already mined areas. SUMMARY OF DETERMINATIONS Table G-1 summarizes the determinations for federally listed threatened, endangered, proposed, and candidate species in the area of the West Hay Creek LBA tract that may result from implementing the Proposed Action or action alternatives. TABLE G-1 
 EVALUATION OF EFFECTS ON FEDERAL THREATENED, ENDANGERED, 
 PROPOSED, AND CANDIDATE SPECIES IN THE AREA OF THE WEST HAY 
 CREEK LBA TRACT 
 Status
Threatened

Name
Bald eagle (Haliaetus leucocephalus) Ute ladies’ - tresses (Spiranthes diluvialis)

Potential Effect
May affect1 May effect1

Endangered

Black-footed ferret (Mustela nigripes) Black-tailed prairie dog (Cynomys ludovicianus)

No effect

Candidate
1

No effect

Not likely to adversely affect individuals or populations.

REGULATORY REQUIREMENTS AND MITIGATION The issuance of a federal coal lease grants the lessee the exclusive right to mine the coal, subject to the terms and conditions of the lease. Lease ownership is necessary for mining federal coal, but lease ownership does not authorize mining operations. Surface coal mining operations are regulated in accordance with the requirements of Wyoming

G-21

State regulations. The SMCRA gives the Office of Surface Mining Reclamation and Enforcement (OSM) primary responsibility to administer programs that regulate surface coal mining operations and the surface effects of underground coal mining operations. Pursuant to section 503 of SMCRA, the WDEQ developed, and in November 1980 the Secretary of the Interior approved, a permanent program authorizing WDEQ to regulate surface coal mining operations and surface effects of underground mining on nonfederal lands within Wyoming. In January 1987, pursuant to section 523(c) of SMCRA, WDEQ entered into a cooperative agreement with the Secretary of the Interior authorizing WDEQ to regulate surface coal mining operations and surface effects of underground mining on federal lands within the state. In order to get approval of this cooperative agreement, the state had to demonstrate that the state laws and regulations are no less effective than, meet the minimum requirements of, and include all applicable provisions of SMCRA. If the West Hay Creek LBA tract is leased under the Proposed Action or action alternatives, it would be a maintenance lease for the existing Buckskin Mine, which currently has both an approved Mineral Leasing Act of 1920 (MLA) mining plan and an approved state mining and reclamation permit. In the case of maintenance leases, the existing MLA mining plan and state mining and reclamation plan must be amended to include the newly leased areas before they can be mined. The LBA tract is located within the permit area for the existing approved Buckskin Mine MLA mining plan and state mining and reclamation plan, but those plans would have to be amended to include mining the coal in the newly leased area before coal removal could occur. In order to amend the existing MLA mining plan and state mining and reclamation permit, the company would be required to submit a detailed permit application package to WDEQ and OSM before starting surface coal mining operations on the newly acquired leases. WDEQ/LQD would review the permit application package to insure that the permit application complies with the permitting requirements, and that the coal mining operation will meet the performance standards of the approved Wyoming program. If the permit application package does comply, WDEQ would issue the applicant an amended permit that would allow the permittee to extend coal mining operations onto the newly acquired leases. OSM, BLM, and other federal agencies review the permit application package to ensure it complies with the terms of the coal lease, the MLA, NEPA, and other federal laws and regulations. OSM would recommend approval, approval with conditions, or disapproval of the MLA mining plan to the Assistant Secretary of the Interior, Land and Minerals Management. Protection of fish, wildlife, and related environmental values is required under the Wyoming Coal Mining Rules and Regulations, Chapter 4, Section (2)(r)(iii) which state: “No surface mining activity shall be conducted which is likely to jeopardize the continued existence of endangered or threatened species listed by the State or the Secretary of the Interior or which will result in the destruction or adverse modification of designated critical habitats of such species in violation of the Endangered Species Act (16 U.S.C. 1531 et seq.). No surface mining activity shall be conducted in a manner which would result in the unlawful taking of a

G-22

bald or golden eagle, its nest, or any of its eggs. The Administrator shall consult with the State and Federal Fish and Wildlife Agencies to identify whether and under what conditions the operation may continue under this provision.” In addition to requiring the operator to minimize disturbances and adverse impacts on 
 fish, wildlife, and related environmental values and prohibiting any surface mining 
 activity which is likely to jeopardize the continued existence of endangered or 
 threatened species, the regulations require that the operator use the best technology 
 currently available to minimize electrocution hazards to raptors; locate and operate haul 
 and access roads to avoid or minimize impacts on important fish and wildlife species;
 and design fences, conveyors, and other potential barriers to permit passage of large 
 mammals. Both the state and federal regulations require Section 7 consultation prior to 
 approval of a mining and reclamation plan and a MLA mining plan. Additional mitigation 
 measures to ensure compliance with the ESA can be developed when the detailed 
 mining plan, which identifies the actual location of the disturbance areas, how and when 
 they would be disturbed, and how they would be reclaimed, is developed and reviewed 
 for approval. At the leasing stage, a detailed mining and reclamation plan is not 
 available for evaluation or development of appropriate mitigation measures. 
 The following is a partial list of measures that the state of Wyoming has required as part 
 of existing mining and reclamation permits in accordance with the state regulatory 
 requirements and which are: 
 x x x x x avoiding bald eagle disturbance;
 restoring bald eagle foraging areas disturbed by mining; 
 using raptor safe power lines; 
 surveying for Ute ladies’-tresses if habitat is present; 
 surveying for black-footed ferrets in prairie dogs towns potentially affected by mining. 


CUMULATIVE IMPACTS If the West Hay Creek LBA tract is leased as proposed and Triton acquires and mines the coal in the West Hay Creek tract, the mining operations could contribute to cumulative effects to T&E plant and wildlife species in the PRB. Existing habitatdisturbing activities in the PRB in Wyoming and Montana include surface coal mining; conventional oil and gas and CBM development; uranium mining; sand, gravel, and scoria mining; ranching; agriculture; road, railroad, and power plant construction and operation; recreational activities; and rural and urban housing development. Mining and construction activities, agriculture, and urban development tend to have more intense impacts on fairly localized areas, while ranching, recreational activities, and oil and gas development tend to be less intensive but spread over larger areas. Oil and gas development and mining activities have requirements for reclamation of disturbed areas as resources are depleted. The net area of energy disturbance in the Wyoming PRB has been increasing. In the short term, this means a reduction in the available habitat for threatened, endangered, proposed, and candidate plant and wildlife species. In the long term, habitat is being and will continue to be restored as reclamation proceeds.

G-23


Oil and gas exploration and production have been ongoing in the PRB for more than 100 years. Conventional (non CBM) oil and gas fields are, for the most part, concentrated in the central and southern parts of the structural basin. Development of the CBM resources from the coal beds is a more recent occurrence, with CBM production in the Wyoming PRB starting in the late 1980s. According to the Wyoming Oil and Gas Conservation Commission, there were approximately 15,040 oil and gas wells producing in the Wyoming PRB as of October 2003. Most (approximately 12,530) of those wells are CBM wells, the remainder (approximately 2,510) are conventional oil or gas wells (Wyoming Oil and Gas Conservation Commission 2003). Additional wells have been drilled in the basin but have been abandoned or are not yet producing. BLM recently completed an environmental impact statement analyzing projected CBM and conventional oil and gas development in the Wyoming PRB over the next 10 years. The Final Environmental Impact Statement and Proposed Plan Amendment for the Powder River Basin Oil and Gas Project (BLM 2003) analyzed the potential impacts of constructing and operating about 39,400 new CBM wells and 3,200 new conventional wells and associated facilities, starting in 2002 and continuing for 10 years. The project area for this analysis encompasses approximately eight million acres, and includes all or portions of Campbell, Converse, Sheridan, and Johnson counties in northeastern Wyoming. Total projected short-term and long-term disturbance associated with the development under the Preferred Alternative was estimated at 211,643 acres and 102,658 acres respectively. As stated previously, in the Final Biological and Conference Opinion for the Powder River Basin Oil and Gas Project, the FWS states that they believe that “as a direct result of the construction of approximately 7,136 miles of new improved roads and 5,311 miles of overhead distribution lines, there will be direct loss of bald eagles” in the PRB (FWS 2002a). BLM estimates that the existing federal coal leases in the Wyoming PRB include approximately 103,615 acres. The currently pending federal coal LBA tracts (including the West Hay Creek LBA tract) include approximately 18,650 acres. The majority of the coal in the areas permitted for surface coal mining is federal, but some state and private leases are included within some of the existing mine permit areas. All of the existing federal coal leases are concentrated near the outcrop of the Wyodak coal bed, which is located along the eastern edge of the CBM project area discussed above. These active coal operations along the Wyodak outcrop had disturbed approximately 62,200 acres as of 2001. Approximately 16,100 of those acres of disturbance are occupied by “permanent” mine facilities such as roads, buildings, and coal handling facilities, which are not available for reclamation. Of the remaining 46,100 acres which represent areas of disturbance available for reclamation, approximately 24,300 acres had been reclaimed. This information is compiled from BLM lease and WDEQ/LQD mining and reclamation permit databases. There are an estimated 9,500 additional acres of disturbance occupied by facilities indirectly associated with surface coal mining (railroad main line and electrical transmission line).

G-24

In addition to the ongoing coal leasing and mining and oil and gas development, there are other projects that are in progress or have been proposed. These projects include the Wygen II coal-fired power plant proposed near the Wyodak Mine, the Two Elk coalfired power plant proposed near the Black Thunder Mine, and the proposed DM&E railroad line. Other power plants have been proposed in this area but have not progressed beyond very preliminary stages. Most of these proposed projects would be constructed within or adjacent to areas of current disturbance. The proposed DM&E railroad line would represent a new corridor of disturbance across the eastern PRB if it is approved and constructed. The total acreage directly affected by surface coal mining and oil and gas development would not be disturbed simultaneously. Some of the disturbed acreage would be reclaimed or be in the process of being reclaimed as new disturbances are initiated in other areas. There would also be cumulative effects to T&E plant and wildlife resources as a result of indirect impacts. One factor is the potential import and spread of noxious weeds around roads and facilities. Noxious weeds have the ability to displace native vegetation and hinder reclamation efforts. Control of noxious weeds is addressed in surface coal mining and reclamation plans. If weed mitigation and preventative procedures are applied to all construction and reclamation practices, the impact of noxious weeds on T&E plants and wildlife would be minimized. In reclaimed areas, vegetation cover often differs from undisturbed areas. In the case of surface coal mines, re-established vegetation would be dominated by species mandated in the reclamation seed mixtures (approved by WDEQ). The majority of the species in the approved reclamation seed mixtures are native to the area; however, reclaimed areas may not serve ecosystem functions presently served by undisturbed vegetation communities and habitats. In the short-term in particular, species composition, shrub cover, and other environmental factors are likely to differ from predisturbance vegetation communities and habitats. Establishment of noxious weeds and alteration of vegetation in reclaimed areas has the potential to alter T&E plant and wildlife habitat composition and distribution. Potential adverse effects to listed and proposed species that have occurred and would continue to occur as a result of existing and potential future activities in the PRB would include direct loss of habitat, indirect loss of habitat due to human and equipment disturbance, habitat fragmentation, displacement of bald eagle prey species and the resultant change in bald eagle foraging, and mortality caused by equipment activities, motor vehicle collisions, power line collisions, and power line electrocution. The existing mines have developed mitigation procedures, as required by SMCRA (30 CFR 816.97) and Wyoming state regulations, to protect T&E species. These procedural requirements would be extended to include mining operations on the LBA tracts, if they are leased as proposed and after required detailed plans to mine the coal and reclaim the mined-out areas are developed and approved.

G-25

BLM SENSITIVE SPECIES EVALUATION Introduction Wyoming BLM has prepared a list of sensitive species to focus species management efforts towards maintaining habitats under a multiple use mandate. The authority for this policy and guidance comes from the ESA of 1973, as amended; Title II of the Sikes Act, as amended; the Federal Land Policy and Management Act (FLPMA) of 1976; and the Department Manual 235.1.1A., General Program Delegation, Director, BLM. The goals of the sensitive species policy are to: x Maintain vulnerable species and habitat components in functional BLM ecosystems. x Ensure sensitive species are considered in land management decisions. x Prevent a need for species listing under the ESA. x Prioritize needed conservation work with an emphasis on habitat. Species Occurrence and Habitat Description Sensitive species were listed for the BLM Buffalo Field Office within its range. Sensitive species do or could occur on or in the area of the West Hay Creek LBA tract. Specialized habitat requirements (caves, cliffs, calcareous rock outcrops) make occupation for other sensitive species unlikely. Table G-2 lists BLM sensitive species and summarizes their habitat requirements. Please refer to the wildlife sections of Chapters 3 and 4 for additional discussion about the occurrence of and potential impacts to upland game birds, including sage grouse, raptors and Migratory Birds of Management Concern in the area of the West Hay Creek LBA Tract. Potential impacts to mountain plover are discussed below. Mountain Plover (Charadrius montanus) The FWS published a proposed rule to list the mountain plover as threatened in 1999 (FWS l999). As discussed previously. on September 9, 2003, FWS published a withdrawal of the proposed rule to list the mountain plover as threatened (FWS 2003). When the listing petition was withdrawn, the status of the mountain plover changed from a proposed threatened species under the ESA to a BLM sensitive species. Although the FWS will no longer be reviewing project impacts to the mountain plover under the ESA they have advised BLM that they encourage provisions that would provide protection for this species, as it continues to be protected under the Migratory Bird Treaty Act. The following information about mountain plover habitat and occurrence in the West Hay Creek LBA tract analysis area is based on the baseline and annual wildlife surveys that have been conducted for the Buckskin Mine. Biology and Habitat Requirements. The mountain plover is a migratory species of the shortgrass prairie and shrub-steppe eco-regions of the arid West. This species uses

G-26


TABLE G-2 
 SENSITIVE SPECIES LIST - BUFFALO FIELD OFFICE 

Habitat and Occurrence in West Hay Creek Analysis Area Presence1 Project Effects2 Rationale

Common Name (scientific name)

Beaver ponds, permanent water in plains and foothills Ponds, sloughs, small streams. NP NI

S

MIIH

Stock reservoirs & natural pools
 will be impacted.
 Prairie habitat not mountain.


S K K K K K K NP NP S K NP NP NP MIIH MIIH MIIH MIIH MIIH MIIH NI NI MIIH MIIH NI NI NI

MIIH

G-27

Cliffs.
 Never recorded
 Basin-prairie shrub, mountain-foothill shrub. 
 Never recorded
 Basin-prairie shrub, mountain-foothill shrub. 
 Rarely observed.
 Lakes, ponds, rivers
 Marshes, wet meadows
 Open woodlands, streamside willow and alder groves. 
 Never recorded
 Mountain streams and rivers in Yellowstone River drainage

Grasslands, weedy fields.
 Occurrence not recorded
 Basin-prairie shrub.
 Regular breeder.
 Grasslands, basin-prairie shrub.
 Infrequent breeder.
 Basin-prairie shrub, grasslands, rock outcrops.
 Historical breeder.
 Basin-prairie shrub, mountain-foothill shrub. 
 Occasional breeder.
 Basin-prairie shrub, mountain-foothill shrub. 
 Infrequently observed.
 Grasslands, plains, foothills, wet meadows.
 Infrequent spring migrant.
 Conifer and deciduous forests.


Sagebrush cover will be
 affected.
 Sagebrush cover will be
 affected.
 Grassland and shrubland
 habitats will be affected. 
 Grassland and shrubland
 habitats will be affected. 
 Sagebrush cover will be
 affected.
 Sagebrush cover will be
 affected.
 Grassland & wet meadow
 habitats will be affected. 
 Forest habitat limited to 
 cottonwood shelterbelt. 
 No nesting habitat.
 Sagebrush cover will be
 affected.
 Sagebrush cover will be
 affected.
 Suitable habitat not present.
 Permanently wet meadows not
 present.
 Shrub or forest riparian habitats
 not present.
 NP NI Outside species range.

Amphibians Northern leopard frog 
 (Rana pipiens)
 Spotted frog
 (Ranus pretiosa)
 Birds Baird’s sparrow
 (Ammodramus bairdii)
 Brewer’s sparrow
 (Spizella breweri)
 Burrowing owl
 (Athene cunicularia)
 Ferruginous hawk
 (Buteo regalis)
 Greater sage-grouse
 (Centrocercus urophasianus)
 Loggerhead shrike
 (Lanius ludovicianus)
 Long-billed curlew
 (Numenius americanus)
 Northern goshawk
 (Accipiter gentilis)
 Peregrine falcon
 (Falco peregrinus)
 Sage sparrow
 (Amphispiza billneata)
 Sage thrasher
 (Oreoscoptes montanus)
 Trumpeter swan
 (Cygnus buccinator)
 White-faced ibis
 (Plegadis chihi)
 Yellow-billed cuckoo
 (Coccyzus americanus)
 Fish Yellowstone cutthroat trout (Oncoryhynchus clarki bouvieri)

Common Name (scientific name) Presence1 Rationale

Habitat and Occurrence in West Hay Creek Analysis Area

Project Effects2

Mountain foothill shrub, grasslands Conifer forests, woodland chaparral, caves and mines Conifer and deciduous forest, caves and mines Cliffs over perennial water, basin-prairie shrub Grasslands Forests, basin-prairie shrub, caves and mines NS NI S MIIH NP NI NS NI NP NI

S

MIIH

Sagebrush cover will be
 affected.
 Habitat not present.
 Limited cottonwood habitat.
 Habitat not present
 Grassland habitat will be 
 affected.
 Limited cottonwood habitat.


NP NP NP

NI NI NI

Habitat not present. Habitat not present.
 Habitat not present.


G-28


Mammals Dwarf Shrew (Sorex nanus) Fringed myotis (Myotis thysanodes)
 Long-eared myotis (Myotis evotis)
 Spotted bat (Euderma maculatum)
 Swift fox (Vulpes velox) Townsend’s big-eared bat (Corynorhinus townsendii) Plants Cary beardtongue (Penstemon caryi) Porter’s sagebrush (Artemisia porteri) William’s wafer parship (Cymopterus williamsii) Calcareous rock outcrops and rocky soil in sage, juniper, Douglas fir and limber pine communities, 5200-8500 ft.
 Sparsely vegetated badlands of ashy or tufaceous mudstone and clay slopes 5300-6500 ft. 
 Open ridgetops and upper slopes with exposed limestone outcrops or rockslides, 6000-8300 ft. 


Notes

1

Presence K Known, documented observation within project area. S Habitat suitable and species suspected, to occur within the project area. NS Habitat suitable but species is not suspected to occur within the project area. NP Habitat not present and species unlikely to occur within the project area.

2

Project Effects NI No impact. MIIH May impact individuals or habitat but will not likely contribute to a trend towards federal listing or a loss of viability to the population or species. WIFV* Will impact individuals or habitat with a consequence that the action may contribute to a trend towards federal listing or cause a loss of viability to the population or species (trigger for a significant action as defined in NEPA). BI Beneficial impact.

high, dry, shortgrass prairie with vegetation typically shorter than four inches tall. Within this habitat, areas of blue grama (Bouteloua gracilis) and buffalograss (Buchloe dactyloides) are most often used, as well as areas of mixed-grass associations dominated by needle-and-thread (Stipa comata) and blue grama (Dinsmore 1983). Mountain plovers often use black-tailed prairie dog towns for breeding, nesting, and feeding. Not all prairie dog towns offer suitable habitat for mountain plover, mostly due to topographic incompatibility. There are habitats other than prairie dog towns that provide nesting, feeding, and breeding habitat for mountain plover. The nest of the mountain plover consists of a small scrape on flat ground in open areas. Most nests are placed on slopes of less than five degrees in areas where vegetation is less than three inches tall in April. More than half of identified nests occurred within 12 inches of old cow manure piles and almost 20% were found against old manure piles in similar habitats in Colorado. Nests in similar habitats in Montana (Dinsmore 1983) and other areas (Ehrlich et al. 1988) were nearly always associated with the heavily grazed shortgrass vegetation of prairie dog colonies. Mountain plovers arrive on their breeding grounds in late March with egg-laying beginning in late April. Breeding plovers show close site fidelity, often returning to the same territory in subsequent years. Clutches are hatched by late June, and chicks fledge by late July. The fall migration begins in late August. Most birds are gone from the breeding grounds by late September. Existing Environment. The BLM Buffalo Field Office contracted two mountain plover nesting surveys in 2001 (Good et al. 2002, Keinath and Ehle 2001). Both contracted surveys conclude mountain plover habitat within the PRB may be sparse and fragmented (Good et al. 2002, Keinath and Ehle 2001). Much of the PRB is dominated by rolling sagebrush. Good et al. (2002) believe that bare ground and vegetation height are the limiting habitat components in the basin’s prairie communities; the areas they detected mountain plovers within the PRB appeared to receive less precipitation and have greater amounts of short grass prairie than the rest of the basin. However, both surveys caution more suitable mountain plover habitat exists than they were able to survey, as they were limited to public roads (Good et al. 2002, Keinath and Ehle 2001). Mountain plover preferred habitat consists of level, open, and exceedingly grazed sites (Knopf 1996) that are generally lacking in the West Hay Creek LBA analysis area. Vegetation on and within ½-mile of the LBA area is too tall and dense to be considered suitable habitat (Triton 2002). Prairie dog towns can provide habitat for the mountain plover; however, no colonies exist within the West Hay Creek LBA area. No mountain plovers have ever been observed during annual wildlife surveys for all migratory birds of high federal interest/migratory bird species of management concern. Qualified biologists watch for all listed species and habitats that could support them while conducting all wildlife species surveys.

G-29


Effects of the Proposed Project. Mountain plover have not been observed in the vicinity if the LBA tract during wildlife surveys conducted for the Buckskin Mine that began in 1977. Typical suitable habitat for this species is not currently located on the tract. Therefore, mining the federal coal included in the West Hay Creek LBA tract will not impact mountain plover individuals or the species

Cumulative Effects. Mineral development is likely to have both beneficial and detrimental effects on mountain plover. Mining activities tend to have more intense impacts on fairly localized areas. Oil and gas development tends to be less intensive but spread over larger areas. Surface disturbance within suitable habitat will likely result in short-term habitat loss in areas to be reclaimed, and permanent or long-term loss where roads and permanent or long-term facilities are located. Power poles, conveyors, and other structures are likely to provide perch sites and hiding cover for mountain plover predators. Vehicle traffic may occasionally run over mountain plovers or their nests. Mineral development may benefit plovers where surface disturbance provides bare ground and reduces shrub cover (Dechant et al. 2001). Oil and gas development and mining activities have requirements for reclamation of disturbed areas as resources are depleted. In reclaimed areas, vegetation cover often differs from disturbed areas. For surface coal mines, re-established vegetation would be dominated by species mandated in the reclamation seed mixtures approved by WDEQ/LQD. The majority of the approved plant species are native to the area; however, reclaimed areas may not serve ecosystem functions presently served by undisturbed vegetation communities and habitats, particularly in the short term, when species composition, shrub cover and other environmental factors are likely to be different. Shifts in habitat composition or distribution following reclamation could increase or decrease potential habitat for prairie dogs in this area, which could lead to an increase or decrease in potential habitat for mountain plovers.

G-30


CREDENTIALS OF SURVEY PERSONNEL Thunderbird Wildlife Consulting, Inc. of Gillette, Wyoming Gwyn McKee Ms. McKee obtained a Master of Science degree in Wildlife Ecology form the University of Missouri-Columbia. She has accumulated more than 16 years of professional experience, with the last nine in Wyoming. Ms. McKee has skills that include planning and conducting surveys for a variety of terrestrial and aquatic species, summarizing data, and preparing technical reports for private, state, and federal agencies. Ms. McKee is considered qualified by all state and federal agencies to conduct T&E and other wildlife surveys within the region. Those qualifications include surveys for mountain plovers and their habitat, and certification by the FWS to conduct black-footed ferret surveys.

Kort M. Clayton Mr. Clayton earned a Masters of Science degree in Biology from the University of Saskatchewan. He has been professionally involved with wildlife issues in the Northern Great Plains for over 10 years. Since 1998, Mr. Clayton has focused on wildlife inventories, clearances, impact analysis, mitigation, and applied research related to energy developments in the PRB of Wyoming and Montana. Those experiences include surveys for most vertebrate taxa in the region, sage grouse research, raptor mitigation projects, and clearance surveys for several federally listed species.

G-31


REFERENCES Buehler, D.A., T.J. Mersmann, J.D. Fraser, and J.K.D. Seegar. 1991 “Non-breeding Bald Eagle Communal and Solitary Roosting Behavior and Roost Habitat on the Northern Chesapeake Bay.” Journal of Wildlife Management 55(2): 273-281. Clark, T.W., and M.R. Stromberg. 1987 Mammals in Wyoming. University of Kansas, Museum of Natural History. Dechant, J.A., M.L. Sondreal, D.H. Johnson, L.D. Igl, D.M. Goldade, M.P. Nennman, and B.R. Euliss. 2001 “Effects of Management Practices on Grassland Birds: Mountain Plover.” U.S. Geological Survey, Northern Prairie Wildlife Research Center, Jamestown, North Dakota, 15 pp. Dinsmore, J.J. 1983 “Mountain Plover (Charadrius montanus).” In J.S. Armbruster, editor. Impact of Coal Surface Mining on 25 Migratory Bird Species of High Federal Interest. Pages 185-196. USFWS FWS/OBS-83/35. Ehrlich, P.R., D.S. Dobkin, and D. Wheye. 1988 The Birder’s Handbook: A Field Guide to the Natural History of North American Birds. Simon and Schuster, New York. Fertig, W., and G. Beauvais. 1999 “Wyoming Plant and Animal Species of Special Concern.” Unpublished report. Wyoming Natural Diversity Databas, Laramie, Wyoming. Fitzgerald, J.P., C.A. Meaney, and D.M. Armstrong. 1994 Mammals of Colorado. Denver Museum of Natural History, Denver, Colorado. Good, R.E., D.P. Young Jr., and J. Eddy. 2002 “Distribution of Mountain Plovers in the Powder River Basin, Wyoming.” Western EcoSystems Technology, Inc. Cheyenne, Wyoming, 10 pp. Grenier, Martin. 2003 Personal communication October 14, 2003, with Nancy Doelger, BLM Casper Field Office, regarding black-footed ferrets. Greiner is with the Wyoming Game and Fish Department. Hansen, A.J., M.V. Stalmaster, and J.R. Newman. 1981 “Habitat Characteristics, Function, and Destruction of Bald Eagle Communal Roosts in Western Washington.” In R.L. Knight, G.T. Allen, M.V. Stalmaster, and C.W. Servheen, eds. Proceedings of the Washington Bald

G-32

Eagle Symposium. The Nature Conservancy, Seattle, Washington, 254 pp. Keinath, D.A. and D. Ehle. 2001 “Survey for Mountain Plover (Charadrius montanus) on Federal Lands in the Powder River Basin.” Wyoming Natural Diversity Database, University of Wyoming. Laramie, Wyoming, 17 pp. Keister, G.P. 1981 “Characteristics of Winter Roosts and Populations of Bald Eagles in Klamath Basin.” M.S. Thesis. Oregon State University, Corvallis, 82 pp. Knopf, F. L. 1996. “Mountain Plover (Charadrius montanus).” The Birds of North America, No. 211 (A. Poole and F. Gill, eds.). The Academy of Natural Sciences, Philadelphia, PA, and The American Ornithologists’ Union, Washington, D.C. Luce, B., A. Cerovski, B. Oakleaf, J. Priday, and L. Van Fleet. 1999 Atlas of Birds, Mammals, Reptiles, and Amphibians in Wyoming. Wyoming Game and Fish Department, Wildlife Division, Cheyenne, Wyoming. McGarigal, K., R.G. Anthony, and F.B. Isaacs. 1991 “Interactions of Humans and Bald Eagles on the Columbia River Estuary.” Wildlife Monograph 115:1-47. Steenhof, K. 1976 “The Ecology of Wintering Bald Eagles in Southeastern South Dakota.” M.S. Thesis. University of Missouri, Columbia, 148 pp. Steenhof, K., S.S. Berlinger, and L.H. Fredrickson. 1980 “Habitat Use by Wintering Bald Eagles in South Dakota.” Journal of Wildlife Management 44(4): 798-805. Triton Coal Company, LLC. 2000 - Buckskin Mine Annual Reports to WDEQ/LQD on file in Sheridan and 2002 Cheyenne, Wyoming. United States. Bureau of Reclamation. 1981 A Survey of Wintering Bald Eagles and Their Habitat in the Lower Missouri Region. Denver, Colorado, 96 pp. United States. Department of the Interior. Bureau of Land Management. 2003 Final Environmental Impact Statement and Proposed Plan Amendment for the Powder River Basin Oil and Gas Project. Buffalo Field Office. Buffalo, Wyoming.

G-33

United States. Fish and Wildlife Service. 1978 “Management of Wintering Bald Eagles.” FWS/OBS-78/79. Washington, D.C., 59 pp. 1986	 “Recovery Plan for the Pacific Bald Eagle.” Portland, Oregon, 160 pp. 1989	 “Black Footed Ferret Survey Guidelines for Compliance with the Endangered Species Act.” USDI Fish and Wildlife Service, Denver, Colorado and Albuquerque, New Mexico. 1995	 “Ute ladies’-tresses Draft Recovery Plan.” U.S. Fish and Wildlife Service, Denver, Colorado, 46 pp. 1999	 “Proposed Threatened Status for the Mountain Plover.” Federal Register 64(30): 7587-7601. 2000 	 12-month Administrative Finding for the Black-tailed Prairie Dog.” Federal Register 65(24): 5476-5488. 2002	 August 20, 2002 Memorandum from Mike Long, Field Supervisor, FWS Wyoming Field Office to Pat Karbs, Writer-Editor, BLM Casper Field Office. 2002a Final Biological and Conference Opinion for the Powder River Basin Oil and Gas Project, Campbell, Converse, Johnson, and Sheridan Counties, Wyoming (Formal Consultation No. ES-6-WY-02-F006). Cheyenne, Wyoming, 58 pp. 2002b “Endangered and Threatened Wildlife and Plants; Threatened Status and Special Regulation for the Mountain Plover.” Federal Register 67(234): 72396-72407. 2002c “Endangered and Threatened Wildlife and Plants; Review of Species that are Candidate or Proposed for Listing as Endangered or Threatened; Annual Notice of Findings on Recycled Petitions; Annual Description of Progress on Listing Actions.” Federal Register 67 (114): 40657-40679. 2003	 “Endangered and Threatened Wildlife and Plants; Withdrawal of the Proposed Rule to List the Mountain Plover as Threatened.” Federal Register 68(174): 53083-53101. 2003a June 3, 2003 Memorandum from Jodi L. Bush, Acting Field Supervisor, FWS Wyoming Field Office to Nancy Doelger, Environmental Protection Specialist, BLM Casper Field Office. 2004	 February 3, 2004 Memorandum from Brian Kelly, Field Supervisor, FWS Wyoming Field Office to Robert Bennett, State Director, BLM Wyoming

G-34

State Office. 2004a “Endangered and Threatened Wildlife and Plants; Review of Species that are Candidates or Proposed for Listing as Endangered or Threatened; Annual Notice of Findings on Resubmitted Petitions; Annual Description of Progress on Listing Actions; Notice of Review: Proposed Rule.” Federal Register 69 (86): 24875-24904.

Wyoming Oil and Gas Conservation Commission. 2003 Personal communication between Nancy Doelger, Environmental Protection Specialist, BLM Casper Field Office, and Rick Marvel and Dave Hutton, October 22, 2003.

G-35


APPENDIX H
COMMENT LETTERS ON THE DRAFT WEST HAY CREEK EIS AND RESPONSES TO THOSE LETTERS

H-1


Response to Majestic Petroleum Operations, LLC. Letter The BLM Wyoming State Office’s Reservoir Management Group (RMG) prepared "Review of Coalbed Methane (CBM) Geology, Production and Economics, West Hay Creek LBA Draft Environmental Impact Statement" (November 2002). The purpose of the study was to evaluate the CBM reservoir, production and reserves in the coal seam(s) that would be mined within the LBA tract. The study was based primarily on production decline analyses from existing CBM wells and generalized volumetric analysis of the CBM reservoir. Study data and methodology are described in the original report. At the time the study was prepared many of the CBM wells in the area lacked sufficient production for decline analysis so not all wells were used. RMG prepared a model decline analysis that included CBM wells located near or adjacent to the LBA tract, and some wells located farther west in adjacent sections in T. 52 N., R. 73 W. This analysis showed estimated average reserves of 132,000 mcf for a typical well and an average six-year economic well life (based on 40-acre spacing). As requested in the comment letter from Majestic Petroleum Operations, LLC, RMG reviewed the reserve and economic life estimates in light of the data included in that letter. The values originally reported by RMG are reasonably comparable to the estimates provided by Majestic, which also included wells located some distance from the tract and active mining. RMG believes that, due to reservoir depletion, estimates that include decline analysis from wells not adjacent to the tract will probably overestimate the reserve volumes. RMG's reservoir analyses show that mine dewatering has resulted in a "regional" lowering of the water table in the mined seam(s) and, consequently, a decline in hydrostatic pressure within the mined seam(s) near the mines. Where the hydrostatic pressure has declined sufficiently, CBM gas has been allowed to desorb from these coals and escape from the reservoir(s). As a result, the CBM reservoirs near the active mine are probably depleted relative to the original/undisturbed reservoir encountered farther west. Additionally, a more specific decline analysis by RMG, based solely on wells located in section 18, T. 52 N., R. 72 W., yielded estimated average reserves of approximately 54,800 mcf with a 2.5 year average economic well life. RMG considers these estimates to be the most representative of reserves within the LBA tract. Additional CBM production might have been reported between the time that RMG prepared its estimates (November 2002) and the time that Majestic prepared its comments (April 2003), which could affect decline-based reserve estimates. It is also possible that some of the production cited in Majestic’s comment letter could be from lower seams that will not be subject to mining. It is not possible to evaluate these factors and the necessity for adjustments, if any, without an extensive study of current data as well as the consultant's study. Due to existing time constraints, RMG did not undertake additional studies.

H-3

The EIS discloses the environmental and socioeconomic impacts of issuing leases for the federal coal in the LBA tract, including the presence of potentially affected private and federal oil and gas leases within the LBA tract (figure 3-15 and table 3-10 in chapter 3) and the existence of ancillary facilities to support oil and gas production. It identifies that, in order for the coal to be mined, oil and gas development must be curtailed, which would affect current CBM wells as well as the timing and potentially the feasibility of developing any remaining undrilled 40-acre spacing units. Appendix D lists the stipulations that are included on coal leases in the Powder River Basin, which includes stipulations addressing multiple mineral development and oil and gas/coal resources. The EIS also discusses BLM Instruction Memorandum No. 2003-253, which addresses BLM policy on conflicts between coal and CBM development. In accordance with this memorandum, royalty incentives can be offered to CBM operators who agree to accelerate production in order to recover the natural gas while simultaneously allowing uninterrupted coal mining operations. In addition, this memorandum also states that it is the policy of the BLM to encourage oil and gas and coal companies to resolve conflicts between themselves; and when requested, the BLM will assist in facilitating agreements between the companies. It is our understanding that Triton Coal and Majestic currently own and cojointly produce gas in the West Hay Creek area. Both have developed a working relationship that will be essential to resolve any issues of CBM gas and coal removal within the West Hay Creek area. We also understand that proposals have been made by both companies to allow resolution of any joint production issues. Triton Coal has stated that they intend to allow immediate gas production from the area and has paid for infrastructure and access to allow this production.

H-4


Response to Dean and Lena Varney Letter

In response to Mr. and Mrs. Varney’s letter, Triton Coal Company representatives recently met with the Varney’s and explained the mine plan for the Buckskin Mine. The 40-acre Varney coal lease is in an area of higher overburden ratio with adjacent geologic faulting. Buckskin’s mine plan is to continue to follow the lower ratio coal outcrop to remain competitive with other PRB mines. Under Buckskin’s current mining projections, they would likely mine a portion of the Varney lease in the next 10 years.

H-6


Response to USDI, National Park Service Letter The West Hay Creek LBA EIS evaluates leasing the LBA tract as a maintenance lease to an existing coal mine, which plans to mine the coal at currently permitted rates using existing facilities. BLM has eight other pending maintenance coal lease applications, five of which were considered in the Final South Powder River Basin Coal EIS, which was released to the public in December 2003. The remaining two pending maintenance coal lease applications will be evaluated in future NEPA analyses. All of these federal coal tracts have been applied for by existing mines in the basin and, if they are leased, they would be mined by those existing mines. As a result they would represent continuations of, not additions to, ongoing mining activities at currently active coal mines in the Wyoming Powder River Basin (PRB).The Final EIS and Proposed Plan Amendment for the Powder River Basin Oil and Gas Project, which was completed in January 2003, analyzed the impacts of drilling 39,400 new CBM wells in the Wyoming PRB in addition to the 12,000 wells that were drilled or permitted when the EIS was prepared. Coal production in the PRB has been steadily increasing since the 1970s in response to increasing demands for electrical power generation in the Midwest and elsewhere. BLM also has concerns about existing and increasing air quality impacts resulting from energy development in the PRB. In order to help us evaluate the potential impacts of future actions more effectively, the Wyoming BLM is currently starting work on a twoyear technical study to assess current coal development, develop projections of expected future development, and develop data and modeled projections of the effects of projected surface coal mining in the Wyoming PRB for use in analyzing the impacts of leasing and mining the two remaining pending LBA tracts. Briefings on this study were held with state and federal agencies last fall. Please contact Mike Karbs with the BLM Casper Field Office for more information on this study. Responses to Specific Comments 1.	 The referenced statement, which is found on page 3-21 of the FEIS, is a broad description of general air quality in rural areas of the PRB, where development and associated monitoring are not yet present. The areas where the surface coal mines are located and where most of the CBM development has occurred to date in the PRB are somewhat concentrated on the eastern flank of the PRB, where the coal is the shallowest and most accessible. There has been extensive air quality monitoring, specifically particulate and NO2 emissions, in this area, which is discussed on pages 3-18 and 3-22 and shown in Figure 3-6 of the FEIS. The values presented as background concentrations in Table 3-2 of the EIS reflect the existing environment, including all of the existing emission sources, as determined by the monitoring data. The projected impacts of the proposed additional 39,400 CBM wells are addressed in the cumulative air quality section of Chapter 4. 2.	 The DEIS does describe the regional topography (“mountainous western United States”), the topography in the PRB (“primarily rolling plains and tablelands of

H-10

moderate relief (with occasional valleys, canyons and buttes), and the topography of the West Hay Creek LBA tract (“an area of elevated ridges broken by minor drainages with an elevation ranging from 4,100 to 4,340 feet” (DEIS page 3-13). The EIS does not describe the LBA tract as mountainous and does not state, in either the air quality section of Chapter 3 or of Chapter 4, that the terrain in the area of the LBA tract will protect areas downwind from the potential effects of increased pollution emissions. It does discuss, on pages 4-55 through 4-70 in the FEIS, the air quality impact analysis prepared for BLM by Argonne National Laboratory, for which air pollutant dispersion modeling was performed using the EPA CALPUFF and the CALMET models to quantify potential cumulative air quality impacts from existing and proposed development in the PRB. The existing development includes the coal mines and existing CBM wells; the proposed development includes the proposed 39,400 CBM wells. This modeling project evaluated potential impacts for the years when the overlapping impacts of oil and gas development, and coal and other development were estimated to be the greatest. The FEIS (pages 4-63 and 4-64) explains that meteorological information was assembled to characterize atmospheric transport and dispersion and that potential CO and NOx emissions were analyzed by to predict potential far-field impacts at 29 mandatory federal PSD Class I and other sensitive areas in Wyoming, Montana, North and South Dakota, and Nebraska, including Wind Cave National Park; maximum predicted cumulative far-field impacts under the development that were predicted by this modeling are shown in table 4-9. The FEIS also discusses potential visibility impacts to Class I areas, including Wind Cave National Park, predicted by this modeling project (pages 4-65 through 4-69, tables 4-11 and 4-12). The statement describing the regional topography as mountainous has been removed from chapter 3 because it is more descriptive of the area included in the cumulative air quality impact analysis, discussed in the Cumulative Impact section of Chapter 4, than it is of the area of the West Hay Creek LBA tract. 3. 	 In the EIS, the term “relatively flat trend” is used to describe the monitored particulate concentrations from 1980 through 1998 as compared to the increase in mining activity (i.e. coal produced and overburden moved) during that same time period. The term “relatively flat trend” is not used to describe the increase in particulate concentrations recorded by monitoring after 1998. The EIS describes the particulate concentration increase following 1998 as “much larger” than had occurred during the previous 18 years, although the increase in coal and overburden production was not comparably larger (FEIS page 3-24). In the FEIS, particulate control measures are discussed on pages 3-26, NOx control measures are discussed on pages 3-28 and 3-29. Table 4-3 summarizes the required mitigation and monitoring measures. These measures are required by regulation and are considered to be part of the Proposed Actions and Alternatives 2 and 3. These requirements, mitigation plans, and monitoring plans are in place for the No Action Alternative, as part of the current approved mining and reclamation plan for the existing Buckskin Mine. If the West Hay Creek LBA tract is leased, these requirements, mitigation plans, and monitoring plans would be included in the mining and reclamation plan revision that would be required for the LBA tract if it is

H-11


leased. This mining and reclamation plan would have to be approved before mining could occur on the tract, regardless of who acquires the tract.

H-12


Response to Wyoming Game and Fish Department Letter 1. Wildlife monitoring for the Buckskin Mine is designed to meet WDEQ/LQD and federal requirements for annual monitoring and reporting of wildlife activity on coal mining areas. Detailed procedures and site-specific requirements have been carried out as approved by WGFD and FWS. The monitoring program is conducted in accordance with appendix B of WDEQ/LQD Coal Rules and Regulations. Baseline wildlife monitoring was conducted from February 1999 through February 2000 on the West Hay Creek LBA tract analysis area concurrent with an analysis conducted for a permit amendment for the Buckskin Mine. Powder River Eagle Studies (now Thunderbird Wildlife Consulting) submitted a proposed scope of work for wildlife baseline studies on the Buckskin Mine expansion area, which proposed no fish or benthic sampling due to the absence of perennial streams in the study area, to Mr. Vern Stelter with the WGFD for review in May of 1999. In response, Powder River Eagle Studies received a letter from Tom Collins, WGFD, dated May 18, 1999, concurring with the Buckskin baseline study proposal as written. Triton received a letter from Gregg Arthur, WGFD, dated December 23, 2003, recommending that WDEQ consider the consultation by Buckskin Mine with WGFD regarding the temporary diversion of Hay Creek to be complete and recommending approval of the temporary diversion. The FEIS includes the available information on the aquatic species that have been observed during annual wildlife surveys conducted for the Buckskin Mine in this drainage As discussed above, the wildlife baseline studies conducted to date have been approved by WGFD and WDEQ. If Triton acquires a lease for the West Hay Creek LBA tract, it would be a maintenance lease for the Buckskin Mine, which has an approved mining and reclamation permit. The approved Buckskin Mine permit area includes the West Hay Creek LBA tract, but Triton would be required to modify their existing mining and reclamation permit to include removing coal from the West Hay Creek LBA Tract before mining operations, including disturbance that would affect Hay Creek, could occur. Mitigation and monitoring plans that are specific to the new lease would be developed at that time. Surface coal mining operations in the State of Wyoming are regulated by the WDEQ/LQD, which must approve the mining and reclamation permits before mining can occur. If the existing monitoring requirements for aquatic species are not adequate, then WGFD could review the proposed plans for wildlife monitoring and address the deficiencies when the permit application package for proposed coal mining and reclamation on the West Hay Creek LBA Tract is submitted for approval by WDEQ/LQD. 3.	 The mitigation requirements summarized in Table 4-3 in the West Hay Creek EIS are part of the existing mining and reclamation plans for surface coal mines in the Powder River Basin that have been submitted to and approved by WDEQ/LQD.

2.	

H-17

The mitigation requirements are developed during the mining permit review and approval process, and changes or additions to those requirements could be made when the permit application package for proposed coal mining and reclamation on the West Hay Creek LBA Tract is submitted to WDEQ for review and approval.

H-18


Response to Wyoming Department of Environmental Quality Letter The air quality sections in the FEIS have been revised in response to comments received from Wyoming Department of Environmental Quality Air Quality Division (WDEQ/AQD) as well as from the Environmental Protection Agency. WDEQ/AQD provided BLM with information about air quality regulations and program procedures as well as corrections to the air quality sections during the revision process. Through this process, we believe that the WDEQ/AQD comments on the Draft West Hay Creek EIS have been addressed.

H-27


Response to US Fish and Wildlife Service Letter 1.	 Several years ago, the Wyoming BLM State Director directed BLM Wyoming field offices to complete section 7 consultation with the FWS prior to issuing new federal coal leases. From the time that decision was made to the issuance of the Draft West Hay Creek coal lease application EIS, no new federal coal leases have been issued in the state. Since the issuance of the draft West Hay Creek EIS, BLM has completed section 7 consultation on five LBA tracts in Campbell and Converse counties in the Powder River Basin and intends to complete section 7 consultation on the West Hay Creek LBA tract prior to making a decision on leasing the West Hay Creek LBA tract. Threatened and Endangered Species. Following discussions with the FWS, OSM, FS, and WDEQ/LQD, BLM has begun attaching a stipulation concerning threatened and endangered species to federal coal leases in Wyoming (appendix D, stipulation (c) of this FEIS).

2.	

Specific Comments 3.	 The referenced statement on page ES-10 of the DEIS summarizes the “Habitat and/or Occurrences” discussion for the bald eagle found in appendix G of the DEIS; it is based on the results of baseline and annual wildlife surveys conducted for the Buckskin Mine. The discussion of potential cumulative wildlife impacts has been revised in chapter 4 and appendix G of the FEIS to include the information provided in your comments. The Wyoming Coal Mining Rules and Regulations, Chapter 4, Section 2(r)(i) require that each surface coal mine operator shall, “to the extent possible using the best technology currently available and consistent with the approved postmining land use, minimize disturbance and adverse impacts on fish, wildlife, and related environmental values, and achieve enhancement of such resources where practicable” and that those activities shall include properly constructing, locating and operating roads and powerlines, including proper design of powerlines to avoid electrocution of raptors. The Wildlife section in chapter 4 of the EIS references the approved raptor mitigation plan for the Buckskin Mine, which is part of the approved mining and reclamation permit. Use of raptor-safe power lines, based on the best technology currently available, is part of the mining and reclamation permit for the mine, as required by law. If the West Hay Creek LBA Tract is leased to Triton, the raptor mitigation plan would be amended to include the newly leased tract as required by FWS and WDEQ/LQD, and the existing mining and reclamation permit would be amended to include mining operations on the LBA tract. 4.	 The EIS analyzes the impacts of leasing a maintenance tract to an existing mine, based on the observed impacts that have occurred and the knowledge that has

H-36

been gained from mining and reclamation practices, mitigation measures, and monitoring of surface coal mining operations, which have been conducted in the Powder River Basin for 30 years. The OSM is a cooperating agency on this EIS and has been a cooperating agency on previously prepared EISs analyzing the impacts of leasing federal coal in the basin. OSM has reviewed this EIS and previously prepared EISs to ensure that the analyses are adequate for their needs when the MLA mining plans are evaluated for approval by the Assistant Secretary of the Interior. Your comments did not specifically identify impacts that have been omitted in this and the previous leasing EISs prepared for the Wyoming PRB. We would suggest scheduling a meeting, to include OSM, to discuss additional information that you have identified which should be included in future coal leasing EISs. 5.	 The FEIS has been revised to include additional information on sage grouse occurrence on the LBA tract and the potential impacts to sage grouse. Additional information regarding the surveys for Ute ladies’-tresses is included in appendix G of the FEIS. Habitat Management, Inc. conducted a survey for Ute ladies’-tresses within the Buckskin Mine Hay Creek permit amendment baseline study area in 1999. Wayne Erickson and Kenneth Carlson of Habitat Management, Inc. managed and were involved in conducting the studies. Both Mr. Erickson and Mr. Carlson have letters from the FWS Colorado Field Services Office recognizing them as qualified to conduct surveys for Ute ladies’-tresses. Other members of the survey team included Dr. Don Hazlett and Mr. Steve Viert of Cedar Creek Associates, Inc., who are both recognized as qualified to conduct Ute ladies’-tresses habitat assessment and surveys by FWS. Pedestrian surveys of all potential habitats were conducted from July 25 through August 4, 1999 and August 31 through September 3, 1999. The survey team met with FWS personnel in Cheyenne on August 30, 1999 to discuss currently acceptable Ute ladies’-tresses survey methods and practices. All wet meadow wetland and lowland prairie vegetation community types were surveyed. The information provided in your comments has been added to the sage grouse discussion in the FEIS. The referenced discussion of potential impacts to displaced songbirds on page 4­ 25 of the DEIS has been revised in the FEIS to address migratory bird species of management concern in Wyoming. As discussed in the EIS, the Buckskin Mine has an existing mine has an approved raptor mitigation plan, which is subject to FWS review and approval before the mining and reclamation plan is approved. If Triton acquires a lease for the West Hay Creek LBA tract, the existing plan for the Buckskin mine would have to be amended to include mining operations in the tract prior to initiation of mining activities on those areas. Any nest that will be impacted by mining operations must be relocated in accordance with the approved raptor mitigation plan, after

6.	

7.	

8.	

H-37

special use permits are secured from FWS and WGFD. The Buckskin Mine has previously completed this process on the existing Buckskin leases. All active raptor nests within the mine permit area are protected further by buffer zones. Mine-related disturbances for the existing approved mining operations are not allowed to encroach in the near vicinity of any active raptor nest from March until hatching, and disturbances near raptor nests containing nestlings is strictly limited to prevent danger to, or abandonment of, the young. BLM does not attach stipulations to lease documents for the purpose of regulating how or when mining operations are conducted because: a)	 such stipulations would not be effective or enforceable since the lease document does not authorize or regulate mining operations; b)	 there are federal and state regulations in place that do direct how surface coal mining operations will be conducted on federal and nonfederal coal leases and there are agencies that are authorized to enforce those regulations. Specifically, as discussed in the “Regulatory Authority and Responsibility” section of the EIS, SMCRA gives the authority for administering programs that regulate surface coal mining operations and surface effects of underground coal mining operations to the OSM. In Wyoming, WDEQ has entered into a cooperative agreement with the Secretary of the Interior to regulate surface coal mining operations and surface effects of underground mining on nonfederal and federal lands within the state; c)	 stipulations apply only to the specific federal lease to which they are attached, while mining operations for a single mine can occur on multiple federal and nonfederal leases as well as on areas within the mining permit that are not leased for coal removal but may be disturbed as a result of mining operations; and d)	 stipulations attached to a specific lease cannot readily be changed to incorporate new information or better technology. Stipulations on federal coal leases can only be changed when the lease is readjusted, which is every 20 years. A mining and reclamation permit applies to the entire mining operation and must be renewed periodically, at which time new information and mitigation measures can be incorporated.

9.	

As discussed in the EIS, the COE reviews all surface coal mining and reclamation permits. COE requires mitigation of all impacted jurisdictional wetlands in accordance with section 404 of the Clean Water Act. They approve the plans for wetland restoration and the number of acres to be restored. COE considers the type and function of each jurisdictional wetland that will be impacted and may require restoration of additional acres if the type and function of the restored wetlands will not completely replace the type and function of the original wetland.

H-38


The wetland mitigation plan approved by COE becomes part of the WDEQ mining permit. 10.	 Additional information about sage grouse habitat affected by the project has been added to the direct and direct impact discussion earlier in chapter 4. Potential cumulative impacts to sage grouse as a result of all anticipated activity in this area are discussed in the wildlife portion of the Cumulative Impact section in chapter 4 of the EIS. 11.	 As discussed in response 2, above, following discussions with the FWS, OSM, FS, and WDEQ/LQD, BLM is attaching a stipulation concerning threatened and endangered to future federal coal leases in Wyoming (see appendix D, stipulation (c) of this FEIS). As discussed in response 8 above, BLM does not attach stipulations designed to regulate how or when mining operations are conducted to lease documents because the lease document does not authorize or regulate mining operations. 12.	 Appendix G of the FEIS has been revised, based on written comments from and oral discussions with FWS that have taken place since the DEIS was published. The revised appendix has been provided to USFWS for further comment and consultation for the West Hay Creek LBA tract will be completed prior to issuance of a decision for the tract. 13.	 Additional information about the techniques, timing, and results of surveys conducted for Ute ladies’-tresses on the tract is included in appendix G of the FEIS and discussed in response 6 above. 14	 As indicated above in responses 1 and 12, section 7 consultation with the FWS will be completed prior to issuance of a lease for the West Hay Creek LBA tract. As discussed in appendix G, consultation is required under the Wyoming Coal Mining Rules and Regulations and the FWS/OSM agreement and FWS will again be consulted during the permit application review process. 15.	 The FEIS has been revised to address this comment although not all of the past and present activity referenced in the comment letter would have impacts that are or would be directly or indirectly cumulative to the actions considered in this EIS. The existing federal coal leases in the PRB occupy approximately 108,011 acres in Campbell and Converse counties, which represents approximately 1.9% of the combined area of these two counties. If the West Hay Creek LBA tract is leased under BLM’s Preferred Alternative, approximately 921 additional acres would be added and the acres of leased federal coal in the PRB would increase by approximately .009%. Most of the direct and indirect impacts that would be related to mining this lease tend to be localized in the area of mining, with the primary exceptions being some of the cumulative air quality, groundwater quantity, and transportation impacts, which are addressed in the “Cumulative Impacts” section in chapter 4 of the EIS. The West Hay Creek LBA tract would be leased as a H-39

maintenance tract for the existing mine; as a result, it represents a continuation of existing mining activity and associated impacts in the Powder River Basin, not new mining development and associated new impacts.

H-40


Response to Environmental Protection Agency Letter In order to respond more accurately to some of your comments, BLM consulted the WDEQ, which has, by statute, the authority and responsibility to implement air quality mitigation in the PRB, as you stated in your cover letter. Both the Air Quality and Water Quality Divisions of WDEQ provided information on their regulatory programs, including monitoring data and mitigation measures, and this information has been used to revise the FEIS in response to your comments. Responses to Detailed Comments 1.	 Air Modeling Discrepancies. The EIS presents information obtained from two air quality impact analyses prepared for different purposes using different modeling techniques and assumptions. A discussion of the differences between the models and assumptions used for the regional air quality impact analysis and the minespecific air quality impact analyses in the Wyoming PRB has been added to the FEIS. a. The background concentrations used in each analysis were not selectively chosen to give predictions less than NAAQS. The differences are discussed below and this information has been included in the FEIS. The WDEQ/AQD air quality permit analyses use a background PM10 concentration of 15 µg/m3, which WDEQ/AQD has chosen as representative of background ambient air quality in the area without activity (i.e., prior to the operation of the coal mine sources). In the WDEQ/AQD air quality permit analyses, potential emissions corresponding to the entire maximum production level from the coal mine undergoing permitting and other coal mines in the area are added to this background concentration, regardless of when the coal mine was permitted or constructed. The cumulative air quality impact analysis prepared to evaluate the impacts of proposed CBM development in Wyoming and Montana uses a background PM10 concentration of 17 µg/m3, which is a recently monitored value that is used as representative of all sources operating as of a specified date (i.e., prior to the addition of more sources). The 17 µg/m3 background PM10 concentration was monitored in Gillette and is used as the background for the entire PRB, including existing coal mining operations, as of the specified date. The Wyoming and Montana cumulative air quality impact analysis was based on inventorying and modeling impacts from sources permitted and constructed after the date corresponding to the monitored background concentration. Using this approach, only the projected production increases at the coal mines, not the entire permitted production, are included in the Wyoming and Montana cumulative air quality impact analysis.

H-50

b. The Wyoming and Montana cumulative air quality impact analysis includes a combined project area of more than 33,000,000 acres, and focuses on oil and gas and coal bed methane development in northeastern Wyoming and southeastern Montana. That analysis considers other sources in the area, including surface coal mines and sources from adjacent states, on a broad cumulative basis. The WDEQ/AQD air quality analyses cover much smaller areas (several thousand acres), focus on specific surface coal mining operations at the surface coal mines in the Wyoming PRB, and consider potential overlapping impacts from adjacent surface coal mining operations. The differences in the air quality analyses methodologies include, but are not limited to: Different models o	 The ISCLT model is used for the WDEQ/AQD air quality permit analyses – annual only o	 CALPUFF is used for the Wyoming and Montana cumulative air quality impact analysis Different emissions inventories for the coal mines o	 Total mine production is used for the WDEQ/AQD air quality permit analyses o	 Projected production increases after a specified date are used for the Wyoming and Montana cumulative air quality impact analysis Different mine boundary representations for the coal mines o	 The lands necessary to conduct mining (LNCM) boundary is used for the WDEQ/AQD air quality permit analysis o	 Representative rectangular areas are used for the Wyoming and Montana cumulative air quality impact analysis Different background PM10 concentrations (see 4.a. above) Given these substantial differences in methodology and scope, a direct comparison of the results of these two analyses is probably not meaningful. It is not unexpected that the concentrations predicted by a WDEQ/AQD air quality permit analysis, which is a near-field analysis covering a small area in detail, is higher in localized areas than those predicted by the Wyoming and Montana

H-51

cumulative air quality impact analysis, which is a broad cumulative analysis covering a substantially larger area using a different methodology. The EIS includes the methodology and results of the WDEQ/AQD analyses in the “Direct and Indirect Impacts” section for air quality. This section covers the direct and indirect impacts of the action being considered, which is leasing additional coal in a specific tract to an existing mine in the PRB. The discussion of the WDEQ/AQD analysis process has been expanded in the FEIS. The cumulative air quality analysis presented in the “Cumulative Air Quality Impact” section and in appendix E was prepared for the Wyoming Final EIS and Proposed Plan Amendment for the Powder River Basin Oil and Gas Project and the Montana Final Statewide Oil and Gas EIS and Proposed Amendment of the Powder River and Billings RMPs. These documents will be referred to as the Wyoming Oil and Gas EIS and the Montana Oil and Gas EIS in the following discussions. The cumulative air quality impact analysis represents a much broader estimate of the potential regional air quality impacts as a result of all development in the PRB. This modeled assessment of potential air quality impacts includes a number of assumptions, which are both over- and under-conservative in nature, and it generalizes impacts due to its nature and scope, but it does represent the most comprehensive air quality analysis that has been conducted for northeast Wyoming and southeastern Montana to date. 2.	 Wyoming DEQ Permit Analysis. The air quality appendix in the EIS pertains to the cumulative impact analysis only and has been labeled accordingly in the FEIS. Additional discussion of the WDEQ/AQD air quality permit analysis process has been added to the air quality discussion in chapters 3 and 4 of the FEIS. Cumulative Impacts Above the PSD Class II Increment. It is not correct to compare the concentrations predicted by the WDEQ/AQD air quality permit analyses to the PSD increments. As indicated in the Regulatory Framework portion of the Air Quality Section of Chapter 3 of the EIS, surface coal mining operations in the PRB are not currently affected by the PSD regulations for two reasons: surface coal mines are not on the EPA list of 28 major emitting facilities for PSD regulation, and point-source emissions from individual mines to not exceed the PSD emissions threshold of 250 tons per year. Fugitive emissions are not included in the definition of potential emissions except for certain specified source types [40 CFR 52.21, (b)(1)(iii)]. Mining related fugitive emissions are exempt from the applicability determination. The discussion has been revised in the FEIS.

3.	

4.	

Nitrogen Dioxide. According to information provided by WDEQ/LQD, the mines have been able to reduce the number of shots that produce nitrogen dioxide (NO2) and the amount of NO2 produced per shot by using different blasting agents, different additives, different initiation systems and sequencing, bore hole liners, and smaller casts blasts. They have not been able to eliminate NO2 production due to the variety of factors that

H-52


can contribute to incomplete combustion of the explosives. Two consecutive blasts using the same product and procedures often produce dramatically different results. a.	 The EIS identifies that there is no short-term exposure standard at either the state or national level for nitrogen dioxide and identifies the NIOSH, OSHA, and EPA short-term exposure criteria. Without an established short-term exposure standard which can be enforced, BLM has not identified a concentration for analyzing risk and developing mitigation that could be implemented by the appropriate regulatory agencies. b.	 Potential receptors that could be impacted by NO2 releases related to blasting would include public highways, occupied dwellings, school bus stops, and other publicly accessible facilities. The roads that pass through the LBA area are county roads, although a portion of US 14-16 is located nearby. The locations of public roads, occupied dwellings, school bus stops, and publicly accessible facilities in the area are shown in figure 3-17 in the FEIS. c.	 Many of the mines in the Wyoming PRB have instituted voluntary measures to reduce the risk of public exposure to intermittent, short term releases of NO2 when large blasts are planned, and WDEQ has required several mines to institute additional such measures. These measures, as well as the some of the blasting procedures that some of the mines have been using to try and reduce NO2 emissions during blasting, are described in the FEIS in the air quality section of chapter 3. 5.	 Safe Concentrations of Nitrogen Dioxide. As discussed above, the FEIS includes the short-term exposure criteria identified by NIOSH, OSHA, and EPA, but recognizes that there is no short-term numerical exposure standard for NO2 at either the federal or state level. According to WDEQ/LQD, with one exception, the mitigation measures being implemented in the PRB are not dependent on a numerical standard, but are administrative controls designed to prevent NO2 from reaching receptors. The exception is the Eagle Butte Mine, which is required to use a set back distance that is based on a numerical exposure limit. Nitrogen Dioxide Concentrations. The Wyoming Mining Association Study that is summarized in the West Hay Creek EIS was designed to monitor NO2 levels in publicly accessible areas and, accordingly, sites were selected for this study based on public accessibility and proximity to mining activities. The Black Thunder study referenced in your comment letter was designed to collect NO2 concentration data for a modeling study and, accordingly, the monitors were located as close to the blasts as feasible in order to collect the necessary data. These locations were in areas that are both inaccessible to the public and cleared of employees during blasting activities. The actual NO2 measurements recorded in the Black Thunder study ranged from non-detectable to 21.4 ppm. The high value was measured 361 feet from the blast. In the FEIS, this discussion has been expanded to include more information and to clarify the differences between

6.	

H-53


the two blasting studies and to discuss some of the changes in nitrogen dioxide emissions since the mines began developing new blasting methods. 7.	 Affected Environment for Nitrogen Dioxide Emissions. The locations of public highways, occupied dwellings and school bus stops in the area of the LBA tract are shown in figure 3-17 in the FEIS. As indicated in the EIS, phone notification of workers and neighbors prior to blasting is both a voluntary and required measure that some mines have implemented when large blasts are planned. This includes occupants of nearby residences. WDEQ/LQD requires some mine operators to close public roads when blasting operations occur nearby, mainly for issues such as fly rock and the startle factor. Mitigation for Nitrogen Dioxide Emissions. The voluntary measures that some mines have instituted to ensure that the general public is not exposed to NO2 as a result of blasting activities are not part of the mining and reclamation permits for these mines. WDEQ/LQD has pursued voluntary measures in order to allow operators to develop new mitigation measures that can be effectively used to address the problems. The mines can choose to discontinue the voluntary measures. However, exposure of the public to blasting clouds containing NO2, with or without voluntary control measures, will trigger enforcement action, including permit requirements designed to control public exposure to NO2 by the WDEQ/LQD. Several mines in the basin currently have permit requirements designed to control public exposure to NO2 as a result of past reports of public exposure to blasting clouds from those mines. Those mines are required to monitor weather conditions before blasting and close roads when appropriate to protect the public The BLM does not authorize mining operations by issuing a lease and BLM is not authorized to approve the mining and reclamation plan, which does regulate how mining operations are conducted on the federal leases. BLM does not attach stipulations designed to regulate how mining operations are conducted to lease documents because: a)	 such stipulations would not be effective or enforceable since the lease document does not authorize or regulate mining operations; b)	 there are federal and state regulations in place that do direct how surface coal mining operations will be conducted on federal and nonfederal coal leases and there are agencies that are authorized to enforce those regulations. Specifically, as discussed in the “Regulatory Authority and Responsibility” section of the EIS, SMCRA gives the authority for administering programs that regulate surface coal mining operations and surface effects of underground coal mining operations to the OSM. In Wyoming, WDEQ has entered into a cooperative agreement with the Secretary of the Interior to regulate surface coal mining operations and

8.	

H-54

surface effects of underground mining on nonfederal and federal lands within the state; c)	 lease stipulations are specific to the federal lease to which they are attached. Mining operations for a single mine can and generally do occur on multiple federal and nonfederal leases as well as on areas within the mining permit that are not leased for coal removal but may be disturbed as a result of mining operations. The mining and reclamation permit applies to the entire mining operation; and stipulations attached to a specific lease cannot readily be changed to incorporate new information or better technology. Stipulations on federal coal leases can only be changed when the lease is readjusted, which is every 20 years. A mining and reclamation permit applies to the entire mining operations and must be renewed periodically, at which time new information and mitigation measures can be incorporated.

d)	

Cumulative Impacts 9.	 Direct and Indirect Impact Analysis vs. Cumulative Impacts. The cumulative air quality, surface water, and groundwater impact analyses were prepared for the Wyoming Oil and Gas EIS and/or the Montana Oil and Gas EIS, but potential impacts from approved surface coal mining activities were considered in those analyses. The Wyoming and Montana Oil and Gas EIS analyses were designed to consider the estimated timing of maximum overlapping impact from CBM development, which will peak during the time of maximum drilling activity, with ongoing surface coal mining activities, which have been and are predicted to continue to increase gradually. In the case of the West Hay Creek EIS, the action that BLM is considering approving is leasing the federal coal resource to an existing mine in the Wyoming PRB. Adding new acreage to an existing mine does not result in the introduction of new impacts; it extends impacts that are already occurring. In the case of the West Hay Creek LBA tract, the applicant does not propose to increase production beyond the currently permitted level. BLM recognizes that the direct and indirect impacts predicted in the EIS may be altered by changes to some of the resources as a result of other activities. When BLM began analyzing the impacts of leasing federal coal under the regulations at 43 CFR 3425 (Leasing on Application) in the Wyoming PRB, a conscious decision was made to separate the discussion of predicted direct and indirect impacts to resources from the discussion of predicted cumulative impacts to resources in order to differentiate between the two analyses, and to ensure that we considered each in our leasing documents. We agree that it could be beneficial to eliminate the duplication and confusion that results from discussing each resource separately in the affected environment, direct and indirect impact, and cumulative impact sections.

H-55

10.	 Groundwater Cumulative Impacts. The federal action that is being analyzed in this EIS is leasing of the federal coal included in the West Hay Creek LBA tract, under the assumption that, if the coal is leased, it will be mined by the adjacent existing Buckskin Mine. The intent of the direct and indirect impact analysis in the EIS is to disclose the direct and indirect impacts of leasing and mining the federal coal in the tract. If that action is not approved, there may be impacts to groundwater as a result of other activities, which are disclosed in the cumulative impact section of the EIS. They will not be a direct or indirect result of approval of the action being considered in this EIS. According to WDEQ/LQD, coal mines are required to replace water supply wells if the mine activities have impacted the well to the extent that the well no longer fulfills its intended purposed. When water wells have been impacted by both coal mining operations and CBM development, WDEQ/LQD’s approach is to try and determine the amount of impact caused by the mining operation. The mine’s responsibility for replacement of the well depends on the amount of impact caused by the mine. There have been cases where both the mine and the CBM operator have shared in the cost of replacing a water supply well. 11.	 Cumulative Impacts, Reasonably Foreseeable Future Actions. The purpose of an EIS is to disclose the potential impacts of a specific proposed federal action so that a decision maker can make an informed decision. That decision should consider the potential impacts of a proposed project when combined with other reasonably foreseeable development in an area. The West Hay Creek EIS cumulative impact analysis includes the projects that BLM has identified as reasonably foreseeable. The analysis assumes increases in coal production based on existing approved mining and reclamation permits and proposed changes in those permits. Assumed levels of CBM production are based on the Wyoming and Montana oil and gas EISs, which is the best available estimate of the levels of CBM and conventional oil and gas development for the next 10 years. Other projects are considered based on their likelihood of completion. There are currently 13 active and 2 inactive existing mines are located in three groups or pods that extend from north of Gillette, Wyoming, to south of Wright, Wyoming. One group of mines is located north and northeast of Gillette, one group of mines is located between Gillette and Wright, and the third group of mines is located east and south of Wright. [The Dave Johnston Mine referenced in your comments, which is located much further south (near Glenrock, Wyoming), has ended mining operations, and is now in the process of reclaiming areas of disturbance.] It is likely that existing mines within the three groups will continue to lease coal adjacent to their existing operations if the coal in those areas can be economically recovered and sold. It is not likely that the area between the groups of mines will be filled in because the coal deposits do not form one continuous thick mineable unit stretching from north of Gillette to south of Wright. The coal splits into thinner beds and the quality of the coal deteriorates in the areas between these groups of mines. That is why there are no existing mines in those

H-56


areas and why the existing mines are not leasing in those areas, even though the overburden in those areas is thinner than the overburden in the tracts that have been applied for, which would make the coal much more economical to recover. When it was active, the Dave Johnston mined coal from entirely different, younger coal beds. BLM has started work on a two-year technical study to assess current coal development, develop projections of expected future development, and develop data and modeled projections of the effects of projected surface coal mining in the Wyoming PRB for use in evaluating the impacts of leasing and mining the two remaining pending LBA tracts. Briefings on this study were held for state and federal agencies, including EPA and WDEQ, in November 2003. Please contact Mike Karbs with the BLM Casper Field Office for more information on this study. 12.	 Noxious Weed Control. The “Vegetation” section of the cumulative impact analysis has been expanded to describe measures that are being required outside of the coal mine permit area to address noxious weeds. A plan for controlling noxious weeds is included in the mining and reclamation plan permit for each mine, including the Buckskin Mine, as discussed in the EIS. 13.	 Wetlands Mitigation. To the extent that the 17.5 acres of jurisdictional wetlands identified on the LBA tract analysis area would be affected by mining, the COE would have to approve a wetland mitigation plan prior to approval of the surface coal mining and reclamation permit revision for the West Hay Creek LBA tract. COE requires mitigation of all impacted jurisdictional wetlands in accordance with section 404 of the Clean Water Act, and determines the number of acres to be restored. COE considers the type and function of each jurisdictional wetland that will be impacted and may require restoration of additional acres if the type and function of the restored wetland will not completely replace the type and function of the original wetland. The wetland mitigation plan approved by COE becomes part of the WDEQ mining permit. 14.	 Mitigation of Nonjurisdictional Wetlands. Restoration of nonjurisdictional wetlands is not regulated by COE under section 404 of the Clean Water Act. Replacement of nonjurisdictional wetlands may be required by the surface management agency, if the surface estate is federally owned, or by the surface owner, if the surface estate is not federally owned. BLM requires restoration of all impacts to wetlands on BLM-administered surface; however, there is no BLM-administered or other federally-administered surface estate included in the West Hay Creek LBA tract, or in this area. WDEQ/LQD requires the restoration of some nonjurisdictional wetlands, depending on the values (importance to wildlife) associated with the wetland. WDEQ requires restoration of playas if they have hydrologic significance. Additional discussion of nonjurisdictional wetlands mitigation has been included in the FEIS.

H-57


15.

Additional information has been added to the discussions of sage grouse and other species in the wildlife sections of the FEIS.

H-58