Revision 1

-i-

SHSH-1001/063-2212A

TABLE OF CONTENTS 3.0
3.1

OPERATION PLANS ....................................................................................................... 1
Operation Plan - General .................................................................................................... 1 3.1.1 Operation Description Narrative .................................................................................. 1 3.1.1.1 Introduction ........................................................................................................ 1 3.1.1.2 Safety ................................................................................................................. 3 3.1.1.3 Abandoned Underground Mines ........................................................................ 3 3.1.1.4 Waste Disposal .................................................................................................. 3 3.1.1.5 Relocation and Re-Route of Utilities ................................................................. 4 3.1.2 Mining Method Narrative............................................................................................. 4 3.1.2.1 Mine Development............................................................................................. 5 3.1.2.2 Haul Roads ......................................................................................................... 6 3.1.2.3 Topsoil Removal ................................................................................................ 7 3.1.2.4 Overburden Removal ......................................................................................... 9 3.1.2.5 Lignite Removal .............................................................................................. 10 3.1.2.6 Design Parameters ........................................................................................... 11 3.1.2.7 Haul Road Maintenance................................................................................... 12 3.1.2.8 Regrading and Reclamation ............................................................................. 12 3.1.3 Mine Support Facilities .............................................................................................. 13 3.1.3.1 Wash Bay ......................................................................................................... 13 3.1.3.2 Fuel Depot........................................................................................................ 14 3.1.3.3 Disposal Procedures ......................................................................................... 14 3.1.3.4 Explosive Storage Area................................................................................... 15 3.1.3.5 Septic System................................................................................................... 15 Existing Structures ............................................................................................................ 15 3.2.1 Existing Structures Narrative ..................................................................................... 16 3.2.1.1 Farmsteads ....................................................................................................... 17 3.2.1.2 Mine Facilities ................................................................................................. 17 3.2.1.3 Surface Water Management Structures............................................................ 17 3.2.2 Farm Building/Structure Removal Narrative ............................................................. 17 Blasting Plan ..................................................................................................................... 18 3.3.1 Procedures .................................................................................................................. 18 3.3.2 Schedule ..................................................................................................................... 20 3.3.3 Monitoring.................................................................................................................. 21 3.3.4 Notices........................................................................................................................ 21 Air Quality Control Plan ................................................................................................... 22 Transportation Facilities ................................................................................................. 24 3.5.1 Transportation Narrative........................................................................................... 25 3.5.1.1 Haul Road Construction ................................................................................. 25 3.5.1.2 Haul Road and Coal Ramp Plan ........................................................................ 27 3.5.1.3 SHLM Access Road......................................................................................... 28 3.5.1.4 Removed, Re-Routed, Temporarily Closed, and Reclaimed Roads ................ 29 3.5.1.5 Culvert and Arch Bridge Design..................................................................... 31 3.5.2 Professional Engineer Certification............................................................................ 35 Surface Water Management.............................................................................................. 36 3.6.1 Surface Water Management Plan ............................................................................... 36 3.6.2 Hydrologic Parameters, Design Procedures and Design Concepts ............................ 39 3.6.3 Water Management Plan for the Mine Plan ............................................................... 41 3.6.4 Designs for Water Management Structures................................................................ 41 3.6.5 Water Management Plan Construction and Operations ............................................. 42
Golder Associates

3.2

3.3

3.4 3.5

3.6

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.7 3.8 3.9

-ii-

SHSH-1001/063-2212A

Protection of Public Parks................................................................................................. 45 Surface Mining Near Underground Mine ......................................................................... 45 Auger Mining Plan............................................................................................................ 45

LIST OF TABLES
Table 3.1-1 Table 3.1-2 Table 3.1-3 Table 3.1-4 Table 3.1-5 Table 3.3-1 Table 3.5-1 Table 3.6-1 Table 3.6-2 Table 3.6-3 Table 3.6-4 Annual Area Disturbed Estimated Lignite Production Equipment List Summaries of Lignite and Overburden Thicknesses Suitable Growth Material Balance by Landowner – Life of Mine Maximum Weight of Explosives to be Detonated within Any 8 Millisecond Delay Period Culvert Design Summary Curve Number Estimates Precipitation Frequency Estimates Ditch Sizing Cover Practice Values

LIST OF FIGURES
Figure 3.1-1 Pit Layout and Facilities Map Figure 3.1-2 Life of Mine Overburden and Lignite Removal Schedule Map Figure 3.1-3a Mine Support Facilities (Conceptual) Figure 3.1-3b Owner’s Offices (Conceptual) Figure 3.1-4 Haul Truck Fueling Depot (Conceptual) Figure 3.1-5a Utilities Re-Route Map – Water Lines Figure 3.1-5b Utilities Re-Route Map – Communication Lines Figure 3.1-5c Utilities Re-Route Map – Underground Gas and Electric Lines Figure 3.1-5d Utilities Re-Route Map – Power Lines Figure 3.2-1a Existing Structures Map – Power Lines Figure 3.2-1b Existing Structures Map – Gas Pipe Lines and Water Lines Figure 3.2-1c Existing Structures Map – Communication Utilities Figure 3.3-1 Blasting Distances Map Figure 3.3-2 Typical Blast Design Using Nonel Trunklines and Downline Delays Figure 3.3-3 Typical Blast Design Using Detonating Cord Figure 3.5-1 General Haul Roads and Coal Ramps Layout Figure 3.5-2 Main Haul Road – Typical Cross-Sections Figure 3.5-3 Access Roads – Typical Cross-Sections Figure 3.5-4 Figure Removed, Number Kept as a Place HolderSite Access Road – Profile Figure 3.5-5 Explosive Material Storage Area Access Road Profile Figure 3.5-6 Pit Access Road – Profile Figure 3.5-7 Main Haul Road – Segment 1 Profile Figure 3.5-8 Main Haul Road – Segment 2 Profile Figure 3.5-9 Main Haul Road – Segment 3 Profile Figure 3.5-10 Main Haul Road – Segment 4 Profile Figure 3.5-11a Site Access Route Map Figure 3.5-11b Right of Way Closure and Road Relocation Map Road Re-Route Map – Roads Temporarily Closed or Removed Figure 3.5-11c Road Re-Route Map – Roads Re-Established/Reclaimed, Re-Opened, or Constructed Figure 3.5-12 Culvert and Bridge Locations
Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 Figure 3.5-13 Figure 3.5-14 Figure 3.6-1 Figure 3.6-2 Figure 3.6-3 Figure 3.6-4 Figure 3.6-5 Figure 3.6-6 Figure 3.6-7 Figure 3.6-8 Figure 3.6-9

-iii-

SHSH-1001/063-2212A

South Branch Heart River HEC-RAS Analysis and Cross-Sections South Branch Heart River Haul Road Bridge Plan Life of Mine Water Management Plan Permit Term Water Management Plan Sheet 1 of 2 Permit Term Water Management Plan Sheet 2 of 2 Ditch CD-1A Ditch CD-2A Pond 1 Pond 2 Small Area Exemptions – Stockpile Containment DesignsPond 3 Small Area Exemptions – Stockpile Containment Designs

LIST OF APPENDICES
Appendix 3.3-1 Appendix 3.3-2 Appendix 3.3-3 Appendix 3.3-4 Appendix 3.3-5 Appendix 3.5-1 Appendix 3.6-1 Appendix 3.6-2 Blast Record Notice of Blasting Schedule Pre-Blast Survey Request Surface Owners Within One Mile of the Permit Boundary Monitoring Equipment Specification Sheet Certification Letter – Primary Roads Certification Letter – Surface Water Management Operations Plans Surface Water Management SEDCAD Reports South Heart Lignite Mine

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-1-

SHSH-1001/063-2212A

3.0
3.1

OPERATION PLANS
Operation Plan - General

In accordance with: • • • • • •

Section 38-14.1-14, North Dakota Century Code (NDCC); Section 38-14.1-15, NDCC; Section 69-05.2-09-1, North Dakota Administrative Code (NDAC); Section 38-14.1-24(19), NDCC; Section 69-05.2-09-14, NDAC; and Section 69-05.2-18, NDAC.

This section addresses the North Dakota requirements for Operation Plans to engage in surface coal mining operations. Plans for mining operations, construction and use of mine support facilities, removal of existing structures, blasting, air pollution control, transportation facilities, and surface water management have been developed by Norwest Corporation (Norwest) and are included in this section. In addition, an application for an Air Quality Permit to Construct for the South Heart Lignite Mine (SHLM) is being developed and will be filed at the North Dakota Department of Health (NDDH). The application package will include a description of the wind erosion mitigation measures and air pollution control plan developed for the proposed mine. 3.1.1 3.1.1.1 Operation Description Narrative Introduction

South Heart Coal LLC (SHC) is planning to develop and operate a surface-lignite mining operation located southwest of the town of South Heart in Stark County, North Dakota. Production is

scheduled at a rate of 2.4 Million tons per year (Mtpy) over the 30-year life of the mine. Production for the first year of operation, 2014, is scheduled for 130,600 tons (t) and 931,900 t for the second year. Production for years 2016 through 2043 are scheduled at 2.4 Mtpy production.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-2-

SHSH-1001/063-2212A

Overburden/topsoil will be removed using a combination of 44-cubic yard (cy) tractor-scrapers, 20-cy hydraulic excavators, D11 class dozers, and 150-t rear dump trucks. Lignite will be removed using 150-t rear dump trucks and 15-cy hydraulic excavators. The productivities of the 44-cy scrapers, D11 class dozers, 150-t class trucks and the 15-cy and 20-cy hydraulic excavators are based on standard operating parameters common within the mining industry or based on actual operating experience. The overburden fleet consisting of

scrapers/dozers/trucks/loaders is projected to remove up to a maximum of approximately 11.5 million (M) cy of overburden material per year. The lignite fleet consisting of trucks/hydraulic excavators is projected to mine 2.4 Mt of lignite per year. Figure 3.1-1 presents the location of topsoil/subsoil storage facilities, haul roads, sediment control structures, and a general pit layout for the life of the mine. Carlson Mining 2009 mining software was used to develop both overburden and lignite production schedules for the life of the mine. The SHLM has an approximate life of 30 years. Mine timing and sequencing for overburden and lignite can be seen on Figure 3.1-2. From 2014 through early 2043, overburden and lignite removal is scheduled for a maximum of five shifts per week, 52 weeks per year. Several other activities will occur prior to the removal of lignite from the Permit Area. These activities include, but are not limited to, removal and stockpiling of topsoil and subsoil, construction of haul roads and lignite access ramps, and the construction of sediment control structures. The work associated with these activities will continue during the normal mining activities within the Permit Area. If required, explosives will be used to fracture and fragment the lignite coal seams to facilitate loading and haulage of the lignite. Blasting will occur between sunrise and sunset Monday through Friday. Blast holes will be drilled using a 6-inch (in) to 9-in diameter rotary drill. SHC anticipates dewatering of the pits will be necessary due to ground water infiltration and surface water run-off into the pit. Water will be collected in ditches and routed to central sump locations where it will be pumped to the sedimentation pond adjacent to the active mining area (Figure 3.1-1 and Figure 3.6-1). In the pond, the suspended solids will be allowed to settle out before the water is

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-3-

SHSH-1001/063-2212A

discharged into natural drainages. Water from the sedimentation pond may be used for haul road dust suppression as required. Table 3.1-1 shows the projected annual disturbed acres per year within the Permit Area. Table 3.1-2 includes the estimated annual lignite production from the two recoverable lignite seams over the life of the mine and within the Permit Area. In addition, Table 3.1-3 lists the equipment that will be used for overburden, topsoil and lignite removal, rough and final grading, topsoil and subsoil replacement, revegetation, and support of other ancillary mining activities. 3.1.1.2 Safety

SHC will develop a plan for compliance with the health and safety standards of the Federal Mine Health and Safety Administration (MSHA). SHC will develop a program to ensure compliance with all applicable SHC and MSHA safety policies. All access to the SHLM site will be controlled and access to the Permit Area will be allowed only under controlled circumstances. Persons entering the SHLM site will be required to undergo hazard training as prescribed by MSHA. 3.1.1.3 Abandoned Underground Mines

No abandoned underground mines have been identified within the Permit Area or the areas adjacent to the Permit Area. 3.1.1.4 Waste Disposal

Disposal of waste within the Permit Area will be limited to that non-coal waste for which a solid waste disposal permit is not required. Those non-coal wastes include wood materials, certain plastic materials, concrete materials, and other mining-related, non-hazardous materials specifically exempted from the requirement to obtain a solid waste disposal permit under the provisions of NDAC 33-20-02.1-01. Those non-coal wastes will be placed and stored in a controlled manner in designated areas within the Permit Boundary in accordance with all applicable regulations including NDAC 69-05.2-19-04. No other waste disposal activities are planned within the Permit Area.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.1.1.5 Relocation and Re-Route of Utilities

-4-

SHSH-1001/063-2212A

The Southwest Water Authority water line, the West Plains Electric underground power line, and the Consolidated Telecom copper phone line located in the northern portion of Sections 20, 21, and 22, Township 139 North, Range 98 West will be relocated to the right-of-way (ROW) corridor located between Pit 1 and Pit 2, as shown on Figure 3.1-5a, Figure 3.1-5b, Figure 3.1-5c, and Figure 3.1-5d. Portions of the Montana-Dakota Utilities Company (MDU) underground gas line which are connected to the Williston Basin Interstate Pipeline Company (WBI) underground gas line will be disconnected from the WBI gas line in the NW1/4 corner of Section 21, Township 139 North, Range 98 West and the NE1/4 corner of Section 22, Township 139 North, Range 98 West. The utilities disconnected during the mining phase of SHC will be re-connected prior to reclamation of the disturbed mining area. The Southwest Water Authority water line and West Plains Electric underground power line located in the N1/4 of Section 34, Township 139 North, Range 98 West will be disconnected and re-routed to the south of their current location, placing the utilities further from the mining activities of Pit 4. The timing for the relocation of the affected utilities can be seen on Figure 3.1-5a, Figure 3.1-5b, Figure 3.1-5c, and Figure 3.1-5d. The figures show the approximate timing and location of all relocated utilities. The actual timing of these relocations may vary due to conditions encountered during mining or changes to the mining plan and/or mining sequence. After completion of mining in the Permit Area and once reclamation has begun, SHC will ensure that the existing and pre-existing utilities affected (relocated) by the mining activities will be re-connected if desired by the owner. All final location of utilities will be subject to approval from the appropriate utility company. 3.1.2 Mining Method Narrative

SHLM will be a surface lignite mining operation located just southwest of South Heart, North Dakota. The SHLM is scheduled to produce 2.4 Mt of lignite for the approximately 30 years of operation (from 2014 through early 2043). The lignite will be hauled using 150-t rear dump trucks to the coal crushing facility which will be located in Section 34, Township 139 North, Range 98 West.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-5-

SHSH-1001/063-2212A

Figure 3.1-1 shows the general mine layout, proposed mining areas, topsoil/subsoil storage areas, haul road locations, and facility locations. Figure 3.1-2 shows the proposed overburden removal sequence by year within the mining Permit Area. Within the Permit Boundary, there are a total of four lignite seams. The seams in top down order are the E Seam, the E1 Seam, the D Seam, and the HT Butte Seam. Within the proposed Permit Area, mining of the HT Butte Seam has not been scheduled because it lies an average of 143 feet (ft) below the D Seam and has a stripping ratio greater than 10 to 1, which is uneconomic to mine (more information on this can be found in Section 2.3). The D Seam is the primary seam scheduled for mining because it averages 17.1 ft in thickness and has an overall average stripping ratio of less than 5 to 1. The average lignite seam and overburden thickness for the individual lignite seams are summarized in Table 3.1-4. 3.1.2.1 Mine Development

After SHLM permit approval, the pre-mining development work will begin with construction of the sedimentation control structures, mine access and haulage roads, mine support facilities area, office, power lines, and various other related facilities. These facilities will be used for a period of

approximately 30 years. All facilities will be located outside a 100 foot setback from all county roads except for the mine access road which connects to the county road to allow access to the mine site. To ensure that no facilities are constructed or no area is disturbed within this 100 foot county road right-of-way setback line, a series of boundary stakes will be set by the surveyor along the setback line to clearly delineate this boundary during facilities construction and early mining activities. Prior to construction of any facilities, the topsoil/subsoil will be removed and stockpiled adjacent to these facilities. Topsoil/subsoil stockpiles will remain through the life of the mine. The mine access road and sedimentation control structures must be constructed and in-place before any additional facility construction work can start. Once the sedimentation control structures are in place, all other facility construction can be completed. Upon mine closure, all facilities will be removed except for those required during the final reclamation phase. After the facilities are removed, the topsoil/subsoil will be replaced and the sites revegetated.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.1.2.2 Haul Roads

-6-

SHSH-1001/063-2212A

Haul roads will be constructed on both undisturbed land (no mining) and reclaimed spoil (mined land). A typical haul road cross-section is included on Figure 3.5-2. Haul road construction on undisturbed lands will consist of removing and storing the topsoil in areas adjacent to the proposed haul road alignment and any proposed borrow areas. SHC plans on using the subsoil along the haul road alignment as material for the road sub-base. If, during construction, the subsoil found along the haulage route or borrow areas consists of weathered bedrock or other material it will be tested for toxicity. Rotary hole cutting samples will be collected and analyzed for electrical conductivity (EC), sodium adsorption ratio (SAR), and texture. A report summarizing the results of these samples will be submitted to the North Dakota Public Service Commission (PSC). If the analyses show the materials meet subsoil quality standards, SHC proposes to use these materials, along with the subsoil, for the sub-base during road construction. If these samples do not meet subsoil standards, then additional borrow areas will be used to recover sufficient subsoil to complete the road construction. Cuts in the borrow areas will be limited to a maximum of 5 ft in depth. Once the sub-base is completed, a top dressing of compacted aggregate or gravel will be added as the final running surface. During construction, culverts will be installed at the proper locations and ditches will be constructed in all road cut sections. Visual monitoring of the cut materials removed for construction will ensure that no poor quality (reduced, gray, or sodic) materials are removed and used. Haul roads in disturbed mining areas will be constructed using borrow materials located along the haul road alignment. The sub-base will be constructed of compacted overburden waste found at the surface. A top dressing of 6 in of compacted aggregate or gravel will be added to the top of the compacted sub-base to provide the final running surface. During construction, culverts will be installed at the proper locations and ditches will be constructed in all road cut sections. Upon completion of mining, all haul roads not scheduled to remain after mining will be reclaimed. All aggregate or gravel will be removed from the road and will be hauled into the final pit for disposal. All culverts will be removed and disposed either by placement in the final pit where they will be covered with spoil material or they will be salvaged and sold as scrap. The sub-base material will be spread to conform to the proposed final contour. Then all topsoil and any stockpiled subsoil in the disturbed mining areas will be respread over the haul road alignment and revegetated.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-7-

SHSH-1001/063-2212A

Some subsoil required for use in SHLM subsoil respread plans may be removed during the construction of haul roads or sediment control structures footprint areas in areas scheduled for mining. The subsoil will be removed from these areas during the haul road construction or prior to the overburden removal operation. Any topsoil removed will be handled in accordance with the reclamation procedures outlined in Section 4.1.1. The general mining sequence will consist of: • • • • • • • • • • 3.1.2.3 Land clearing (if any); Topsoil/subsoil removal; Pre-stripping of overburden (when required); Primary overburden removal; Lignite drilling, blasting (when required); Lignite loading. hauling and crushing; Backfilling; Final grading; Replace topsoil/subsoil; and Replace vegetative cover. Topsoil Removal

Topsoil and subsoil removal will precede the pre-stripping of the overburden from the areas to be disturbed by mining, roads, and facilities. The topsoil lift will be removed using 44-cy

tractor-scrapers to the depths indicated on the soil survey maps Figure 2.4-2A, Figure 2.4-2B, and Figure 2.4-2C. The subsoil material will be removed after the topsoil using the same scraper fleet to the depths indicated on the soil survey maps Figure 2.4-2A, Figure 2.4-2B, and Figure 2.4-2C. Topsoil/Subsoil volumes required for replacement were estimated using two methods. Method 1 used a gridded model to estimate the total thickness of Suitable Growth Material (SPGM) required. A SPGM thickness replacement grid was developed using the overburden quality drill hole data and the respread depth criteria outlined in NDAC 69-05.2-15-04-4 of the regulations. Table 3.1-5 shows the required average replacement depth is 3.5 feet while the average in-place topsoil/subsoil thickness

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-8-

SHSH-1001/063-2212A

is 2.4 feet. This results in a deficit of 1.1 feet or approximately 6.15M bank cubic meters (bcy) of SPGM which will be obtained from within the disturbed pit area. Method 2 outlined in Policy Memorandum No. 17 was the second method used to estimate the required SPGM respread depths for the Permit Area. One hundred-one (101) Ninety-nine (99) overburden sample holes are located within the proposed Permit Boundary (See Figure 4.1-10a). Using these 99 101 holes, Table 4.1-1 was developed to estimate the total depth of SPGM required to meet the cover standards for sodic spoil found in Policy Memorandum No.3, Part l-A(l). The proposed SPGM respread depths range from 24 to 48 inches with 29 holes showing 24 inches, 4 holes showing 36 inches, 12 holes showing 42 inches and 54 56 holes showing 48 inches. The average respread depth for this Permit Area using these 99 101 sample holes is 39 inches or 3.25 feet. This would result in a deficit of 0.28 feet or 2.2 Million bank cubic yards (Mbcy). Therefore during reclamation, SHLM will recover and store approximately 2.2 Mbcy of suitable overburden from the proposed pit area as a subsoil supplement. This is discussed in Section 4.1.1.1. The topsoil/subsoil and the suitable overburden removed will be placed in topsoil/subsoil and suitable overburden stockpiles when it cannot be directly hauled and placed as final respread on final graded areas. When requested by the property owner, the topsoil/subsoil will be stockpiled according to surface ownership to prevent mixing of topsoil from one ownership parcel with another. Areas where the topsoil will be stockpiled include the box cuts and areas where mining advances from one surface ownership parcel to another. Figure 1.3-2 shows the surface land ownership parcels as listed in Table 3.1-5. The tractor-scrapers will place the topsoil/subsoil on the stockpiles in compliance with NDAC 69-05-2-18.01(5). A dozer will create a diversion ditch around the topsoil stockpile to help prevent erosion. Ramps from one lift to another will be constructed at grades not to exceed eight percent (8%). At all other times, topsoil will be direct hauled from the future mining area to the regrade area as described in Section 4.1.1. In order to assure that sufficient SPGM will be available for respread, additional suitable soil will be available in the same area for salvage as indicated on the soil survey maps (Figure 2.4-2A, Figure 2.4-2B, and Figure 2.4-2C). However, in cases where sufficient topsoil/subsoil is not

available, suitable overburden material will be used to make-up the deficit of suitable topsoil. Table 3.1-5 shows the volume of suitable topsoil/subsoil available for removal/respread for each landowner within the Permit Boundary. In addition, the table shows the total volume of suitable topsoil/subsoil and suitable overburden required to meet the final reclamation requirements for each landowner. Based on SHC overburden geochemical model, there appears to be sufficient additional

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-9-

SHSH-1001/063-2212A

suitable overburden available within the disturbance area to satisfy any potential suitable SPGM shortfall of any landowner (See Section 4.1.1.1). In general, the topsoil/subsoil removal and respread or stockpiling operation will occur during the summer and fall seasons (April – October) of the year preceding mining. Because the initial overburden mining operation is starting in mid year 2013, the topsoil for the remaining 6 months of 2013 and for the first 4 months of 2014 must be removed between the beginning of July and the end of October, 2013. The contractor will attempt to schedule topsoil and subsoil removal operations during the approximately 8 frost free months. Normally, the fall topsoil removal operations are scheduled to remove sufficient SPGM to allow mining operations to continue until spring of the following year. Such stockpile locations and the other affected areas are shown on Figure 3.1-1. The actual locations of topsoil/subsoil stockpiles may vary slightly from those shown on the figure due to actual field conditions. SHC will directly respread as much SPGM, without stockpiling, as is legally and logistically possible. The stockpiling will be in accordance with methods approved by the PSC. Volumes will be measured by load count or topographical survey. The stockpiles will be seeded as soon as possible with an approved mixture of grasses to help control weed infestation and water and wind erosion (Section 4.3). Each topsoil stockpile will be identified by a sign post bearing a name or number specific to that stockpile. 3.1.2.4 Overburden Removal

The overburden depths within the Permit Area range from 13 to 105 ft in thickness. After the topsoil and suitable subsoil material have been removed and stockpiled, the initial box cut overburden material (a minimum width of 3 mining cuts or 450 ft) will be removed and hauled to an out-of-pit stockpile (Figure 3.1-1). The overburden stockpile will be located north of the initial box cut. The overburden stockpile will be built in a maximum of 4-ft lifts to comply with NDAC 6905-2-18.01(5). The overburden material will remain stockpiled until it can be respread back on the regrade area. The overburden material will be removed using the contractor’s truck/shovel/scraper fleet. When a sufficiently large regrade area is completed, the stockpiled box cut overburden material will be removed from the stockpiles and respread equally over this large area. Final grading of the area will be achieved using dozers and motor graders as required. The location of the out-of-pit overburden stockpiles can be seen on Figure 3.1-1. The actual locations of the outof-pit overburden stockpiles may vary slightly from those shown on the figure due to actual field

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-10-

SHSH-1001/063-2212A

conditions. This determination will be made in the field and dictated by the amount of material needed to regrade the existing pit. Beginning in mid-2014, the overburden truck/loader/dozer fleet is scheduled to work five shifts per week, up to 52 weeks per year. Dozer assistance for the overburden removal operation may be required in areas where harder material is encountered. Portions of the overburden material that are classified as suitable overburden may be used as SPGM in areas where there is not sufficient SPGM material to meet reclamation requirements. Stockpiling of SPGM may be required due to mine sequencing constraints. The SPGM stockpile locations are shown on Figure 3.1-1.

The actual locations of SPGM stockpiles may vary slightly from those shown on the map due to actual field conditions. When overburden/interburden stockpiling is necessary, the overburden

truck/loader/scraper fleet will haul the SPGM from the pre-stripping area to the stockpile locations. A dozer will then be used to push the SPGM into 4-ft lifts to comply with NDAC 69-05-2-18.01(5). Ramps from one lift to another will be constructed at grades not to exceed 8%. Final grading of the area will be achieved by the dozer fleet as required. 3.1.2.5 Lignite Removal

The truck/loader/dozer fleet will remove the overburden above the E seam (where present) by loading and hauling this overburden into the adjacent mined-out pit area. If any recoverable E seam is encountered, the top of the E lignite seam will be cleaned using track dozers, motor graders, or rubber-tired dozers, ripped, and then hauled to the coal crushing facility located at the Plant Facility. The truck/loader/dozer fleet will then remove the overburden above the E1 seam (where present) by loading and hauling this overburden into the adjacent mined-out pit area. If any recoverable E1 seam is encountered, the top of the E1 lignite seam will be cleaned using track dozers, motor graders, or rubber-tired dozers, ripped and hauled to the coal crushing facility located at the Plant Facility. The overburden/interburden above the D seam, which includes the unrecoverable E and E1 seams, will then be loaded and hauled by the truck/loader/dozer fleet into the same adjacent mined-out pit area using the same method described for removal of the E seam overburden/interburden. Once the D seam is exposed, track dozers, motor graders, or rubber-tired dozers will clean the top of the lignite. The lignite will be prepared for loading by either blasting the lignite or ripping the lignite with a D11 class dozer. When the D seam is ready for loading, a 15-cy front hydraulic excavator will load the lignite into 150-t rear dump trucks for direct transport to the coal crushing facility located at the Plant Facility. If the coal crushing facility is unable to accept the lignite, it will be stockpiled adjacent to

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-11-

SHSH-1001/063-2212A

the truck dump hopper located at the Plant Facility. This lignite stockpile will be able to store approximately 100,000 t of lignite. Lignite loading operations are scheduled to work one eight-hour shift, five days a week, 52 weeks per year. Any production shortfall will be made up by either working overtime or additional loading shifts. 3.1.2.6 Design Parameters

Face angles for benches are designed at 50 degrees (from horizontal), pit widths are designed at 150 ft wide, and the angle of repose for the spoil material is designed at 37 degrees. An overall pit slope angle of 43 degrees (from horizontal) was used for planning purposes. The above design parameters are based on a geotechnical investigation performed by Norwest (Ennis et. al. 2007). SHC does not plan to blast the overburden material, but if blasting of the lignite is needed it will be drilled on a 16 ft by 16 ft pattern using between 6- to 9-in holes. The designed powder factor used for lignite blasting is 0.25 pounds (lbs)/t. During development of the mine plan, significant consideration was giving to maximizing the utilization and conservation of the lignite being recovered in the Permit Area so that re-affecting the land in the future can be minimized. The same consideration was given to maximizing the recovery of the lignite in the Permit Area in order to minimize total land disturbance. To ensure that lignite recovery will be maximized, the following procedures will be followed: • Lignite will be prepared for loading using a combination of rubber-tired dozers, motor graders, or tractor scrapers. Cleaning will remove extraneous material on top of the lignite seam and minimize the lignite loss by removing only the small amounts of remaining overburden material or any oxidized lignite. The contract miner will monitor the loading of the lignite to ensure that the operators are taking the maximum amount of lignite from the floor and ribs while maintaining the lignite quality at contract compliance levels. Lignite haul trucks will not be overloaded to ensure that lignite spillage is minimized.

•

•

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.1.2.7 Haul Road Maintenance

-12-

SHSH-1001/063-2212A

The lignite will be hauled from the mine area to the coal crushing facility located within the northern portion of Section 34, Township 139 North, Range 98 West, from 2014 through mid-2043. During non-freezing conditions, fugitive dust from the haul roads will be controlled using a 20,000 gallon (gal) water truck to water the haul roads. Agglomerating agents may be added to the water to minimize the amount of water needed on the haul road to control the dust. 3.1.2.8 Regrading and Reclamation

Following the removal of all recoverable coal, rough grading of the overburden spoils will begin. A more detailed description of the rough grading can be found in Section 4.1. Projected respread depths for topsoil/subsoil will be determined based on overburden soil characteristics described in Section 2.3. The texture, SAR, and saturation percentage of the final graded spoil will be determined by a PSC evaluation of the pre-mine overburden data, sample analyses of the graded spoil on an approved grid collected by SHC or by a combination of both. Once the PSC and SHC have established a satisfactory baseline of regraded spoil characteristics, the topsoil/subsoil replacement can begin. Once the final grading and sampling is completed and approved by the PSC, the topsoil/subsoil or suitable overburden material will be respread in 24-, 36-, 42- or 48-in lifts using tractor scrapers or end dump trucks. With the assistance of grade stakes placed on 100-ft centers or GPS machine guidance systems, the topsoil/subsoil or suitable overburden will be spread on the regarded spoil and with the aid of additional equipment (motor graders, tractors, discs, etc.). The topsoil/subsoil or suitable overburden will be spread to a required depth. When the topsoil/subsoil or suitable

overburden areas are approved by the PSC, the area will be revegetated as described in Section 4.3. Table 3.1-5 shows the volume of suitable topsoil/subsoil available for removal/respread for each landowner within the Permit Area. In addition, the table shows the total volume of suitable

topsoil/subsoil and overburden required to meet the final reclamation requirements for each landowner. Based on SHC overburden geochemical model, there appears to be sufficient additional suitable overburden available within the disturbance area to satisfy any potential suitable SPGM shortfall of any landowner.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.1.3 Mine Support Facilities

-13-

SHSH-1001/063-2212A

Mine operations require facilities to: • • • • • • • Maintain equipment; Wash mobile equipment; Store parts and supplies; Provide offices for professional and administrative staff; Provide safety/training facilities; Store explosive supplies; and Process waste water from mine office and shop facilities.

Figure 3.1-3a and Figure 3.1-3b are conceptual drawings showing the mine support facilities for the operation. Figure 3.1-4 is a conceptual drawing of the refueling equipment proposed for the mine site. These structures will be constructed using conventional methods that may include buried

footings, slabs on grade, basic steel frame structure with insulation, and siding. The support buildings total approximately 27,500 square feet (ft2). The buildings will be temperature controlled (heated and air conditioned). Activities performed in these facilities will include administrative and management, mine planning, other engineering services, warehousing, and equipment maintenance. Materials that will be used during maintenance of equipment include replacement parts, welding supplies, steel, oils, lubricants, ethylene glycol, and various other supplies. These materials will be stored, handled, and disposed of in manners necessary to ensure the safety of operating personnel, the protection of the environment, and compliance with all applicable laws and regulations. 3.1.3.1 Wash Bay

The mine facilities include a wash bay to clean mobile equipment prior to performing preventative maintenance (PMs) and major repairs. Mud, grease, and oils dislodged from the equipment during washing will form a slurry which will be directed into a concrete sump where the majority of the solids will settle out. Oil and grease washed from the equipment will rise to the top of the water in

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-14-

SHSH-1001/063-2212A

the sump and will be removed using an oil-grease trap and/or an oil-water separator. The oil free water will be discharged into a wash water settling pond located near the wash bay. The wash water settling pond provides additional capacity to settle out fine silts and clays from the wash water. It also will be equipped with an oil-water separator to capture oil that is not captured in the concrete sump. The cleaned water may be released into natural drainages under a National Pollutant Discharge Elimination System (NPDES) permit, or pumped back to the wash bay for re-use. Both the sump and wash water storage pond will require periodic cleaning to remove buildup of mud. This mud will be loaded into haulage trucks and deposited in designated areas in mined-out areas inside the pit. The oil that is skimmed off the wash water will be collected in 55-gal drums or larger storage bins and sent to an off-site licensed recycler. 3.1.3.2 Fuel Depot

The haul truck fueling depot will consist of one steel 9,500 gal double wall diesel storage tank built for use in transportation of fuel. A fabric spill liner will be provided 20 ft beyond the extent of the fuel trailer and an additional 20 ft x 20 ft area where the trucks will be refueled. Haul trucks and other mine vehicles will be refueled while on the 20 ft square apron. The liner will collect spill that occur during fueling operations. Operators will be trained in fueling procedures. The fueling training will include discussion of how to safely handle the fuel as a potential environmental and fire hazard. Figure 3.1-4 contains an illustration of the planned installation. This sketch shows that the

impervious liner is planned to extend 20 ft beyond the area under the trailer and that it will be installed under 12-in of fill material to assure that the liner stays in place and to assure that any spill is contained in this area. Emergency shut offs will be located near the pumps mounted on the trailer. Also, fire extinguisher and/or fire hydrants will be placed nearby to fight fuel fires. 3.1.3.3 Disposal Procedures

After mining activities are completed, any soils or construction materials contaminated with fuel or oils will be collected and disposed of off-site in landfills licensed to handle these materials or treated and disposed of on-site in accordance with all applicable laws and regulations. Other facilities or

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-15-

SHSH-1001/063-2212A

structures will be dismantled and sold as scrap, or buried on-site with sufficient cover to allow vegetation growth. 3.1.3.4 Explosive Storage Area

The explosive storage area located at SHC will be used to store adequate blasting materials. The storage area will consist of two separate magazine buildings and an explosive storage bin. One storage magazine will store detonators, blasting caps, delays, and other initiating devices. The other storage magazine will store detonating cord, boosters, and other explosive devices and products. The blasting storage bin will have the capacity of storing 25 t of explosives. All explosive materials will be stored in accordance with Federal, State, and local laws. 3.1.3.5 Septic System

The septic system will be located near the mine office and shop facilities. The system will be designed and sized to process water from mine office and maintenance shop showers, sinks, and toilets. The system will include a septic tank and leach field located adjacent to the mine office and warehouse facilities. Prior to installation of the septic system, the area will be tested to ensure that a septic system and leach field will function properly. If testing indicates that a septic system would not operate properly, there are two options for waste water treatment. Option 1 is to install a waste water vault or tank to store the sewage on-site until it can be transported off-site to a proper waste water treatment facility. Option 2 is to install a package waste water treatment that will process all the wastes and allow discharge of the treated water. All facilities will be designed to meet all county and state laws. 3.2 Existing Structures

In accordance with: • • Section 38-14.1-14, NDCC; and Section 69-05.2-09-3, NDAC.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.2.1 Existing Structures Narrative

-16-

SHSH-1001/063-2212A

Based on the definitions in NDAC 69-05.2-09-03, there are no existing mining-related structures in the Permit Area. There are, however, a number of existing non-mining structures (e.g., utilities) within and near the Permit Area including: • • • • • •

Southwest Water Authority water line (1.5 in to 12 in); AT&T fiber optics line; Consolidated Telecom copper line and fiber optic line; Sprint-Nextel fiber optics line; ELM Locating and Utilities Services telephone line; West Plains Electric 345-kilovolt (kV) and 230-kV transmission lines, and underground power line; Montana-Dakota Utilities underground 12-in gas line and 41.6-kV transmission line; Williston Basin Interstate Pipeline Company 2-in and 16-in natural gas pipeline; Plains All American 4-in and 6-in crude oil pipeline; and Stark County and Section Line roads (un-paved).

•

• • •

Figure 3.2-1a, Figure 3.2-1b and Figure 3.2-1c show the proposed mining pit layout and the location of the utility structures. Figure 3.1-5a, Figure 3.1-5b, Figure 3.1-5c, and Figure 3.1-5d show the re-route locations for all the utility lines within the SHC Permit Area. West Plains Electric’s underground power transmission line, Williston Basin Interstate Pipe Line Company’s natural gas line, Consolidated Telecom’s copper line, and South West Water Authority’s water line will be rerouted to the ROW area as shown on Figure 3.1-5a, Figure 3.1-5b, Figure 3.1-5c, and Figure 3.1-5d in order to avoid damaging these utilities during mining. If required, the West Plains Electric overhead power lines will be raised to gain clearance sufficient to allow mining and support equipment to pass under.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-17-

SHSH-1001/063-2212A

SHC will obtain the necessary license(s) or permits required to conduct coal mining activities near, adjacent, or under the utility structures in the Permit Area. 3.2.1.1 Farmsteads

Refer to Section 1.5.5 for a description of existing farmstead locations, road closures, and operations within one hundred feet of a road ROW. 3.2.1.2 Mine Facilities

Refer to Section 3.1 for a description of all the mine facilities to be constructed within the Permit Area. 3.2.1.3 Surface Water Management Structures

Refer to Section 3.6 for a description of the surface water structures. 3.2.2 Farm Building/Structure Removal Narrative

In certain portions of the SHC Permit Area where mining activities will occur, existing structures including but not limited to residential homes, farm structures, farm buildings, storage containers, and barns may need to be removed prior to any nearby mining activity. Figure 3.2-1a shows the areas where the farm structures may be removed. Prior to mining through any area containing the various farm structures, SHC will establish a construction zone perimeter around the area to be affected. SHC will then place geo-textile fences around the construction perimeter to help minimize the disturbance of the topsoil and subsoil within this area. Then a combination of equipment, tractor-scrapers, dozers, and motor graders will pre-strip the topsoil/subsoil within the construction area and haul it to topsoil/subsoil stockpiles as described in Section 3.1.2. The existing structures within the construction zone will then be demolished. To the extent that it can be done without adverse impact to the environment and is allowed by applicable laws and regulations, the wood and other construction debris will be buried in the mined-out pits. Any of this material classified as hazardous waste or determined to be otherwise unsuitable for disposal on-site will be stored and handled accordingly and disposed of at an off-site waste disposal facility permitted to receive those types of waste.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-18-

SHSH-1001/063-2212A

Any fluids, chemicals, sewage, oil, fuel, or liquid storage containers located in the construction area will be removed prior to demolition. The fuel, liquids, or oils collected will be disposed of off-site at facilities permitted to handle those types of wastes. 3.3 Blasting Plan

In accordance with: • • • • 3.3.1

Section 38-14.1-14, NDCC; Section 38-14-1-24, NDCC; Section 69-05.2-09-04, NDAC; and Section 69-05.2-17, NDAC. Procedures

SHC will follow and comply with all applicable Federal, State, and local laws, regulations, and requirements pertaining to the use, handling, preparation, and storage of explosives. When loosening the coal cannot be accomplished efficiently by ripping with dozers, SHC will use explosives to fracture and fragment the lignite seams to facilitate the loading and preparation of the lignite. Blast holes will be drilled using a rotary drill capable of drilling 6- to 9-in diameter holes. The size of a blasting shot will depend on the area available for drilling, the wetness of the holes, and/or the location of the nearest occupied dwelling. A blasting shot could range from a single hole to a maximum of three hundred holes. Prior to blasting, all the mine access roads within the vicinity of the blast area will be posted with blast warning signs. Within the pit area where blasting will occur, all mining activities will cease, all mobile equipment will be removed to a safe distance from the blasting area, and access ramps to the area being blasted will be blocked until the blast area has been cleared. Prior to detonating the blast, audible warning signals will be sounded. The sound is a follows: •

Pre-Blast Warning: A 1-minute (60 seconds) steady siren warning 5 min prior to the blast;

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 •

-19-

SHSH-1001/063-2212A

Blast Warning: A 1-minute (60 seconds) wailing siren will sound prior to final detonation to notify all personal of the pending blast; and All Clear Signal: Following the blast, the blast site will be inspected for misfires and once the blast site is cleared, a steady siren signal for 1 minute (60 seconds) will sound after the blast area has been cleared.

•

Blasting within the Permit Area will comply with the requirements outlined in NDAC 69-05.2-17-05. No blasting will take place within 500 ft of any gas or oil collection lines, fluid transmission pipelines, sewer lines, disposal wells, petroleum or gas storage facilities, municipal water storage facilities, occupied dwelling, or farm buildings. No blasting will take place within 150 ft of any electric transmission lines. There will be no blasting within 1,000 ft of an occupied dwelling, public building, school, church, or community or institutional building outside the Permit Area. Within the proposed Permit Area, there are no public buildings within 300 ft of the planned pit areas. SHC will ensure that the maximum amount of explosives initiated in an eight-millisecond (ms) period does not exceed the blasting standards required to control ground vibrations. Table 3.3-1 shows the maximum weight of explosives that can be detonated within an 8-ms delay period based on the scaled distances to an existing structure within or outside the Permit Area. For the Permit Area, the weight of explosives for each drill hole will range from a minimum of 22 lbs to a maximum of 55 lbs with the average drill hole containing 45 lbs. Figure 3.3-1 shows the distances to farm and other building structures within one mile of the Permit Area. The map also includes a table showing the scaled distances, at 400-ft intervals, and the maximum weight of explosives that can be detonated within an 8 ms delay period. A cross-section and plan view of a typical blast pattern showing the burden and spacing of drill holes and delays are shown on Figure 3.3-2 (a non-electric system (nonel) and Figure 3.3-3 (detonating cord system). Blast holes will be completed as shown in the drawings with the primers, explosives (ammonium nitrate/fuel oil (ANFO)), and stemming placed in the holes as shown. The primers/boosters may be placed at the bottom of the hole, decked (two primers separated by some distance) or collar loaded, depending on drill hole conditions. A non-electric ignition system will be used to ignite the non-electric trunk line delays or detonating cord used for blast initiation. Bulk ANFO will be used in dry holes while pre-bagged ANFO will be used in wet holes. Information for each blast will be recorded using the blast record shown in Appendix 3.3-1.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-20-

SHSH-1001/063-2212A

In addition, all blasting activities will be conducted by trained, experienced, and competent persons who understand the hazards involved in a blasting operation. All blasts will be conducted under the supervision of a certified blaster as required by Federal law and MSHA. All drilling and blasting activities will be conducted by SHC employees or contractors. The drilling and blasting plan for each blast will be approved by a certified blaster and be implemented by SHC employees or contractors working under the guidance of the certified blaster. 3.3.2 Schedule

SHC will publish a blasting schedule in the Dickinson Press or another newspaper that is generally circulated in the area where blasting will occur at least ten days but not more than twenty days prior to beginning the blasting program. That schedule will be republished annually or more frequently as necessary. Copies of the blasting schedule will be distributed to all local governments and utilities that might be affected by the blasting and to all residents within one-half mile of the blasting area as required by law. If a significant change in the blasting schedule and/or location becomes necessary after publication and distribution of the notices described above, a revised blasting schedule will be published as described above and also sent to residents living within one-half mile of the blasting site at least ten days, but not more than twenty days prior to implementation of the new blasting schedule or blasting at the new location. An example of the blasting notice can be found in Appendix 3.3-2. Blasting may occur at other times than specified in the blasting schedule due to emergency situations. These situations may include rain, lightning, atmospheric conditions, or operator or public safety issues. If a blast is delayed due to hazardous weather, such as a thunder storm, such that detonation would occur other than during the time frame listed in the blast schedule, notice will be given to all residents within one-half mile of the blasting site and a complete written report will be filed with the PSC no later than three days following the blast. Such report will include a description of the delay, when the actual blast occurred, what warning notices were given, and a copy of the blasting report.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.3.3 Monitoring

-21-

SHSH-1001/063-2212A

Thirty days prior to any blasting, SHC will notify in writing all residents and landowners of manmade dwellings or structures located within one mile of the Permit Area with instructions on how to request a pre-blast survey. An example of this pre-blast survey is found in Appendix 3.3-3. If a pre-blast survey is requested by any landowners, SHC will hire an independent contractor to conduct a pre-blast survey. The contractor will supply three copies of the pre-blast survey. All requested preblast surveys by land owners located within one mile of the permit boundary will be performed and completed prior to any blasting. One copy will be kept at the SHLM site, one copy will sent to the PSC, and one copy sent to the landowner. Records of all blasting conducted at the SHLM site will be kept on file for a period of three years. Appendix 3.3-1 contains a typical page of the recorded blast information. SHC may conduct seismic monitoring at the nearest dwelling if access is granted, or seismic monitoring will be situated such that the monitoring devices are on a straight line between the mine Permit Boundary and the structure being monitored. The blasting and measuring systems of the seismic monitoring systems will follow the guidelines as outlined in NDAC 69-05.2-17-05. An example specification sheet that details the types, capacities, and sensitivities of monitoring equipment can be found in Appendix 3.3-5. This example is provided through PreSeisTek and is found in Appendix 3.3-5. If the monitoring data clearly shows that SHC is in compliance, seismic monitoring may be discontinued. 3.3.4 Notices

The following is a list of government agencies and the newspaper that will receive a blasting schedule notice: • North Dakota Public Service Commission 600 E. Boulevard, Dept 408 Bismark, ND 58505-0480 Stark County Commissioners County Courthouse 51 3rd St. E Dickinson, ND 58601 Stark County Sheriff

•

•

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 66 Museum Dr. Dickinson, ND 58602 • Dickinson Press 1815 1st St. W Dickinson, ND 58602

-22-

SHSH-1001/063-2212A

Appendix 3.3-4 provides a list of landowners, residents, and building owners that are located within one mile of the Permit Area and who must be notified at least 30 days prior to any blasting of their right to request a pre-blast survey for their properties. With this notification, SHC will include a copy of the blasting schedule notice as required. 3.4 Air Quality Control Plan

Sections 38-14.1-14(2)(j) NDCC and 69-05.2-09-05 NDAC require that SHC specify the measures it will employ to comply with the air pollution control requirements of the NDDH and any other measures necessary to effectively control wind erosion and resulting air pollution. Mining involves the movement of soil, overburden and coal, and generates fugitive dust, all of which are considered in the emission inventory for the proposed mine. The operations associated with the SHLM that may result in particulate matter emissions include the following: • • • •

Topsoil removal, loading and unloading, and transport; Overburden removal, loading and unloading, and transport; Coal drilling, blasting, removal, loading, unloading, transport and storage; and Reclamation.

The surface mine operations described above can generate fugitive dust due to handling, hauling and storage of topsoil, overburden, and coal. SHC will implement the appropriate best management practices to minimize the fugitive dust emissions. The proposed control measures will include: • • •

Minimizing drop heights associated with material loading and unloading; Application of water and/or other dust suppressants on mine haul roads; Vehicle speed limits on mine haul roads;

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 • •

-23-

SHSH-1001/063-2212A

Use of best management practices (BMPs) to reduce potential emission from storage piles; and Concurrent reclamation of areas disturbed by mining in order to reduce the overall size of the disturbed surface area that would be vulnerable to wind erosion.

Particulate emissions from material handling (e.g., loading haul trucks, unloading haul trucks, etc.) are a source of fugitive dust emissions. Those emissions will be controlled by minimizing the drop height (e.g., from the loader bucket to the haul truck bed). This measure will serve to minimize the amount of material exposed at any one time to the potential for wind entrainment of fine particles in the material. Particulate emissions from unpaved haul roads will be controlled using a combination of wet suppression sprays and speed limits. Wet suppression is the preferred control option and will reduce potential emissions by approximately 90%. Fugitive dust emissions from traffic on unpaved roads are partly a function of vehicle speed, with slower speeds generating less dust. SHC will control speeds of the mine haul trucks to minimize fugitive dust entrainment and resulting emissions. SHC will use compaction and, as necessary, dust suppression sprays to minimize fugitive emission from the material storage piles. Compaction and application of dust suppression sprays represent the most stringent technically and economically feasible particulate control system available for material handling storage piles. As described in other areas of this application document, SHC is committed to undertaking reclamation of disturbed surface as soon as practical after mining is completed in the area and as allowed by the regulatory authorities. Concurrent reclamation will serve to minimize the amount of surface vulnerable to wind erosion and thereby reduce resulting fugitive dust emissions. NDAC 69-05.2-09-02(10) requires that an application for a permit to open and operate a surface coal mine include maps showing specific features of the mine including each air pollution collection and control facility. SHC understands the term "air pollution collection and control facility" to refer to a stationary air pollution control device such as a baghouse or scrubber. As required by NDAC 6905.2-09-02(10), the locations of such stationary pollution control devices could readily be reflected on a map.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-24-

SHSH-1001/063-2212A

However, as described above, no discrete air pollution collection and control facilities are proposed for the SHLM. That is because the mining activities proposed in this permit application are

conducted with mobile equipment ill suited to the application of stationary air pollution collection and control facilities as SHC understands that term. Instead, as described above, SHC proposes air pollution control measures (e.g., minimization of material drop heights) and practices (e.g., application of water) to reduce emissions to the atmosphere from the proposed mining activities. Therefore, because SHC proposes no air pollution control and collection facilities none are reflected on the maps provided as part of this application. SHC will apply to the North Dakota Department of Health for the required air quality-related permitto-construct in which SHC will propose the air pollution control measures and practices described here. SHC has applied to the NDDH for an air quality permit-to-construct for the SHLM. 3.5 Transportation Facilities

In accordance with: • • • • • • Section 38-14.1-07, NDCC; Section 38-14.1-24(15), NDCC; Section 69-05.2-09-06, NDAC; Section 69-05.2-04-01.3, NDAC; Section 69-05.2-24, NDAC; and Section 69-05.2-09-07, NDAC.

A description of the transportation facilities to be constructed, used, and maintained for the mine is provided in this section. In addition, a letter certifying that the plans and drawings pertaining to the primary roads have been prepared by or under the direction of a certified registered professional engineer with experience in the design and construction of roads is provided in Appendix 3.5-1 and a discussion of this letter is location in Section 3.5.2. This section will also include a plan to relocate or use any existing county and section line roads.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.5.1 3.5.1.1 Transportation Narrative Haul Road Construction

-25-

SHSH-1001/063-2212A

The development of haul roads at the SHLM site will require the construction of a portion of the main haul road through undisturbed areas to facilitate mining equipment mobilization and coal haulage to the coal crushing facility. The proposed haul roads and pit access ramps are shown on Figure 3.5-1. The haul roads and ramps may or may not be constructed in the exact locations shown due to unforeseen changes in mining conditions or other factors. The intent of illustrating the haul roads and ramps is to show the method that will be used in the coal haulage process. The actual locations will be based on the conditions encountered in the field, pit placement, and advancement of the pits. Typical haul road cross-sections constructed in undisturbed areas and regrade areas are illustrated on Figure 3.5-2. The typical main haul road will be designed using the following parameters: • • • • • • • Road Travel Width (Minimum): Road Bed Slope: Road Embankment Slopes: 60 ft; 1% to ditches; 4H to 1V for trapezoid ditches; 3H to 1V for triangular ditches; 4 ft for trapezoid ditches 3H to 1V or Less unless otherwise specified; 10-year/24-hour precipitation event; and 100-year flood flow on South Branch Heart River

Ditch Bottom Width: Ditch Backslope: Culvert Design: Arch Bridge Design

Compacted cover over culverts will be sufficient to withstand vertical soil pressures along with loads from mining equipment. Berms will be installed between the road drainage and the pits. A typical profile of the mine support facilities site access road is illustrated in Figure 3.5-4. Figure 3.5-5 and Figure 3.5-6 illustrates a typical profiles of the access road for the explosive materials storage area. Figure 3.5-6 illustrates a typical profile of the pit access road which will be

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-26-

SHSH-1001/063-2212A

used to transport employees and equipment from the mine support facilitates to the active working areas within the mine. Typical haul road profiles are illustrated on Figure 3.5-7¸ Figure 3.5-8, Figure 3.5-9 and Figure 3.5-10. The haul road will be constructed using either overburden material, subsoil material, or a mixture of overburden and subsoil depending on the road cut and fill material quality. For roads constructed across regraded spoil, each new haul road segment will be designed using the final regrade contours of the regraded area. The road will be constructed such that the final road elevation will be approximately 2 ft above the final spoil regrade contour elevation. The haul road construction methods will be documented to develop the necessary material handling procedures during the reclamation of each haul road segment. Haul roads that are constructed on undisturbed land may require subsoil borrow areas to facilitate initial haul road construction. Locations of subsoil borrow areas are conceptual and will vary

depending on the quality testing performed prior to road construction. Final locations, however, will be on “knobs” or “ridges” of hills near the initial haul road alignment and will not be located across drainages. Each borrow area will be a self-contained non-contributing feature or structure which will trap all precipitation. Borrow areas will be located within the Permit Boundary and the proposed Disturbance Boundary. If the runoff from these borrow areas cannot be routed through a

sedimentation impoundment, then runoff from these areas will be controlled by Best Management Practices (BMPs) in order to prevent additional contribution of sediment to streams (Section 3.6.1). Topsoil removed will be placed adjacent to the haul road or on the nearest topsoil stockpile according to surface ownership, if requested. Size of borrow areas will be dictated by the above constraints and will also be dependent upon actual weather and soil moisture conditions at the time of construction. Subsoil unsuitable for road construction (i.e., supersaturated) will be removed from the road subgrade and placed on the elevated portion of each borrow area. Subsoil removed from the borrow areas will be limited to oxidized and other materials that visually appear to be of subsoil quality (i.e., not gray, reduced, or very coarse material). Upon reclamation, fill from the roads will be returned to the borrow areas to restore them to the approved post-mining topography (PMT), and topsoil will be respread on both the reclaimed borrow areas and road areas as outlined in the reclamation plan.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.5.1.2 Haul Road and Coal Ramp Plan

-27-

SHSH-1001/063-2212A

The Main Haul Road (MHR) segment 1 begins at the planned coal crushing facility and heads north following the west side of Pit 3. It crosses the South Branch Heart River at approximately station 40+00 and continues northeast until reaching the boundary of Pit 1; at which point the haul road parallels Pit 1 until station 112+50. Where MHR segment 1 crosses the South Branch Heart River, approximately station 40+00 to 41+00, a concrete arch bridge will be engineered and constructed to support the loads of the mining equipment. Prior to design and construction of the bridge a survey and soil samples of the area will be conducted. A conceptual design of the concrete arch bridge has been preparedbridge , which demonstrates that the structure can safely accommodate the peak flow from a 100-year event. The design includes an and HEC-RAS hydraulic analysis of theand cross-sections developed from the available 2-foot contour map for the location. Designs for the concrete arch bridge are providedcan be seen in on Figure 3.5-13 and Figure 3.5-14.; The hydraulic analysis these drawings are conceptual and based on the two foot topographic map is believed to provide upper bound estimates of water surface elevations because the topographic surface does not delineate the full extent of channel incision in the vicinity of the structure. Geotechnical investigations of foundation materials will be completed to prepare the construction designs. A detailed survey of the area will also be performed to support the construction designs. These construction designs will be submitted for approval prior to construction of the concrete archavailable topography and soil information. A detailed survey of the area and soil sampling will need to be completed prior to actual design and construction of the bridge. Coal ramps for the Pit 1 area will branch off from this main haul road to provide access into the active mining areas. Haul road segment MHR 1 and coal ramps will be used for coal haulage from Pit 1 to the coal crushing facilities and will remain in place until mining begins in Pit 2. Prior to completion of mining in Pit 1, the MHR segment 2 will be constructed to facilitate the mining of Pit 2. A portion of the MHR segment 2 will be constructed during the initial phase of mining of Pit 1. The segment of MHR 2 will begin at the intersection of MHR 1 and MHR 2, approximately station 112+12 on MHR 1, and MHR 2 will extend to approximately station 56+13 where it will connect to the pit access road. This segment of the haul road will serve as access to Pit 1 and the haul route for overburden being placed on the out-of-pit overburden stockpile 1 located in Section 21 of Township 139 North, Range 98 West. The other MHR segments (the remainder of 2, and all of MRH 3, and 4) will be constructed as needed as mining advances within the SHC Permit Area.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-28-

SHSH-1001/063-2212A

Pit ramps will branch off the MHRs at 1,000- to 3,000-ft intervals. Individual ramp lengths will vary depending on the mining conditions encountered and pit depths. Pit ramps will slope down through the mine spoils at grades between two to eight percent until they reach the approximate pit bottom. As mining progresses further from the main haul road, older portions of the pit ramp will be backfilled and reclaimed to the approximate final spoil regrade elevation. A new ramp will then be constructed at grades discussed previously which will allow a more efficient and economical haul truck operation. Figure 3.5-1 shows the general layout of the coal access ramps to be constructed at SHC. These ramp locations are approximate and may change based on material conditions encountered in the field. 3.5.1.3 SHLM Access Road

Access to SHC mine will start from the South Heart Exit from Interstate Highway 94 and will follow this route (Figure 3.5-11a): • • • • Take South Heart Road (121st Avenue, SW) south from I-94 approximately 0.75 miles to the intersection of old Highway 10; Turn right and travel 1 mile west on Highway 10 to the intersection of 122nd Avenue SW; Turn left and travel 1 2 1/3 miles south on 122nd Avenue SW to the intersection of 38th Street SW; and Turn right onto SHC Access Road and travel approximately 1 mile west into the SHC Support Facilities.

The SHLM access road will require upgrading and paving as described below: •

Segment 1 – Interstate 94 to Highway 10 – Improvements as agreed-upon with Stark County; Segment 2 – Highway 10 to 122nd Avenue SW – Improvements as agreed-upon with Stark County; and Segment 3 – 122nd Avenue SW to 38th Street SW – Improvements as agreed-upon with Stark County.

•

•

Upon approval for road construction from the Stark County Board of County Commissioners, 1 mile of Highway 10 will be improved as necessary to support anticipated mine traffic, approximately

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-29-

SHSH-1001/063-2212A

2 miles of existing county road will be upgraded and paved. This work will occur prior to the opening of the SHLM. 3.5.1.4 Removed, Re-Routed, Temporarily Closed, and Reclaimed Roads

During the course of mining it will be necessary to temporarily close certain section line rights-ofway and the trails that occupy them. It will also be necessary to temporarily close and/ or relocate certain county-maintained roads. SHC will work closely with the Stark County Board of

Commissioners on road closure/re-route plans and will obtain the Commissioners' approval of all changes to county-maintained roads prior to implementing those changes. Figure 3.5-11B shows the schedule and location for the proposed road closures/re-routes within the pPermit aArea. All road closures will be approved by the Stark County Board of Commissioners prior to their closure for mining. SHC will petition the County to close trails and roads only when necessary, allowing time for any required County administrative process. Reclamation and reopening plans for the closed roads will also be subject to the approval of the Stark County Commissioners. All relocated and rebuilt roads and trails will be constructed to a condition equal to or better than their pre-mining condition and will comply with applicable County road construction guidelines. In Section 16 and 15 of Township 139 North, Range 98 West there is one unpaved road that will be closed during mining and is listed below: • East-west road located along the south section line.

In Section 22 of Township 139 North, Range 98 West there is one unpaved road that will be closed during mining and is listed below: • North-south road located along the west section line.

In Section 20 of Township 139 North, Range 98 West there is one unpaved road that will be closed during mining and is listed below: • East-west road located along the north section line; and

In Section 27 of Township 139 North, Range 98 West there are three unpaved roads that will be closed during mining and are listed below: • East-west road located along portions of the north section line;

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 • •

-30-

SHSH-1001/063-2212A

North-South road located along the southern portion of the west section line; North-South road located along the northern portion of the west section line.

In Section 33 of Township 139 North, Range 98 West there are two unpaved roads that will be closed during mining and are listed below: • • East-west road located along the north section line; North-South road located along the east section line.

These roads will be closed and relocated as shown on Figure 3.5-11b and Figure 3.5-11c. An overpass will be constructedis planned for construction on 122nd Avenue prior toin 2038. The overpass will run north to south along 122nd Avenue in the SW1/4 of Section 23 and SE1/4 of Section 22 of Township 139 North, Range 98 West as shown on Figure 3.5-11cb. The overpass is being constructed to allow safe access for mine traffic to portions of the mine on the both sides of 122nd Avenue. The overpass will allow mine traffic (haul trucks, mine vehicles, mobile equipment, etc.) to pass under 122nd Avenue. Detailed design and construction plans for the planned overpass will be provided to the Stark County Road Superintendent and to the PSC as a permit revision prior to any construction. SHC will conduct detailed soil, traffic, and geotechnical studies to support design of the overpass and the detailed design plans will be certified by a professional engineer prior to submission to the Stark County Highway Superintendent and the PSC for approval. The overpass will stay in place and not be removed post-mining. The existing unpaved section line road (41st Street SW) running east to west along the north section line of Sections 33 and 34 of Township 139 North, Range 98 West will be closed as shown on Figure 3.5-11b. The section line public right-of-way (ROW) that runs north to south along the west section line of Section 34 of Township 139 North, Range 98 West will also be closed. Prior to the closure of these existing section line roads and public ROW, new section line roads will be constructed that run east to west along the south section lines of Sections 33 and 34 of Township 139 North, Range 98 West and then north-south along the west section line ROW of Section 33 to intersect with existing 41st Street at the northwest corner of Section 33. Figure 3.5-11c shows the preliminary proposed road relocations that SHC has designed that will have minimal or no travel affects on residents who use these roads. Once the Stark County Board of County Commissioners has approved the SHC-proposed road relocations and re-alignments, the 10,600 ft of the new section

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-31-

SHSH-1001/063-2212A

line road that will run east to west along the southern section line of Section 33 and 34 of Township 139 North, Range 98 West will be built. Also, approximately 5,300 feet of road will be constructed along the west boundary of section 33 to tie the newly constructed portion of 42nd Street to existing 41st Street. Prior to the beginning of mine construction, the following roads will be closed throughout the entire mine life: • • The unpaved section line ROW along the western boundary of Section 21 of Township 139 North, Range 98 West; The eastern 1/3 of the unpaved road lying along the northern section line road in Section 27 of Township 139 North, Range 98 West; The northern and eastern unpaved section line road in Section 33 of Township 139 North, Range 98 West; The southern 1/2 of the unpaved road lying along the western section line road in Section 27 of Township 139 North, Range 98 West; and All other unpaved roads in Section 27 of Township 139 North, Range 98 West.

• •

•

Once mining is complete within the Permit Area and reclamation has begun, all the section line and county roads affected during the mining activities will be reclaimed to a condition equal to or better than their pre-mining conditions or as stipulated with the Stark County Board of Commissioners. All final road designs and construction will be subject to approval from the Stark County Board of Commissioners and will comply with all county road construction guidelines. 3.5.1.5 Culvert and Arch Bridge Design

This section presents the design characteristics and location of the culverts that will be installed for the Permit Area. Haul Road Culvert Installation Designs: Culvert CC#1 through Haul Road Drainage Area = 178.3 acres (includes drainage contained by berm and facilities area at the north side of the mine) Estimated 10-year peak flow (Q10) = 61.15 cubic feet per second (cfs)

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-32-

SHSH-1001/063-2212A

Estimated 100-year peak flow (Q100) = 155.53 cfs Use one (1) 60-in diameter corrugated metal pipe (CMP) or two (2) 44” x 72” arched culverts Projecting inlet Minimum slope = 1% Passes: Q10 with Headwater (HW) depth of 3.75 ft Q100 with HW depth of 6.5 ft Culvert CC#2 through Haul Road Drainage Area = 98.16 acres Q10 = 80.19 cfs Q100 = 188.92 cfs Use one 60-in diameter CMP or one 36” x 58” arched culvert Projecting inlet Minimum slope = 2.00% Passes: Q10 with HW depth of 4 ft Q100 with HW depth of 7.8 ft Culvert CC#3 through Haul Road Drainage Area = 33.16 acres Q10 = 24.42 cfs Q100 = 67.13 cfs Use one 36-in diameter CMP Projecting inlet Minimum slope = 1% Passes: Q10 with HW depth of 3 ft Q100 with HW depth of 7.5 ft Culvert CC#4 through Haul Road Drainage Area = 67.43 acres Q10 = 42.96 cfs Q100 = 120.65 cfs Use one 48–in diameter CMP Projecting inlet Minimum slope 1% Passes: Q10 with HW depth of 3.4 ft Q100 with HW depth of 9.6 ft Culvert CC#5 through Haul Road Drainage Area = 472.16 acres Q10 = 181.9 cfs Q100 = 465.35 cfs

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-33-

SHSH-1001/063-2212A

Use one 96-in diameter CMP or one 87” x 137” arched culvert or two 69” x 98” arched culverts Projecting inlet Minimum slope 1.5% Passes: Q10 with HW depth of 5 ft Q100 with HW depth of 9.69 ft Culverts CC#6 and CC#7 are located on the site access road. CC#6 transfers water from the haul road and the facilities area under the road to Pond 3. During the permit term, culvert CC#7 transfers undisturbed area runoff under the site access road. For life of mine water management plans, culvert CC#7 will become the outlet structure for Pond 5. A design section for CC#7 is included in Figure 3.5-12 to ensure that the Con/Span concrete arch culvert can also function as the spillway for Pond 5. A 14-foot wide Con/Span concrete arch culvert with a 4-foot rise and wingwalls set within an angle ranging from 30o to 75o can safely accommodate peak flows from a 100-year, 6-hour event for conditions prior to pond construction and following pond construction. The invert elevation at the inlet to the Con/Span concrete arch culvert is at 2,497.6 feet and the access road elevation at Station 5+00 is at an elevation of 2,502 feet. Culvert CC#6 site facility access area road (W) Drainage Area = 150.678.743 acres Q10 = 11.63 cfs Q100 = 197.36 cfs Use one 6036–in diameter CMP Projecting inlet Minimum slope 1.5% Passes: Q10 with HW depth of 4.52.0 ft Q100 with HW depth of 10 2.8 ft Culvert CC#7 site facility area access road (E) Drainage Area = 202.224.31 acres Q100 = 194 8.6 cfs undisturbed Q100 = 264 14.48 cfs disturbed Use one 24-in diameter CMP Projecting inlet Minimum slope 2% 14-foot by 4-foot Con/Span concrete arched culvert with wing walls Minimum slope 1.0%

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-34-

SHSH-1001/063-2212A

Passes: Q100 with HW depth of 2.8 ft (undisturbed) and 3.36 (disturbed)24-in diameter CMP Projecting inlet Minimum slope 2% Passes: Q10 with HW depth of 1.75 ft Q100 with HW depth of 2.7 ft Culverts CC#8 and CC#9 route water across small drainages traversed by the Explosives Storage access road. Culvert CC#8 Explosive storage access road Drainage Area = 40.6 acres Q10 = 56.3 cfs Use one 48–in diameter CMP Projecting inlet Minimum slope 1% Passes: Q10 with HW depth of 3.6 ft Culvert CC#9 Explosive storage access road Drainage Area = 113.4 acres Q10 = 148.5 cfs Use one 66–in diameter CMP Minimum slope 1.0% Passes: Q10 with HW depth of 5.5 ft Culvert CC# 10 routes water across a small swale crossed by the access road to SOVB-10. Culvert CC#10 SOVB-10 access road Drainage Area = 36.14 acres Q10 = 52 cfs Use one 45–in diameter CMP Projecting inlet Minimum slope 1% Passes: Q10 with HW depth of 3.75 ft Culverts will be installed on MHR segment 1 at the stations shown on Figure 3.5-3. The culverts are designed for the peak flow from a 100-year, 24-hour storm event based on the higher of the peak flows from the drainage under initial mining conditions versus the drainage following reclamation.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-35-

SHSH-1001/063-2212A

MRH 1 culvert design information is summarized in Table 3.5.1. Additional information on the locations of other culverts are displayed on Figure 3.5-12, and the design of culverts shown in Table 3.5-1 can be found in Appendix 3.6.2 – Surface Water Management SEDCAD Reports. Haul Road Crossing, South Branch Heart River A bridge structure consisting of three 48-foot Con/Span concrete arch culverts will be installed where the Main Haul road Segment 1 (MHR1) crosses the South Branch Heart River at MHR1 Station 40+00 as shown on Figure 3.5-14. The drainage area of the South Branch Heart River at the haul road crossing is approximately 115.2 square miles. Peak flows at this location were estimated using the USGS method for estimating the magnitude and frequency of peak discharge on ungaged streams in North Dakota (Williams-Sether, 1992). The estimated 10-year and 100-year design flows used in this section are: • • Q10 = 1,859 cfs Q100 = 5,932cfs

The design for the haul road crossing of the South Branch Heart River included a HEC-RAS analysis of the changes in the floodplain elevations for the design flows at the location of the bridge structure and upstream of the structure. Three 48-foot Con/Span concrete arch culverts have been specified for the design to keep the increase in the floodplain elevations to within approximately 2.2 feet at cross section 18+400 located approximately 2000 feet upstream of the bridge structure and haul road crossing as shown in Figure 3.5-13. The Cons/Span bridge structure will safely pass the peak flow from a 100-year event of 5,932 cfs. The flood elevation for a 100-year event at the bridge structure is estimated to be at 2519.07 feet as shown in Figure 3.5-14. The minimum elevation of the Haul Road crossing the flood plain will be 2520.5 to ensure that the haul Road is not breached during the 100-year flood. 3.5.2 Professional Engineer Certification

As required by NDAC 69-05.2-09-06(2), the plans and drawings pertaining to the primary roads submitted for permit have been prepared by, or under the direction of a certified registered professional engineer with experience in the design and construction of roads. The plans and

drawings for the primary roads are contained in Section 3.5.1. Appendix 3.5-1 contains a certification letter, affixed with the stamp and signature of the professional engineer, for the plans and drawings of

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-36-

SHSH-1001/063-2212A

primary roads and culverts included in this permit application. The original certification letter is on file at Golder Associates Inc., 44 Union Boulevard, Suite 300, Lakewood, Colorado 80228. 3.6 Surface Water Management

In accordance with: • • • • 3.6.1 Section 38-14.1-14(1)(o), NDCC; Section 38-14.1-14(2)(h), NDCC; Section 69-05.2-09-09, NDAC; and Section 69-05.2-16, NDAC. Surface Water Management Plan

A water management plan, presented on Figure 3.6.1, has been developed to address the regulatory requirements for water management for the proposed surface coal mine operations over the life-ofmine period. The water management plan for mine operations addresses the design, construction, and operation of a network of structures which will collect and treat surface runoff from areas disturbed by surface mining operations, thereby preventing any additional contribution of suspended solids to waters downstream of the impacted area. These will minimize erosion and prevent additional

contributions of sediment on undisturbed areas or to stream flow or runoff outside the Permit Area to the extent possible. The structures that comprise this network include a sedimentation ponds,

sediment sump, collection ditches, and temporary diversions. The water management plan also addresses pit water pumping and treatment. Other objectives of the water management plan are to reduce potential operational delays that result from inflows of surface water runoff into the active mining areas and to provide a source of water supply for dust suppression and mine use. The following sections of the surface water management plan include a description of design procedures and criteria, a plan for water management and detailed designs for all structures to be constructed during the permit term. Appendix 3.6-1 presents a letter certifying that the plans and drawings pertaining to the water management structures have been prepared by, or under the direction of a certified registered professional engineer with experience in the design and construction of surface water management structures.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-37-

SHSH-1001/063-2212A

The watersheds associated with the water management plan and the locations of major operational water management structures that have been developed for the proposed operations are shown on Figure 3.6-2 and Figure 3.6-3. Upgradient diversion structures, highwall berms, and impoundments may also used to minimize the surface runoff entering the active mine area. These measures serve to reduce the volume of disturbed area runoff that will need to pass through sediment control structures. It also serves to reduce potential operational delays that result from frequent inflows of surface water runoff into the active mining areas. Figure 3.6.4 and Figure 3.6-5 include the layouts of the collection ditches (CD1A, and CD2A) and the sedimentation ponds that will be utilized to control and treat drainage from areas disturbed by mining activities, including disturbed areas that have been graded, seeded, or planted prior to discharge to streams and effect compliance with applicable Federal and State water quality requirements. Runoff from disturbed areas that cannot be treated in the sedimentation pond is either contained by berms or treated using BMPs in order to prevent additional contribution of sediment to streams. These may include the use of sumps, check dams, berms, silt fences, bale dikes, rock or grass sediment filters, riprap, mulches, and other measures independently or in combination to reduce runoff, trap sediment, or treat runoff water. The sediment ponds are temporary impoundments that have been engineered to meet the requirements of the North Dakota State Engineer and the appropriate Water Resource District, as well as the performance standards for the PSC. The impoundments are designed to contain, at a minimum, the runoff resulting from a 10-year, 24-hour storm event plus an estimated sediment storage capacity for at least 3 years of expected sediment yield. The structures are partially excavated ponds with low-height embankments. The design height for the embankment includes a five percent allowance for settling and no side slopes are steeper than 3H:1V. The pond design includes an emergency spillway capable of passing the peak discharge resulting from a 100-year, 6-hour precipitation event with a minimum of one-foot of freeboard with the spillway flowing at design depth. The designs for the pond and ditches were developed using the hydrologic parameters and design procedures presented in Section 3.6.2. There are three two ponds and one sump proposed for the initial permit term. Pond 1 handles flow from the northern portion of the pit area and a plan view, embankment and emergency spillway cross section are shown on Figure 3.6-6, along with graphs showing stage-area-capacity and stagedischarge. A sump located on the southeast corner of the facilities area will contain storm runoff.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-38-

SHSH-1001/063-2212A

Water will be pumped from the sump to Pond 1 for treatment, prior to discharge. Pond 2 treats the drainage from the southern half of Pit 1, and designs are shown on Figure 3.6-7. Pond 3 treats the watershed associated with the facilities area, and points south. The engineered drawings for Ponds 1 and 2 are displayed in Figures 3.6-86 and Figure 3.6-7, respectively . Design calculations for the Ponds 1, 2 and the sump are included in Appendix 3.6.2. Detailed water plans associated with later permit terms, including water structures associated with Pits 2 through 5 and Ponds 43 through 11 will be submitted through the permit revision or permit renewal process at least six months prior to the desired construction date. Construction will not begin until detailed design plans for the

structures are approved by the PSC. Sedimentation control structures will be installed before any major mining activities commence in the contributing watershed. Prior to the construction of these structures, the topsoil will be removed and stockpiled from the construction site and the surface scarified. Suitable overburden removed from the excavated portion of the pond basin is used for embankment construction. Material used in the embankment construction will be free of sod, large rocks, and other large pieces of vegetated matter. The embankment material is then used to reclaim the pond basin. Excess overburden excavated from pond sites and not otherwise used to construct embankments or haul roads will be disposed of as spoil or stockpiled for pond reclamation. The sedimentation pond and associated control structures are temporary and will be removed and the affected area reclaimed when sediment control is no longer required to treat disturbed area runoff. It is assumed that the sedimentation pond will remain in service for a period of up to 10 years following topsoil placement and seeding of all disturbed areas draining to the pond. Storm water and ground water pumped from the mining pits will be stored and treated in the sedimentation pond. Pit water will typically be collected at in-pit sumps where it will be pumped into ditches that drain to the sedimentation pond. During life of mine operations, the operator will employ temporary stream channel diversions on the West Tributary of the South Branch Heart River during operations in Pit 2, and temporary diversion of the South Tributary to the South Branch Heart River during operations in Pit 4A as shown on Figure 3.6-1. These diversions will be installed to prevent additional contributions of suspended solids to stream flow and runoff outside the Permit Area, and engineered to maximize stability. They will be designed to handle the 100-year 6-hour storm. Design calculations for the diversion

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-39-

SHSH-1001/063-2212A

segments DD-1, DD-2 and DD-3 for the West Tributary are included in Appendix 3.6.2. Detailed designs associated with the construction of these temporary diversions will be submitted through the permit revision or permit renewal process at least six months prior to the desired construction date. Construction will not begin until detailed design plans for the structures are approved by the PSC. Following mining, the West Tributary and the South Tributary will be reconstructed in a geomorphically stable configuration per designs in Section 4-1. 3.6.2 Hydrologic Parameters, Design Procedures and Design Concepts

The procedures utilized in determining the required capacity for the proposed sedimentation ponds include the determination of curve numbers (CN) for hydrologic soil cover complexes for subwatersheds draining to the ponds in order to estimate the runoff volumes for the 10-year, 24-hour design rainfall magnitudes. The curve number estimates for B, C and D hydrologic soil groups under different levels of disturbance and reclamation cover at the mine are provided in Table 3.6-1. Procedures for determining these values were developed and published in Barfield et al. 1983. The 3-year sediment storage volume was calculated using the Revised Universal Soil Loss Equation (RUSLE) method within the Civil Software Sediment, Erosion, Discharge by Computer Aided Design (SEDCAD). A Rainfall value of 50 was acquired from the Isoerodent Map of the Eastern US. Most of the soils were silt loams, and an erodible particle size distribution for silt loams were entered into the model. Thus, a K of 0.37 was used for the soil erodibility factor, unless sandier, B soils were present, in which case a K of 0.24 was utilized. Representative slope lengths and slopes were entered for each subwatershed. Table 3.6-4, summarizes the Cover factor values, which varied based on reclamation success. Shows the factors used in calculating the 3 year sediment storage volume for the sedimentation pond along with the results. The Pond Structure Detail in the SEDCAD modeling in Appendix 3.6.2 for each pond identifies the three-year sediment storage volume and elevation, and it is also displayed on Figure 3.6-6 and Figure 3.6-7. The SEDCAD software from Civil Software Design was utilized in developing the detailed designs for collection ditches, sedimentation pond, culverts, and BMPs for the Permit Area disturbance. SEDCAD includes routines for estimating runoff volumes using the Natural Resources Conservation Service (NRCS) CN procedure, calculating time of concentrations, estimating storm erosion, and performing flood flow and sediment routing. The time of concentration (Tc) is the duration of time for water to travel from the most remote portion of the subwatershed to the outlet. SEDCAD also includes routines for designing ditches, diversion channels, and sedimentation ponds. Sedimentation

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-40-

SHSH-1001/063-2212A

pond design features include the generation of area-elevation-capacity relationships for impoundments, alternative design options for primary and emergency spillways and calculation of impoundment freeboard levels and sediment capture results. All of the design specifications for the surface water management structures can be found in Appendix 3.6.2, Surface Water Management SEDCAD Reports. Collection ditches will be engineered as earthen channels, sized to safely pass design velocities or protect vulnerable transition zones. Collection ditch freeboard will be at least 0.3 ft deep for a 10-year, 24-hour storm event. Temporary diversions are designed for estimated peak flow from the 10-year event or larger. The peak flows for these designs are determined using SEDCAD. Culvert installations for the haul roads have been designed to pass the 10-year 24-hour event with a headwater diameter ratio of 1. They will safely pass the peak flow from a 100-year, 6-hour

precipitation event as described in Section 3.5. Either the SEDCAD software or the SurvCADD Software, distributed by Carlson Software, has been utilized to size culvert installations. Culvert installations for small access roads are sized for the 10-year 24-hour storm. The Rainfall Frequency Atlas of the United States, U.S. Weather Bureau Technical Paper No. 40 (TP-40), was used to obtain precipitation data for the region. The design rainfall events from TP-40 are currently used and accepted by the PSC, the North Dakota State Water Commission (SWC), the NRCS (formerly called SCS), and other State and Federal agencies dealing with water management. The design precipitation events used to determine watershed runoff volumes and peak flows are summarized in Table 3.6-2. For design of the drainage density and slopes for the PMT, the design engineers have relied on a geomorphic-based design approach which uses information from pre-mine channel and floodplain characteristics to establish design configurations for the reclaimed channels that incorporate appropriate gradients, channel lining, revegetation, and roughness features as appropriate, and minimize the potential for landslides. The pre-mining channel and floodplain characteristics of the South Branch Heart River within the Permit Area are summarized in the Draft Report on South Heart Geomorphic Field Work prepared by Golder (Golder 2007). The PMT and hydrologic reclamation plans, including plans for stream channel reclamation permanent diversions and wetland restoration are presented in Section 4.1.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1 3.6.3

-41-

SHSH-1001/063-2212A

Water Management Plan for the Mine Plan

Figure 3.6-2 and Figure 3.6-3 include the layout of the collection ditches, culverts, and sedimentation ponds sediment that will be utilized from 2014 through 2019 to treat drainage from areas disturbed by mining activities prior to discharge to streams. The sedimentation ponds are utilized to control runoff and sediment from the disturbed areas. The sedimentation ponds are designed and constructed to meet applicable effluent limitation requirements and design standards. The pond is designed to have sufficient storage capacity to store and treat sediment and runoff from a 10-year, 24-hour precipitation event. The disturbed area runoff north and east of Pit 1 will be collected by either the road drainage ditches or Ditch CD-1A and routed to sedimentation pond 1. Ditch designs are summarized in Table 3.6-3. Ditch CD-1A includes three haul road culverts (CC#1-CC#3). The haul road culvert designs

are provided in Section 3.5. The profile and typical cross section for CD-1A are provided on Figure 3.6-4. The profile and typical cross section for CD-2A are provided on Figure 3.6-5.

Ditch CD-2A includes one culvert, CC#5. Another culvert, CC#4, routes haul road drainage under the road to the north side of sediment pond 2. Culverts CC#6 and CC#7 are located on the site access road; CC#6 transfers water from the haul road and the facilities area under the road to Pond 3. Culverts CC#8 and CC#9 route water across small drainages traversed by the Explosives Storage access road. Culvert CC# 10 routes water across a small swale crossed by the access road to SOVB-10. Several stockpiles are located where collection ditches could not be installed to direct runoff from these stockpiles to the sedimentation ponds. Sediment control from these isolated locations will be maintained by the use of BMPs including berms and grass filters to treat runoff from these topsoil stockpiles. Also, mulch, grass filters and straw wattles are utilized as BMPs to treat any haul road drainage that may reach surface drainages. These stormwater BMPs are identified on Figure 3.6-9 Figure 3.6-8 along with the location and typical design for containment berms for stockpiles identified for small area exemptions. 3.6.4 Designs for Water Management Structures

Figure 3.6-1 shows the layout of the water management plan, including the sedimentation pond and the sediment sump, which are utilized to control runoff and sediment from the disturbed areas.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-42-

SHSH-1001/063-2212A

The sedimentation ponds are designed and constructed to meet applicable effluent limitation requirements and design standards. The ponds are designed to have sufficient storage capacity to store and treat sediment and runoff from a 10-year, 24-hour precipitation event. The design plans for the sedimentation ponds are included on Figure 3.6-6, and Figure 3.6-7,. and Figure 3.6-8. The disturbed area runoff will be collected by the haul road ditches and by ditches CD-1A and CD-2A, which will route flows to the sedimentation ponds. The plan includes five haul road culverts. The haul road culvert designs are provided in Section 3.5. The profiles and typical cross sections for CD-1A and CD-2A are provided on Figure 3.6-34 and Figure 3.6-45. Table 3.6.3, Main Haul Road Ditch Design Summary, shows the ditch design parameters along with the size of the watershed, 10 Yr. – 24 hr. peak flows, and the flow velocity within these ditches. The other design parameters can be found in Appendix 3.6.2. 3.6.5 Water Management Plan Construction and Operations

Runoff from disturbed areas that cannot be treated in the sedimentation ponds is either contained by berms or treated using BMPs in order to prevent additional contribution of sediment to streams. These may include the use of sumps, check dams, berms, silt fences, bale dikes, sediment filters, riprap, mulches, and other measures independently or in combination to reduce runoff, trap sediment, or treat runoff water. The sediment pond shall be constructed according to plans approved by the PSC. Prior to the construction of the sedimentation pond, BMPs will be employed to limit stormwater runoff from the pond construction area. This may include the establishment of a downgradient barrier between the construction area and the drainage if vegetative filters are inadequate to protect the waterway. Staking may occur to identify the maximum limits of disturbance associated with the pond and safe construction travelways. sedimentation. The topsoil will be removed and stockpiled from the construction site and the surface may be scarified. The sedimentation pond will then be constructed using appropriately textured materials from the excavation; supplemental materials will be placed in waste piles or back into mined pits. The outlet works will be built as designed, ensuring that there are energy dissipaters at the discharge points where diversions intersect with natural streams and the exit velocity is greater than the Culverts should be installed across drainages to minimize off-site

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-43-

SHSH-1001/063-2212A

receiving stream using energy dissipaters, riprap channels, surge ponds, and other devices to reduce erosion, prevent deepening or enlargement of stream channels and minimize disturbances to the hydrologic balance. The embankment fill outslopes, the emergency spillway, and the surrounding disturbed area above the high water line will be re-seeded as soon as practical during the subsequent seeding period. Mulch may be applied to facilitate revegetation success. The active upstream face of the sedimentation pond near the active high water lines may be rip-rapped or similarly armored to ensure stabilization of the embankment from erosion and sudden drawdown. Following construction of the sedimentation pond, BMPs will be undertaken where needed to minimize disturbance of existing runoff and associated surface water. Ditches will be installed at appropriate gradients and protections shall be used in critical zones such as curves or transitions from gradually sloping segments to steeply sloping segments. Roughening the surface, use of terraces or installation of sediment barriers such as earthen berms, silt fences, straw bale dikes and brush windrows may be performed to minimize erosion by retaining sediment within disturbed areas. Straw wattles or grass filters will be utilized as BMPs to treat any haul road drainage that may reach surface drainages. Pumping of pit water to the sediment ponds will be performed on an as needed basis. Pit sumps will be maintained within the active mine pits to allow for pit water to be managed and minimize the need to pump pit water during storm runoff events. Road construction operations will employ one or more BMPs to minimize off-site siltation and runoff. These may include one or more of the following techniques. The operator may try to schedule road construction during seasons of low precipitation probability. Construction may be preceded by staking of the outer limits of disturbance and employing sediment barriers such as berms, silt fences, straw bales, brush windrows, and rock check dams between the disturbance and the downgradient drainage if vegetative filters are inadequate to minimize off-site sedimentation. Culverts will be constructed to minimize siltation in the culvert through the use of sumps upstream of the inlet and use of an adequate slope (equal or greater than two percent) for drainage through the pipe(s). Downgradient erosion will be minimized through the use of energy dispersal materials such as rocks at the pipe outlet. Ditches will be surveyed to ensure that engineered gradients are achieved. Road fill outslopes and cuts will be re-seeded and mulched at the first possible revegetation season following construction.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-44-

SHSH-1001/063-2212A

Sediment will be removed periodically to maintain an adequate storage volume for the design event. An as-built survey shall be performed immediately following construction and a staff gage or other measuring device will be installed to establish the design sediment level and the design pump-out level. It is anticipated that sediment may need to be removed every other year, except at times when much of the design watershed is below grade in the pit. Seasonal monitoring of sediment levels within the pond is proposed to allow adequate planning for sediment pond maintenance. The sedimentation ponds and the sediment sump will be dewatered to levels specified in the design as soon as possible following a storm event. The water will be removed from the sedimentation pond as soon as water quality appears to be within acceptable limits for discharge. Also, pond level may be drawn down to the actual sediment level in the pond if water is needed for dust suppression or other mine water uses. Pond inspections will be conducted regularly during constructions by a registered professional engineer or specialist under the direction of a registered professional engineer experienced in the construction of impoundments. Written reports shall be prepared and maintained near the SHLM site. Following completion of construction, the registered professional engineer shall promptly provide the SWC with a certified report documenting the periodic inspection during construction and general compliance with the engineered plans, including a determination of the pond volume. Any deviations from the approved plans will be discussed and ramifications of the differences summarized. Once the impoundments are operating, they will be inspected at least annually until the removal of the structure or release of the performance bond. Annual reports should address stability of the structure, other hazardous conditions, depth and elevation of any impounded water, existing storage capacity, any existing or required monitoring, and instrumentation. A copy of all inspection reports will be maintained at or near the SHLM site. Water quality monitoring will be performed in compliance with applicable governmental permits resulting in periodic reports to the SWC. Monitoring will be adequate to accurately record both the quantity and quality of water leaving the Permit Area and be conducted using reliable test data. Monitoring for point source discharges will be conducted according to NDDH standards and result in notification to the SWC within five days of receipt of the analytical results that indicated non-compliance with permit conditions or applicable standard. If a North Dakota pollutant discharge elimination system effluent limit non-compliance situation does occur, the analytical reports will accompany the notice of non-compliance. Water quality reporting to the SWC will include

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

Revision 1

-45-

SHSH-1001/063-2212A

completed North Dakota pollutant discharge elimination system reporting and associated analytical data. In the event that flocculants are needed to effect compliance for any of the surface water management structures, appropriate documentation of the product and protocol for use will be submitted to both the NDDH and the SWC for approval prior to use. 3.7 Protection of Public Parks

In accordance with: • •

Section 69-05.2-04-01, NDAC; and Section 69-05.2-09-08, NDAC.

There are no places listed on the National Register of historic places that may be adversely affected by the proposed mining operations within the Permit Boundary. 3.8 Surface Mining Near Underground Mine

In accordance with: • •

Section 69-05.2-09-10, NDAC; and Section 69-05.2-13-06, NDAC.

There are no mining activities within 500 ft (152.04 meters) of an underground mine. 3.9 Auger Mining Plan

In accordance with: •

Section 69-05.2-09-18, NDAC.

There will no be auger mining at the SHLM site.

Golder Associates
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

TABLES

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

FIGURES

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

APPENDIX 3.3-1 BLAST RECORD

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

APPENDIX 3.3-2 NOTICE OF BLASTING SCHEDULE

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

APPENDIX 3.3-3 PRE-BLAST SURVEY REQUEST

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

APPENDIX 3.3-4 SURFACE OWNERS WITHIN ONE MILE OF THE PERMIT BOUNDARY

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

APPENDIX 3.3-5 MONITORING EQUIPMENT SPECIFICATION SHEET

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

APPENDIX 3.5-1 CERTIFICATION LETTER - PRIMARY ROADS

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

APPENDIX 3.6-1 CERTIFICATION LETTER – SURFACE WATER MANAGEMENT OPERATIONS PLANS

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

APPENDIX 3.6-2 SURFACE WATER MANAGEMENT SEDCAD REPORTS SOUTH HEART LIGNITE MINE

Revision 1

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_ TXT_R1_24SEP10.Docx

TABLE 3.1-1 ANNUAL AREA DISTURBED
Year 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 Area Disturbed (acres) 25 50 50 61 48 87 86 92 84 75 92 91 84 82 75 82 75 81 77 80 81 78 77 69 68 75 82 94 104 97 94 102 39

Note: Acres disturbed in 2011-2013 included areas for to infrastructure and facilities development for the mine expansion. Acres disturbed from 2014-2043 are attributed to mine operations.

Revision 0

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_1-1-3_3-1_R0_10MAR10.Doc

TABLE 3.1-2 ESTIMATED LIGNITE PRODUCTION
Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 E Seam* (ton) 0 0 0 0 2,379 86,287 31,644 127,341 0 26,257 34,786 9,241 0 0 0 0 1,274 0 0 5,485 69,863 112,049 34,588 6,255 16,953 0 9,841 0 E1 Seam* (ton) 0 0 0 0 36,194 28,781 48,544 35,271 5,481 37,229 111,598 191,407 118,756 94,670 83,149 94,950 52,251 48,443 69,558 110,724 129,357 197,617 152,695 80,656 152,608 6,087 169,069 0 D Seam (ton) 138,182 969,489 2,525,856 2,525,404 2,490,656 2,371,225 2,397,191 2,282,681 2,531,842 2,470,863 2,390,642 2,357,389 2,430,609 2,415,243 2,462,251 2,454,572 2,510,565 2,507,822 2,491,710 2,445,781 2,377,294 2,257,047 2,301,035 2,386,073 2,308,132 2,488,616 2,298,881 2,521,656 Grand Total (ton) 138,182 969,489 2,525,856 2,525,404 2,529,229 2,486,292 2,477,378 2,445,293 2,537,322 2,534,350 2,537,026 2,558,037 2,549,364 2,509,914 2,545,400 2,549,522 2,564,091 2,556,264 2,561,268 2,561,990 2,576,514 2,566,713 2,488,318 2,472,984 2,477,693 2,494,703 2,477,792 2,521,656

430 54,735 2,393,655 2,448,819 17,154 76,599 1,145,255 1,239,007 591,827 2,186,428 67,647,616 Total 70,425,871 *The E and E1 seams are not present through the entire Permit Area.

Revision 0

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_1-1-3_3-1_R0_10MAR10.Doc

TABLE 3.1-3 EQUIPMENT LIST
Equipment Topsoil Removal Equipment 44-cubic yard Scraper (CAT 657 Class) Overburden Mining Equipment Dozer (CAT D-11 Class) 20-cubic yard Hydraulic Shovel (Hitachi EX2100 Class) 16-cubic yard Front End Loader (CAT 992 Class) 150-ton Haul Truck – Rear Dump (CAT 785D Class) Coal Mining Equipment 15-cubic yard Hydraulic Shovel (Hitachi EX1900 Class) 150-ton Haul Truck – Rear Dump (CAT 785D Class) Coal Drill 6 – 9 inch, 45,000-pound Pull Down Reclamation Equipment Dozer (CAT D-11 Class) Support/Maintenance Equipment Dozer (CAT D-11 Class) Rubber Tired Dozer (CAT 834H Class) 3-cubic yard Hydraulic Shovel (CAT 345D L Class) Motor Grader (CAT 16M Class) Low Boy w/Tractor (250 ton trailer w/150 ton truck) Water Truck (CAT 777 Class; 20,000 gallon) 40-ton Rough Terrain Crane Bulk Explosives Truck Field Lube Truck Mechanic Service Truck Electricians Truck Sport Utility Vehicles Light Duty Truck ¾ ton Light Duty Truck 1 ton 12 Passenger Van Portable Compressor (250 cubic feet per minute, 79 horsepower) Diesel Welder 6-inch High Head pump High Volume – Low Head Pump (Crisafulli Pumps) Light Plants Pieces of Equipment 1 to 2

1 to 4 1 1 3 to 8

1 1 to 5 1

1

1 to 2 1 1 1 to 2 1 1 to 2 1 1 1 1 1 2 2 2 4 2 1 2 2 2

Revision 0

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_1-1-3_3-1_R0_10MAR10.Doc

TABLE 3.1-4 SUMMARIES OF LIGNITE AND OVERBURDEN THICKNESSES
Average Minimum Thickness (feet) Thickness (feet) Topsoil 2.9 0.4 E Overburden 17.6* 15.0* E Lignite Seam 3.1* 0* E1 Overburden 11.0* 0* E1 Lignite Seam 2.1* 0* D Overburden 36.8 0 D Lignite Seam 17.2 0 HT Butte Overburden 145.3 88.7 HT Butte Lignite Seam 12.7 9.8 *The E and E1 seam is not present through the entire Permit Area. Strata Maximum Thickness (feet) 5.0 64.4* 5.3* 33.4* 4.4* 98.6 22.8 186.4 13.3

Revision 0

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_1-1-3_3-1_R0_10MAR10.Doc

TABLE 3.1-5 SUITABLE GROWTH MATERIAL BALANCE BY LANDOWNER - LIFE OF MINE Surface Land Ownership Area (acres) Required SPGM (cy) Required SPGM Thickness (ft)

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) Gary & Barbara Medune Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) 1.59 7,664.29 2.72 1.39 6,278.07 2.55 1.34 6,474.22 2.73 1.29 6,934.91 3.03

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) James & Lisa Wagner Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 1,148.75 0.45 4,168.76 1.63 5,317.51 2.08 (2,346.78) 598.04 0.27 5,940.38 2.65 6,538.42 2.92 260.34 1,021.65 0.47 5,411.68 2.51 6,433.32 2.98 (40.90) 1,013.22 0.49 1,013.61 0.49 2,026.83 0.97 (4,908.08)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) 7.95 38,415.50 2.72 18.85 97,053.53 2.90 21.92 141,572.35 3.64 26.80 189,096.59 3.98 13.22 72,589.60 3.09 24.16 94,534.76 2.21 59.37 257,832.86 2.45 3.13 16,735.20 3.01 12.13 73,626.21 3.42 10.14 53,219.01 2.96 13,091.42 0.95 2,661.87 0.35 9,375.19 0.75 40,221.38 2.85

-

-

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) James & Rosella Perdaems Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 11,618.55 0.91 19,126.29 1.49 30,744.84 2.40 (7,670.66) 22,901.86 0.75 48,635.48 1.60 71,537.35 2.35 (25,516.18) 21,469.54 0.61 73,797.09 2.09 95,266.62 2.69 (46,305.73) 34,646.00 0.80 96,980.71 2.24 131,626.71 3.04 (57,469.88) 13,588.46 0.64 53,353.05 2.50 66,941.51 3.14 (5,648.08) 27,517.75 0.71 76,468.49 1.96 103,986.24 2.67 9,451.49 57,632.46 0.60 233,992.88 2.41 291,625.34 3.04 33,792.48 2,746.31 0.54 12,827.97 2.54 15,574.28 3.08 (1,160.92) 10,432.98 0.53 47,153.44 2.41 57,586.42 2.94 (16,039.79) 7,992.28 0.49 35,824.78 2.19 43,817.06 2.68 (9,401.95)

-

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) 151,986.18 13.46 652,455.12 3.18 434,840.97 1.84 190,211.80 1.46 271,259.26 2.74 1,110,385.49 4.14 2,938,078.78 4.07 58,517 1.48 66,528.47 0.87 128,978.92 1.51 -

Revision 1
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_TBL3_1-5_R1_21JUL10.xlsx\TABLE 3.1_5

Norwest Corporation

Page 1 of 6

SHSH-1001/063-2212A

TABLE 3.1-5 SUITABLE GROWTH MATERIAL BALANCE BY LANDOWNER - LIFE OF MINE Surface Land Ownership Area (acres) Required SPGM (cy) Required SPGM Thickness (ft)

2034 0.35 2,331.89 3.71

2035 0.33 2,332.13 4.01

2036 0.40 2,839.00 4.01

2037

2038

2039

2040

2041

2042

2043

Grand Total 1.08 7,503.02 3.91

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) Gary & Barbara Medune Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 75.02 0.13 75.02 0.13 150.03 0.26 (2,181.86) 139.75 0.26 139.75 0.26 279.50 0.53 (2,052.63) 246.66 0.38 246.66 0.38 493.32 0.77 (2,345.68)

8,300.00 461.43 0.26 461.43 0.26 922.85 0.53 (6,580.17)

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) 8,526.61 0.98 0.35 2,089.50 3.38 22,766.79 1.92 11,431.33 3.20 -

(7,000.00) 42,724.74 2.03 35,725 5.96 29,441.00 2.88

-

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) James & Lisa Wagner Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 262.41 0.47 262.41 0.47 524.82 0.93 (1,564.68)

32,400.00 4,044.06 0.43 16,796.84 1.55 20,840.90 2.17 (8,600.10)

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) 8,652.44 2.19 4.43 25,516.44 3.24 94.34 660,657.28 3.95 64.34 390,924.65 3.42 -

(12,000.00) 74,002.30 1.42 62,002 360.79 2,111,773.97 3.15

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) James & Rosella Perdaems Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 5,094.30 0.71 18,071.10 2.53 23,165.40 3.24 (2,351.04) 85,499.76 0.56 271,700.32 1.79 357,200.08 2.35 (303,457.20) 90,974.67 0.88 203,174.86 1.96 294,149.54 2.83 (96,775.12)

2,323,000.00 392,114.93 0.67 1,191,106.46 2.13 1,583,221.39 2.72 (528,552.58)

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) 38,762.43 0.92 333,708.28 0.65 624,045.83 1.79 -

(740,000.00) 6,999,758.20 2.03 6,259,758

Revision 1
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_TBL3_1-5_R1_21JUL10.xlsx\TABLE 3.1_5

Norwest Corporation

Page 2 of 6

SHSH-1001/063-2212A

TABLE 3.1-5 SUITABLE GROWTH MATERIAL BALANCE BY LANDOWNER - LIFE OF MINE Surface Land Ownership Area (acres) Required SPGM (cy) Required SPGM Thickness (ft)

2014

2015 12.26 64,663.22 2.97

2016 59.20 320,676.64 3.05

2017 28.07 179,124.12 3.60

2018 0.61 4,344.27 3.99

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) Jerry & Sandra Perdaems Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 10,924.45 0.55 25,667.46 1.30 36,591.90 1.85 (28,071.32) 51,433.71 0.54 166,375.54 1.74 217,809.25 2.28 (102,867.39) 25,190.17 0.56 81,449.11 1.80 106,639.28 2.35 (72,484.84) 236.68 0.24 2,119.95 2.14 2,356.63 2.38 (1,987.65)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) 446,239.12 3.42 2,148,344.87 3.50 471,431.28 2.12 33,670.63 4.26 4.17 22,171.24 3.00 0.36 1,978.73 3.07 -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 2,598.76 0.39 20,382.32 2.83 22,981.08 3.42 809.84 337.00 0.57 2,311.29 3.94 2,648.30 4.52 669.56

John Buckman

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) 190,447.60 3.79 24.82 125,271.59 2.84 9,148.40 2.10 87.60 531,441.73 3.42 87.21 614,587.86 3.97 83.75 594,554.07 4.00 84.72 550,644.86 3.66 86.28 472,764.10 3.09 79.70 516,767.99 3.65 80.11 515,305.42 3.62 77.12 482,548.14 3.53 80.19 526,919.47 3.70 77.93 522,301.17 3.78 73.68 488,740.73 3.74

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) Mary Louise Peters et Al Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 39,689.76 0.99 130,214.39 3.25 169,904.15 4.24 44,632.56 83,926.16 0.59 377,065.36 2.67 460,991.52 3.26 (70,450.21) 78,592.49 0.56 326,124.27 2.32 404,716.76 2.88 (209,871.11) 91,018.46 0.67 237,291.22 1.76 328,309.68 2.43 (266,244.39) 116,239.97 0.85 285,302.35 2.09 401,542.32 2.94 (149,102.54) 128,595.01 0.92 396,040.02 2.85 524,635.03 3.77 51,870.93 83,760.73 0.65 294,920.48 2.29 378,681.20 2.94 (138,086.79) 86,287.94 0.67 284,376.75 2.20 370,664.69 2.87 (144,640.73) 85,587.87 0.69 287,541.58 2.31 373,129.45 3.00 (109,418.69) 85,579.59 0.66 270,162.97 2.09 355,742.56 2.75 (171,176.91) 76,410.38 0.61 209,833.87 1.67 286,244.26 2.28 (236,056.91) 76,397.24 0.64 199,250.68 1.68 275,647.92 2.32 (213,092.81)

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) 1,144,266.80 4.80 5,414,998.44 5.22 3,116,250.06 4.42 2,347,111.61 3.81 563,879 0.96 1,262,000 1.51 1,177,292.69 2.27 864,048.03 2.18 589,543.45 2.75 396,601.53 2.69 1,394,606.76 3.99 2,064,879.29 4.85

Revision 1
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_TBL3_1-5_R1_21JUL10.xlsx\TABLE 3.1_5

Norwest Corporation

Page 3 of 6

SHSH-1001/063-2212A

TABLE 3.1-5 SUITABLE GROWTH MATERIAL BALANCE BY LANDOWNER - LIFE OF MINE Surface Land Ownership Area (acres) Required SPGM (cy) Required SPGM Thickness (ft)

2034

2035

2036

2037

2038

2039

2040 0.08 301.00 2.00

2041

2042

2043

Grand Total 100.23 569,109.26 3.12

-

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) Jerry & Sandra Perdaems Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 30.32 0.22 98.63 0.72 128.95 0.94 (172.05)

626,000.00 87,815.32 0.42 275,710.69 1.54 363,526.01 2.25 (205,583.25)

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) -

(262,000.00) 3,099,685.89 3.01 2,837,686 4.53 24,149.98 3.03

-

-

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy)

26,600.00 2,935.77 0.48 22,693.61 3.38 25,629.38 3.50 1,479.40

John Buckman

-

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) 34.51 232,087.47 3.79 31.23 221,481.29 4.00 13.02 92,421.33 4.00 0.02 124.28 4.00 -

(1,000.00) 199,596.01 2.94 198,596 1,001.90 6,487,961.50 3.67

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) Mary Louise Peters et Al Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 33,003.28 0.59 73,392.78 1.32 106,396.06 1.91 (125,691.40) 31,077.17 0.62 70,068.76 1.39 101,145.92 2.01 (120,335.37) 15,444.62 0.74 32,910.29 1.57 48,354.91 2.30 (44,066.42) 15.80 0.56 80.29 2.84 96.09 3.40 (28.18)

7,136,800.00 1,111,626.49 0.69 3,474,576.04 2.14 4,586,202.53 2.84 (1,901,758.97)

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) 1,627,837.56 5.84 1,826,499.40 4.97 699,423.21 5.39 96.62 0.86 -

(2,551,000.00) 24,489,333.83 3.65 21,938,334

Revision 1
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_TBL3_1-5_R1_21JUL10.xlsx\TABLE 3.1_5

Norwest Corporation

Page 4 of 6

SHSH-1001/063-2212A

TABLE 3.1-5 SUITABLE GROWTH MATERIAL BALANCE BY LANDOWNER - LIFE OF MINE Surface Land Ownership Area (acres) Required SPGM (cy) Required SPGM Thickness (ft)

2014

2015 13.62 72,149.19 2.99

2016 12.54 66,745.51 3.00

2017 3.00 15,960.61 3.00

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Patrick & Katherine Kuylen

Total SPGM Removal Requirement (+10%) Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 12,595.83 0.57 17,867.87 0.81 30,463.70 1.39 (41,685.49) 11,616.44 0.57 15,398.12 0.76 27,014.56 1.34 (39,730.95) 2,144.00 0.44 3,482.06 0.72 5,626.06 1.16 (10,334.55)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) 347,619.48 2.70 121,134.60 2.27 1.07 5,703.65 3.00 237.99 37.32 221,906.47 3.35 83.32 527,512.12 3.57 90.45 584,227.19 3.64 95.20 549,380.81 3.25 71.57 413,009.30 3.25 0.89 3,859.23 2.43 13.22 50,929.61 2.17 10.51 41,993.65 2.25 10.46 43,500.80 2.34 10.41 42,510.85 2.30

-

-

-

-

-

-

-

-

-

Total SPGM Removal Requirement (+10%) Robert & Brenda Kuylen Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 750.48 0.43 1,468.75 0.85 2,219.23 1.28 (3,484.42) 30,721.07 0.51 85,034.05 1.41 115,755.11 1.92 (106,151.36) 72,946.33 0.54 198,669.45 1.48 271,615.78 2.02 (255,896.35) 77,971.71 0.53 220,640.39 1.51 298,612.10 2.05 (285,615.10) 76,522.33 0.50 259,274.73 1.69 335,797.06 2.19 (213,583.76) 53,903.17 0.47 133,704.11 1.04 187,607.28 1.62 (225,402.01) 703.82 0.49 3,181.24 2.20 3,885.06 2.69 25.83 12,560.59 0.59 44,547.46 2.09 57,108.04 2.68 6,178.44 9,847.88 0.58 36,865.73 2.17 46,713.61 2.75 4,719.96 9,720.43 0.58 40,123.15 2.38 49,843.58 2.95 6,342.78 10,101.38 0.60 38,942.55 2.32 49,043.93 2.92 6,533.08

-

-

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Sum of Area (acres) Sum of Required Suitable SPGM (cy) Thickness Required Suitable Material (ft) Sum of Available Salvage SPGM (cy) Available Salvage SPGM Thickness (ft) Sum of Available Suitable Overburden (cy) Total Excess of Suitable Material (cy) NOTE: Reference Figure1.3-2 for Surface Land Ownership Parcel Map Total 7.95 38,416 2.72 30,745 2.40 151,986 44.73 233,866 2.95 138,593 1.92 1,446,314 37,769.94 2.73 94.72 534,698 3.18 342,310 2.24 2,742,090 567,613.52 3.07 95.19 606,088 3.59 359,647 2.34 1,229,495 1,883,803.08 4.30 97.15 604,446 3.51 340,914 2.18 2,188,733 1,910,816.95 3.19 90.45 584,227 3.64 298,612 2.05 1,910,817 4,744,228.07 7.01 95.20 549,381 3.25 335,797 2.19 4,744,228 5,821,224.65 9.32 95.73 507,544 2.99 291,594 1.89 6,931,610 88.37 405,276 2.58 484,511 3.40 4,272,793 87.97 533,420 3.42 463,640 3.27 5,424,147 87.21 614,588 3.97 404,717 2.88 3,116,250 83.75 594,554 4.00 328,310 2.43 2,347,112 84.72 550,645 3.66 401,542 2.94 563,879 89.41 489,499 3.08 540,209 3.74 1,320,516 91.83 590,394 3.62 436,268 2.94 1,243,821 25,866.30 2.83 91.15 572,384 3.54 418,367 2.84 1,018,893 466,953.54 3.18 91.93 541,142 3.32 435,555 2.94 1,069,588 278,336.50 2.22 92.09 575,191 3.52 408,995 2.75 677,600 244,549.60 1.94 89.73 572,276 3.59 342,521 2.37 1,648,532 238,883.29 1.97 85.38 538,186 3.55 326,719 2.37 2,343,984

Revision 1
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_TBL3_1-5_R1_21JUL10.xlsx\TABLE 3.1_5

Norwest Corporation

Page 5 of 6

SHSH-1001/063-2212A

TABLE 3.1-5 SUITABLE GROWTH MATERIAL BALANCE BY LANDOWNER - LIFE OF MINE Surface Land Ownership Area (acres) Required SPGM (cy) Required SPGM Thickness (ft)

2034

2035

2036

2037

2038 19.57 103,091.80 2.97

2039 113.78 726,985.14 3.60

2040 106.94 655,013.58 3.45

2041

2042

2043

Grand Total 269.43 1,639,945.83 3.17

-

-

-

-

-

-

-

Patrick & Katherine Kuylen

Total SPGM Removal Requirement (+10%) Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 14,390.00 0.46 31,308.43 0.97 45,698.43 1.45 (57,393.38) 92,059.33 0.50 215,440.36 1.12 307,499.70 1.68 (419,485.44) 113,468.56 0.66 265,928.79 1.54 379,397.35 2.20 (275,616.23)

1,803,900.00 246,274.17 0.53 549,425.63 0.99 795,699.80 1.83 (844,246.03)

-

-

-

-

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Area (acres) Required SPGM (cy) Required SPGM Thickness (ft) 40.17 251,415.41 3.53 38.03 242,504.24 3.59 73.92 517,758.55 3.95 89.05 632,139.86 4.00 276,210.21 1.78 83.84 591,510.41 3.98 332,722.77 0.60 2,097,494.88 3.09 35.88 237,154.16 3.72 53.56 357,793.35 3.76

(1,008,000.00) 3,175,419.93 1.74 2,167,420 838.88 5,314,809.66 3.23

-

-

-

Total SPGM Removal Requirement (+10%) Robert & Brenda Kuylen Lift 1 Salvage Soil (cy) Lift 1 Salvage Soil Thickness (ft) Lift 2 Salvage Soil (cy) Lift 2 Salvage Soil Thickness (ft) Total Salvage SPGM (cy) Lift 1 and Lift 2 Total Salvage SPGM Thickness (ft) Lift 1 and Lift 2 Excess (Deficit) Required Subsoil (cy) 29,097.49 0.45 91,630.15 1.28 120,727.64 1.86 (130,687.77) 21,566.23 0.35 64,684.20 0.95 86,250.43 1.41 (156,253.81) 45,898.97 0.38 105,588.77 0.87 151,487.75 1.27 (366,270.80) 61,792.73 0.43 130,587.58 0.91 192,380.31 1.34 (439,759.55) 82,288.08 0.61 217,338.58 1.61 299,626.65 2.22 (291,883.76) 36,797.27 0.64 115,233.59 1.99 152,030.86 2.63 (85,123.30) 55,180.23 0.64 181,063.91 2.10 236,244.14 2.73 (121,549.21)

5,846,300.00 688,370.19 0.52 1,968,578.37 1.60 2,656,948.56 1.96 (2,657,861.10)

-

-

-

Excess (Deficit) Required Subsoil/Suitable Material Available Suitable Overburden (cy) Available Suitable Overburden Thickness (ft) Excess (Deficit) Available of Suitable Material (cy) Sum of Area (acres) Sum of Required Suitable SPGM (cy) Thickness Required Suitable Material (ft) Sum of Available Salvage SPGM (cy) Available Salvage SPGM Thickness (ft) Sum of Available Suitable Overburden (cy) Total Excess of Suitable Material (cy) NOTE: Reference Figure1.3-2 for Surface Land Ownership Parcel Map Total 630,429.27 4.63 75.38 487,924 3.65 227,799 1.87 2,275,446 781,182.95 5.68 69.58 466,318 3.78 187,676 1.67 2,630,449 517,310.19 3.83 87.34 613,019 3.96 200,336 1.42 1,228,165 371,000.77 1.94 89.06 632,264 4.00 192,476 1.34 371,097 613,079.75 1.70 103.40 694,602 3.79 345,325 2.07 889,290 113.78 726,985 3.60 307,500 1.68 332,723 111.45 680,831 3.44 402,692 2.24 2,136,257 94.34 660,657 3.95 357,200 2.35 333,708 309,813.28 1.37 100.22 628,079 3.53 446,180 2.76 933,859 614,282.10 2.19 53.56 357,793 3.76 236,244 2.73 614,282

(3,189,000.00) 20,057,143.75 3.51 16,868,144 2,582.80 16,184,694 3.53 10,032,991 2.41 58,137,665 50,367,665

Revision 1
I:\06\2212A\0400\0401\Rev1\CH3\0632212A_3_TBL3_1-5_R1_21JUL10.xlsx\TABLE 3.1_5

Norwest Corporation

Page 6 of 6

SHSH-1001/063-2212A

TABLE 3.3-1 MAXIMUM WEIGHT OF EXPLOSIVES TO BE DETONATED WITHIN ANY 8 MILLISECOND DELAY PERIOD
200 to 3,000 feet Distance Max Weight 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1,000 1,050 1,100 1,150 1,200 1,250 1,300 16 25 36 40 53 67 83 100 119 140 162 186 212 239 268 298 331 364 400 437 476 517 559 3,050 to 5,850 feet Distance Max Weight 3,050 3,100 3,150 3,200 3,250 3,300 3,350 3,400 3,450 3,500 3,550 3,600 3,650 3,700 3,750 3,800 3,850 3,900 3,950 4,000 4,050 4,100 4,150 3,075 3,177 3,280 3,385 3,492 3,600 3,710 3,821 3,935 4,050 4,166 4,284 4,404 4,526 4,649 4,774 4,900 5,028 5,158 5,289 5,422 5,557 5,693 5,900 to 8,700 feet Distance Max Weight 5,900 5,950 6,000 6,050 6,100 6,150 6,200 6,250 6,300 6,350 6,400 6,450 6,500 6,550 6,600 6,650 6,700 6,750 6,800 6,850 6,900 6,950 7,000 8,239 8,379 8,521 8,663 8,807 8,952 9,098 9,246 9,394 9,544 9,695 9,847 10,000 10,154 10,310 10,467 10,625 10,784 10,944 11,106 11,269 11,433 11,598 8,750 to 11,550 feet Distance Max Weight 8,750 8,800 8,850 8,900 8,950 9,000 9,050 9,100 9,150 9,200 9,250 9,300 9,350 9,400 9,450 9,500 9,550 9,600 9,650 9,700 9,750 9,800 9,850 18,121 18,329 18,538 18,748 18,959 19,172 19,385 19,600 19,816 20,033 20,251 20,471 20,692 20,914 21,137 21,361 21,586 21,813 22,041 22,270 22,500 22,731 22,964 11,600 to 14,400 feet Distance Max Weight 11,600 11,650 11,700 11,750 11,800 11,850 11,900 11,950 12,000 12,050 12,100 12,150 12,200 12,250 12,300 12,350 12,400 12,450 12,500 12,550 12,600 12,650 12,700 31,849 32,124 32,400 32,678 32,956 33,236 33,517 33,799 34,083 34,367 34,653 34,940 35,228 35,518 35,808 36,100 36,393 36,687 36,982 37,279 37,576 37,875 38,175

Revision 0
I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_1-1-3_3-1_R0_10MAR10.Doc

Golder Associates

SHSH-1001/063-2212A

Page 1 of 3

TABLE 3.3-1 MAXIMUM WEIGHT OF EXPLOSIVES TO BE DETONATED WITHIN ANY 8 MILLISECOND DELAY PERIOD
200 to 3,000 feet Distance Max Weight 1,350 602 1,400 648 1,450 695 1,500 744 1,550 794 1,600 846 1,650 900 1,700 955 1,750 1,012 1,800 1,071 1,850 1,131 1,900 1,193 1,950 1,257 2,000 1,322 2,050 1,389 2,100 1,458 2,150 1,528 2,200 1,600 2,250 1,674 2,300 1,749 2,350 1,826 2,400 1,904 2,450 1,984 3,050 to 5,850 feet Distance Max Weight 4,200 5,831 4,250 5,971 4,300 6,112 4,350 6,255 4,400 6,400 4,450 6,546 4,500 6,694 4,550 6,844 4,600 6,995 4,650 7,148 4,700 7,302 4,750 7,459 4,800 7,617 4,850 7,776 4,900 7,937 4,950 8,100 5,000 8,264 5,050 6,036 5,100 6,156 5,150 6,278 5,200 6,400 5,250 6,524 5,300 6,649 5,900 to 8,700 feet Distance Max Weight 7,050 11,764 7,100 11,931 7,150 12,100 7,200 12,270 7,250 12,441 7,300 12,613 7,350 12,786 7,400 12,961 7,450 13,137 7,500 13,314 7,550 13,492 7,600 13,671 7,650 13,851 7,700 14,033 7,750 14,216 7,800 14,400 7,850 14,585 7,900 14,772 7,950 14,959 8,000 15,148 8,050 15,338 8,100 15,529 8,150 15,721 8,750 to 11,550 feet Distance Max Weight 9,900 23,198 ,950 23,433 10,000 23,669 10,050 23,906 10,100 24,144 10,150 24,384 10,200 24,625 10,250 24,867 10,300 25,110 10,350 25,354 10,400 25,600 10,450 25,847 10,500 26,095 10,550 26,344 10,600 26,594 10,650 26,846 10,700 27,098 10,750 27,352 10,800 27,607 10,850 27,863 10,900 28,121 10,950 28,379 11,000 28,639 11,600 to 14,400 feet Distance Max Weight 12,750 38,476 12,800 8,779 12,850 39,082 12,900 39,387 12,950 39,693 13,000 40,000 13,050 40,308 13,100 40,618 13,150 40,928 13,200 41,240 13,250 41,553 13,300 41,867 13,350 42,183 13,400 42,499 13,450 42,817 13,500 43,136 13,550 43,456 13,600 43,778 13,650 44,100 13,700 44,424 13,750 44,749 13,800 45,075 13,850 45,402

Revision 0
I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_1-1-3_3-1_R0_10MAR10.Doc

Golder Associates

SHSH-1001/063-2212A

Page 2 of 3

TABLE 3.3-1 MAXIMUM WEIGHT OF EXPLOSIVES TO BE DETONATED WITHIN ANY 8 MILLISECOND DELAY PERIOD
200 to 3,000 feet Distance Max Weight 2,500 2,066 2,550 2,150 2,600 2,235 2,650 2,321 2,700 2,410 2,750 2,500 2,800 2,592 2,850 2,685 2,900 2,780 2,950 2,877 3,000 2,975
NOTES: 1. Max = Maximum 2. W = Max Weight 3. D = Distance 4. 0 to 300 feet: W = (D/50)2 5. 301 to 5000 feet: W = (D/55)2 6. 5001 feet and up: W = (D/65)2

3,050 to 5,850 feet Distance Max Weight 5,350 6,775 5,400 6,902 5,450 7,030 5,500 7,160 5,550 7,291 5,600 7,422 5,650 7,556 5,700 7,690 5,750 7,825 5,800 7,962 5,850 8,100

5,900 to 8,700 feet Distance Max Weight 8,200 15,915 8,250 16,109 8,300 16,305 8,350 16,502 8,400 16,701 8,450 16,900 8,500 17,101 8,550 17,302 8,600 17,505 8,650 17,709 8,700 17,915

8,750 to 11,550 feet Distance Max Weight 11,050 28,900 11,100 29,162 11,150 29,425 11,200 29,690 11,250 29,956 11,300 30,222 11,350 30,491 11,400 30,760 11,450 31,030 11,500 31,302 11,550 31,575

11,600 to 14,400 feet Distance Max Weight 13,900 45,730 13,950 46,060 14,000 46,391 14,050 46,722 14,100 47,056 14,150 47,390 14,200 47,725 14,250 48,062 14,300 48,400 14,350 48,739 14,400 49,079

Revision 0
I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_1-1-3_3-1_R0_10MAR10.Doc

Golder Associates

SHSH-1001/063-2212A

Page 3 of 3

TABLE 3.5-1 CULVERT DESIGN SUMMARY
Culvert Name Contributing Watershed (acre) Peak Flow (cfs) No. Culverts Culvert Dimensions (feet) (1) 5-ft round or (2) 44" x 72" Arched Culverts 5 5-ft round or 36" x 58" arched 5 3 3 4 3.75 (1) 8-ft round or (1) 87"x137" or (2) 69" x 98" Arched Culverts 6 5 5 14-ft x 4-ft Con/Span Arch 4 5.5 3.75 (2) 7' or (1) 7.25' x 11.5' Arched or (1) 12' Round CMP 1(12')

Area

Storm

HW/D

Pond 1

CC#1

178.324

100-6

155.53

1 or 2

1.28

Pond 1

CC#1

178.324

10-24

61.15

1

0.75

Pond 1 Pond 1 Pond 1 Pond 1 Pond 2 Pond 2

CC#2 CC#2 CC#3 CC#3 CC#4 CC#4

98.156 98.156 33.159 33.159 67.43 67.43

100-6 10-24 100-6 10-24 100-6 10-24

188.92 80.19 67.13 24.42 120.65 42.96

1 1 1 1 1 1

1.56 0.8 2.5 1 2.4 0.93333

Pond 2

CC#5

472.16

100-6

465.35

1

1.21125

Pond 2 Pond 3 Inlet Pond 3 Inlet

CC#5 CC#6 CC#6

472.16 150.67 150.67

10-24 100-6 10-24

181.9 197.36 83.75 194Undist; 264 Dist 56.33 148.49 52

1 1 1

Site Access Road E Explosives Storage Cvt W Explosive Storage Cvt SAE SOVB-10

CC#7 CC#8 CC#9 CC#10

202.22 40.596 113.44 36.14

100-6 10-24 10-24 10-24

1 1 1 1

1 2.0 0.9 0.7 for 194 cfs; 0.84 for 264 cfs 0.9 1.0 1.0

West Branch

CVT 55+75

100-6

706.41

1 or 2

1.15

West Branch Diversion

CVT 70+51

100-6

707

1

1.2

Revision 0

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_5-1-3_6-4_R0_10MAR10.Doc

TABLE 3.6-1 CURVE NUMBER ESTIMATES
Disturbance/Cover Description Topsoil Salvage, Backfilled & Freshly Topsoiled (Cultivated Agricultural Lands, Fallow, Bare Soil) Pit Area and Haul Roads (Other Agricultural Lands, Farmsteads, Buildings, Lanes and Surrounding Lots) Undisturbed South Branch Heart River Undisturbed Pit 1 (s 1-5) 1 Reclaim (2T/ac Mulch) (Cultivated Agricultural Lands, Small Grain contoured & crop residue-Good condition) 2 Reclaim (Modest Growth, some remaining mulch)(Cultivated Agricultural Lands, Small Grain contoured & crop residue-Poor condition) 3 Reclaim Growth comparable to mulch 4 Reclaim (Pasture Good) Cover Classification B Soil C Soil D Soil

86.0

91

94

74.0

82

86

Wooded (fair) Pasture (fair)

73 69 72.0 80 84 83

73.0

81

84

72.0 61.0

80 74

83 80

Revision 0

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_5-1-3_6-4_R0_10MAR10.Doc

TABLE 3.6-2 PRECIPITATION FREQUENCY ESTIMATES
Storm 2102510010255010024-hour 24-hour 24-hour 24-hour 6-hour 6-hour 6-hour 6-hour Precipitation (inches) 1.75 3.10 3.50 4.50 2.35 2.75 3.20 3.55

Revision 0

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_5-1-3_6-4_R0_10MAR10.Doc

TABLE 3.6-3 DITCH SIZING

Ditch MHR 1 ditch between CC #3 and CC #2(W) MHR 1 ditch between CC#3 and Pond 1(E) MHR 1 ditch between N end of road and CC#1 (W) MHR 1 ditch between CC #4 & CC#3 MHR 1 ditch between CC#3 & CC#2 CD1A ditch between N end of road & CC #1 (E) MHR 1 ditch between CC #2 and CC #1 MHR 1 ditch below CC#4 CD2A ( S to N) Note: cfs – cubic feet per second

Contributing Watershed (acre) 36.272 136.467 150.5 1.579 5.056 8.743 22.224 67.43 472.16

10-year 24hour Flow (cfs) 24.23 102.47 55.43 1.66 11 11.63 16.04 42.96 181.9

Shape Trap Trap Trap Tri Tri Tri Tri Trap Trap

Flow Depth (feet) 1.12 2.26 2.01 0.59 1.19 1.29 1.37 1.69 2.03

Ditch Depth (feet) 1.42 2.56 2.31 0.89 1.49 1.59 1.67 1.99 2.33

Bottom Width (feet) 4 4 4 0 0 0 0 4 12

Top Width (feet) 13.94 21.9 20.18 5.32 8.95 9.51 10.04 15.95 30.67

Revision 0
I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_5-1-3_6-4_R0_10MAR10.Doc

Golder Associates

SHSH-1001/063-2212A

TABLE 3.6-4 COVER PRACTICE VALUES
Classification Disturbed First Year Reclaim Second Year Reclaim Third Year Reclaim 2 T/ac mulch; 84-90% cover Similar to 1 T/ac mulch; 50-69% cover 0% canopy cover; 60% ground cover; grass 25% canopy cover 0.5 m fall height; 60% ground cover; grass 50% canopy cover 0.5 m fall height; 80% ground cover; grass Description C Factor 1.0 0.1 0.24 0.042

Fourth Year Reclaim

0.038

Fifth Year Reclaim

0.012

Revision 0

Golder Associates

SHSH-1001/063-2212A

I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_TBL3_5-1-3_6-4_R0_10MAR10.Doc

0 2500

25 00

2525
25 25 00

250 0

2525

25 00

2500
0 25 0

250

0

25 00

2550

2 250500 0
25 00

2525

2475

2475

0 50 25

12

252 5

25 25
4 5 247

25

0 0

25

00 25 25
7 2475

2475

25

9
2 50 2 500

25 50

24

75

7
2550

2 24

5 25 2

2550

8
255 2550

00

5 75

2 25

5 5

25 25 25

0 00

2475

10
24 7 5

2525

25

25

CC#8

262
2600

5
26 00

2475

2 57 5

SPGM-8

CC#9

SPGM-7

SPGM-5

2500

R99W R98W

25 7 5

2

550

75

2550

252

2500

5

Pond 6

2500

Pond 3
75 2475 24

247 5

250

0

25 50

252

2475
24 75

24

75

2475
2 5 2475

00

25

75

252 5
25 50

EXPLOSIVE MATERIALS STORAGE

2475

Heart River
2500
2500

2525

11
24 24 75 75

12

2650

25

2625

26

2650

26

5 2 57 5 5

00 00 25

Heart River
2475

7

2475

2550 2550

2475

25 2500

5

2475

R98W R97W
2475

50 2500

00

25
2675

2550
75

SPGM-1

Pond 5
25 25

25 25 75 75
2 75 2575

2500
24247 75 5
2475 2475

SPGM-2

2625

2575
2 0 260
2625

25 00
5 25 25 25

5 5 26 26 0 0

13

25 26

2600

25 50

26 26

0

25

CD-1B

SOVB-2

SOVB-1

PIT 5

2

5 62

2575
SOVB-5

16

SOVB-3

75

18
2 0 65

25

17
2575

00 26

252

5
255 0

OVB-2

15

25

25

255

0

250

14
0
75 2475
2475

255

2550

13

18

0

SOVB-7

SOVB-6

25

50

PIT 2
2525

25 25

26 5

0

CD-2A

50 50 2 25

0

2 26

25 2525

260

262 5

SOVB-4

25 25
2525

SPGM-4

26

00

Wes

00

2500

2575

00

DD-2b DD-2a

DD-3

SPGM-9
2500
CVT70+51

SPGM-3

26

Rive OVBr -6

50

0 265

50 26

262

SPGM-10

5
SPGM-6 SPGM-20
6 26

DD-1a

2500

hH

2675

260

2500

VB -

2625

20
26 00

26 2 5

VB -

75

SO

21
0 26 0

9

25

2525

2500

SO

CC#2

22

Pond 1
CD1A
25 00

25 00
0 2500

8

Sou

24

2

th B

5 67

26

CC#6

CC#7

ranc

50
26 50

25 25

SPGM-21

0

25

50

75

MINE SUPPORT FACILITIES
2 0 2500

eart

SPGM-13

25

0 25

SPGM-19

SOVB-12

25 0

0

PIT 4b

0

SOVB-13

262 5

25

2 2 26 5

2 0 2500

50 265

25 25

t Trib

00 00

utary

Pond 4

25 25 50 50

25 25 75 75

5 50

19
5 2 7 267

25 25 CC#1

25

00

0 0 25 25 0 0

23
OVB-5

2500

5 250 0

6 25 50

-10

00

50

SO

2575
2550
25 75

SPGM-12

2525

2500
S PG M

7 -1

252

5

2525

262

2550

SPGM-11

250

5

257

5

CC#10

2575

SP

2650

GM

2600

26

-1

0

2500

PIT 1

24

Pond 10
25 2500

VB

25

PIT 4a
25 00

19

5 255

2 2 252

25 75

25 2

5

2550
2650

25 2

2600

252

SP
252 5

5

G

M

8 -1

0

5

5

26 26 5 25

26 2650

2525

25

2525
26 00

50

30
26
26 00

26

25

26
25

00
25 75

29
50 25

So
25 2 5

Bra uth

n

ch

He

OVB-4 25 50

25 25

2525

255

0
25 25

2575
260 0

25

25

26

2525

O

V

00

0

255

25

25

50

2550

2600

50

252 5

25 25
252 5

260

0

25 75

2550

2625

255

0
2575

26
2600

00

2575

260

2575

2600

2600

2575

50

26

25

0
2575

2600

2600
2625

2600

75

5 257

25 25

25

2600
7 2 25 5 5

34
25 75

50
26

35
00
2625

26

25

33

2575

25

50

31

50 25

32

2575

2625

25

26

25

2550

2600

2550

262

2625

2550

5

25

0 260

50

T139N T138N
260 0

25

50

26

25
0 65

25

2600

2575
2550

25 50

255

26

0

26 25
2 25

2 575
25
2 260
25

26

26

25

75

25

2550

2600

0

26 26 2 25

5 25

Pond 2

5 25

2 25 5 25

2575
2550

252

2 25

5

257

5
2 25 75

art

e Riv

r
25

50

-14 GM 15 P 25 S GM25 SP
25
50

25
5 0 255

25

5 25 50 50

28

25

3 B-

27

25

25
SOVB-11

25

50

2575

25 50

255 0

26

25

75

25 50

25

5 255 0

30

25 2550

257 5
252 5
25 25

25

25

25
25

75

5 25 7 75

PIT 3
25 25

50

25

75

0 255

25 25 5 25

S u Sout

5 25 2 25

25

75

6 26 0 00

0 26 26

5 2525

50 25

2 25

5

h Tri h Tri

0 0

75 75 25 25

5 252

75 75 25

ry ry b ta buta

25 2550

25 2525

2 2 262 5

2625

2 25 50

25 50

2 2525

5 2525

25

262 5

36
2650

31

2 26

62 2625

5 25 5 50

00

26 00

2 25 50

26 00

25 0 50

2550

75 75

2 26

2 26

00

0 50

25

2
50

2625

75

2650

26

257 5

5 26 2

25

25 7

25 75
267 2675

27

00

T139N T138N

57 2575

2 0 2550

26 26 00 00
26 26 50

1,000

5

1,000 FEET SCALE 1:12,000 1 IN. EQUALS 1,000 FT. IF PRINTED AT 34 IN. X 44 IN.

500

0

0 0

262 2625

2 255 0 0

0 0 26 26

2 0 260 0

0 0
00 26
26

5 257

00 2600

260

25

26

0 00 5 60 5 26 57 2

5 5

75
PROJECT

LEGEND
MINE PIT BOUNDARY PERMIT BOUNDARY DISTURBANCE BOUNDARY DRAINAGE WAY D SEAM OUTCROP E SEAM OUTCROP E1 SEAM OUTCROP PONDS DIVERSIONS DITCH HAUL ROAD

6
RESIDENCE CULVERT GRASS FILTER/STRAW WATTLE OUT-OF-PIT SPOIL STOCKPILE SUITABLE PLANT GROWTH MATERIAL STOCKPILE SUITABLE OVERBURDEN MATERIAL STOCKPILE TOWNSHIP & RANGE
13

75 25
500 FT. BLASTING BUFFER FOR OCCUPIED DWELLINGS

26 26 50 50

REFERENCE
Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2009. Disturbance Boundary: Norwest, 02/05/2010. Township, Range and Section: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet.
TITLE

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA

EXPLOSIVE MATERIALS STORAGE ACCESS ROAD TOPOGRAPHY (10 FT. INTERVALS)

PIT LAYOUT AND FACILITIES MAP
PROJECT No. DESIGN CADD CHECK REVIEW JDS JDS JRH JRH 4284-01-400 02/01/10 09/03/10 09/09/10 09/09/10 FILE No. Pit and Facilities Map.dwg SCALE AS SHOWN REV. 1

2600

TOPOGRAPHY INDEX (25 FT. INTERVALS) MINE SUPPORT FACILITIES

SECTION

Figure 3.1-1

250

25 00
25 25 00 00

2525

2525

25 00

2525

25
25

00

2500
00 25

00 25

25

2550

0
247

2475
5

25 00

2 5 0 0

2 5

00

0

9
2500

2

2475

2 4 7 5

2

255
0 5 5

0

8

0

12

25

25 25

25 25

0

2 5 0 0
247
2475

7
2550

247

24

5

25 25

5

0

75

25

5

25 25

00

10
24 75
2475

2525

Heart River
2500
2475

2525

11
24 75
25 00

12
75

25 75

25 00

25

75

25 25
50 25

Heart River
2475

7

26
2600

25

247 5

2575

250 0

R99W

R98W

257

5

0 255

25 75

25 25

2500

24

2550

250 0

75

25

00

26 00
2650

25 50

2475

2475

25

2475
24 75

24

2550

2475
247

2500

5

26 25

2650

2550

2475

2500

25

2475

R98W R97W

250 0

2625

26 00

2 5 7 5
2675

0 255

Year 2027
2500

25 75

2625

25

2575

25

25 00

2424 7575
2475

257 5

5 247

2 6 5 0
2 26 5

2625

Year 2032

Year 2031

Year 2030

13

2600

25 50

Year 2026

26 00
26 25

25 25

2475

Year 2043

Year 2042

Year 2029

Year 2028

25 75

18
26 25
0

PIT 5

17
2575

00 26

Year 2035

Year 2034

Year 2033

2575

16

15

Year 2025

2

25 25
5 2 5

50 25

50 25

25 00

14
2475
2475

Year 2038

Year 2037

255

5 26

2550

0

13

18

Year 2036

25

50

PIT 2
2525
25 25
2525

Year 2024

25

25

25

26 50

50

26 00

26

2525

2625

Year 2023

Wes t Tri buta ry

26 00

2500

2575

00

00

5 267
50 26
6 5 0

26

00

5

2

5

25

25 50

00 25

2500

Y ea r2 02 1

2625

Y ea r2 02 0

Year 2041

75

Y ea r2 01 8

Y ea r2 01 7

21

Y ea r2 01 9

2625

20

25

2525

Y ea r2 01 6

250

00 26

0

22

25 00
2500

23

Year 2042

24

Y ea r2 01 5

19

75 26

Y ea r2 01 4

75

2

25 00

Year 2021
26 50

So uth Bra nch He art Riv er

26 50

50 26

5 26

0

262

5

2500

PIT 4b

Year 2042

26 25

Year 2022
2500

25

25 00

2650

2 6 5 0

2600

25 00

26 25

75 25

257 5
2550

2500

26 00

25 50

25 00

Year 2040

2525

2500

2575
25
255 0

25

25

252

5

75

25

25 25

2550
265 0

25

25

2600

25

25

26 25
265 0
2

250 0

2 5 0

2 5 5 0

0

2 5 7 5

250

5 2 5 2

2

5

0

0

0

2 5 0 0

2500

25 00

PIT 1

24

26 75
75

PIT 4a
00
252

19

2500

25

25 50

5

26 25

252 5

2650

252 5

2525

26

25 50

2 5 5 0

26 25

25 25

25

00

25

2575

252
2550

25

5

25 75
25

25

30
26

2 26
26

5

00

29
25 75

So
2525

u

th

an Br

ch

Ri rt a He

ve

r
2
2 5 2 5

50

25

5

2

25

5

75

25 50

255 0

28

2

25

2525

Year 2038

0 55

50 25
25
25

2 5 2 5

00

Year 2040
25

26 00

26

25

50 25

27
2550

25 25

25 50

257

5

2 5 5 0

255

0

26

25

75

2 5 5 0

25

25

Year 2039

25 50

30

257
25

5

25

75

26

00

25

25

25
2 5

75

25 75

0

25 25

25 25

255

PIT 3
25

5

75 25

50 25
75 25

25 25

5

25

25 50

2550

2600

25 50

25

00 26

25 75

0

2550

262

2575

50 25

252 5
2575

26

2575

2600

26

00

260 0

25

50

2575

2

5

5

00
75 25

0 260

25 25

25 25

2600

33
25 75

2575

34
25 75

50

35
26 00

26

32

2575
25

50

262

36

2575

2600 2625

2600

75

31

50 25

25

5

25 26

26 25

25 25
2550

0

Sou

25

26

25

25 25

25

00

26

252 5
25 25
25 75

th T r ib u ta ry

00
2600

2 5 7 5

2525

26 25

2625

2 5 5 0

2 5 5 0

2550

2600

25

00

2550

26

2625

2550

0 260

50

2

5

T138N
26 00

5

0

26 25
0 5 6 2

26 25

2600

2575
2550

25

50

25 50

T139N
2575

26 25

25

25

26 00
257

26

75

25

255 0

0

26 00

252 5

2525

262 5

2625

36
2650

31

26

262

25 50

00

26

25 50

26 00

25 50

5

25

2550

75

26

26 25

50

2625

25 75

25

50

T139N
2 7 0 0

1,000

500

0

1,000

2650
26 25

FEET

5

255

26 00
26

257 5

25 26

2

5

25 75
7

T138N
1 0 REV DATE

SCALE 1:12,000 1 IN. EQUALS 1,000 FT.
IF PRINTED AT 34 IN. X 44 IN.

26 00
25 50

0

50

2625

2675

5

26

26 00

00
0

260

2

6

0

26 25

09/09/10 03/31/10

JDS JDS DES

COMPLETENESS COMMENTS ORIGINAL PERMIT SUBMITTAL

JDS JDS CADD

JRH JRH CHK

JRH JRH RVW

25

2600

75

2

REVISION DESCRIPTION

26 2

PROJECT

LEGEND
PERMIT BOUNDARY MINE PIT BOUNDARY
DRAINAGE WAY

OVERBURDEN AND LIGNITE REMOVAL SEQUENCE
Year 2014 Year 2015 Year 2016 Year 2017 Year 2018 Year 2019 Year 2020 Year 2021 Year 2022

REFERENCE
Year 2038 Year 2039
Year 2040 Year 2041 Year 2042

Year 2030 Year 2031 Year 2032 Year 2033 Year 2034 Year 2035 Year 2036 Year 2037

Year 2023
Year 2024 Year 2025 Year 2026 Year 2027 Year 2028 Year 2029

TOPOGRAPHY (10 FT. INTERVALS)
2600

TOPOGRAPHY INDEX (25 FT. INTERVALS)
MINE SUPPORT FACILITIES

Year 2043

Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet.

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA
TITLE

LIFE OF MINE OVERBURDEN AND LIGNITE REMOVAL SCHEDULE MAP
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

LOM Removal Timing.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

01/22/10 01/26/10 02/10/10 02/15/10

SCALE

1

TOWNSHIP & RANGE
13

SECTION

Figure 3.1-2

340'-0"

MAINTENANCE SAMPLE PREPARATION WAREHOUSE SMALL VEHICLE MAINTENANCE SHOP
STORAGE

MANAGER LUBRICATION AND FLUIDS STORAGE

ELECTRICAL AND HYDRAULIC REPAIR SHOP

TOOL

COAL LABORATORY

WORK AREA

83'-10"

TIRE SHOP EQUIPMENT
STORAGE OFFICE WAREHOUSE SHOP FORMAN

MEN'S
MECH

MAINTENANCE BAY

PM BAY

WASH BAY WELDING BAY TO RETAINING POND

TIRE SHOP SLAB

WOMEN'S

APPROACH APRON

PATIO - RAISED TRAILER ACCESS

OFFICE BUILDING

10'x40' DOUBLE-WDE
TRAILER

SAFETY AND TRAINING

10'x40' DOUBLE-WIDE
TRAILER

16

8

0

MINE SUPPORT
FACILITIES

16 FEET

SCALE 1:160 1 IN. EQUALS 16 FT.
IF PRINTED AT 22 IN. X 34 IN.

GRAVEL PARKING LOT

w/ BLOCK HEATERS
20 SPACES
0 REV

03/31/10
DATE

CJH DES

ORIGINAL

PERMIT SUBMITTAL

55'-0"

CJH CADD

JDS CHK

JRH RVW

REVISION DESCRIPTION

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA
TITLE

MINE SUPPORT FACILITIES

(CONCEPTUAL)
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Facilities & Fuel Depot.dwg
AS NOTED
REV.

CJH CJH JDS
JRH

01/26/10 02/02/10 02/10/10 02/15/10

SCALE

0

Figure 3.1-3a

COMPUTER MECH STORAGE NETWORK KITCHEN

DOCUMENT STORAGE VAULT

MINE ENGINEER

82'-2"

CONFERENCE ACCOUNT

SURVEYORS

ADMIN

RECEPTION

MINE COPIER CENTER MANAGER

SAFETY

66'-8"

8

4

0

8
FEET

SCALE 1:8 1 IN. EQUALS 8FT.
IF PRINTED AT 22 IN. X 34 IN.

0 REV

03/31/10
DATE

CJH DES

ORIGINAL

PERMIT SUBMITTAL

CJH CADD

JDS CHK

JRH RVW

REVISION DESCRIPTION

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA
TITLE

OWNER'S OFFICES

OWNER'S OFFICES

(CONCEPTUAL)
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Facilities & Fuel Depot.dwg
AS NOTED
REV.

CJH CJH JDS
JRH

01/26/10 01/26/10 02/10/10 02/15/10

SCALE

0

Figure 3.1-3b

20'-0"

DIESEL PUMPING TRAILER

(DOUBLE WALL TANK w/ PUMPS)

20'-0"

9,500 GAL

20'-0"

FABRIC SPILL LINER PROVIDED IN THE AREA

50

25

0

50 FEET

20'-0"

20'-0"

OF THE TRAILER PLUS 20' ALL SIDES AND A 20' x 20'
AREA THAT THE TRUCK FUELING WILL BE LOCATED

SCALE 1:50 1 IN. EQUALS 50 FT.

20'-0"

IF PRINTED AT 22 IN. X 34 IN.

LINER WILL BE BURIED UNDER 12"
OF FILL
03/31/10
DATE CJH DES ORIGINAL PERMIT SUBMITTAL CJH CADD JDS CHK JRH RVW

0 REV

REVISION DESCRIPTION

PROJECT

NOTES:
Fueling facility to be located in an area of localized depressed elevation sufficient in size to prevent spills from draining into waterways while the spill is being cleaned-up.

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA

PLAN VIEW OF TRUCK FUELING STATION

TITLE

HAUL TRUCK FUELING DEPOT

(CONCEPTUAL)
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Facilities & Fuel Depot.dwg
AS NOTED
REV.

CJH CJH JDS
JRH

01/26/10 02/02/10 02/10/10 02/15/10

SCALE

0

Figure 3.1-4

COMPUTER MECH STORAGE NETWORK KITCHEN

DOCUMENT STORAGE VAULT

MINE ENGINEER

82'-2"

CONFERENCE ACCOUNT

SURVEYORS

ADMIN

RECEPTION

MINE COPIER CENTER MANAGER

SAFETY

66'-8"

8

4

0

8
FEET

SCALE 1:8 1 IN. EQUALS 8FT.
IF PRINTED AT 22 IN. X 34 IN.

0 REV

03/31/10
DATE

CJH DES

ORIGINAL

PERMIT SUBMITTAL

CJH CADD

JDS CHK

JRH RVW

REVISION DESCRIPTION

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA
TITLE

OWNER'S OFFICES

OWNER'S OFFICES

(CONCEPTUAL)
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Facilities & Fuel Depot.dwg
AS NOTED
REV.

CJH CJH JDS
JRH

01/26/10 01/26/10 02/10/10 02/15/10

SCALE

0

Figure 3.1-3b

20'-0"

DIESEL PUMPING TRAILER

(DOUBLE WALL TANK w/ PUMPS)

20'-0"

9,500 GAL

20'-0"

FABRIC SPILL LINER PROVIDED IN THE AREA

50

25

0

50 FEET

20'-0"

20'-0"

OF THE TRAILER PLUS 20' ALL SIDES AND A 20' x 20'
AREA THAT THE TRUCK FUELING WILL BE LOCATED

SCALE 1:50 1 IN. EQUALS 50 FT.

20'-0"

IF PRINTED AT 22 IN. X 34 IN.

LINER WILL BE BURIED UNDER 12"
OF FILL
03/31/10
DATE CJH DES ORIGINAL PERMIT SUBMITTAL CJH CADD JDS CHK JRH RVW

0 REV

REVISION DESCRIPTION

PROJECT

NOTES:
Fueling facility to be located in an area of localized depressed elevation sufficient in size to prevent spills from draining into waterways while the spill is being cleaned-up.

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA

PLAN VIEW OF TRUCK FUELING STATION

TITLE

HAUL TRUCK FUELING DEPOT

(CONCEPTUAL)
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Facilities & Fuel Depot.dwg
AS NOTED
REV.

CJH CJH JDS
JRH

01/26/10 02/02/10 02/10/10 02/15/10

SCALE

0

Figure 3.1-4

12

7

8

9

10

11

12

7

R99W

R98W R98W R97W

13

18

PIT 5

17

16

15

14

13

18

UTILITIES TO BE DISCONNECTED AND/OR RE-ROUTED PRIOR TO 2021 UTILITIES TO BE DISCONNECTED

PIT 2
AND/OR RE-ROUTED PRIOR TO 2021

DC C

DC C

PIT 4b
UTILITIES TO BE

24

19

20

DISCONNECTED

21

AND/OR RE-ROUTED

22

PRIOR TO 2021

23

PIT 1

24

PIT 4a

19

25

30

29

28

27

26

25

30

UTILITIES TO BE DISCONNECTED AND/OR RE-ROUTED

PIT 3
DC

PRIOR TO 2038

36

31

32

33

34

35

36

31

T139N T138N T139N T138N
1,000
500 0

1,000

FEET

1

SCALE 1:12,000 1 IN. EQUALS 1,000 FT.
IF PRINTED AT 34 IN. X 44 IN.

6

5

4

3

2
REFERENCE
Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Projection: StatePlane, North Dakota South, NAD27, Feet.

1 REV

07/08/10
DATE

JDS DES

COMPLETENESS

COMMENT

JDS CADD

JRH CHK

JRH RVW

REVISION DESCRIPTION

PROJECT

LEGEND
PERMIT BOUNDARY AREA MINE PIT BOUNDARY
DC C

UTILITY DISCONNECT POINT (GENERAL AREA) UTILITY CONNECT POINT (GENERAL AREA)

STRUCTURE/BUILDING

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

(BUILDING, HOMESTEAD,
SILO, GRANARY, BARN,

SOUTH HEART, NORTH DAKOTA
TITLE

TOWNSHIP & RANGE
13

SECTION SOUTHWEST WATER AUTHORITY - WATER LINE WATER LINE RE-ROUTE

FARM STRUCTURE, etc.)

UTILITIES RE-ROUTE MAP WATER LINES
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Utility Re-Route.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

09/08/09 01/27/10 02/10/10 02/15/10

SCALE

1

Figure 3.1-5a

12

7

8

9

10

11

12

7

R99W

R98W R98W R97W

13

18

PIT 5

17

16

15

14

13

18

UTILITIES TO BE DISCONNECTED AND/OR RE-ROUTED PRIOR TO 2021

PIT 2
UTILITIES TO BE DISCONNECTED AND/OR RE-ROUTED PRIOR TO 2021
DC C

C

DC C

C

PIT 4b
24

19

20

21

22

23

PIT 1

24

PIT 4a

19

25

30

29

28

27

26

25

30

UTILITIES TO BE DISCONNECTED AND/OR RE-ROUTED

PIT 3
DC

PRIOR TO 2038

36

31

32

33

34

35

36

31

T139N T138N T139N T138N
1,000
500 0

1,000

FEET

SCALE 1:12,000 1 IN. EQUALS 1,000 FT.
IF PRINTED AT 34 IN. X 44 IN.

1
LEGEND
PERMIT BOUNDARY AREA MINE PIT BOUNDARY
DC C

6
UTILITY DISCONNECT POINT (GENERAL AREA) UTILITY CONNECT POINT (GENERAL AREA)
SPRINT-NEXTEL FIBER OPTIC LINE
STRUCTURE/BUILDING

5
REFERENCE
(BUILDING, HOMESTEAD,
SILO, GRANARY, BARN,

1 REV

07/08/10
DATE

JDS DES

COMPLETENESS COMMENT REVISION DESCRIPTION

JDS CADD

JRH CHK

JRH RVW

PROJECT

TOWNSHIP & RANGE
13

SECTION

FARM STRUCTURE, etc.)

AT&T FIBER OPTIC LINE
FIBER OPTIC LINE/CORRIDOR

Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Projection: StatePlane, North Dakota South, NAD27, Feet.

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA
TITLE

UTILITIES RE-ROUTE MAP COMMUNICATION LINES
PROJECT No.
DESIGN CADD CHECK
REVIEW

CONSOLIDATED TELECOM - COPPER LINE (PHONE LINE)
PHONE LINE RE-ROUTE

4284-01-400

FILE No.

Utility Re-Route.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

09/08/09 01/27/10 02/10/10 02/15/10

SCALE

1

Figure 3.1-5b

12

7

8

9

10

11

12

7

R99W

R98W R98W R97W

13

18

PIT 5

17

16

15

14

13

18

PIT 2
UTILITIES TO BE DISCONNECTED

PRIOR TO 2033

Natural Gas Station

DC

PIT 4b
DC

24

C

DC

19

UTILITIES TO BE

20

DISCONNECTED

21

PRIOR TO 2021

22

23

UTILITIES TO BE DISCONNECTED AND/OR RE-ROUTED PRIOR TO 2020

PIT 1

24

PIT 4a

19

DC C

25

30

29

28

27

26

25

30

PIT 3

36

31

32

33

34

35

36

31

T139N T138N T139N T138N
1,000
500 0

1,000

FEET

SCALE 1:12,000 1 IN. EQUALS 1,000 FT.

1

IF PRINTED AT 34 IN. X 44 IN.

6

5

4

3
REFERENCE
Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Projection: StatePlane, North Dakota South, NAD27, Feet.

1 REV

07/08/10
DATE

JDS DES

COMPLETENESS COMMENT REVISION DESCRIPTION

JDS CADD

JRH CHK

JRH RVW

PROJECT

LEGEND
PERMIT BOUNDARY AREA MINE PIT BOUNDARY
DC C

UTILITY DISCONNECT POINT (GENERAL AREA) UTILITY CONNECT POINT (GENERAL AREA)

STRUCTURE/BUILDING

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

(BUILDING, HOMESTEAD,
SILO, GRANARY, BARN,

SOUTH HEART, NORTH DAKOTA
TITLE

TOWNSHIP & RANGE
13

SECTION UNDERGROUND GAS OR ELECTRIC UTILITY - MONTANA-DAKOTA UTILITIES UNDERGROUND GAS LINE RE-ROUTE WILLSTON BASIN INTERSTATE PIPELINE COMPANY - GAS LINE

FARM STRUCTURE, etc.)

UTILITIES RE-ROUTE MAP UNDERGROUND GAS AND ELECTRIC LINES
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Utility Re-Route.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

09/08/09 01/27/10 02/10/10 02/15/10

SCALE

1

Figure 3.1-5c

12

7

8

9

10

11

12

7

R99W

R98W
345 kV

41.6 kV

R98W R97W

13

18

PIT 5

17

16

15

14

13

18

UTILITIES TO BE DISCONNECTED AND/OR RE-ROUTED PRIOR TO 2021 UTILITIES TO BE DISCONNECTED

PIT 2
UTILITIES TO BE DISCONNECTED AND/OR RE-ROUTED PRIOR TO 2021
DC

AND/OR RE-ROUTED

PRIOR TO 2033

DC C DC

C

DC C

PIT 4b
UTILITIES TO BE DISCONNECTED

230 kV

24

19

20

Substation

21

AND/OR RE-ROUTED

22

PRIOR TO 2021

23

PIT 1

24

PIT 4a

19

25

30

29

28

27

26

25

30

PIT 3

36

31

32

33

34

35

36

31

T139N T138N T139N T138N
1,000
500 0

1,000

FEET

SCALE 1:12,000 1 IN. EQUALS 1,000 FT.
IF PRINTED AT 34 IN. X 44 IN.

1

6

5

4

3
REFERENCE
Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Projection: StatePlane, North Dakota South, NAD27, Feet.

1 REV

07/08/10
DATE

JDS DES

COMPLETENESS COMMENT REVISION DESCRIPTION

JDS CADD

JRH CHK

JRH RVW

PROJECT

LEGEND
PERMIT BOUNDARY AREA MINE PIT BOUNDARY
DC C

UTILITY DISCONNECT POINT (GENERAL AREA) UTILITY CONNECT POINT (GENERAL AREA)

STRUCTURE/BUILDING

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

(BUILDING, HOMESTEAD,
SILO, GRANARY, BARN,

SOUTH HEART, NORTH DAKOTA
TITLE

TOWNSHIP & RANGE
13

SECTION POWER LINE POWER LINE RE-ROUTE TRANSMISSION LINE

FARM STRUCTURE, etc.)

UTILITIES RE-ROUTE MAP POWER LINES
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Utility Re-Route.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

09/08/09 01/27/10 02/10/10 02/15/10

SCALE

1

Figure 3.1-5d

7

8

9

10

11

12

7

R99W

R98W
345 kV

41.6 kV

SOUTH HEART

R98W R97W

18

PIT 5

17

16

15

14

13

18

PIT 2
OCCUPIED DWELLING

1

FARM BUILDINGS - TO BE REMOVED PRIOR TO MINING OCCUPIED DWELLING

2

FARM BUILDINGS -

TO BE REMOVED PRIOR TO MINING

3

FARM BUILDINGS - TO BE REMOVED PRIOR TO MINING

PIT 4b

230 kV

19

20

WAPA

Substation

21

22

23

PIT 1
OCCUPIED DWELLING

24

PIT 4a
4
FARM BUILDINGS - TO BE REMOVED PRIOR TO MINING

19

6

OCCUPIED DWELLING
FARM BUILDINGS

OCCUPIED DWELLING FARM BUILDINGS - TO BE REMOVED PRIOR TO MINING

30

29

28

27

26

25

30

PIT 3

31

32

33

34

35

36

2,000

1,000

0

2,000

31 SCALE 1:24,000 1 IN. EQUALS 2,000 FT.
IF PRINTED AT 17 IN. X 22 IN.

FEET

T139N T138N
LEGEND
PERMIT BOUNDARY AREA MINE PIT BOUNDARY ROADS TRANSMISSION LINE OVERHEAD POWER LINE
STRUCTURE/BUILDING

T139N
0

03/31/10
DATE

JDS

ORIGINAL PERMIT SUBMITTAL REVISION DESCRIPTION

JDS CADD

JRH CHK

JRH RVW

REV

DES

PROJECT

REFERENCE
(BUILDING, HOMESTEAD,
SILO, GRANARY, BARN,

Permit Boundary: Norwest, 11/10/2009. Mine Pit Boundary: Norwest, 01/20/2010.
PLSS: ND HUB, 6/20/2006.

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA
TITLE

TOWNSHIP & RANGE
13

FARM STRUCTURE, etc.)

SECTION UNDERGROUND UTILITY - MONTANA-DAKOTA UTILITIES

Road: Digitzed from aerial photography, 6/19/2007 Projection: StatePlane, North Dakota South, NAD27, Feet.

EXISTING STRUCTURES MAP POWER LINES
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Existing Structures.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

11/30/07
01/28/10 02/10/10 02/15/10

SCALE

0

Figure 3.2-1a

7

8

9

10

11

12

7

R99W

R98W R98W R97W

18

PIT 5

17

16

15

14

13

18

PIT 2
OCCUPIED DWELLING

1

FARM BUILDINGS

OCCUPIED DWELLING

2

FARM BUILDINGS

Natural Gas Station

3

FARM BUILDINGS

PIT 4b

19

20

21

22

23

PIT 1
OCCUPIED DWELLING

24

PIT 4a
4
FARM BUILDINGS

19

OCCUPIED DWELLING
FARM BUILDINGS

OCCUPIED DWELLING
FARM BUILDINGS

30

29

28

27

26

25

30

PIT 3

31

32

33

34

35

2,000

1,000

0

2,000

36

FEET

SCALE 1:24,000 1 IN. 31 EQUALS 2,000 FT.
IF PRINTED AT 17 IN. X 22 IN.

T139N T138N
LEGEND
PERMIT BOUNDARY AREA MINE PIT BOUNDARY
STRUCTURE/BUILDING

T139N
REV DATE

0

03/31/10

JDS DES

ORIGINAL PERMIT SUBMITTAL REVISION DESCRIPTION

JDS CADD

JRH CHK

JRH RVW

PROJECT

REFERENCE
(BUILDING, HOMESTEAD,
SILO, GRANARY, BARN,

Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010.
PLSS: ND HUB, 6/20/2006.

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA
TITLE

TOWNSHIP & RANGE
13

SECTION WILLSTON BASIN INTERSTATE PIPELINE COMPANY - GAS LINE SOUTHWEST WATER AUTHORITY - WATER LINE

FARM STRUCTURE, etc.)

Road: Digitzed from aerial photography, 6/19/2007 Projection: StatePlane, North Dakota South, NAD27, Feet.

EXISTING STRUCTURES MAP GAS PIPE LINES AND WATER LINES
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Existing Structures.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

11/30/07
01/28/10 02/10/10 02/15/10

SCALE

0

UNDERGROUND UTILITY (MONTANA-DAKOTA UTILITIES)

Figure 3.2-1b

7

8

9

10

11

12

7

R99W

R98W R98W R97W

18

PIT 5

17

16

15

14

13

18

PIT 2
OCCUPIED DWELLING

1

FARM BUILDINGS

OCCUPIED DWELLING

2

FARM BUILDINGS

3

FARM BUILDINGS

PIT 4b

19

20

21

22

23

PIT 1
OCCUPIED DWELLING

24

PIT 4a
4
FARM BUILDINGS

19

OCCUPIED DWELLING
FARM BUILDINGS

OCCUPIED DWELLING
FARM BUILDINGS

30

29

28

27

26

25

30

PIT 3

31

32

33

34

35

36

2,000

1,000

0

2,000

SCALE 1:24,000 1 IN. EQUALS 2,000 FT.
IF PRINTED AT 17 IN. X 22 IN.

31

FEET

T139N T138N
LEGEND
PERMIT BOUNDARY AREA MINE PIT BOUNDARY

T139N
0

03/31/10
DATE

JDS DES

ORIGINAL PERMIT SUBMITTAL REVISION DESCRIPTION

JDS CADD

JRH CHK

JRH RVW

REV

PROJECT

REFERENCE
AT&T FIBER OPTIC LINE
FIBER OPTIC LINE/CORRIDOR
STRUCTURE/BUILDING

(BUILDING, HOMESTEAD,
SILO, GRANARY, BARN,

Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010.
PLSS: ND HUB, 6/20/2006.

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA
TITLE

TOWNSHIP & RANGE
13

SECTION

FARM STRUCTURE, etc.)

CONSOLIDATED TELECOM - COPPER LINE (PHONE LINE)
SPRINT-NEXTEL FIBER OPTIC LINE

Road: Digitzed from aerial photography, 6/19/2007 Projection: StatePlane, North Dakota South, NAD27, Feet.

EXISTING STRUCTURES MAP COMMUNICATION UTILITIES
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Existing Structures.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

11/30/07
01/28/10 02/10/10 02/15/10

SCALE

0

Figure 3.2-1c

7

4659 ft

8

9
3805 ft
EXPLOSIVE
MATERIALS

10

448 2 ft

11

12

7

33 58 ft

STORAGE

R99W

R98W
345 kV

41.6 kV

SOUTH HEART

3802 ft

2174 ft

1559 ft

511 ft

R98W R97W

3136

ft

6227 ft

18

PIT 5

17

16

15

14

13

18

PIT 2
OCCUPIED DWELLING
FARM BUILDINGS

OCCUPIED DWELLING
FARM BUILDINGS

(TO BE REMOVED)

(TO BE REMOVED)
t 6f 170
ft

91 3
21

07 17

ft
201 t 4f

ft
FARM BUILDINGS

12 22

Natural Gas Station

19

ft

(TO BE REMOVED)
60 6
681 ft

PIT 4b
MAXIMUM PERMISSIBLE

1329 ft

1644 ft

230 kV

ft

19

20

WAPA

Substation

21

22

EXPLOSIVE WEIGHT CHART*
23
24

DISTANCE (ft.)
400 800

PIT 1
OCCUPIED DWELLING
FARM BUILDINGS

PIT 4a
(TO BE REMOVED)
69 1 ft

MAX. WEIGHT (lbs.) 19 53
212

1,200 1,600 2,000 2,400
OCCUPIED DWELLING
FARM BUILDINGS

476 846

1,322 1,904 2,592 3,385 4,284 5,289

2,800 3,200 3,600

OCCUPIED DWELLING
FARM BUILDINGS

1480 ft

(TO BE REMOVED)

1563 ft

30

29

28
293 ft

27

4,000

26

25

4,400 4,800 5,200

30

6,400

7,617 6,400 7,422 8,521

PIT 3
5624 ft
159 2f t

5,600 6,000

5550 ft

*lbs per 8 ms delay period
2,000 1,000
0

2,000

FEET

SCALE 1:24,000 1 IN. EQUALS 2,000 FT.
IF PRINTED AT 17 IN. X 22 IN.

31

32

33

34

35

36

1 0 REV

09/09/10 03/31/10
DATE

JDS JDS DES

COMPLETENESS

ORIGINAL PERMIT SUBMITTAL REVISION DESCRIPTION

31

COMMENT

JDS JDS CADD

JRH JRH CHK

JRH JRH RVW

PROJECT

T139N
LEGEND
PERMIT BOUNDARY MINE PIT BOUNDARY
WATER PIPELINES GAS PIPELINES

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA

REFERENCE
MINE SUPPORT FACILITIES

TITLE

TOWNSHIP & RANGE
13

FIBER OPTIC LINE/CORRIDOR FIBER OPTIC LINE CONSOLIDATED TELECOM - COPPER LINE

STRUCTURE/BUILDING (BUILDING, HOMESTEAD, SILO, GRANARY, BARN, FARM STRUCTURE, etc.)

Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010.
PLSS: ND HUB, 6/20/2006.

BLASTING DISTANCES MAP
PROJECT No.
DESIGN CADD CHECK
REVIEW

SECTION

Projection: StatePlane, North Dakota South, NAD27, Feet.

4284-01-400

FILE No.

Blasting Distances.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

08/20/09

SCALE

1

500 FT BLASTING BUFFER

09/03/10
09/09/10 09/09/10

FOR OCCUPIED DWELLINGS

ELECTRIC LINES (UNDERGROUND, OVERHEAD LINES)

Figure 3.3-1

EXISTING LIGNITE SEAM TOE

EXISTING LIGNITE SEAM CREST

EXISTING HIGHWALL TOE

EXISTING HIGHWALL CREST

150'

LIGNITE SEAM 16'

NONEL TRUNKLINE DELAY

16'

LIGNITE SEAM

TYPICAL POWDER FACTOR = 0.25 LBS/TON

NONEL DOWNHOLE DELAY (TYPICALLY INSERTED IN BOOSTER)
ALREADY FRACTURED LIGNITE SEAM

ANFO BOOSTER

BLAST DESIGN PLAN VIEW

LOADED HOLE CROSS-SECTION

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

LEGEND
NONEL TRUNKLINE DELAY DRILL HOLE

TYPICAL BLAST DESIGN USING NONEL TRUNKLINES AND DOWNLINE DELAYS
PROJECT No. DESIGN CADD CHECK REVIEW JDS JDS JRH JRH 4284-01-400 09/11/07 09/11/07 02/10/10 02/15/10 FILE No. SCALE Blast Design.dwg NONE REV. 0

Figure 3.3-2

EXISTING LIGNITE SEAM TOE

EXISTING LIGNITE SEAM CREST

EXISTING HIGHWALL TOE

EXISTING HIGHWALL CREST

150'

LIGNITE SEAM 16'

TRUNKLINE DETONATING CORD

16'

DOWNHOLE DETONATING CORD LIGNITE SEAM TYPICAL POWDER FACTOR = 0.25 LBS/TON

ANFO BOOSTER

ALREADY FRACTURED LIGNITE SEAM

BLAST DESIGN PLAN VIEW

LOADED HOLE CROSS-SECTION

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

LEGEND
DETONATING CORD MS DELAY DRILL HOLE

TYPICAL BLAST DESIGN USING DETONATING CORD
PROJECT No. DESIGN CADD CHECK REVIEW JDS JDS JRH JRH 4284-01-400 09/11/07 09/11/07 02/10/10 02/15/10 FILE No. SCALE Blast Design.dwg NONE REV. 0

Figure 3.3-3

25

00 25

25

2475

24 75

25

9
2500

50

24 75

7
25
2550
2525

247

75 24

252

2550

8
2550

00

25

5

5

2 25 5

00

2475

10
24 7 5

25

CC#8

2475

15+00

5+00

2600

26
2650
2650

25
00

20

0+00

262

5

+0

0

10+00

2575

CC#9

EMPS 1b
10+00

2500

R99W R98W

2575

2

550
2550

75

252

5

2500

247

25

2550

2500

5

250

0

2475 24

75

50

252

2475
7 24 5

24

75

2475

00

2

5 57

252

24 7 5

Heart River
2500

2525

11
24 75

12

2625

26

26 25

257 5

25 00

5

Heart River
2475

7

25

50

2475

2500
5

24 7 5

2475

2500

EMPS 1a
15+00

2475

65+00 60+00

R98W R97W
247 5

2500

25

00

2550

20+00

60+00
25 55+00 25

2500
24247 75 5
00

75

75 25

2675

2625

20+00

CHR 2-4c
2575

CHR 2-3c
0+00 25+00 20+00 15+00 10+00 5+00

2575

25 26

CHR 5-2
2600

2625

25+

45+00

00 25

50+00

55+00

25

20+00

15+00

10+00

5+00

0+00

26 50

50+00

25 75

18

15+00

30+
26
2575

00

50 45+00
45+00 40+00 40+00 0+00

50+00

2475 2475

0 260

25 25

25 26

PIT 5

2 26

5

10+00

17
2575

00

40+00

20+00

16 2-4b CHR
20+00 15+00 10+00 5+00
25

35+00

45+00

252
25 25

5
255 0

35+00 0+00 25+00 20+00 15+00

CHR 2-3b
40+00

15

255

50 26

5+00

35+00

255

0

40+00

250

14
0
2475
2475

CHR 5-1

30+00

2550

0

35+00 35+00 30+00

13

25+00

15+00 0+00
25+00 20+00 15+00
10+00

CHR 2-5a
10+00 5+00 0+00
50 25 50
2575

45+00

10+00

5+00

18

25+00

PIT 2
25+00 20+00 15+00
25 25

30+00

25
30+00

25

26 50

50+00

2625

260

20+00

0+00

5+00

55+00

20+00

25+00 20+00 20+00

15+00
0

15+00

2525

CHR 2-5

35+00

30+00

60+00

20+00 26 0

25+00

CHR 2-4

15+00

00

10+00

CHR 2-3

10+00
5+00
5+00

CHR 2-2

262 5
26 50

5+00

10+00

CHR 2-1

65+00

10+00

15+00

0+00

85+00

80+00

75+00

70+00

65+00

60+00

55+00

50+00

45+00

40+00

35+00

20+00

15+00

5+00

25 25

30+00

+0

19
267 5

2625

15

+0

25

0

20
26 00

20

0

26

2625
70+00 65+00 60+00 55+00 50+00

21
45+00 40+00

CH R

105

10

35+00

30+00

75

5+ 00 2525

25

0

00 26

2500

0

CC#2
+0

1-1
000

22
90 +0 0

+00

25 00
85 +0

95+
00

00

CHR 4-2

+0

23
10+00

2500

25 25 CC#1

Sou th

+0

2

0

5 67

25

26

+0

110

CC#6

CC#7

50

+00

Bra nc

50

75

10+00

0

0+00 0+00

hH

2675

260 0

25+00

25

0+00

eart

25 50

30+00

0+00

00 25

105+0

0

CHR 4-3
25 00

10

0+

00

25 00

5+00

Rive

r

265

0

50 26

262

CVT70+51

5

70+00

5+00

10+00

0+00

2500

0+00

5+00

PIT 4b
5+00

25

10+00

15+00 Wes t Trib utary 15+00

2500

20+00 CHR 2-4a 20+00 15+00 10+00 5+00 0+00

CHR 2-3a
10+00 5+00

25+00 2525 0+00

0

25+00

26 00

2525

25+00

2 250+0 50 0

50

15

2600
5 257
CC#10

26

10 +0 0

CH R
00 5+

2500

0

+0

25

26 25

2500

265 0

25 00

50 25

75 25

2500

50 26

10+00

15+00

00 0+

2500

25

100 +00
2500

+ 90

2500

250

95+ 00

PIT 1

24

0+00 00

25

00

2650

250

262 5

0+

65+00

60+00

55+00

50+00

45+00

40+00

2525

2575
25 75

35 +0 0

2500

70+00

252

5

2525

2550

75+

0

257

5

1-2
00

80
00

PIT 4a 4-1 CHR
15+00 20+00 25+00 30+00
255

5+00

15+00

20+00

0

19

0

+ 80

+0

85

0

+0

00

2500

+0 75

0

0 0+00

70 +0 0 65
60 +0 0

25

5+00

10+00

00

+0

0

5 252

55

0

0

+0

+0

2550

30

5

252

+0

0

75

20 +0 0

15 +0 0

10 +0 0

2650

00

5+

0

25

55+00

40

+0

2525
40+00

50

45+00

2525

1-3
00

25

2550

CH R

60+00

25

45 +0 0

25 25

2600

25

26 25

0

65+00

25

2525

50

+0

0

2650

5

30
26
26 00

2

5 62

00 26
75
25

29
25
25
2 0 55
0 255

uth So
2525
25

nc Bra

hH

e

50

257

5
75 25

2550
25

25

25 25

25

R art

ive

r
0 +0 40 5+00

0+

0

25+00

20+00

25

2525

25

25

2575
25

20+00

CHR 3-252 2

5
25 25

15+00
25 75

257

5

260 0

15+00

10+00
75
25 50

252
25

0

5

255

10+00

15+00

0+00

25+00

5+00

30+00

25

25

50

2550

2600

25 50

252

0 0+
260 0

25

25

0

5

75

2550

2625

0 255

2575

26

00

2525

2575

260

2575

2600

2600

25

50

252

2575

5+00

25 50

0+00

0
2575

2600

75

2

2600

2600

575

25

2

2600
25 75

34
25 75

35
26 00
2625

26

5 52

33

2575

25 50

50

31

25

25

50
2525

32

2575

2625

25

2625

26 25

25 25

5

CHR 3-1

25 25

35+00

25

20+00

25

10+00

PIT 3

25

75

0 255

26 0

2550

2600

00

26

2550

2 26

2625

2550

00

2600

5

25 50

T139N T138N
2 600

26 25
25 50

26 25
0 65

25

2600

2575
2550

25

50

255

26

0

2575
25
26
25

26

26

25

75

25

26 25
2525

25 25

25

26 00

35

25

2575

0 +0 50

252

25

0 +0

50

30

0 +0 45

+0 0
25 0 +0

35+00
255

25

25
25

10+00

15+00

20+

0+00

50

25
50

35+ 00

30+00

28

25

30+00

27
10+00

2 25

5

50

2575

00

50 25

0

25+00
255 0

26

25

75

25

50

25

255 0

30

2550 0+00

5+00

25

2 25 5
2550

h Sout

5+00

25

75

26

25

00

00 26

2525

25

Tribu

75

25 75

tary
2600

2525

262 5

2625

50 25
25 50

26

25

262
26

5

2625
2650

36

2,000

2,000 FEET SCALE 1:24,000 1 IN. EQUALS 2,000 FT. IF PRINTED AT 17 IN. X 22 IN.

1,000

0

31

26

25 50

00

50 25

25 50

25 75

2550

26

26

00

50

25

2
50

2625

75

2650

26

257
25

5

00 27

PROJECT

LEGEND
PERMIT BOUNDARY MINE PIT BOUNDARY MAIN HAUL ROAD CENTERLINE LIGNITE RAMP CENTERLINE
13

REFERENCE
Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. PLSS: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet.

T139N T138N
SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA

2575

2550

26 00
26 50

CULVERT DRAINAGE WAY TOPOGRAPHY (5 FT. INTERVALS) TOWNSHIP & RANGE SECTION

00

TITLE

GENERAL HAUL ROADS AND COAL RAMPS LAYOUT
PROJECT No. DESIGN CADD CHECK REVIEW JDS JDS JRH JRH 4284-01-400 01/28/10 09/03/10 09/09/10 09/09/10 FILE No.Haul Routes & Lignite Ramps.dwg SCALE AS SHOWN REV. 1

EXPLOSIVE MATERIALS STORAGE ACCESS ROAD MINE SUPPORT FACILITIES EXPLOSIVE STORAGE AREA

Figure 3.5-1

4'

16'

30'

30'

16'

4'

6" Scoria
1%
TOPSOIL SUBSOIL

C/L

1%
SUBSOIL SUB BASE

3:1

4:1

4:1

3:1

TOPSOIL SUBSOIL

TYPICAL HAUL ROAD CROSS-SECTION ON REGRADE

4'

16'

30'

30'

16'

4'

6" Scoria
1%

C/L

1%
COMPACTED FILL

4:1

4:1

HAUL ROAD CROSS-SECTION OF TYPICAL FILL AREA

4'

16'

30'

30'

16'

4'

15

15 FEET SCALE 1:180 1 IN. EQUALS 15 FT. IF PRINTED AT 11 IN. X 17 IN.

7.5

0

6" Scoria 1%
3:1

C/L

1%

4:1

4:1

3:1

HAUL ROAD CROSS-SECTION OF TYPICAL CUT AREA
PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

I, James R. Hitt, certify that the plans for the Main Haul Road Cross-Sections were prepared by myself or under my direct supervision

MAIN HAUL ROAD TYPICAL CROSS-SECTIONS
PROJECT No. 4284-01-400 JDS JDS JRH JRH 01/28/10 01/29/10 02/10/10 02/15/10 FILE No.Haul Routes & Lignite Ramps.dwg SCALE AS SHOWN REV. 0 DESIGN CADD CHECK REVIEW

This document was originally issued and sealed by James R. Hitt, PE, registration number PE 2445 on February 15, 2010, and is stored at Golder Associates Inc., 44 Union Boulevard, Suite 300, Lakewood Colorado.

Figure 3.5-2

1'

3'

15'

15'

3'

1'

6" Scoria
3:1
4:1

C/L
1%

1%

4:1

3:1

SITE ACCESS ROAD CROSS-SECTION OF TYPICAL CUT AREA

1'

3'

15'

15'

3'

1'

6" Scoria
3:1

C/L
1%

10

4:1

1%

4:1

COMPACTED FILL

3:1

10 FEET SCALE 1:120 1 IN. EQUALS 10 FT. IF PRINTED AT 11 IN. X 17 IN.

5

0

SITE ACCESS ROAD CROSS-SECTION OF TYPICAL FILL AREA

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

I, James R. Hitt, certify that the plans for the Main Haul Road Cross-Sections were prepared by myself or under my direct supervision

ACCESS ROADS TYPICAL CROSS-SECTIONS
PROJECT No. 4284-01-400 JDS JDS JRH JRH 01/28/10 01/29/10 02/10/10 02/15/10 FILE No.Haul Routes & Lignite Ramps.dwg SCALE AS SHOWN REV. 0 DESIGN CADD CHECK REVIEW

This document was originally issued and sealed by James R. Hitt, PE, registration number PE 2445 on February 15, 2010, and is stored at Golder Associates Inc., 44 Union Boulevard, Suite 300, Lakewood Colorado.

Figure 3.5-3

PVC STA.6+99.51 PVC ELEV.2516.04

PVC STA.14+51.90 PVC ELEV.2519.87

PVC STA.19+42.16 PVC ELEV.2527.36

PVT STA.7+82.51 PVT ELEV.2516.57

PVT STA.14+64.90 PVT ELEV.2520.00

83.00VC 284.24K-Val 758.76SD

13.00VC 12.38K-Val 376.02SD

83.00VC 21.55K-Val 95.88SD

ELEVATION (FEET)

2550
0.78%
0.49%
1.54%

PVT STA.20+25.16 PVT ELEV.2527.04

2550
1 - 4 ft CMP or
-2.31 %

2500 0+00

1 - 5.5 ft CMP or

2500 V = 50:1

5+00

10+00 15+00 20+00 25+00 (FEET) STATION H = 500:1

EXPLOSIVE MATERIALS STORAGE SITE ACCESS ROAD 1b

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

LEGEND
EXISTING TOPOGRAPHY PROFILE HAUL ROAD PROFILE

I, James R. Hitt, certify that the plans for the Main Haul Road Cross-Sections were prepared by myself or under my direct supervision

EXPLOSIVE MATERIAL STORAGE AREA ACCESS ROAD PROFILE 1b
PROJECT No. 4284-01-400 JDS JDS JRH JRH 01/28/10 01/29/10 02/10/10 02/15/10 FILE No.Haul Routes & Lignite Ramps.dwg SCALE AS SHOWN REV. 0 DESIGN CADD CHECK REVIEW

This document was originally issued and sealed by James R. Hitt, PE, registration number PE 2445 on February 15, 2010, and is stored at Golder Associates Inc., 44 Union Boulevard, Suite 300, Lakewood Colorado.

Figure 3.5-5

PVC STA.28+59.82 PVC ELEV.2560.36

PVC STA.34+53.72 PVC ELEV.2558.52

PVC STA.49+40.07 PVC ELEV.2526.02

PVC STA.54+80.16 PVC ELEV.2521.46 PVT STA.55+19.84 PVT ELEV.2521.57

PVC STA.58+37.76 PVC ELEV.2526.00 PVT STA.59+62.24 PVT ELEV.2526.80

PVC STA.64+73.13 PVC ELEV.2526.25

PVT STA.31+40.18 PVT ELEV.2561.99

PVT STA.35+46.28 PVT ELEV.2556.98

PVT STA.49+65.45 PVT ELEV.2525.64

280.36VC 83.00K-Val 186.46SD

92.57VC 83.00K-Val 234.08SD

25.37VC 18.00K-Val 239.57SD

39.67VC 124.48VC 18.00K-Val 83.00K-Val 143.02SD 201.89SD

53.74VC 18.00K-Val 112.74SD

2600
-1.11%
-2.22 %
% 2.88

PVT STA.65+26.87 PVT ELEV.2526.99

2600

ELEVATION (FEET)

2550
2.27%

2550
-0.81%

1.39%

-0.11%

1 - 12 ft CMP

2500

1 - 12 ft round CMP or 2 - 7ft Arched or 1 - 7.25x11.5ft Arched

2500

2450 0+00 5+00

2450 V = 50:1
SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE PROJECT No.
This document was originally issued and sealed by James R. Hitt, PE, registration number PE 2445 on February 15, 2010, and is stored at Golder Associates Inc., 44 Union Boulevard, Suite 300, Lakewood Colorado.

10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 65+00 70+00 75+00 STATION (FEET)

H = 500:1

EXPLOSIVE MATERIALS STORAGE SITE ACCESS ROAD 1a

PROJECT

LEGEND
EXISTING TOPOGRAPHY PROFILE HAUL ROAD PROFILE

I, James R. Hitt, certify that the plans for the Main Haul Road Cross-Sections were prepared by myself or under my direct supervision

EXPLOSIVE MATERIAL STORAGE AREA ACCESS ROAD PROFILE 1a
4284-01-400 JDS JDS JRH JRH 09/02/10 09/02/10 09/09/10 09/09/10 FILE No.Haul Routes & Lignite Ramps.dwg SCALE AS SHOWN REV. 1 DESIGN CADD CHECK REVIEW

Figure 3.5-6

PVC STA.102+32.68 PVC ELEV.2511.03

338.31VC 83.00K-Val 186.46SD

5.89VC 18.00K-Val 1000.00SD

48.82VC 18.00K-Val 120.33SD

35.30VC 18.00K-Val 160.59SD

338.22VC 151.00K-Val 251.50SD

5.95VC 4.03VC 18.00K-Val 1000.00SD 936.94SD

18.00VC 42.27K-Val 1000.00SD

2650 ELEVATION (FEET)

PVT STA.102+50.68 PVT ELEV.2511.01

PVC STA.3+30.77 PVC ELEV.2607.76

PVC STA.17+96.98 PVC ELEV.2567.49

PVC STA.36+75.52 PVC ELEV.2513.19

PVC STA.56+82.28 PVC ELEV.2508.98

PVC STA.64+30.82 PVC ELEV.2521.98

PVC STA.84+30.01 PVC ELEV.2516.65 PVT STA.84+35.96 PVT ELEV.2516.64

PVC STA.87+37.12 PVC ELEV.2516.26 PVT STA.87+41.15 PVT ELEV.2516.25

PVT STA.6+69.09 PVT ELEV.2603.77

PVT STA.18+02.88 PVT ELEV.2567.31

PVT STA.37+24.35 PVT ELEV.2512.44

PVT STA.57+17.58 PVT ELEV.2509.26

PVT STA.67+69.04 PVT ELEV.2524.23

2650

2600

0.86%
-3.2 2%

2600

2550
-2.89 %

Bridge Crossing South Heart Branch River
-0.18%

1 - 6 ft CMP
1.78%

1 - 3.75 ft CMP 1 - 3 ft CMP
-0.46%
-0.13%

2550
1 - 5 ft CMP
-0.35%

1 - 5 ft CMP
0.08%

5+00

MHR 1

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

LEGEND
EXISTING TOPOGRAPHY PROFILE HAUL ROAD PROFILE

I, James R. Hitt, certify that the plans for the Main Haul Road Cross-Sections were prepared by myself or under my direct supervision

MAIN HAUL ROAD SEGMENT 1 PROFILE
PROJECT No. 4284-01-400 JDS JDS JRH JRH 01/28/10 01/29/10 02/10/10 02/15/10 FILE No.Haul Routes & Lignite Ramps.dwg SCALE AS SHOWN REV. 0 DESIGN CADD CHECK REVIEW

This document was originally issued and sealed by James R. Hitt, PE, registration number PE 2445 on February 15, 2010, and is stored at Golder Associates Inc., 44 Union Boulevard, Suite 300, Lakewood Colorado.

V = 50:1

2500 0+00

2500 10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 65+00 70+00 75+00 80+00 85+00 90+00 95+00 100+00 105+00 110+00 115+00 STATION (FEET) H = 500:1

Figure 3.5-7

PVC STA.8+51.00 PVC ELEV.2512.45

PVC STA.22+49.74 PVC ELEV.2516.80

PVC STA.32+83.56 PVC ELEV.2552.39

PVC STA.40+50.73 PVC ELEV.2544.89

PVC STA.61+49.49 PVC ELEV.2555.24

18.00VC 76.14K-Val 1000.00SD

18.00VC 5.70K-Val 85.97SD

151.00VC 30.62K-Val 113.25SD

18.00VC 9.17K-Val 148.74SD

18.00VC 17.86K-Val 411.54SD

18.00VC 30.64K-Val 2344.98SD

2650

PVC ELEV.2564.27 PVT ELEV.2564.60

PVC STA.67+53.95 PVT STA.67+71.95

PVT STA.8+69.00 PVT ELEV.2512.49

PVT STA.22+67.74 PVT ELEV.2517.14

PVT STA.34+34.56 PVT ELEV.2553.90

PVT STA.40+68.73 PVT ELEV.2544.81

PVT STA.61+67.49 PVT ELEV.2555.42

2650

ELEVATION (FEET)

2600
2.10%
1.51%

2600

2550
% 3.47
0.08%
0.31%

-1.46%

0.50%

2550

2500 0+00

2500 V = 50:1
PROJECT

5+00

10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 65+00 70+00 75+00 80+00 85+00 90+00 STATION (FEET) H = 500:1

MHR 2

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

LEGEND
EXISTING TOPOGRAPHY PROFILE HAUL ROAD PROFILE

I, James R. Hitt, certify that the plans for the Main Haul Road Cross-Sections were prepared by myself or under my direct supervision

MAIN HAUL ROAD SEGMENT 2 PROFILE
PROJECT No. 4284-01-400 JDS JDS JRH JRH 01/28/10 01/29/10 02/10/10 02/15/10 FILE No.Haul Routes & Lignite Ramps.dwg SCALE AS SHOWN REV. 0 DESIGN CADD CHECK REVIEW

This document was originally issued and sealed by James R. Hitt, PE, registration number PE 2445 on February 15, 2010, and is stored at Golder Associates Inc., 44 Union Boulevard, Suite 300, Lakewood Colorado.

Figure 3.5-8

PVC STA.101+92.48 PVC ELEV.2508.50

20.90VC 18.00K-Val 320.88SD

16.71VC 18.00K-Val 484.78SD

15.46VC 252.38VC 18.00K-Val 83.00K-Val 576.18SD 186.46SD

17.11VC 18.00K-Val 461.88SD

31.41VC 18.00K-Val 182.68SD

135.15VC 138.24VC 83.00K-Val 196.20SD 194.87SD

19.05VC 18.00K-Val 376.22SD

15.33VC 18.00K-Val 587.56SD

13.44VC 18.00K-Val 831.15SD

15.04VC 18.00K-Val 615.20SD

ELEVATION (FEET)

2550
-1.22%
-0.06%

PVT STA.102+07.52 PVT ELEV.2508.67

PVC STA.11+89.55 PVC ELEV.2513.16

PVC STA.17+19.91 PVC ELEV.2512.73

PVC STA.26+92.27 PVC ELEV.2521.12

PVC STA.29+35.20 PVC ELEV.2525.26

PVC STA.42+18.03 PVC ELEV.2512.27

PVC STA.51+58.94 PVC ELEV.2508.80

PVC STA.57+32.42 PVC ELEV.2516.46 PVT STA.58+67.58 PVT ELEV.2517.23

PVC STA.60+30.88 PVC ELEV.2516.83 PVT STA.61+69.12 PVT ELEV.2515.34

PVC STA.66+18.89 PVC ELEV.2506.75

PVC STA.73+92.34 PVC ELEV.2500.07

PVC STA.90+47.79 PVC ELEV.2500.00

PVT STA.12+10.45 PVT ELEV.2513.03

PVT STA.17+36.63 PVT ELEV.2512.80

PVT STA.27+07.73 PVT ELEV.2521.32

PVT STA.31+87.58 PVT ELEV.2525.79

PVT STA.42+35.15 PVT ELEV.2512.13

PVT STA.51+90.34 PVT ELEV.2508.96

PVT STA.66+37.95 PVT ELEV.2506.49

PVT STA.74+07.66 PVT ELEV.2500.00

PVT STA.90+61.23 PVT ELEV.2500.05

2550
0.87%
1.73%

-1.31%
-0.36%

2500

1.38%

-0.24%

-1.91%

1.58%

-0.85%

0.00%

0.75%

2500

2450 0+00 5+00

2450 V = 50:1
PROJECT No.
This document was originally issued and sealed by James R. Hitt, PE, registration number PE 2445 on February 15, 2010, and is stored at Golder Associates Inc., 44 Union Boulevard, Suite 300, Lakewood Colorado.

10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 65+00 70+00 75+00 80+00 85+00 90+00 95+00 100+00 105+00 110+00 STATION (FEET)

H = 500:1

MHR 3

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

LEGEND
EXISTING TOPOGRAPHY PROFILE HAUL ROAD PROFILE

I, James R. Hitt, certify that the plans for the Main Haul Road Cross-Sections were prepared by myself or under my direct supervision

MAIN HAUL ROAD SEGMENT 3 PROFILE
4284-01-400 JDS JDS JRH JRH 01/28/10 01/29/10 02/10/10 02/15/10 FILE No.Haul Routes & Lignite Ramps.dwg SCALE AS SHOWN REV. 0 DESIGN CADD CHECK REVIEW

Figure 3.5-9

PVC STA.2+89.23 PVC ELEV.2610.93

PVC STA.17+78.63 PVC ELEV.2599.14

PVC STA.20+77.08 PVC ELEV.2594.76 PVT STA.21+22.92 PVT ELEV.2594.65

PVC STA.27+93.49 PVC ELEV.2601.64 PVT STA.28+06.51 PVT ELEV.2601.82

PVC STA.34+82.88 PVC ELEV.2613.76

PVT STA.5+10.77 PVT ELEV.2611.69

PVT STA.18+21.37 PVT ELEV.2598.61

221.54VC 83.00K-Val 186.46SD

42.74VC 45.83VC 83.00K-Val 18.00K-Val 428.08SD 126.25SD

13.02VC 18.00K-Val 916.94SD

61.74VC 83.00K-Val 312.45SD

ELEVATION (FEET)

2650
1.02%

PVT STA.35+44.62 PVT ELEV.2614.62

2650

2600

1.68%

-0.99%
-1.50%

1.76%

1.04%

2600

2550 0+00 5+00

2550 V = 50:1 10+00 15+00 20+00 25+00 30+00 35+00 40+00 STATION (FEET)

H = 500:1

MHR 4

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

LEGEND
EXISTING TOPOGRAPHY PROFILE HAUL ROAD PROFILE

I, James R. Hitt, certify that the plans for the Main Haul Road Cross-Sections were prepared by myself or under my direct supervision

MAIN HAUL ROAD SEGMENT 4 PROFILE
PROJECT No. 4284-01-400 JDS JDS JRH JRH 01/28/10 01/29/10 02/10/10 02/15/10 FILE No.Haul Routes & Lignite Ramps.dwg SCALE AS SHOWN REV. 0 DESIGN CADD CHECK REVIEW

This document was originally issued and sealed by James R. Hitt, PE, registration number PE 2445 on February 15, 2010, and is stored at Golder Associates Inc., 44 Union Boulevard, Suite 300, Lakewood Colorado.

Figure 3.5-10

INTERSTATE 94

INTERSTATE 94
121st AVEN UE SW

2

1

6

5

4

3

2

1

6

5

OLD HIGHWAY 10

11

12

7

8

9

10

11

12

122nd AVEN UE SW

7

8

R99W

R98W

R98W R97W
W MAIN AVENUE

4th STRE ET

38th STREET SW
14

13

18

PIT 5

17

16

15

14

13

18

17

PIT 2
CLOSE PRIOR TO
2021

39th STREET SW

CLOSE & REMOVE PRIOR TO 2021
RE-ESTABLISH AFTER RECLAMA TION PROCEEDS 2039

OPEN AFTER RECLAMATION PROCEEDS 2044

CLOSE & REMOVE PRIOR TO 2021
RE-ESTABLISH AFTER RECLAMAT ION PROCEEDS 2028

39th STREET SW

PIT 4b
23
24

19

20

21

22

23

PIT 1

24

PIT 4a
RE-ESTABLISHED
AFTER

19

20

40th STREET SW

RECLAMATION CLOSE&REMOVE PROCEEDS 2041 PRIOR TO 2014

OVER/UNDERPASS - TO BE DESIGNED AND CONSTRUCTED

PRIOR TO 2038

40th STREET SW
BRIDGE - TO BE DESIGNED AND CONSTRUCTED PRIOR TO
2014

26

25

30

29

28

27

26

25

30

29

RE-ESTABLISHED
AFTER

RECLAMATION

CLOSE&REMOVE
PRIOR TO 2014

PIT 3
CLOSE PRIOR TO 2014 OPEN AFTER SITE IS MINED OUT 2044

41st STREET SW 125th AVEN UE SW

CLOSE PRIOR TO PROCEEDS 2041 2014 CONS TRUC T PRIO R TO 2014 OPEN AFTER SITE IS MINED OUT
2044

123rd AVEN UE SW

122nd AVEN UE SW

41st STREET SW

35

36

33

OPEN AFTER SITE IS MINED OUT

31

32

34

35

36

31

32

CLOSE

PRIOR

TO 2014

T139N T138N

CONSTRUCT PRIOR TO 2014

CONSTRUCT PRIOR TO 2014

3,000
T139N T138N

1,500

0

3,000

42nd STREET SW

FEET

SCALE 1:36,000 1 IN. EQUALS 3,000 FT.
IF PRINTED AT 17 IN. X 22 IN.

2

1

6

5

4

3

2

1

6
0 REV

03/31/10
DATE

5

JDS DES

ORIGINAL PERMIT SUBMITTAL REVISION DESCRIPTION

JDS CADD

JRH CHK

JRH RVW

PROJECT

LEGEND
PERMIT BOUNDARY MINE PIT BOUNDARY MINE SUPPORT FACILITIES

REFERENCE
Permit Boundary: Norwest, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010.
PLSS: ND HUB, 6/20/2006.

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE

SOUTH HEART, NORTH DAKOTA
TITLE

TOWNSHIP & RANGE
13

SECTION EXISTING ROAD IMPROVED SECTION FOR SITE ACCESS ROAD NEW SECTION FOR MINE SUPPORT FACILITIES ACCESS ROAD

Drainage Ways: Digitized from aerial photography, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet.

SITE ACCESS ROUTE MAP
PROJECT No.
DESIGN CADD CHECK
REVIEW

4284-01-400

FILE No.

Road Re-Route.dwg
AS SHOWN
REV.

JDS JDS
JRH JRH

01/28/10 01/29/10 02/10/10 02/15/10

SCALE

0

Figure 3.5-11a

45

13

50

126th Ave SW

125th Avenue SW

37th Street SW

55

13

60

65

13

70

75

13

80

85

L E G E N D
Bridge Over/Underpass
4

124th Avenue SW

123rd Avenue SW

122nd Avenue SW

R99W
4

R98W

121st Avenue SW

Highway 10 W

R98W

R97W
50

50

County Roads Major, County Maintained Road Section Line ROW Section Line Trail Closure (1) Operations Within 100 ft Southern Re-Route Permit Boundary Mine Pit Boundary Coal Removal Timing Railroad Township and Range Section Disturbance Area

12

Proposed closure planned in 202

7

8
37th 1/2 Street SW

9

10

11

12

7

7

Proposed closure planned in 2027 45

Proposed closure planned in 2025
2027

38th Street SW
45

Proposed operations within 100 ft planned in 2022

Proposed closure planned in 2027

Proposed closure planned in 203 5

13

18

2026

17

16

15

2025

14
St re et

13
4t h

18

2024

39th Street SW

2043 2042

2038

2037

2036

2035

2034

2033

Proposed closure planned in 2035
4

2032

2031

2023

Proposed closure planned in 2027

40

2030

2029 2028 2027

Proposed closure planned in 2020 2022

Proposed closure planned in 2040
2042

39th Street SW
4

Proposed operations within 100 ft planned in 2014

2021 2016 2015 2014

40

Proposed closure planned in 201

Proposed closure planned in 2014

24

19

20

2021

2020

2019

2018

2017

2041

2042

21

22

23

24

19

2040

9

40th Street SW
Proposed closure planned in 2019 35

Proposed closure planned in 2014

Over/Underpass - Planned to be designed and constructed in 2038

N O T E S
40th Street SW

Proposed closure for the life of mine Bridge - Planned to be designed and constructed in 2014

(1) All closed roads will reopen as reclamation proceeds. (2) Closure of 41st Street SW will not occur until the Southern Re-Route is in place. 35

Proposed closure planned in 2019

25

30
125th Avenue SW
126th Ave SW

29

28

Proposed closure for the life of mine

27
2040

26

25

30

R E F E R E N C E

41st Street SW

2038

2039

4

30

Proposed closure for the life of mine

Proposed closure for the life of mine

41st Street SW

4

30

Road Closure Information: Norwest, 9/16/2010. Permit Boundary: Norwest, 11/12/2009. Disturbance Area: Norwest, 9/16/2010. Mine Pits and Coal Removal Timing: Norwest, 1/21/2010. Township, Range and Sections: ND HUB, 6/20/2006. Roads: Digitized from aerial photography, 6/19/2006; categorized by Stark County Road Superintendent, 8/12/2010. Projection: StatePlane, North Dakota South, NAD27, Feet.

DRAFT
1,500 750 0

Proposed relocation planned in 201

Proposed closure for the life of min e

M:\GNPD\SouthHeart\ArcMap\Permit\CH3\Transportation.mxd | 9/28/2010 11:23:52 AM | AReither

36

31

32

33

124th Avenue SW

123rd Avenue SW

34
122nd Avenue SW

35
121st Avenue SW

36

31

SCALE 1:18,000 1 IN = 1,500 FT

1,500 FEET

IF PRINTED AT 22 IN X 34 IN

T139N
25000ft.N

REV

1

8/12/2010 DATE

DES

AJR

COMPLETENESS COMMENT REVISION DESCRIPTION

AJR GIS

CHK

AM

RVW

RLK

3

T138N

PROJECT

Proposed relocation planned in 2013

Proposed relocation planned in 2013

42nd Street SW
2
13

25
TITLE

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA

4

1
13

6
13

5
55
13

4
60 65

3
70

1
75
13

6
80 85

RIGHT OF WAY CLOSURE AND ROAD RELOCATION MAP
PROJECT NO. DESIGN GIS CHECK REVIEW AJR AJR AM RLK 063-2122A 06/23/2010 09/15/2010 09/15/2010 09/15/2010 FILE SCALE Transportation.mxd AS SHOWN REV. 1

45000ft.E

1

50

6

5

4

Denver, Colorado

FIG 3.5-11B

3

LEGEND
SEDIMENT POND STUDY AREA PERMIT BOUNDARY DIVERSION MINE DITCH PIT BOUNDARY DISTURBANCE BOUNDARY STREAM CHANNEL DISTURBANCE STREAM BUFFER WETLAND BUFFER STREAM BUFFER SPGM STOCKPILE OVB STOCKPILE SOVB STOCKPILE CULVERT CONCRETE ARCH BRIDGE HAUL ROAD ACCESS ROAD ROAD FACILITY AREA SECTION TOPOGRAPHY (5 FT. INTERVALS)

SPGM-7

SPGM-5

17
PIT 5

16

15

14

PIT 2

23

SPGM-9 SPGM-10

PIT 4b

21 22
SO VB

FACILITY AREA Sump

23

20
PIT 1
VB -10
-1 6

-9

Pond 1
VB -8

SO

PIT 4a
SP GM
SPGM-11 SPGM-12

SO

Pond 2

29

28
SEE FIGURE 3.5-13 & 3.5-14 FOR BRIDGE DETAILS

27

26

PROJECT

PIT 3

0

2000'

4000'
TITLE

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA

Feet REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

CULVERT & BRIDGE LOCATIONS
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

Figure 3.5-12

80 25
25 20

180+ 00 178 +00 17 6+ 00 17 4+ 00 17 2+ 00 17 0+ 00 16 8+ 00 166 +00 164+ 00 162+0 0

130 +00 132 +00 134 +00 136 +00 138 +00 140 14 +00 2+ 00 14 4+ 00
14

25 3

0

LEGEND
2510

251 0

+00 186 184+00

182+00

FLOODPLAIN FEMA 100 YEAR HEC-RAS CROSS SECTION STREAM ALIGNMENT BRIDGE LOCATION TOPOGRAPHY (2 FT. INTERVALS)

136 +

25 20

160+00

158+00 0 156+0 +00 154

184+00 182+00 1 80 178 +00 17 +00 6+ 00 17 4+ 00 17 2+ 00 17 0+ 00 16 8+ 00 166 +00

00

2255 54 0 8

164+ 00

162+0

0

0

255 0

160+00

50 155+ 00 154+ 5 +2 153

158+00

00 8+ 18 00 0+ 19 00 2+ 19 00 4+ 19 00 6+ 8 19 7+2 19

138 +00 140 +00
2+ 00

00
2530

00 6+ 00 14 8+ 0 14 0 0+ 15 +00 152

14 4+
14 6+ 50

14 8+

1000'

2000'

00

15

254

00 0+

0

Feet
RIVER CROSS SECTION PLAN VIEW
TOPOGRAPHY (2 FT. INTERVALS)

+00 1522+63 15

255

0

2570

2560

2550 Elevation (ft)

RIVER CROSS SECTION AT STA 16+325
LOOKING DOWNSTREAM Scale: 1"=250' Vertical Exaggeration 10x

2540

2530

2520

2510

2500 0

500

1000

1500 Station (ft)

2000

2500

3000

RIVER CROSS SECTION AT STA 18+400
2545 2540 Elevation (ft) 2535 2530 2525 2520 2515 25100
TITLE PROJECT

LOOKING DOWNSTREAM Scale: 1"=250' Vertical Exageration 10x

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
500 1000 Station (ft) 1500 2000 2500

REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

SOUTH BRANCH HEART RIVER HEC-RAS ANALYSIS AND CROSS SECTIONS
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

Figure 3.5-13

ELEVATION
Scale: 1"=20'

Q100 Water Surface Elev = 2,519.07' amsl Q50 Water Surface Elev = 2,516.48' amsl Q10 Water Surface Elev = 2,514.8' amsl

NOTES: The bridge will be prefabricated off-site and delivered by Contech Construction Products Inc. This drawing is not to be use for construction, and bridge design may vary with final construction. Bridge assembly shall be done in accordance to Contech CON/SPAN bridge system instructions. Bridge placement and foundation shall be built according to State and local code. Precast wing walls to be included for CON/SPAN bridge. Site -specified soils and topography required for design of footer foundation.

LEGEND
ROAD ALIGNMENT 25 FT WETLAND BUFFER 100 FT STREAM BUFFER DISTURBANCE BOUNDARY TOPOGRAPHY (2 FT. INTERVALS)

0

300'

600'

Feet
BRIDGE PLAN
TOPOGRAPHY (2 FT. INTERVALS)
PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

SOUTH BRANCH HEART RIVER HAUL ROAD BRIDGE PLAN
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

PREFABRICATED CONCRETE BRIDGE CROSS SECTION

Figure 3.5-14

LEGEND
SEDIMENT POND STUDY AREA PERMIT BOUNDARY DIVERSION MINE DITCH PIT BOUNDARY DISTURBANCE BOUNDARY WATERSHED BOUNDARY SUB-WATERSHED BOUNDARY FOR CVT 70+51 SUB-WATERSHED BOUNDARY FOR CVT 55+75 STREAM CHANNEL SPGM STOCKPILE OVB STOCKPILE SOVB STOCKPILE SMALL AREA EXEMPTION BERM CULVERT CONCRETE ARCH BRIDGE PUMP STATION HAUL ROAD ACCESS ROAD ROAD GRASS FILTER BMP STRAW WATTLE BMP FACILITY AREA SECTION TEMPORARY DIVERSION DD1A TEMPORARY DIVERSION DD1B TEMPORARY DIVERSION DD2A TEMPORARY DIVERSION DD2B TEMPORARY DIVERSION DD3 TOPOGRAPHY (5 FT. INTERVALS)

7

8

9

10

11

12

Pond 6

Pond 3

SPGM-8 SPGM-7

SPGM-5

SPGM-1

Pond 5

SPGM-2

23

SOVB-2

SWS1-1

PIT 5

HIGHWALL PROTECTION POND 1

17
SOVB-5

16

SOVB-3

SOVB-1

18

OVB-2

15

14

13

HIGHWALL PROTECTION POND 2

SOVB-6

SWS1-1

SOVB-7

PIT 2

SW 2-1

SW 1-1

SOVB-4

SPGM-4

Pond 4

SPGM-9 SPGM-10
SW 3-2 SW 2-2

SPGM-3

OOB V V-6B6

PIT 4b
SPGM-19

SPGM-6 SPGM-20
SWS1-2

SPGM-21

21 22

FACILITY AREA

23
Sump

SOVB-12

SO V

B-

9

19

20
PIT 1
-10 VB
-1 6

VB

-8

Pond 1

SOVB-13

SO

SO

SPGM-11 SPGM-12
SP G M 7 -1

SP

GM

S

M PG

8 -1

Pond 2

30

29

28
O V 3 B-

27

OVB-4

SP

GM SP

GM

14
15

SOVB-11

26

OVB-5

2B DD

SWS3-1

24
Pond 10

PIT 4a

25

PIT 3

0

1000'

2000'

Feet

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section:: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

LIFE OF MINE WATER MANAGEMENT PLAN
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

Figure 3.6-1

LEGEND
SEDIMENT POND STUDY AREA PERMIT BOUNDARY DIVERSION MINE DITCH DISTURBANCE BOUNDARY WATERSHED BOUNDARY SUB-WATERSHED BOUNDARY FOR CVT 70+51 SUB-WATERSHED BOUNDARY FOR CVT 55+75 TIME OF CONCENTRATION STREAM CHANNEL WETLAND BUFFER SPGM STOCKPILE OVB STOCKPILE SOVB STOCKPILE SMALL AREA EXEMPTION BERM CULVERT HAUL ROAD ACCESS ROAD ROAD STRAW WATTLE BMP FACILITY AREA SECTION TOPOGRAPHY (5 FT. INTERVALS)

23

SPGM-7

SPGM-5

16

15

14

SW 2-1

0

600'

1200'

SWS3-1

Feet

SPGM-9
PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section:: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

PERMIT TERM WATER MANAGEMENT PLAN SHEET 1 OF 2
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

Figure 3.6-2

SWS3-1

SPGM-9 SPGM-10
SW 2-2 SW 3-2

SWS1-2

21 22
VB 9 B8 SO
FACILITY AREA Sump

SO V

Ce

ll 2

Pond 1

PIT 1
VB -10

SO

SPGM-11 SPGM-12

SP

GM

-1

6

Pond 2

LEGEND
SEDIMENT POND STUDY AREA PERMIT BOUNDARY DIVERSION MINE DITCH PIT BOUNDARY DISTURBANCE BOUNDARY WATERSHED BOUNDARY SUB-WATERSHED BOUNDARY FOR CVT 70+51 SUB-WATERSHED BOUNDARY FOR CVT 55+75 TIME OF CONCENTRATION STREAM CHANNEL STREAM BUFFER WETLAND BUFFER SPGM STOCKPILE OVB STOCKPILE SOVB STOCKPILE SMALL AREA EXEMPTION BERM CULVERT CONCRETE ARCH BRIDGE HAUL ROAD ACCESS ROAD ROAD STRAW WATTLE BMP SECTION TOPOGRAPHY (5 FT. INTERVALS)

0

600'

1200'

Feet

PROJECT

23

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section:: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

PERMIT TERM WATER MANAGEMENT PLAN SHEET 2 OF 2
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

Figure 3.6-3

LEGEND

0

300'

600'

DITCH ALIGNMENT SEDIMENT POND STREAM BUFFER WETLAND BUFFER STREAM CHANNEL DISTURBANCE BOUNDARY PIT BOUNDARY TOPOGRAPHY (5 FT. INTERVALS)

Feet

TYPICAL DITCH CUT SECTION
SCALE: 1"=6'

ll 2 Ce

Pond 1

TYPICAL DITCH FILL SECTION
SCALE: 1"=6'

CD-1A

PROJECT

ELEVATION

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

DITCH CD-1A
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

HORIZONTAL SCALE: 1"=300' VERTICAL EXAGGERATION X10

Figure 3.6-4

CD-2A

LEGEND
DITCH ALIGNMENT SEDIMENT POND STREAM BUFFER WETLAND BUFFER STREAM CHANNEL DISTURBANCE BOUNDARY PIT BOUNDARY CULVERT TOPOGRAPHY (5 FT. INTERVALS)

ELEVATION
HORIZONTAL SCALE: 1"=400' VERTICAL EXAGGERATION X 20

0

400'

800'

Feet

TYPICAL DITCH SECTION
SCALE: 1"=6'

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

DITCH CD-2A
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

Figure 3.6-5

LEGEND
SEDIMENT POND STREAM BUFFER WETLAND BUFFER STREAM CHANNEL DISTURBANCE BOUNDARY PIT BOUNDARY TOPOGRAPHY (5 FT. INTERVALS)

0

200'

400'

Feet
ELEVATION

A'

POND 1 PROFILE A - A'
SCALE: 1"=200'

ELEVATION

ll 2 Ce

Pond 1 Cell 1

POND 1 EMBANKMENT SECTION
SCALE: 1"=20'

CELL 1 POND 1 EMERGENCY SPILLWAY SECTION
SCALE: 1"=10'

A CELL 2 POND 1 OPEN SPILLWAY SECTION
SCALE: 1"=10'

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

POND 1
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

Figure 3.6-6

0

200'

400'

POND 2 PROFILE B - B'

Feet

ELEVATION

B'

POND 2 PROFILE
SCALE: 1"=200'

Pond 2

ELEVATION POND 2 EMBANKMENT SECTION
SCALE: 1"=20'

LEGEND B
SEDIMENT POND STREAM BUFFER WETLAND BUFFER STREAM CHANNEL DISTURBANCE BOUNDARY PIT BOUNDARY TOPOGRAPHY (5 FT. INTERVALS)

POND 1 EMERGENCY SPILLWAY SECTION
SCALE: 1"=10'

PROJECT

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA
TITLE

REFERENCE
T139N R98W Permit Boundary: IEI, 11/12/2009. Mine Pit Boundary: Norwest, 01/20/2010. Township, Range and Section: ND HUB, 6/20/2006. Drainage Ways: Digitized from aerial photography, 6/19/2007. Contours: Generated from aerial photography stereo pairs, 6/19/2007. Projection: StatePlane, North Dakota South, NAD27, Feet. Contours are set at 5' intervals, unless otherwise specified.

POND 2
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

AS SHOWN

REV.

1

Figure 3.6-7

Pond 6

LEGEND
Pond 3

Pond 5

23

17

16

15

SEDIMENT POND STUDY AREA PERMIT BOUNDARY DIVERSION MINE DITCH PIT BOUNDARY DISTURBANCE BOUNDARY WATERSHED BOUNDARY TIME OF CONCENTRATION STREAM CHANNEL SPGM STOCKPILE SOVB STOCKPILE OVB STOCKPILE SMALL AREA EXEMPTION BERM CULVERT CONCRETE ARCH BRIDGE HAUL ROAD ACCESS ROAD ROAD GRASS FILTER BMP STRAW WATTLE BMP SECTION TOPOGRAPHY (5 FT. INTERVALS)

PIT 2

SPGM-9 SPGM-10
0 1000' 2000'

Feet

21 22

FACILITY AREA

PROJECT Sump

SOUTH HEART COAL LLC SOUTH HEART LIGNITE MINE SOUTH HEART, NORTH DAKOTA

TITLE

Pond 1

PIT 1
10
Pond 10

SMALL AREA EXEMPTIONS - STOCKPILE CONTAINMENT DESIGNS
PROJECT No. DESIGN CADD CHECK REVIEW APO JLS JRH JRH 23-428403 2/15/10 2/15/10 2/15/10 2/15/10 FILE No. SCALE
Ponds & Ditches.dwg

VB -

AS SHOWN

REV.

1

SO

Figure 3.6-8

APPENDIX 3.3-1 BLAST RECORD

South Heart Lignite Mine Blasting Record Date: Time: Wind Direction: Wind Velocity: Temperature (X): Material Blasted (X): Average Depth of Holes: Length of Stemming: Decking: Were mats used: Yes Yes No No <0 Coal: feet (ft) ft 10-32: Shale: Diameter of Holes: Type of Stemming: Number of decks per hole: Type of Mat: ft Direction of Building: Length of Decks Weight of Mat: ft lbs Scaled Distance: Pattern (X): Staggered: Square: a.m. p.m. Job: Blaster: Weather (X): 10-32: 32-50: Sandstone: inches Clear 32-50: 50-70: Other: Permit: Signature: Partly Cloudy 50-70: 70 and above: Comments: Reason for Unscheduled Blast: Burden: ft Spacing: ft Location: License #: Cloudy Rain Pattern #: # of Helpers: Snow

Other Precautions:

Distance to nearest non-company building:

Number of Holes:

Pounds (lbs)/Hole

Maximum lbs/Hole

Method of Firing

Maximum Weight of Explosives allowable in 8 ms Delay Actual Weight of Explosive used within an 8 ms Delay High Explosives: lbs lbs lbs lbs SUBTOTAL N.C.N lbs tubes Type of Delays used: lbs bulk ANFO SUBTOTAL Slurry: Prima Cord: Grain: B.C.Y. ft oz. Total Explosives Used: Powder Factor: lbs lbs lbs Number of Delays Used: Seq. Position Used: Number of Caps Used: Number of Caps Used: Seq. Time Used: Length of Leg wires: Length of Leg wires: ft ft x power primers x power primers cast primers (Other: ) lbs Nonel: Other: Type of Circuit (X): Actual number of Holes Detonated within an 8 ms Delay Machine (X): Sequential: Nonel: Other: Series: CD-600: Electric Cap: Explanation: Parallel: Other:

Method of Detonation (X):

Was blast Seismographed: Person Taking Record:

Yes

No

Location of Seismograph: Seismograph reading: Vibration: Decibels:

Distance to Blast:

Direction:

Golder Associates

Revision 0
I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_APP3_3-1_R0_22FEB10.xlsSheet1

SHSH-1001/063-2212A

APPENDIX 3.3-1 BLAST RECORD

South Heart Lignite Mine Blasting Record - Sketch of Blast Pattern

LEGEND X - Delay O - Drill Hole □ - Decking
__

- Det Cord Burden: Spacing:

Highwall

Overburden - Coal Edge

SPOILS

Golder Associates

Revision 0
I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_APP3_3-1_R0_22FEB10.xlsSheet1

SHSH-1001/063-2212A

Great Northern Project Development L.P.
1022 East Divide Avenue, Suite E Bismarck, ND 58501 701-223-8783

NOTICE OF BLASTING SCHEDULE SOUTH HEART COAL LLC
As required by Pubic Law 95-87 and the Rules and Regulations promulgated there under (part 715.19 – Office of Surface Mining Reclamation and Enforcement, Department of the Interior) and Chapter 38-14.1 of the North Dakota Century Code, Section 69-05-.2-17-03 of the North Dakota Administrative Code, South Heart Coal LCC (SHC) is hereby giving notice of the blasting schedule for the area know as South Heart Lignite Mine, located near the town of South Heart, North Dakota. Blasting may only occur between sunrise and sunset Monday through Saturday, January 1, 2014 – December 31, 2014. Ramps into pit areas where blasting is to occur will be blocked. Prior to blasting, all the mine access roads within the vicinity of the blast area will be posted with blast warning signs. Prior to detonating the blast, audible warning signals will be sounded. The sound is a follows: •

Pre-Blast Warning: A 1 minute (60 seconds) steady siren warning 5 minutes prior to the blast. Blast Warning: A 1 minute (60 seconds) wailing siren will sound prior to final detonation to notify all personal of the pending blast. All Clear Signal: Following the blast, the blast site will be inspected for misfires and once the blast site is cleared, a steady siren signal for 1 minute (60 seconds) will sound after the blast area has been cleared.

•

•

Blasting may occur at other times due to emergency situations where rain, lightning, atmospheric conditions, or operator or public safety requires unscheduled detonation. If a blast is delayed due to hazardous weather, such as those listed above, notice will be given to all residents within onehalf mile of the blasting site and a complete written report will be filed with the North Dakota Public Service Commission no later than three days following the blast. Such report will include a description of the delay, when the actual blast occurred, what warning notices were given, and a copy of the blasting report. Blasting may occur in the mine permit area in Sections 22 Township 139 North, Range 98 West.

Great Northern Project Development L.P.
1022 East Divide Avenue, Suite E Bismarck, ND 58501 701-223-8783

Dear Landowner/Resident: The North Dakota Public Service Commission requires mining companies who use explosives to notify all residents and owners of manmade dwellings or structures within one mile of the permit boundary about how to request a pre-blasting survey. You are receiving this letter because you have a residence or own a structure within one mile of the permit boundary for the South Heart Lignite Mine. South Heart Coal LLC (SHC) may be conducting blasting operations within this permit in the near future. You may request a pre-blasting survey by contacting the Reclamation Division of the North Dakota Public Service Commission (PSC), State Capital, Bismarck, ND at (701)-328-7096, or me at South Heart Coal LLC at (88)-888-8888, ext 888 during regular business hours. An

independent contractor will be employed by SHC to determine and document the existing condition of your dwelling and other structures that could reasonably be affected by blasting. Copies of the survey results will be provided to you, to SHC, and to the Reclamation Division of the PSC. If requested, this pre-blast survey will be conducted at no cost to you. Blasting will occur only during the daylight hours on a schedule published once a year in the Dickinson Press (see Attachment). The schedule may be changed periodically, but you will receive notice at least ten days, but not more than twenty days prior to implementation of the new schedule. If you have any questions or comments, feel free to contact me at (888)-888-8888, ext 888. Sincerely, South Heart Coal LLC Name Title

APPENDIX 3.3-4 SURFACE OWNERS WITHIN ONE MILE OF THE PERMIT BOUNDARY
NAME Anderson Family Trust Anderson Legacy, LLP Binstock, Alvin G. and Laurie J. Buckman, John F. Burlington Northern, Inc. Eberts, Dennis J. and Allan E. Eberts, Kenneth A., et al. Emmil, Leocadia Family Trust Garrison, Mark and Sheila Gentry, Elaine B. Gregory, Marvin W. and Elizabeth T. Jablonsky, Edward Jarrett, Jeff and Deborah Klein, Larry R. Kudrna, Kenneth D. Kudrna, Randall Kudrna, Randall L. and Kaylene Kuylen, Patrick and Katherine Kuylen, Robert F. and Brenda K. Lisko, Clara and Fisher Gladys Meduna, Gary L. and Barbara Montana Dakota Utilities Murphy, Seth J. O'Brien, Darby and Renita Obritsch, Lambert Pavel, Robert B. Perdaems, James D. and Rosella J. Perdaems, Jerry F. and Sandra M. Perzinski, Eugenia Perzinski, James PHP, LLP Sanders, Donald et al. Steffan, Neal and Rhonda J. Tangen, Neil and Laura U.S.A. Western Power Administration Wagner Farms LP Wagner, Glen R. Wagner, Gordon L. Wagner, James Wagner, James and Lisa Wagner, Jerry and Millie Wandler, Donald M. West Plains Electric Cooperative Williston Basin Interstate Pipeline Co. PARTIES Roger A. Anderson, Trustee ADDRESS 301 11th Street 301 11th St. 4060 - 126 Ave. S.W. CITY Sidney Sidney South Heart South Heart Seattle South Heart Medora Dickinson South Heart Bakersfield Belfield Dickinson South Heart Bismarck South Heart South Heart South Heart South Heart South Heart Dickinson South Heart Dickinson Dickinson South Heart Sumner Bismarck South Heart South Heart South Heart South Heart Dickinson Dickinson South Heart South Heart Billings South Heart South Heart Dickinson South Heart South Heart South Heart Dickinson Dickinson Bismarck South Heart STATE MT MT ND ND WA ND ND ND ND CA ND ND ND ND ND ND ND ND ND ND ND ND ND ND WA ND ND ND ND ND ND ND ND ND MT ND ND ND ND ND ND ND ND ND ND ZIP 59270 59270 58655 58655 98134 58655 58645 58601 58655 93312 58622 58601 58655 58503-1061 58655 58655 58655 58655 58655 58601 58655 58601 58601 58655 98390 58503-0139 58655 58655 58655 58655 58601 58601 58655 58655-9742 59107 58655 58655 58601 58655-9754 58655-9754 58655 58601 58601 58501 58655

Attn: John Karl Kenneth A., Dennis J., and Allan E. Eberts, Tenants in Common Delores Baudoin, Lydia Meduna, Trustees

2454 Occidental Ave. S., Ste. 1A

14621 Blacktail Road 11435 Hwy 10 W. 13200 Meachan Rd. 1040 11th St. West 525 Weatherby Way 11961 41st Street SW 3975 - 120th Ave. S.W. 3975 120 Ave SW 12230 40th St. SW P.O. Box 273 P.O. Box 123 1133 Broadway West 12350 Highway 10 W. 3881 121st Ave. S.W. 2805 208th Ave. E. 3113 Daytona Dr. P.O. Box 45 P.O. Box 45

James M. Perzinski, Trustee of Anton V. and Eugenia Perzinski Family Trust

11933 - 39th St. S.W. 11933 - 39th St. S.W. 965 11th Ave. W.

Donald Sanders, Fox Living Trust and Donna M. Pasicznyk 499 9th St. E. 12410 41st St. SW P.O. Box 35800 P.O. Box 219 P.O. Box 245 1170 Franklin St. 12274 Hwy 10 12274 Hwy 10

2156 4th Ave. E. 400 N. 4th St.

Zarak, William J, Jr. and Darlene L. Family Trust Darlene L. and Christopher N. Zarak, Trustees

Revision 0
I:\06\2212A\0400\0401\Rev0\CH3\0632212A_3_APP3_3-4_R0_12MAR10.xlsx\SurfaceOwners_1MiBlastingArea

Golder Associates

SHSH-1001/063-2212A

Page 1 of 1

Chapter 2
Specifications
Data Recorded Frequency Response

Specifications

One (1) acoustic and three (3) seismic channels. Mini-Seis: 2 to 500 Hz. (-3 dB. points) at 2048 samples per second. Lower sample rates reduce the high frequency response proportionately. Mini-Seis II: 2 to 250 Hz. (-3 dB points) at 1024 samples per second.

Seismic Sensors Microphone Memory

Three component mounted velocity geophones or accelerometers, depending on the ordered recording ranges. Ceramic element rated to at least 160 dB. Solid state with all summary, setup, and recorded data retained with power off. A lithium backup battery retains data if primary power fails. A 24 hour clock maintains the date and time accurate to within 1 minute per month, even if primary power fails. Allows an instrument to be active only during selected hours on a daily basis. The high contrast LCD has two lines of 40 characters to facilitate the instrument's setup. It also allows the operator to view operating parameters and summary data. Contains 6 keys for entering setup data and operating commands. A log of the last 64 on/off cycles is kept in memory to indicate the active monitoring periods. If the timer is used, the log is updated each time it activates. Internal 6 volt rechargeable. With a fully charged battery all models will operate from 7 to 10 days at 1024 samples per sec. Longer times may be obtained using the timer mode or external power from a small solar cell or automobile battery. A standard automobile battery will keep the internal battery at full charge for several months at moderate temperatures. If the external battery fails, the unit will continue to operate on its internal battery.

Clock Timer Mode Display

Optional Keypad Power on Log

Battery Operating Time

External Battery Life

3

Chapter 2. Specifications

Charging

An internal charging circuit allows charging with the supplied plug-in wall mount charger or any 10 to 15 volt DC supply. Power supplies for international use are available. 0 to 130 degrees F (-18 to 54 degrees C) Heavy gauge aluminum for effective electrical shielding and rugged protection. A stainless steel case is optional. The case is sealed allowing shallow burial. Approximately 7.5 in. x 4.5 in. x 2.5 in. Approximately 3.5 lbs. (1.6 Kg.) without accessories. Adds 2 lbs. (.9 Kg.) above the aluminum case weight. Approximately 6 lbs. (2.7 Kg.) including the storage case. Mini-Seis: The full waveform signature is stored in solid state memory for up to 340 events. Mini-Seis II 1/8M: Approximately 10 to 20 typical blast events. Mini-Seis II 1/4M: Approximately 50 to 100 typical blast events. Mini-Seis II 1/2M: Approximately 150 to 250 typical blast events.

Operating Temperature Case

Size Weight - Aluminum Case Weight - Stainless Steel Weight - Accessories Waveform Data

Summary Data

Summarized data include the event time, date, battery voltage, peak measurements, unit serial number and frequencies. The summarized data are stored in solid state memory for the last 341 events. Mini-Seis: From 2048 samples per second per channel down to 32 samples per second per channel. Mini-Seis II: 1024 or 512 samples per second per channel.

Sample Rate

Recording Units Seismic Recording Ranges

English (U.S.) or metric. Standard (x2) 0.005 IPS to 2.5 IPS (0.125 to 64 MMPS) 0.01 IPS to 5.0 IPS (0.25 to 127 MMPS) 0.02 IPS to 10.0 IPS (0.50 to 254 MMPS) Optional (x1 - accelerometers) 0.01 IPS to 5.0 IPS (0.25 to 127 MMPS) 0.02 IPS to 10.0 IPS (0.50 to 254 MMPS) 0.04 IPS to 20.0 IPS (1.00 to 508 MMPS) Optional (x4) 0.0025 IPS to 1.2 IPS (0.063 to 30.5 MMPS) 0.005 IPS to 2.5 IPS (0.125 to 64 MMPS) 0.01 IPS to 5.0 IPS (0.25 to 127 MMPS) Optional (x8) 0.0013 IPS to 0.6 IPS (0.033 to 15.2 MMPS)

4

Chapter 2. Specifications

0.0025 IPS to 1.2 IPS (0.063 to 30.5 MMPS) 0.005 IPS to 2.5 IPS (0.125 to 64 MMPS) Acoustic Ranges Trigger Levels 0.02 to 2.56 millibars (100 to 142 dB) 0.04 to 5.12 millibars (106 to 148 dB). Seismic 2.5 IPS Range - 0.01 to 0.57 IPS (0.25 to 14.5 MMPS). 5.0 IPS Range - 0.02 to 1.14 IPS (0.5 to 29 MMPS). 10.0 IPS Range - 0.04 to 2.28 IPS (1.0 to 58 MMPS). Seismic trigger sensitivities are proportionally modified by optional gains. Acoustic - 106 to 142 dB or 112 to 148 dB. Manual Trigger Record Duration Allows triggering from the keyboard or by an external input. One unit may be used to trigger additional instruments. Mini-Seis: From 1 to 6 seconds at a sample rate of 2048 samples per second. At lower sample rates, the duration is automatically increased proportional to the amount of decrease in the sample rate. Mini-Seis II: From 1 to 9 seconds at 1024 samples per second. Cycle Time Mini-Seis: At 1024 samples per second, up to 12 seconds of data can be taken with only 50 milliseconds between events. After 12 seconds of data are stored, another event cannot be taken until the previous data have been processed. Processing requires about 3 seconds per second of recording time. Mini-Seis II: Maximum continuous data time is 9 seconds. Records Stored Calibration Test (Seismic) Up to 341 typical coal mine or quarry blast events. A dynamic transducer test is performed automatically after each event or manually on command. The test is stored in the summarized data and may be downloaded as an event. An electronic test of the microphone is performed with the seismic test and is stored in memory along with the seismic test. In a remote installation, an automatic calibration test occurs if no event has been recorded for 84 hours. Data can be downloaded and setup commands can be uploaded directly by computer or remotely by modem. From 1200 to 38.4K.

Calibration Test (Acoustic) 84 Hour Cal Test RS232 Serial Port Baud Rate

5

James R. Hitt Senior Mining Engineer

February 15, 2010 File No. 4284 North Dakota Public Service Commission Reclamation Division State Capital 13th Floor 600 E. Boulevard Ave., Dept. 408 Bismarck ND 58505-0480 Subject: Certification Letter – Primary Roads To the Reviewing Agency: I have reviewed and hereby certify the information and design drawings for primary roads that are contained with the transportation operation plan for the South Heart Lignite Mine, which were prepared by myself or under my direction, for the purpose of filing the original South Heart Lignite Mine Permit. I further certify that the primary road plans meet the requirements of Article 69-05.2 of the North Dakota Administrative Code and were developed using current and prudent engineering practices and procedures and the applicable design requirements established by the North Dakota Public Service Commission.

Yours sincerely NORWEST CORPORATION

James R. Hitt Senior Mining Engineer ND Registration No. PE-2445 Enclosures

136 East South Temple, 12th Floor • Salt Lake City, Utah 84111 USA • Tel 801.539.0044 • USA 800.266.6351 • Fax 801.539.0055 • www.norwestcorp.com

SALT LAKE CITY / CALGARY / DENVER / GOLDEN / VANCOUVER / CHARLESTON W V / PITTSBURGH / BEIJING

James R. Hitt Senior Mining Engineer

September 10, 2010 File No. 4284 North Dakota Public Service Commission Reclamation Division State Capital 13th Floor 600 E. Boulevard Ave., Dept. 408 Bismarck ND 58505-0480 Subject: Certification Letter – Surface Water Management Operations Plans To the Reviewing Agency: I have reviewed and hereby certify the information and design drawings within the surface water management operations plans for the South Heart Lignite Mine, were prepared by myself or under my direction, for the purpose of filing of the original South Heart Lignite Mine Permit. I further certify that the surface water management operation plans meet the requirements of Article 6905.2 of the North Dakota Administrative Code and were developed using current and prudent engineering practices and procedures and the applicable design requirements established by the North Dakota Public Service Commission.

Yours sincerely NORWEST CORPORATION

James R. Hitt Senior Mining Engineer ND Registration No. PE-2445 Enclosures

136 East South Temple, 12th Floor • Salt Lake City, Utah 84111 USA • Tel 801.539.0044 • USA 800.266.6351 • Fax 801.539.0055 • www.norwestcorp.com

SALT LAKE CITY / CALGARY / DENVER / GOLDEN / VANCOUVER / CHARLESTON WV / PITTSBURGH / BEIJING

APPENDIX 3.6.2 SURFACE WATER MANAGEMENT SEDCAD REPORTS SOUTH HEART LIGNITE MINE

Appendix 3.6.2 Surface Water Management SEDCAD Reports

Pond 1 10-Year 24-Hour Storm includes CC#1- CC#3……………………...………….1 Pond 1 100-Year 6-Hour Storm includes CC#1- CC#3 ………………………………..25 SHLM Facilities Area Sump & CC#7 10-24 ………………………...42 SHLM Facilities Area Sump & CC#7 100-6 ………………………...55 Pond 2 10-Year 24-Hour Storm includes CC#4- CC#5………………………………...60 Pond 2 100-Year 6-Hour Storm includes CC#4- CC#5………………………………...74 Small Area Exemption (SAE) Explosives Storage Area………………………………..82 SAE OVB-1……………………………………………………………………….…….88 SAE SOVB-10……………………………………………………………………..……97 SAE SPGM 9&10……………………………….………………………………....…..103 SAE SPGM 13………………………………………………………………………... 109 CC#8 East Explosives Storage Culvert………………………………………………..115 CC#9 West Explosives Storage Culvert……………………………….........................121 CVT 70+51 and DD-2, DD-3 of West Tributary Diversion…………………….……..127 CVT 55+75 and West Tributary Diversion DD-1……………………….………...…..135

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

Pond 1 10-year, 24-hour storm

Great Northern South Heart Post-Mining Flows Flow to South Branch Heart River

CBEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

1

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 10 yr - 24 hr 3.100 inches

Particle Size Distribution:
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 Silt Loam 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 33.000% 0.000%

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

2

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Culvert Culvert Channel Channel Culvert Channel Pond Channel Channel Channel Channel Pond Culvert Stru # #2 #3 #5 #6 #7 #8 #9 #12 #13 #14 #15 #16 #17 (flows into) ==> ==> ==> ==> ==> ==> ==> ==> ==> ==> ==> ==> ==> Stru # #5 #6 #6 #16 #16 #7 End #2 #3 #17 #7 #9 #16 Musk. K (hrs) 0.342 0.101 0.101 0.101 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Musk. X Description 0.272 CC#3 0.265 CC#2 0.265 Haul road ditch below CC#3 0.265 Haul road ditch below CC#2 0.000 CC#1 0.000 Haul road from north 0.000 Pond 1 - Cell 2 0.000 MHR1 north ditch to CC#3 0.000 MHR1 north ditch to CC#2 0.000 MHR2 north ditch to Pond 1 0.000 MHR1 north ditch to CC#1 0.000 Pond 1 - Cell 1 0.000 CC#6

#14 Chan'l #17 Culvert #15 Chan'l #8 Chan'l #7 Culvert #12 Chan'l #2 Culvert #5 Chan'l #13 Chan'l #3 Culvert #6 Chan'l #16 Pond #9 Pond
Filename: Pond 1 10-24 9-7-10 w open chan.sc4

3

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Routing Details:
Stru # #2 #2 #3 #3 #6 #6 Land Flow Condition 8. Large gullies, diversions, and low flowing streams Muskingum K: 8. Large gullies, diversions, and low flowing streams Muskingum K: 8. Large gullies, diversions, and low flowing streams Muskingum K: 0.41 2.87 700.00 1.92 0.41 2.87 700.00 1.92 Slope (%) 0.46 Vert. Dist. (ft) 11.50 Horiz. Dist. (ft) 2,500.00 Velocity (fps) 2.03 Time (hrs) 0.342 0.342 0.101 0.101 0.101 0.101

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

4

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Summary:
Immediate Contributing Area (ac) #14 #17 #15 #8 #7 #12 #2 #5 #13 #3 #6 #16 In Out In Out 8.743 0.000 22.224 150.500 5.600 1.579 31.580 3.113 5.056 93.100 2.039 4.170 Total Contributing Area (ac) 8.743 8.743 22.224 150.500 178.324 1.579 33.159 36.272 5.056 98.156 136.467 327.704 Peak Discharge (cfs) 11.63 11.63 16.04 55.43 61.15 1.66 24.42 24.23 11.00 80.19 102.47 154.30 49.58 50.82 0.00 Total Runoff Volume (ac-ft) 0.87 0.87 2.23 12.80 16.04 0.12 2.58 3.03 0.99 11.37 14.80 32.79 0.00 34.20 0.00 12.6 12.6 15.1 347.7 560.5 0.0 27.8 30.7 13.0 586.3 621.7 1,202.3 547.3 557.4 557.4 Sediment (tons) Peak Sediment Conc. (mg/l) 20,629 20,629 14,818 32,316 103,423 434 17,040 15,436 17,387 87,445 69,489 58,365 0 16,144 0 Peak Settleable Conc. (ml/l) 8.05 8.05 5.71 1.78 18.84 0.17 3.66 2.94 6.79 16.73 13.39 11.16 0.00 0.11 0.00 4.10 4.10 1.91 1.09 4.60 0.08 1.69 1.41 3.76 7.09 5.84 5.18 0.00 0.09 0.00 24VW (ml/l)

#9

9.462

337.166

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

5

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6

Particle Size Distribution(s) at Each Structure

Structure #14 (MHR2 north ditch to Pond 1):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 33.000% 0.000%

Structure #17 (CC#6):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 33.000% 0.000%

Structure #15 (MHR1 north ditch to CC#1):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 In/Out 100.000% 100.000% 96.061% 91.138% 87.200% 82.277% 60.615%

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

6

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

7
Size (mm) 0.0040 0.0010 In/Out 33.609% 0.000%

Structure #8 (Haul road from north):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 77.711% 0.000%

Structure #7 (CC#1):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 98.483% 96.587% 95.071% 93.175% 84.833% 60.756% 0.000%

Structure #12 (MHR1 north ditch to CC#3):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 33.000% 0.000%

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

7

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

8

Structure #2 (CC#3):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 86.773% 47.725% 0.000%

Structure #5 (Haul road ditch below CC#3):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 90.471% 49.759% 0.000%

Structure #13 (MHR1 north ditch to CC#2):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 33.000% 0.000%

Structure #3 (CC#2):
Size (mm) 2.0000 1.0000 In/Out 100.000% 100.000%

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

8

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

9
Size (mm) 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 99.791% 99.698% 99.581% 90.379% 49.710% 0.000%

Structure #6 (Haul road ditch below CC#2):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 100.000% 99.740% 99.622% 99.475% 90.159% 49.589% 0.000%

Structure #16 (Pond 1 - Cell 1):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In 100.000% 100.000% 99.226% 98.129% 97.293% 96.249% 87.173% 54.518% 0.000% Out 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 0.000%

Structure #9:
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 Filename: Pond 1 10-24 9-7-10 w open chan.sc4 In 100.000% 100.000% 100.000% 99.837% 99.765% 99.675% Out 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

9

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

10
Size (mm) 0.0160 0.0040 0.0010 In 99.278% 98.790% 0.000% Out 0.000% 0.000% 0.000%

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

10

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

11

Structure Detail:
Structure #14 (Erodible Channel) MHR2 north ditch to Pond 1
Triangular Erodible Channel Inputs: Material: Alluvial silts colloidal
Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.3 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 11.63 cfs 1.29 ft 7.71 ft 2.35 fps 4.95 sq ft 0.610 ft 0.52 1.59 ft 9.51 ft w/ Freeboard

Structure #17 (Culvert) CC#6
Culvert Inputs:
Length (ft) 30.00 Slope (%) 1.50 Manning's n 0.0240 Max. Headwater (ft) 2.00 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 11.63 cfs Minimum pipe diameter: 1 - 30 inch pipe(s) required

Structure #15 (Erodible Channel) MHR1 north ditch to CC#1
Triangular Erodible Channel Inputs: Material: Alluvial silts colloidal

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

11

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

12
Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Left Sideslope Ratio 3.0:1

Right Sideslope Ratio 3.0:1

Slope (%) 0.4

Manning's n 0.0250

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 16.04 cfs 1.37 ft 8.24 ft 2.83 fps 5.66 sq ft 0.652 ft 0.60 1.67 ft 10.04 ft w/ Freeboard

Structure #8 (Erodible Channel) Haul road from north
Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 4.00 Left Sideslope Ratio 4.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.2 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 55.43 cfs 2.01 ft 18.08 ft 2.50 fps 22.21 sq ft 1.191 ft 0.40 2.31 ft 20.18 ft w/ Freeboard

Structure #7 (Culvert) CC#1
Culvert Inputs:

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

12

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

13
Slope (%) 1.00 Manning's n 0.0240 Max. Headwater (ft) 3.75 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Length (ft) 90.00

Culvert Results: Design Discharge = 61.15 cfs Minimum pipe diameter: 1 - 60 inch pipe(s) required

Structure #12 (Erodible Channel) MHR1 north ditch to CC#3
Triangular Erodible Channel Inputs: Material: Alluvial silts colloidal
Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.4 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 1.66 cfs 0.59 ft 3.52 ft 1.61 fps 1.03 sq ft 0.278 ft 0.52 0.89 ft 5.32 ft w/ Freeboard

Structure #2 (Culvert) CC#3
Culvert Inputs:
Length (ft) 90.00 Slope (%) 1.00 Manning's n 0.0240 Max. Headwater (ft) 3.00 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 24.42 cfs Minimum pipe diameter: 1 - 36 inch pipe(s) required

Structure #5 (Erodible Channel) Haul road ditch below CC#3
Filename: Pond 1 10-24 9-7-10 w open chan.sc4

13

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

14

Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 4.00 Left Sideslope Ratio 4.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.5 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 24.23 cfs 1.12 ft 11.84 ft 2.73 fps 8.87 sq ft 0.730 ft 0.56 1.42 ft 13.94 ft w/ Freeboard

Structure #13 (Erodible Channel) MHR1 north ditch to CC#2
Triangular Erodible Channel Inputs: Material: Alluvial silts colloidal
Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.4 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 11.00 cfs 1.19 ft 7.15 ft 2.58 fps 4.27 sq ft 0.566 ft 0.59 1.49 ft 8.95 ft w/ Freeboard

Structure #3 (Culvert) CC#2
Culvert Inputs:
Filename: Pond 1 10-24 9-7-10 w open chan.sc4

14

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

15
Slope (%) 2.00 Manning's n 0.0240 Max. Headwater (ft) 4.00 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Length (ft) 90.00

Culvert Results: Design Discharge = 80.19 cfs Minimum pipe diameter: 1 - 60 inch pipe(s) required

Structure #6 (Erodible Channel) Haul road ditch below CC#2
Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 4.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 4.0:1 Slope (%) 0.4 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 102.47 cfs 2.26 ft 19.80 ft 3.82 fps 26.85 sq ft 1.314 ft 0.58 2.56 ft 21.90 ft w/ Freeboard

Structure #16 (Pond) Pond 1 - Cell 1
Pond Inputs:
Initial Pool Elev: Initial Pool: *Sediment Storage: Dead Space: 2,499.20 ft 8.63 ac-ft 2.15 ac-ft 0.00 %

*Sediment capacity based on Average Annual R of 50.0 for 3 year(s)

Straight Pipe

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

15

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

16
Barrel Length (ft) 48.00 Barrel Slope (%) 2.00 Manning's n 0.0240 Spillway Elev (ft) 2,499.20 Entrance Loss Coefficient 0.90 Tailwater Depth (ft) 0.00

Barrel Diameter (in) 18.00

Straight Pipe
Barrel Diameter (in) 12.00 Barrel Length (ft) 48.00 Barrel Slope (%) 2.00 Manning's n 0.0240 Spillway Elev (ft) 2,499.40 Entrance Loss Coefficient 0.90 Tailwater Depth (ft) 0.00

Emergency Spillway
Spillway Elev 2,502.00 Crest Length (ft) 24.00 Left Sideslope 4.00:1 Right Sideslope 4.00:1 Bottom Width (ft) 20.00

Pond Results:
Peak Elevation: H'graph Detention Time: Pond Model: Dewater Time: Trap Efficiency: 2,502.84 ft 7.36 hrs CSTRS 2.34 days 0.00 %

Dewatering time is calculated from peak stage to lowest spillway

Elevation-Capacity-Discharge Table
Elevation 2,496.71 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.20 2,499.40 2,499.50 2,500.00 2,500.50 2,501.00 2,501.50 Area (ac) 3.121 3.199 3.336 3.476 3.619 3.765 3.825 3.884 3.914 4.066 4.220 4.378 4.538 Capacity (ac-ft) 0.000 0.919 2.552 4.255 6.029 7.875 8.634 9.405 9.795 11.790 13.861 16.011 18.239 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.544 1.054 3.573 6.757 9.776 12.559 17.14* 4.48* 11.70 5.00 3.20 2.45 Spillway #1 Spillway #2 Dewater Time (hrs) Top of Sed. Storage

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

16

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

17
Area (ac) 4.701 4.867 4.981 5.036 5.208 5.382 5.560 5.740 Capacity (ac-ft) 20.549 22.941 24.602 25.416 27.977 30.624 33.360 36.185 Discharge (cfs) 14.011 17.018 49.577 65.541 123.834 199.206 295.116 412.431 Dewater Time (hrs) 3.45 5.00 3.75 Peak Stage Spillway #3

Elevation 2,502.00 2,502.50 2,502.84 2,503.00 2,503.50 2,504.00 2,504.50 2,505.00

*Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit.

Detailed Discharge Table
Combined Elevation (ft) Straight Pipe (cfs) Straight Pipe (cfs) Emergency Spillway (cfs) Total Discharge (cfs) 2,496.71 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.20 2,499.40 2,499.50 2,500.00 2,500.50 2,501.00 2,501.50 2,502.00 2,502.50 2,503.00 2,503.50 2,504.00 2,504.50 2,505.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 (3)>0.544 (3)>0.587 (3)>2.251 (3)>4.630 (1)>6.667 (6)>9.027 (6)>10.103 (6)>11.075 (6)>11.969 (6)>12.803 (6)>13.589 (6)>14.320 (6)>15.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 (2)>0.467 (1)>1.321 (1)>2.127 (6)>3.110 (6)>3.532 (6)>3.908 (6)>4.255 (6)>4.580 (6)>4.860 (6)>5.138 (6)>5.415 (6)>5.677 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.688 48.992 106.170 180.479 275.381 391.747 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.544 1.054 3.573 6.757 9.776 12.559 14.011 17.018 65.541 123.834 199.206 295.116 412.431

Structure #9 (Pond) Pond 1 - Cell 2
Pond Inputs:
Initial Pool Elev: Initial Pool: Filename: Pond 1 10-24 9-7-10 w open chan.sc4 2,497.50 ft 12.84 ac-ft

17

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

18
*Sediment Storage: Dead Space: 1.00 ac-ft 0.00 %

*Sediment capacity based on Average Annual R of 50.0 for 3 year(s)

Emergency Spillway
Spillway Elev 2,501.00 Crest Length (ft) 100.00 Left Sideslope 4.00:1 Right Sideslope 4.00:1 Bottom Width (ft) 20.00

Pond Results:
Peak Elevation: H'graph Detention Time: Pond Model: Dewater Time: Trap Efficiency: 2,500.99 ft 0.00 hrs CSTRS 0.00 days 0.00 %

Dewatering time is calculated from peak stage to lowest spillway

Elevation-Capacity-Discharge Table
Elevation 2,496.11 2,496.50 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.50 2,500.00 2,500.50 2,500.99 2,501.00 2,501.50 2,502.00 2,502.50 2,503.00 2,503.50 2,504.00 2,504.50 2,505.00 Area (ac) 9.081 9.168 9.280 9.392 9.505 9.619 9.734 9.849 9.965 10.081 10.196 10.198 10.316 10.435 10.554 10.674 10.794 10.916 11.037 11.160 Capacity (ac-ft) 0.000 3.562 8.174 12.842 17.566 22.348 27.186 32.081 37.035 42.046 47.006 47.116 52.244 57.432 62.679 67.986 73.353 78.780 84.269 89.818 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.341 32.682 75.955 136.784 213.354 305.913 428.015 571.042 0.00 Peak Stage Spillway #1 Dewater Time (hrs) Top of Sed. Storage

Detailed Discharge Table
Filename: Pond 1 10-24 9-7-10 w open chan.sc4

18

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

19
Combined Elevation (ft) Emergency Spillway (cfs) Total Discharge (cfs) 2,496.11 2,496.50 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.50 2,500.00 2,500.50 2,501.00 2,501.50 2,502.00 2,502.50 2,503.00 2,503.50 2,504.00 2,504.50 2,505.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.341 32.682 75.955 136.784 213.354 305.913 428.015 571.042 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.341 32.682 75.955 136.784 213.354 305.913 428.015 571.042

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

19

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

20

Subwatershed Hydrology Detail:
Stru # #14 SWS # 1 SWS Area (ac) 8.743 8.743 8.743 1 2 6.464 15.760 22.224 1 2 133.840 16.660 150.500 1 5.600 178.324 1 1.579 1.579 1 2 14.180 17.400 33.159 1 3.113 36.272 1 5.056 5.056 1 2 3 4 5 6.720 18.990 5.380 37.790 24.220 98.156 1 2.039 136.467 1 4.170 327.704 1 9.462 337.166 0.000 0.000 0.000 100.000 M 0.000 0.000 0.000 100.000 F 0.072 0.000 0.000 93.000 M 0.151 0.190 0.098 0.236 0.174 0.291 0.042 0.000 0.361 0.161 0.183 0.262 0.000 0.242 0.255 61.000 73.000 82.000 94.000 80.000 M M M M M 0.000 0.000 0.000 93.000 M 0.209 0.000 0.000 91.000 M 0.147 0.207 0.114 0.000 0.305 0.000 82.000 73.000 M M 0.000 0.000 0.000 73.000 M 0.064 0.000 0.000 91.000 M 1.266 0.228 0.204 0.023 0.312 0.354 81.000 61.000 M M 0.000 0.298 0.000 0.207 0.000 0.265 93.000 73.000 M M Time of Conc (hrs) 0.000 Musk K (hrs) 0.000 Musk X 0.000 Curve Number 78.000 UHS M Peak Discharge (cfs) 11.63 11.63 11.63 14.06 8.50 16.04 54.92 3.34 55.43 11.62 61.15 1.66 1.66 14.88 10.55 24.42 4.46 24.23 11.00 11.00 1.53 11.88 8.40 58.06 22.88 80.19 4.44 102.47 9.91 154.30 22.48 50.82 Runoff Volume (ac-ft) 0.874 0.874 0.874 1.265 0.965 2.229 12.350 0.451 12.801 1.009 16.039 0.121 0.121 1.400 1.064 2.585 0.448 3.033 0.989 0.989 0.184 1.171 0.653 6.200 2.171 11.367 0.399 14.798 1.077 32.788 2.443 34.198

Σ
#17 #15

Σ

Σ
#8

Σ
#7

Σ
#12

Σ
#2

Σ
#5

Σ
#13

Σ
#3

Σ
#6

Σ
#16

Σ
#9

Σ

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

20

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

21

Subwatershed Sedimentology Detail:
Stru # #14 SWS # 1 Soil K L (ft) S (%) C P PS # Sediment (tons) 12.6 12.6 12.6 1 2 0.320 0.240 30.00 378.00 1.00 0.40 1.0000 0.0380 1.0000 1.0000 1 1 14.8 0.4 15.1 1 2 0.370 0.240 300.00 59.00 5.00 8.50 0.2400 0.0380 1.0000 1.0000 1 1 395.0 1.0 347.7 1 0.320 153.00 9.80 1.0000 1.0000 1 197.7 560.5 1 0.240 30.00 1.00 0.0380 1.0000 1 0.0 0.0 1 2 0.370 0.240 275.80 105.00 3.60 4.10 0.2400 0.0380 1.0000 1.0000 1 1 30.0 2.0 27.8 1 0.320 30.00 1.00 1.0000 1.0000 1 5.0 30.7 1 0.370 30.00 1.00 1.0000 1.0000 1 13.0 13.0 1 2 3 4 5 0.240 0.240 0.370 0.370 0.370 216.00 172.00 144.00 412.00 292.00 2.60 1.50 1.00 3.60 2.70 0.2400 0.0380 0.0420 1.0000 0.0420 1.0000 1.0000 1.0000 1.0000 1.0000 1 1 1 1 1 1.2 1.0 0.6 698.1 6.7 586.3 1 0.370 30.00 1.00 1.0000 1.0000 1 4.7 621.7 1 0.370 325.00 0.10 1.0000 1.0000 1 7.7 1,202.3 1 0.320 1.00 1.00 1.0000 1.0000 1 10.1 557.4 Peak Sediment Conc. (mg/l) 0.370 30.00 1.00 1.0000 1.0000 1 20,629 20,629 20,629 15,499 500 14,818 37,350 3,384 32,316 236,583 103,423 434 434 29,144 2,702 17,040 15,138 15,436 17,387 17,387 9,357 1,209 1,282 144,882 4,222 87,445 15,604 69,489 9,935 58,365 5,749 16,144 Peak Settleable Conc (ml/l) 8.05 8.05 8.05 6.05 0.11 5.71 3.20 0.55 1.78 92.33 18.84 0.17 0.17 8.52 0.67 3.66 4.54 2.94 6.79 6.79 1.91 0.31 0.50 43.52 1.20 16.73 6.09 13.39 3.88 11.16 2.24 0.11 4.10 4.10 4.10 3.35 0.06 1.91 1.99 0.26 1.09 51.95 4.60 0.08 0.08 4.56 0.34 1.69 2.43 1.41 3.76 3.76 0.98 0.16 0.26 23.80 0.64 7.09 3.38 5.84 2.04 5.18 1.18 0.09 24VW (ml/l)

Σ
#17 #15

Σ

Σ
#8

Σ
#7

Σ
#12

Σ
#2

Σ
#5

Σ
#13

Σ
#3

Σ
#6

Σ
#16

Σ
#9

Σ

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

21

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

22

Subwatershed Time of Concentration Details:
Stru # #2 SWS # 1 Land Flow Condition 7. Paved area and small upland gullies 5. Nearly bare and untilled, and alluvial valley fans #2 #2 1 2 Time of Concentration: 3. Short grass pasture 7. Paved area and small upland gullies #2 #3 2 1 Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #3 #3 1 2 Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #3 #3 #3 #3 2 3 3 4 Time of Concentration: 3. Short grass pasture Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies 7. Paved area and small upland gullies #3 #3 4 5 Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #3 #5 5 1 Time of Concentration: 8. Large gullies, diversions, and low flowing streams 7. Paved area and small upland gullies #5 #6 1 1 Time of Concentration: 7. Paved area and small upland gullies 8. Large gullies, diversions, and low flowing streams #6 #7 1 1 Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 8. Large gullies, diversions, and low flowing streams #7 1 Time of Concentration: 1.67 4.82 3.00 30.00 180.00 623.00 1.290 6.580 1.00 0.46 0.29 2.30 30.00 500.00 2.010 2.030 0.46 1.00 6.90 0.29 1,500.00 30.00 2.030 2.010 2.70 2.70 16.20 23.46 600.00 869.00 1.640 3.300 2.78 2.78 2.24 16.68 18.29 20.00 600.00 658.00 891.00 1.660 3.350 3.010 1.05 3.00 287.00 0.810 1.50 1.50 9.00 7.26 600.00 484.00 1.220 2.460 2.60 2.60 15.60 14.79 600.00 569.00 1.610 3.240 1.77 1.77 10.62 8.64 600.00 488.50 1.060 2.670 Slope (%) 2.20 2.20 Vert. Dist. (ft) 8.44 13.20 Horiz. Dist. (ft) 383.90 600.00 Velocity (fps) 2.980 1.480 Time (hrs) 0.035 0.112 0.147 0.157 0.050 0.207 0.103 0.048 0.151 0.136 0.054 0.190 0.098 0.098 0.100 0.054 0.082 0.236 0.101 0.073 0.174 0.205 0.004 0.209 0.004 0.068 0.072 0.038 0.026 0.064

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

22

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

23
Slope (%) 3.46 3.52 2.84 0.85 1.04 Vert. Dist. (ft) 10.00 14.00 50.00 30.00 40.00 Horiz. Dist. (ft) 289.00 398.00 1,759.00 3,529.00 3,847.00 Velocity (fps) 1.860 3.770 3.390 1.850 2.050 Time (hrs) 0.043 0.029 0.144 0.529 0.521 1.266 1.18 10.50 890.00 1.080 0.228 0.228 0.40 0.40 2.40 0.62 600.00 156.00 0.630 1.270 0.264 0.034 0.298

Stru # #8

SWS # 1

Land Flow Condition 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies

#8 #8 #8 #15

1 2 2 2

Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies

#15

2

Time of Concentration:

Subwatershed Muskingum Routing Details:
Stru # #2 #2 #2 #2 #3 #3 #3 #3 #3 #3 #3 #3 #8 SWS # 1 1 2 2 1 1 2 2 4 4 5 5 1 Land Flow Condition 7. Paved area and small upland gullies Muskingum K: 7. Paved area and small upland gullies Muskingum K: 5. Nearly bare and untilled, and alluvial valley fans Muskingum K: 7. Paved area and small upland gullies Muskingum K: 7. Paved area and small upland gullies Muskingum K: 7. Paved area and small upland gullies Muskingum K: 7. Paved area and small upland gullies 7. Paved area and small upland gullies #8 #8 1 2 Muskingum K: 7. Paved area and small upland gullies 4.23 15.00 355.00 4.130 2.24 1.75 22.00 19.00 983.85 1,088.50 3.010 2.650 0.78 8.00 1,028.00 1.770 0.63 13.00 2,070.00 1.590 0.87 2.50 287.20 1.870 0.97 10.00 1,029.00 0.980 1.75 19.00 1,088.00 2.660 Slope (%) 1.75 Vert. Dist. (ft) 19.00 Horiz. Dist. (ft) 1,088.51 Velocity (fps) 2.650 Time (hrs) 0.114 0.114 0.113 0.000 0.291 0.291 0.042 0.042 0.361 0.361 0.161 0.161 0.090 0.114 0.204 0.023

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

23

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

24
Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) 0.023 1.35 0.63 8.00 5.00 591.00 790.00 2.340 1.600 0.070 0.137 0.207

Stru # #8 #15

SWS # 2 2

Land Flow Condition Muskingum K: 7. Paved area and small upland gullies 7. Paved area and small upland gullies

#15

2

Muskingum K:

Filename: Pond 1 10-24 9-7-10 w open chan.sc4

24

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

Pond 1 100-year, 6-hour storm

Great Northern South Heart Post-Mining Flows Flow to South Branch Heart River

CBEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

25

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 6 hr 3.550 inches

Particle Size Distribution:
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 Silt Loam 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 33.000% 0.000%

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

26

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Culvert Culvert Channel Channel Culvert Channel Pond Channel Channel Channel Channel Pond Culvert Stru # #2 #3 #5 #6 #7 #8 #9 #12 #13 #14 #15 #16 #17 (flows into) ==> ==> ==> ==> ==> ==> ==> ==> ==> ==> ==> ==> ==> Stru # #5 #6 #6 #16 #16 #7 End #2 #3 #17 #7 #9 #16 Musk. K (hrs) 0.342 0.101 0.101 0.101 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Musk. X Description 0.272 CC#3 0.265 CC#2 0.265 Haul road ditch below CC#3 0.265 Haul road ditch below CC#2 0.000 CC#1 0.000 Haul road from north 0.000 Pond 1-Cell 2 0.000 MHR1 north ditch to CC#3 0.000 MHR1 north ditch to CC#2 0.000 MHR2 north ditch to Pond 1 0.000 MHR1 north ditch to CC#1 0.000 Pond 1 - Cell 1 0.000 CC#6

#14 Chan'l #17 Culvert #15 Chan'l #8 Chan'l #7 Culvert #12 Chan'l #2 Culvert #5 Chan'l #13 Chan'l #3 Culvert #6 Chan'l #16 Pond #9 Pond
Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

27

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Routing Details:
Stru # #2 #2 #3 #3 #6 #6 Land Flow Condition 8. Large gullies, diversions, and low flowing streams Muskingum K: 8. Large gullies, diversions, and low flowing streams Muskingum K: 8. Large gullies, diversions, and low flowing streams Muskingum K: 0.41 2.87 700.00 1.92 0.41 2.87 700.00 1.92 Slope (%) 0.46 Vert. Dist. (ft) 11.50 Horiz. Dist. (ft) 2,500.00 Velocity (fps) 2.03 Time (hrs) 0.342 0.342 0.101 0.101 0.101 0.101

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

28

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Summary:
Immediate Contributing Area (ac) #14 #17 #15 #8 #7 #12 #2 #5 #13 #3 #6 #16 In Out In Out 8.743 0.000 22.224 150.500 5.600 1.579 31.580 3.113 5.056 93.100 2.039 4.170 Total Contributing Area (ac) 8.743 8.743 22.224 150.500 178.324 1.579 33.159 36.272 5.056 98.156 136.467 327.704 Peak Discharge (cfs) 21.78 21.78 25.89 94.94 105.15 3.28 44.63 43.72 18.30 136.48 175.67 262.57 139.49 142.08 65.50 Total Runoff Volume (ac-ft) 1.11 1.11 2.77 16.20 20.17 0.16 3.31 3.85 1.17 13.85 18.18 40.69 0.00 43.04 0.00 20.5 20.5 22.1 529.9 844.7 0.1 44.1 48.2 19.1 839.9 894.9 1,770.8 992.0 1,006.2 353.5 Sediment (tons) Peak Sediment Conc. (mg/l) 21,242 21,242 14,720 33,130 112,628 449 17,024 15,438 17,119 82,517 64,953 59,400 0 22,200 0 Peak Settleable Conc. (ml/l) 8.29 8.29 5.66 1.46 19.46 0.18 3.66 2.92 6.68 14.95 11.90 10.81 0.00 0.12 0.00 5.24 5.24 2.24 1.05 5.21 0.11 2.09 1.73 4.65 7.89 6.51 5.77 0.00 0.10 0.00 24VW (ml/l)

#9

9.462

337.166

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

29

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

11

Structure Detail:
Structure #14 (Erodible Channel) MHR2 north ditch to Pond 1
Triangular Erodible Channel Inputs: Material: Alluvial silts colloidal
Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.3 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 21.78 cfs 1.63 ft 9.76 ft 2.75 fps 7.93 sq ft 0.771 ft 0.54 1.93 ft 11.56 ft w/ Freeboard

Structure #17 (Culvert) CC#6
Culvert Inputs:
Length (ft) 30.00 Slope (%) 1.50 Manning's n 0.0240 Max. Headwater (ft) 2.00 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 21.78 cfs Minimum pipe diameter: 1 - 45 inch pipe(s) required

Structure #15 (Erodible Channel) MHR1 north ditch to CC#1
Triangular Erodible Channel Inputs: Material: Alluvial silts colloidal

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

30

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

12
Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Left Sideslope Ratio 3.0:1

Right Sideslope Ratio 3.0:1

Slope (%) 0.4

Manning's n 0.0250

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 25.89 cfs 1.64 ft 9.86 ft 3.19 fps 8.11 sq ft 0.780 ft 0.62 1.94 ft 11.66 ft w/ Freeboard

Structure #8 (Erodible Channel) Haul road from north
Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 4.00 Left Sideslope Ratio 4.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.2 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 94.94 cfs 2.56 ft 21.91 ft 2.86 fps 33.14 sq ft 1.465 ft 0.41 2.86 ft 24.01 ft w/ Freeboard

Structure #7 (Culvert) CC#1
Culvert Inputs:

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

31

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

13
Slope (%) 1.00 Manning's n 0.0240 Max. Headwater (ft) 3.75 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Length (ft) 90.00

Culvert Results: Design Discharge = 105.15 cfs Minimum pipe diameter: 1 - 84 inch pipe(s) required

Structure #12 (Erodible Channel) MHR1 north ditch to CC#3
Triangular Erodible Channel Inputs: Material: Alluvial silts colloidal
Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.4 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 3.28 cfs 0.76 ft 4.55 ft 1.91 fps 1.72 sq ft 0.359 ft 0.55 1.06 ft 6.35 ft w/ Freeboard

Structure #2 (Culvert) CC#3
Culvert Inputs:
Length (ft) 90.00 Slope (%) 1.00 Manning's n 0.0240 Max. Headwater (ft) 3.00 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 44.63 cfs Minimum pipe diameter: 1 - 54 inch pipe(s) required

Structure #5 (Erodible Channel) Haul road ditch below CC#3
Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

32

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

14

Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 4.00 Left Sideslope Ratio 4.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.5 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 43.72 cfs 1.49 ft 14.41 ft 3.19 fps 13.69 sq ft 0.923 ft 0.58 1.79 ft 16.51 ft w/ Freeboard

Structure #13 (Erodible Channel) MHR1 north ditch to CC#2
Triangular Erodible Channel Inputs: Material: Alluvial silts colloidal
Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.4 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 18.30 cfs 1.44 ft 8.66 ft 2.93 fps 6.25 sq ft 0.685 ft 0.61 1.74 ft 10.46 ft w/ Freeboard

Structure #3 (Culvert) CC#2
Culvert Inputs:
Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

33

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

15
Slope (%) 2.00 Manning's n 0.0240 Max. Headwater (ft) 4.00 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Length (ft) 90.00

Culvert Results: Design Discharge = 136.48 cfs Minimum pipe diameter: 1 - 108 inch pipe(s) required

Structure #6 (Erodible Channel) Haul road ditch below CC#2
Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 4.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 4.0:1 Slope (%) 0.4 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 175.67 cfs 2.86 ft 24.04 ft 4.38 fps 40.12 sq ft 1.615 ft 0.60 3.16 ft 26.14 ft w/ Freeboard

Structure #16 (Pond) Pond 1 - Cell 1
Pond Inputs:
Initial Pool Elev: Initial Pool: *Sediment Storage: Dead Space: 2,499.20 ft 8.42 ac-ft 2.37 ac-ft 0.00 %

*Sediment capacity based on Average Annual R of 50.0 for 3 year(s)

Straight Pipe

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

34

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

16
Barrel Length (ft) 48.00 Barrel Slope (%) 2.00 Manning's n 0.0240 Spillway Elev (ft) 2,499.20 Entrance Loss Coefficient 0.90 Tailwater Depth (ft) 0.00

Barrel Diameter (in) 18.00

Straight Pipe
Barrel Diameter (in) 12.00 Barrel Length (ft) 48.00 Barrel Slope (%) 2.00 Manning's n 0.0240 Spillway Elev (ft) 2,499.40 Entrance Loss Coefficient 0.90 Tailwater Depth (ft) 0.00

Emergency Spillway
Spillway Elev 2,502.00 Crest Length (ft) 24.00 Left Sideslope 4.00:1 Right Sideslope 4.00:1 Bottom Width (ft) 20.00

Pond Results:
Peak Elevation: H'graph Detention Time: Pond Model: Dewater Time: Trap Efficiency: 2,503.60 ft 5.09 hrs CSTRS 2.22 days 0.00 %

Dewatering time is calculated from peak stage to lowest spillway

Elevation-Capacity-Discharge Table
Elevation 2,496.78 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.20 2,499.40 2,499.50 2,500.00 2,500.50 2,501.00 2,501.50 Area (ac) 3.139 3.199 3.336 3.476 3.619 3.765 3.825 3.884 3.914 4.066 4.220 4.378 4.538 Capacity (ac-ft) 0.000 0.707 2.341 4.044 5.818 7.664 8.423 9.193 9.583 11.578 13.650 15.799 18.028 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.544 1.054 3.573 6.757 9.776 12.559 17.14* 6.10 11.70 5.00 3.20 2.45 Spillway #1 Spillway #2 Dewater Time (hrs) Top of Sed. Storage

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

35

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

17
Area (ac) 4.701 4.867 5.036 5.208 5.245 5.382 5.560 5.740 Capacity (ac-ft) 20.337 22.729 25.205 27.765 28.315 30.413 33.148 35.973 Discharge (cfs) 14.011 17.018 65.541 123.834 139.491 199.206 295.116 412.431 Dewater Time (hrs) 2.10 2.20 1.95 1.20 0.35 Peak Stage Spillway #3

Elevation 2,502.00 2,502.50 2,503.00 2,503.50 2,503.60 2,504.00 2,504.50 2,505.00

*Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit.

Detailed Discharge Table
Combined Elevation (ft) Straight Pipe (cfs) Straight Pipe (cfs) Emergency Spillway (cfs) Total Discharge (cfs) 2,496.78 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.20 2,499.40 2,499.50 2,500.00 2,500.50 2,501.00 2,501.50 2,502.00 2,502.50 2,503.00 2,503.50 2,504.00 2,504.50 2,505.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 (3)>0.544 (3)>0.587 (3)>2.251 (3)>4.630 (1)>6.667 (6)>9.027 (6)>10.103 (6)>11.075 (6)>11.969 (6)>12.803 (6)>13.589 (6)>14.320 (6)>15.007 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 (2)>0.467 (1)>1.321 (1)>2.127 (6)>3.110 (6)>3.532 (6)>3.908 (6)>4.255 (6)>4.580 (6)>4.860 (6)>5.138 (6)>5.415 (6)>5.677 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.688 48.992 106.170 180.479 275.381 391.747 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.544 1.054 3.573 6.757 9.776 12.559 14.011 17.018 65.541 123.834 199.206 295.116 412.431

Structure #9 (Pond) Pond 1-Cell 2
Pond Inputs:
Initial Pool Elev: Initial Pool: Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4 2,501.00 ft 46.77 ac-ft

36

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

18
*Sediment Storage: Dead Space: 1.34 ac-ft 0.00 %

*Sediment capacity based on Average Annual R of 50.0 for 3 year(s)

Emergency Spillway
Spillway Elev 2,501.00 Crest Length (ft) 100.00 Left Sideslope 4.00:1 Right Sideslope 4.00:1 Bottom Width (ft) 20.00

Pond Results:
Peak Elevation: H'graph Detention Time: Pond Model: Dewater Time: Trap Efficiency: 2,502.38 ft 3.32 hrs CSTRS 0.52 days 0.00 %

Dewatering time is calculated from peak stage to lowest spillway

Elevation-Capacity-Discharge Table
Elevation 2,496.15 2,496.50 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.50 2,500.00 2,500.50 2,501.00 2,501.50 2,502.00 2,502.38 2,502.50 2,503.00 2,503.50 2,504.00 2,504.50 2,505.00 Area (ac) 9.090 9.168 9.280 9.392 9.505 9.619 9.734 9.849 9.965 10.081 10.198 10.316 10.435 10.525 10.554 10.674 10.794 10.916 11.037 11.160 Capacity (ac-ft) 0.000 3.218 7.830 12.498 17.223 22.004 26.842 31.738 36.691 41.702 46.772 51.901 57.088 61.068 62.335 67.642 73.009 78.437 83.925 89.474 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.341 32.682 65.504 75.955 136.784 213.354 305.913 428.015 571.042 3.80* 6.05 2.60 Peak Stage Spillway #1 Dewater Time (hrs) Top of Sed. Storage

*Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit.

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

37

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

19

Detailed Discharge Table
Combined Elevation (ft) Emergency Spillway (cfs) Total Discharge (cfs) 2,496.15 2,496.50 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.50 2,500.00 2,500.50 2,501.00 2,501.50 2,502.00 2,502.50 2,503.00 2,503.50 2,504.00 2,504.50 2,505.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.341 32.682 75.955 136.784 213.354 305.913 428.015 571.042 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.341 32.682 75.955 136.784 213.354 305.913 428.015 571.042

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

38

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

20

Subwatershed Hydrology Detail:
Stru # #14 SWS # 1 SWS Area (ac) 8.743 8.743 8.743 1 2 6.464 15.760 22.224 1 2 133.840 16.660 150.500 1 5.600 178.324 1 1.579 1.579 1 2 14.180 17.400 33.159 1 3.113 36.272 1 5.056 5.056 1 2 3 4 5 6.720 18.990 5.380 37.790 24.220 98.156 1 2.039 136.467 1 4.170 327.704 1 9.462 337.166 0.000 0.000 0.000 100.000 M 0.000 0.000 0.000 100.000 F 0.072 0.000 0.000 93.000 M 0.151 0.190 0.098 0.236 0.174 0.291 0.042 0.000 0.361 0.161 0.183 0.262 0.000 0.242 0.255 61.000 73.000 82.000 94.000 80.000 M M M M M 0.000 0.000 0.000 93.000 M 0.209 0.000 0.000 91.000 M 0.147 0.207 0.114 0.000 0.305 0.000 82.000 73.000 M M 0.000 0.000 0.000 73.000 M 0.064 0.000 0.000 91.000 M 1.266 0.228 0.204 0.023 0.312 0.354 81.000 61.000 M M 0.000 0.298 0.000 0.207 0.000 0.265 93.000 73.000 M M Time of Conc (hrs) 0.000 Musk K (hrs) 0.000 Musk X 0.000 Curve Number 78.000 UHS M Peak Discharge (cfs) 21.78 21.78 21.78 23.40 16.25 25.89 93.49 8.64 94.94 19.59 105.15 3.28 3.28 26.44 20.41 44.63 7.45 43.72 18.30 18.30 3.94 22.99 15.18 95.42 41.30 136.48 7.38 175.67 16.05 262.57 36.41 142.08 Runoff Volume (ac-ft) 1.114 1.114 1.114 1.495 1.273 2.768 15.532 0.664 16.196 1.204 20.169 0.159 0.159 1.751 1.404 3.314 0.536 3.850 1.169 1.169 0.271 1.545 0.815 7.308 2.745 13.854 0.472 18.175 1.231 40.690 2.793 43.036

Σ
#17 #15

Σ

Σ
#8

Σ
#7

Σ
#12

Σ
#2

Σ
#5

Σ
#13

Σ
#3

Σ
#6

Σ
#16

Σ
#9

Σ

Filename: Pond 1 100-6 9-7-10 open chan & not pumped.sc4

39

Printed 09-09-2010

SEDCAD 4.0
Copyright 1998-2002 Pamela J. Schwab Civil Software Design

1

S Heart CC#1 Alternative Culvert Sizing 100-6 Storm 105.15 cfs - (2) 42" Culverts
Culvert Inputs:
Length (ft) 90.00 Slope (%) 100.00 Manning's n 0.0240 Max. Headwater (ft) 4.00 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Minimum pipe diameter: 1 - 42 inch pipe(s) required

Detailed Performance Curves
Design Discharge = 52.58 cfs Maximum Headwater = 4.00 ft (BOLD indicates design pipe size)
Headwater (ft) 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 4.40 4.80 5.20 5.60 6.00 Discharge (cfs) ( 36 in) 1.59 4.50 8.26 12.71 17.77 23.36 29.43 35.96 42.27 47.70 52.64 57.14 61.31 65.22 68.92 Discharge (cfs) ( 42 in) 1.86 5.24 9.63 14.83 20.73 27.25 34.34 41.95 50.06 58.63 65.63 72.28 78.36 84.01 89.30 Discharge (cfs) ( 45 in) 1.99 5.62 10.32 15.89 22.21 29.19 36.79 44.95 53.63 62.82 72.47 79.63 86.89 93.58 99.82

SEDCAD Utility Run

40

Printed 09-09-2010

SEDCAD 4.0
Copyright 1998-2002 Pamela J. Schwab Civil Software Design

1

S Heart CC#1 Alternative Culvert Sizing 100-6 Storm 105.15 cfs - (3) 36" Culverts
Culvert Inputs:
Length (ft) 90.00 Slope (%) 1.00 Manning's n 0.0240 Max. Headwater (ft) 3.50 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Minimum pipe diameter: 1 - 36 inch pipe(s) required

Detailed Performance Curves
Design Discharge = 35.05 cfs Maximum Headwater = 3.50 ft (BOLD indicates design pipe size)
Headwater (ft) 0.35 0.70 1.05 1.40 1.75 2.10 2.45 2.80 3.15 3.50 3.85 4.20 4.55 4.90 5.25 Discharge (cfs) ( 30 in) 6.01 7.53 8.87 10.09 11.22 13.82 17.92 22.03 25.12 27.31 29.34 31.23 33.02 34.71 36.33 Discharge (cfs) ( 36 in) 8.23 10.57 12.67 14.56 16.32 17.94 20.62 26.01 31.56 37.01 41.44 44.61 47.58 50.37 53.01 Discharge (cfs) ( 42 in) 10.46 13.78 16.79 19.54 22.07 24.43 26.63 29.03 35.79 42.76 49.86 56.80 63.06 67.38 71.43

SEDCAD Utility Run

41

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

SHLM Facilities Area Sump & CC#7

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: Facilities Area Sump 10 24 open channel.sc4

42

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 10 yr - 24 hr 3.100 inches

Particle Size Distribution:
Size (mm) 4.0000 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0150 0.0123 0.0079 0.0047 0.0025 0.0008 DustySiltLoam 100.000% 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 45.530% 26.520% 14.500% 8.330% 3.510% 0.000% Sandy Loam 100.000% 100.000% 70.000% 67.000% 58.000% 52.000% 38.000% 21.000% 17.000% 13.000% 11.000% 8.000% 0.000% Silt Loam 100.000% 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 58.000% 38.000% 33.000% 0.000% 0.000%

Filename: Facilities Area Sump 10 24 open channel.sc4

43

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Pond Channel Culvert Channel Stru # #1 #2 #3 #4 (flows into) ==> ==> ==> ==> Stru # End #1 #2 #3 Musk. K (hrs) 0.000 0.000 0.000 0.000 Musk. X Description 0.000 Sump 0.000 Outlet of CC#7 to pond 0.000 CC#7 0.000 Ditch along N side of Rd & Fac Area

#4 Chan'l #3 Culvert #2 Chan'l #1 Pond

Filename: Facilities Area Sump 10 24 open channel.sc4

44

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #4 #3 #2 #1 In Out 4.160 0.150 1.780 0.903 Total Contributing Area (ac) 4.160 4.310 6.090 6.993 Peak Discharge (cfs) 8.29 8.60 9.81 11.95 0.00 Total Runoff Volume (ac-ft) 0.73 0.75 0.88 1.11 0.00 1.3 1.3 1.3 1.4 1.4 Sediment (tons) Peak Sediment Conc. (mg/l) 2,409 2,336 2,239 1,760 0 Peak Settleable Conc. (ml/l) 1.52 1.48 1.41 1.10 0.00 0.83 0.81 0.70 0.56 0.00 24VW (ml/l)

Filename: Facilities Area Sump 10 24 open channel.sc4

45

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Particle Size Distribution(s) at Each Structure

Structure #4 (Ditch along N side of Rd & Fac Area):
Size (mm) 4.0000 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0150 0.0123 0.0079 0.0047 0.0025 0.0008 In/Out 100.000% 100.000% 100.000% 96.020% 91.045% 87.065% 82.081% 45.575% 26.546% 14.514% 8.338% 3.513% 0.000%

Structure #3 (CC#7):
Size (mm) 4.0000 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0150 0.0123 0.0079 0.0047 0.0025 0.0008 In/Out 100.000% 100.000% 100.000% 96.020% 91.044% 87.064% 82.080% 45.575% 26.546% 14.514% 8.338% 3.513% 0.000%

Structure #2 (Outlet of CC#7 to pond):
Filename: Facilities Area Sump 10 24 open channel.sc4

46

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6
Size (mm) 4.0000 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0150 0.0123 0.0079 0.0047 0.0025 0.0008 In/Out 100.000% 100.000% 100.000% 96.044% 91.099% 87.142% 82.189% 45.773% 26.844% 14.727% 8.549% 3.492% 0.000%

Structure #1:
Size (mm) 4.0000 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0150 0.0123 0.0079 0.0047 0.0025 0.0008 In 100.000% 100.000% 100.000% 96.043% 91.097% 87.140% 82.185% 46.050% 27.451% 15.181% 9.026% 3.424% 0.000% Out 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Filename: Facilities Area Sump 10 24 open channel.sc4

47

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

7

Structure Detail:
Structure #4 (Erodible Channel) Ditch along N side of Rd & Fac Area
Triangular Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.2 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 8.29 cfs 1.31 ft 7.85 ft 1.62 fps 5.13 sq ft 0.620 ft 0.35 1.61 ft 9.65 ft w/ Freeboard

Structure #3 (Culvert) CC#7
Culvert Inputs:
Length (ft) 50.00 Slope (%) 2.00 Manning's n 0.0240 Max. Headwater (ft) 1.75 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 8.60 cfs Minimum pipe diameter: 1 - 24 inch pipe(s) required

Structure #2 (Erodible Channel) Outlet of CC#7 to pond
Triangular Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal

Filename: Facilities Area Sump 10 24 open channel.sc4

48

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

8
Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Left Sideslope Ratio 3.0:1

Right Sideslope Ratio 3.0:1

Slope (%) 0.2

Manning's n 0.0300

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 9.81 cfs 1.39 ft 8.36 ft 1.69 fps 5.82 sq ft 0.661 ft 0.36 1.69 ft 10.16 ft w/ Freeboard

Structure #1 (Pond) Sump
Pond Inputs:
Initial Pool Elev: Initial Pool: *Sediment Storage: Dead Space: 2,495.50 ft 0.33 ac-ft 0.00 ac-ft 20.00 %

*Sediment capacity based on Average Annual R of 50.0 for 3 year(s)

Emergency Spillway
Spillway Elev 2,499.00 Crest Length (ft) 10.00 Left Sideslope 3.00:1 Right Sideslope 3.00:1 Bottom Width (ft) 20.00

Pond Results:
Peak Elevation: H'graph Detention Time: Pond Model: Dewater Time: Trap Efficiency: 2,497.06 ft 0.00 hrs CSTRS 0.00 days 0.00 %

Dewatering time is calculated from peak stage to lowest spillway

Elevation-Capacity-Discharge Table

Filename: Facilities Area Sump 10 24 open channel.sc4

49

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

9
Area (ac) 0.648 0.672 0.696 0.720 0.745 0.748 0.770 0.796 0.822 0.849 0.876 0.903 Capacity (ac-ft) 0.000 0.328 0.669 1.023 1.389 1.435 1.768 2.160 2.564 2.982 3.413 3.858 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.145 55.544 Spillway #1 0.00 Peak Stage Dewater Time (hrs) Top of Sed. Storage

Elevation 2,495.00 2,495.50 2,496.00 2,496.50 2,497.00 2,497.06 2,497.50 2,498.00 2,498.50 2,499.00 2,499.50 2,500.00

Detailed Discharge Table
Combined Elevation (ft) Emergency Spillway (cfs) Total Discharge (cfs) 2,495.00 2,495.50 2,496.00 2,496.50 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.50 2,500.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.145 55.544 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.145 55.544

Filename: Facilities Area Sump 10 24 open channel.sc4

50

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

10

Subwatershed Hydrology Detail:
Stru # #4 SWS # 1 2 SWS Area (ac) 0.490 3.670 4.160 1 0.150 4.310 1 2 0.140 1.640 6.090 1 0.903 6.993 0.000 0.000 0.000 100.000 F 0.003 0.158 0.158 0.000 0.085 0.000 91.000 73.000 M M 0.030 0.000 0.000 91.000 M Time of Conc (hrs) 0.131 0.087 Musk K (hrs) 0.055 0.000 Musk X 0.308 0.000 Curve Number 91.000 91.000 UHS M M Peak Discharge (cfs) 0.74 7.62 8.29 0.31 8.60 0.29 1.07 9.81 2.15 11.95 Runoff Volume (ac-ft) 0.071 0.661 0.732 0.022 0.754 0.019 0.102 0.875 0.233 1.109

Σ
#3

Σ
#2

Σ
#1

Σ

Subwatershed Sedimentology Detail:
Stru # #4 SWS # 1 2 Soil K L (ft) S (%) C P PS # Sediment (tons) 0.0 1.3 1.3 1 0.370 20.00 2.00 0.0200 1.0000 1 0.0 1.3 1 2 0.370 0.340 20.00 200.00 2.00 0.20 0.0200 0.0120 1.0000 1.0000 1 3 0.0 0.0 1.3 1 0.370 276.00 0.10 0.0200 1.0000 3 0.0 1.4 Peak Sediment Conc. (mg/l) 0.370 0.370 10.00 546.00 0.50 3.80 0.0200 0.0200 1.0000 1.0000 1 1 124 2,612 2,409 387 2,336 401 115 2,239 158 1,760 Peak Settleable Conc (ml/l) 0.07 1.65 1.52 0.24 1.48 0.25 0.04 1.41 0.07 1.10 0.04 0.91 0.83 0.16 0.81 0.17 0.02 0.70 0.03 0.56 24VW (ml/l)

Σ
#3

Σ
#2

Σ
#1

Σ

Subwatershed Time of Concentration Details:
Stru # #2 #2 #2 SWS # 1 1 2 Land Flow Condition 5. Nearly bare and untilled, and alluvial valley fans Time of Concentration: 3. Short grass pasture 0.20 0.40 200.00 0.350 Slope (%) 2.00 Vert. Dist. (ft) 0.39 Horiz. Dist. (ft) 19.50 Velocity (fps) 1.410 Time (hrs) 0.003 0.003 0.158 Printed 09-09-2010

Filename: Facilities Area Sump 10 24 open channel.sc4

51

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

11
Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) 0.158 2.00 1.76 0.39 5.00 19.50 283.91 2.840 2.670 0.001 0.029 0.030 0.20 0.85 425.00 0.900 0.131 0.131 2.83 15.00 530.00 1.680 0.087 0.087

Stru # #2 #3

SWS # 2 1

Land Flow Condition Time of Concentration: 7. Paved area and small upland gullies 7. Paved area and small upland gullies

#3 #4 #4 #4 #4

1 1 1 2 2

Time of Concentration: 7. Paved area and small upland gullies Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans Time of Concentration:

Subwatershed Muskingum Routing Details:
Stru # #2 #2 #4 #4 SWS # 1 1 1 1 Land Flow Condition 3. Short grass pasture Muskingum K: 7. Paved area and small upland gullies Muskingum K: 1.83 10.00 546.00 2.720 Slope (%) 0.20 Vert. Dist. (ft) 0.40 Horiz. Dist. (ft) 200.00 Velocity (fps) 0.350 Time (hrs) 0.158 0.158 0.055 0.055

Filename: Facilities Area Sump 10 24 open channel.sc4

52

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

SHLM Facilities Area Sump & CC#7

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: Facilities Area Sump 100 6 open channel.sc4

53

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 6 hr 3.550 inches

Particle Size Distribution:
Size (mm) 4.0000 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0150 0.0123 0.0079 0.0047 0.0025 0.0008 DustySiltLoam 100.000% 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 45.530% 26.520% 14.500% 8.330% 3.510% 0.000% Sandy Loam 100.000% 100.000% 70.000% 67.000% 58.000% 52.000% 38.000% 21.000% 17.000% 13.000% 11.000% 8.000% 0.000% Silt Loam 100.000% 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 58.000% 38.000% 33.000% 0.000% 0.000%

Filename: Facilities Area Sump 100 6 open channel.sc4

54

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Pond Channel Culvert Channel Stru # #1 #2 #3 #4 (flows into) ==> ==> ==> ==> Stru # End #1 #2 #3 Musk. K (hrs) 0.000 0.000 0.000 0.000 Musk. X Description 0.000 Sump 0.000 Outlet of CC#7 to pond 0.000 CC#7 0.000 Ditch along N side of Rd & Fac Area

#4 Chan'l #3 Culvert #2 Chan'l #1 Pond

Filename: Facilities Area Sump 100 6 open channel.sc4

55

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #4 #3 #2 #1 In Out 4.160 0.150 1.780 0.903 Total Contributing Area (ac) 4.160 4.310 6.090 6.993 Peak Discharge (cfs) 13.96 14.48 16.71 20.18 0.00 Total Runoff Volume (ac-ft) 0.88 0.91 1.07 1.34 0.00 1.9 1.9 2.0 2.0 2.0 Sediment (tons) Peak Sediment Conc. (mg/l) 2,394 2,321 2,206 1,755 0 Peak Settleable Conc. (ml/l) 1.51 1.47 1.39 1.10 0.00 1.02 0.99 0.85 0.69 0.00 24VW (ml/l)

Filename: Facilities Area Sump 100 6 open channel.sc4

56

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

7

Structure Detail:
Structure #4 (Erodible Channel) Ditch along N side of Rd & Fac Area
Triangular Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.2 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 13.96 cfs 1.59 ft 9.54 ft 1.84 fps 7.58 sq ft 0.754 ft 0.36 1.89 ft 11.34 ft w/ Freeboard

Structure #3 (Culvert) CC#7
Culvert Inputs:
Length (ft) 50.00 Slope (%) 2.00 Manning's n 0.0240 Max. Headwater (ft) 1.75 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 14.48 cfs Minimum pipe diameter: 1 - 36 inch pipe(s) required

Structure #2 (Erodible Channel) Outlet of CC#7 to pond
Triangular Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal

Filename: Facilities Area Sump 100 6 open channel.sc4

57

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

8
Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Left Sideslope Ratio 3.0:1

Right Sideslope Ratio 3.0:1

Slope (%) 0.2

Manning's n 0.0300

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 16.71 cfs 1.70 ft 10.20 ft 1.92 fps 8.68 sq ft 0.807 ft 0.37 2.00 ft 12.00 ft w/ Freeboard

Structure #1 (Pond) Sump
Pond Inputs:
Initial Pool Elev: Initial Pool: *Sediment Storage: Dead Space: 2,495.50 ft 0.33 ac-ft 0.00 ac-ft 20.00 %

*Sediment capacity based on Average Annual R of 50.0 for 3 year(s)

Emergency Spillway
Spillway Elev 2,499.00 Crest Length (ft) 10.00 Left Sideslope 3.00:1 Right Sideslope 3.00:1 Bottom Width (ft) 20.00

Pond Results:
Peak Elevation: H'graph Detention Time: Pond Model: Dewater Time: Trap Efficiency: 2,497.36 ft 0.00 hrs CSTRS 0.00 days 0.00 %

Dewatering time is calculated from peak stage to lowest spillway

Elevation-Capacity-Discharge Table

Filename: Facilities Area Sump 100 6 open channel.sc4

58

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

9
Area (ac) 0.648 0.672 0.696 0.720 0.745 0.763 0.770 0.796 0.822 0.849 0.876 0.903 Capacity (ac-ft) 0.000 0.327 0.669 1.023 1.389 1.665 1.768 2.159 2.564 2.982 3.413 3.857 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.145 55.544 Spillway #1 0.00 Peak Stage Dewater Time (hrs) Top of Sed. Storage

Elevation 2,495.00 2,495.50 2,496.00 2,496.50 2,497.00 2,497.36 2,497.50 2,498.00 2,498.50 2,499.00 2,499.50 2,500.00

Detailed Discharge Table
Combined Elevation (ft) Emergency Spillway (cfs) Total Discharge (cfs) 2,495.00 2,495.50 2,496.00 2,496.50 2,497.00 2,497.50 2,498.00 2,498.50 2,499.00 2,499.50 2,500.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.145 55.544 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.145 55.544

Filename: Facilities Area Sump 100 6 open channel.sc4

59

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

Pond 2

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

60

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 10 yr - 24 hr 3.100 inches

Particle Size Distribution:
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 Silt Loam 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 33.000% 0.000%

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

61

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Pond Culvert Channel Culvert Stru # #1 #2 #3 #4 (flows into) ==> ==> ==> ==> Stru # End #1 #4 #1 Musk. K (hrs) 0.000 0.000 0.000 0.000 Musk. X Description 0.000 Emergency Spillway 0.000 Northern Ditch and CC #4 0.000 Southern Ditch 0.000 CC #5

#3 Chan'l #4 Culvert #2 Culvert #1 Pond

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

62

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #3 #4 #2 #1 In Out 472.160 0.000 67.430 7.500 Total Contributing Area (ac) 472.160 472.160 67.430 547.090 Peak Discharge (cfs) 181.90 181.90 42.96 186.96 0.00 Total Runoff Volume (ac-ft) 39.72 39.72 5.23 45.41 0.00 597.5 597.5 8.2 605.8 605.8 Sediment (tons) Peak Sediment Conc. (mg/l) 21,201 21,201 2,338 20,641 0 Peak Settleable Conc. (ml/l) 2.26 2.26 0.42 2.22 0.00 1.17 1.17 0.21 1.05 0.00 24VW (ml/l)

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

63

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Particle Size Distribution(s) at Each Structure

Structure #3 (Southern Ditch):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 99.881% 61.885% 0.000%

Structure #4 (CC #5):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In/Out 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 99.881% 61.885% 0.000%

Structure #2 (Northern Ditch and CC #4):
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 In/Out 100.000% 100.000% 99.122% 98.025% 97.147% 96.050% 91.221%

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

64

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6
Size (mm) 0.0040 0.0010 In/Out 52.114% 0.000%

Structure #1:
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 In 100.000% 100.000% 100.000% 100.000% 100.000% 100.000% 99.762% 61.751% 0.000% Out 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

65

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

7

Structure Detail:
Structure #3 (Erodible Channel) Southern Ditch
Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 4.0:1 Right Sideslope Ratio 4.0:1 Slope (%) 0.5 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 181.90 cfs 2.03 ft 28.27 ft 4.44 fps 40.94 sq ft 1.423 ft 0.65 2.33 ft 30.67 ft w/ Freeboard

Structure #4 (Culvert) CC #5
Culvert Inputs:
Length (ft) 132.00 Slope (%) 1.50 Manning's n 0.0240 Max. Headwater (ft) 5.00 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 181.90 cfs Minimum pipe diameter: 1 - 96 inch pipe(s) required

Structure #2 (Culvert) Northern Ditch and CC #4
Culvert Inputs:

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

66

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

8
Slope (%) 1.00 Manning's n 0.0240 Max. Headwater (ft) 3.50 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Length (ft) 135.00

Culvert Results: Design Discharge = 42.96 cfs Minimum pipe diameter: 1 - 45 inch pipe(s) required

Structure #1 (Pond) Emergency Spillway
Pond Inputs:
Initial Pool Elev: Initial Pool: *Sediment Storage: Dead Space: 2,502.75 ft 2.79 ac-ft 1.09 ac-ft 0.00 %

*Sediment capacity based on Average Annual R of 50.0 for 3 year(s)

Emergency Spillway
Spillway Elev 2,511.80 Crest Length (ft) 30.00 Left Sideslope 3.00:1 Right Sideslope 3.00:1 Bottom Width (ft) 20.00

Pond Results:
Peak Elevation: H'graph Detention Time: Pond Model: Dewater Time: Trap Efficiency: 2,511.24 ft 0.00 hrs CSTRS 0.00 days 0.00 %

Dewatering time is calculated from peak stage to lowest spillway

Elevation-Capacity-Discharge Table
Elevation 2,502.21 2,502.35 2,502.40 2,502.50 2,502.75 2,503.00 2,503.50 2,504.00 Filename: Pond 2 S 10-24 rev 2-5-10.sc4 Area (ac) 5.167 5.172 5.173 5.177 5.185 5.193 5.210 5.227 Capacity (ac-ft) 0.000 0.723 0.981 1.499 2.794 4.091 6.692 9.301 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Dewater Time (hrs) Top of Sed. Storage

67

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

9
Area (ac) 5.244 5.260 5.277 5.294 5.311 5.328 5.345 5.362 5.379 5.396 5.413 5.430 5.525 5.621 5.669 5.718 5.777 5.816 5.915 6.014 6.114 6.215 6.317 6.420 Capacity (ac-ft) 11.919 14.545 17.179 19.822 22.474 25.133 27.802 30.478 33.163 35.857 38.559 41.270 44.009 46.795 48.180 49.630 51.355 52.514 55.447 58.429 61.461 64.543 67.677 70.861 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.554 22.942 64.824 123.820 195.344 286.475 396.619 Spillway #1 0.00 Peak Stage Dewater Time (hrs)

Elevation 2,504.50 2,505.00 2,505.50 2,506.00 2,506.50 2,507.00 2,507.50 2,508.00 2,508.50 2,509.00 2,509.50 2,510.00 2,510.50 2,511.00 2,511.24 2,511.50 2,511.80 2,512.00 2,512.50 2,513.00 2,513.50 2,514.00 2,514.50 2,515.00

Detailed Discharge Table
Combined Elevation (ft) Emergency Spillway (cfs) Total Discharge (cfs) 2,502.21 2,502.35 2,502.40 2,502.50 2,502.75 2,503.00 2,503.50 2,504.00 2,504.50 2,505.00 2,505.50 2,506.00 Filename: Pond 2 S 10-24 rev 2-5-10.sc4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Printed 02-10-2010

68

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

10
Combined Elevation (ft) Emergency Spillway (cfs) Total Discharge (cfs) 2,506.50 2,507.00 2,507.50 2,508.00 2,508.50 2,509.00 2,509.50 2,510.00 2,510.50 2,511.00 2,511.50 2,511.80 2,512.00 2,512.50 2,513.00 2,513.50 2,514.00 2,514.50 2,515.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.554 22.942 64.824 123.820 195.344 286.475 396.619 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.554 22.942 64.824 123.820 195.344 286.475 396.619

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

69

Printed 02-10-2010

SEDCAD 4.0
Copyright 1998-2002 Pamela J. Schwab Civil Software Design

1

S Heart CC-5 Alternative Culvert Sizing 10-6 Storm 181.9 cfs - (2) 60" Culverts
Culvert Inputs:
Length (ft) 132.00 Slope (%) 1.50 Manning's n 0.0240 Max. Headwater (ft) 4.50 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Minimum pipe diameter: 1 - 60 inch pipe(s) required

Detailed Performance Curves
Design Discharge = 90.81 cfs Maximum Headwater = 4.50 ft (BOLD indicates design pipe size)
Headwater (ft) 0.45 0.90 1.35 1.80 2.25 2.70 3.15 3.60 4.05 4.50 4.95 5.40 5.85 6.30 6.75 Discharge (cfs) ( 54 in) 2.85 8.05 14.78 22.76 31.80 41.80 52.68 64.36 76.80 89.94 98.79 100.99 127.84 138.24 145.05 Discharge (cfs) ( 60 in) 3.16 8.94 16.42 25.28 35.34 46.45 58.53 71.51 85.33 99.94 115.30 131.37 135.30 141.68 173.37 Discharge (cfs) ( 66 in) 3.48 9.83 18.06 27.81 38.87 51.09 64.38 78.66 93.86 109.93 126.83 144.51 162.94 177.02 179.73

SEDCAD Utility Run

70

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

11

Subwatershed Hydrology Detail:
Stru # #3 SWS # 1 2 3 4 5 6 7 SWS Area (ac) 82.870 78.460 91.300 96.160 71.390 38.070 13.910 472.160 472.160 1 2 46.480 20.950 67.430 1 7.500 547.090 0.311 0.000 0.000 73.000 M 0.279 0.124 0.124 0.000 0.301 0.000 77.000 74.000 M M Time of Conc (hrs) 0.450 0.265 0.160 0.337 0.711 0.402 0.168 Musk K (hrs) 2.247 2.222 1.908 1.748 0.715 0.000 0.000 Musk X 0.230 0.222 0.227 0.142 0.176 0.000 0.000 Curve Number 74.000 82.000 81.000 82.000 77.000 74.000 74.000 UHS M M M M M M M Peak Discharge (cfs) 40.47 73.38 91.53 83.53 33.18 19.56 9.64 181.90 181.90 32.95 23.17 42.96 3.98 186.96 Runoff Volume (ac-ft) 5.351 7.633 8.599 9.351 5.405 2.465 0.916 39.719 39.719 3.536 1.695 5.232 0.459 45.411

Σ
#4 #2

Σ

Σ
#1

Σ

Subwatershed Sedimentology Detail:
Stru # #3 SWS # 1 2 3 4 5 6 7 Soil K L (ft) S (%) C P PS # Sediment (tons) 10.0 393.0 173.1 203.4 40.3 5.7 1.2 597.5 597.5 1 2 0.370 0.370 610.00 343.00 1.50 2.90 0.0420 0.0130 1.0000 1.0000 1 1 8.0 1.8 8.2 1 0.320 224.00 0.60 0.0120 1.0000 1 0.1 605.8 Peak Sediment Conc. (mg/l) 0.370 0.370 0.370 0.370 0.370 0.370 0.370 188.50 160.00 415.00 409.00 353.00 387.00 78.00 6.10 2.10 6.00 4.90 5.70 5.20 6.40 0.0120 0.9500 0.0700 0.1000 0.0420 0.0130 0.0130 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1 1 1 1 1 1 1 2,296 62,351 25,260 26,540 9,230 3,164 1,894 21,201 21,201 3,115 1,604 2,338 215 20,641 Peak Settleable Conc (ml/l) 0.37 16.19 7.33 6.30 1.09 0.57 0.52 2.26 2.26 0.74 0.63 0.42 0.04 2.22 0.22 9.64 4.26 3.77 0.65 0.31 0.26 1.17 1.17 0.40 0.31 0.21 0.02 1.05 24VW (ml/l)

Σ
#4 #2

Σ

Σ
#1

Σ
Filename: Pond 2 S 10-24 rev 2-5-10.sc4

71

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

12

Subwatershed Time of Concentration Details:
Stru # #1 #1 #2 SWS # 1 1 1 Land Flow Condition 3. Short grass pasture Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #2 #2 #2 #3 1 2 2 1 Time of Concentration: 7. Paved area and small upland gullies Time of Concentration: 3. Short grass pasture 6. Grassed waterway #3 #3 1 2 Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #3 #3 2 3 Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #3 #3 3 4 Time of Concentration: 3. Short grass pasture 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #3 #3 4 5 Time of Concentration: 3. Short grass pasture 7. Paved area and small upland gullies 7. Paved area and small upland gullies #3 #3 5 6 Time of Concentration: 3. Short grass pasture 7. Paved area and small upland gullies 7. Paved area and small upland gullies #3 #3 6 7 Time of Concentration: 3. Short grass pasture 7. Paved area and small upland gullies #3 7 Time of Concentration: 3.56 1.78 17.00 13.79 478.00 775.00 1.500 2.680 5.17 2.61 0.38 20.00 15.00 5.00 387.00 575.00 1,316.00 1.810 3.250 1.240 0.70 2.55 0.23 3.50 37.50 3.00 497.00 1,471.00 1,308.00 0.670 3.210 0.960 3.98 1.67 0.26 10.00 15.00 1.00 251.00 898.04 378.07 1.590 1.290 1.030 3.29 1.02 20.00 5.00 607.00 490.00 1.810 2.030 16.60 2.08 30.00 55.00 180.70 2,645.00 4.070 2.900 6.10 1.88 23.00 55.00 377.00 2,929.90 1.970 2.050 1.64 19.00 1,155.68 2.580 2.38 1.88 8.00 41.00 335.82 2,177.00 1.540 2.760 Slope (%) 0.59 Vert. Dist. (ft) 4.00 Horiz. Dist. (ft) 683.06 Velocity (fps) 0.610 Time (hrs) 0.311 0.311 0.060 0.219 0.279 0.124 0.124 0.053 0.397 0.450 0.012 0.253 0.265 0.093 0.067 0.160 0.043 0.193 0.101 0.337 0.206 0.127 0.378 0.711 0.059 0.049 0.294 0.402 0.088 0.080 0.168

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

72

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

13

Subwatershed Muskingum Routing Details:
Stru # #2 #2 #3 SWS # 1 1 1 Land Flow Condition 7. Paved area and small upland gullies Muskingum K: 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies #3 #3 1 2 Muskingum K: 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies #3 #3 2 3 Muskingum K: 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies #3 #3 3 4 Muskingum K: 7. Paved area and small upland gullies 6. Grassed waterway #3 #3 #3 4 5 5 Muskingum K: 7. Paved area and small upland gullies Muskingum K: 0.21 5.00 2,370.79 0.920 0.11 0.21 2.00 5.00 1,855.28 2,370.79 0.660 0.680 7.41 0.40 0.11 0.21 52.00 7.00 2.00 5.00 702.00 1,731.00 1,855.00 2,370.00 5.470 1.270 0.660 0.920 0.26 7.41 0.40 0.11 0.21 3.00 52.00 7.00 2.00 5.00 1,156.06 702.00 1,731.00 1,855.00 2,370.00 1.020 5.470 1.270 0.660 0.920 3.10 0.26 7.41 0.40 0.11 0.21 10.00 3.00 52.00 7.00 2.00 5.00 323.00 1,156.00 702.00 1,731.00 1,855.00 2,370.00 3.540 1.020 5.470 1.270 0.660 0.920 Slope (%) 1.64 Vert. Dist. (ft) 19.00 Horiz. Dist. (ft) 1,155.68 Velocity (fps) 2.580 Time (hrs) 0.124 0.124 0.025 0.314 0.035 0.378 0.780 0.715 2.247 0.314 0.035 0.378 0.780 0.715 2.222 0.035 0.378 0.780 0.715 1.908 0.780 0.968 1.748 0.715 0.715

Filename: Pond 2 S 10-24 rev 2-5-10.sc4

73

Printed 02-10-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

Pond #2 South

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: Pond 2 S 100-6 rev 2-5-10.sc4

74

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 6 hr 3.550 inches

Particle Size Distribution:
Size (mm) 2.0000 1.0000 0.5000 0.2500 0.1250 0.0630 0.0160 0.0040 0.0010 Silt Loam 100.000% 100.000% 96.000% 91.000% 87.000% 82.000% 60.000% 33.000% 0.000%

Filename: Pond 2 S 100-6 rev 2-5-10.sc4

75

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #3 #4 #2 #1 In Out 472.160 0.000 67.430 7.500 Total Contributing Area (ac) 472.160 472.160 67.430 547.090 Peak Discharge (cfs) 313.33 313.33 76.74 322.92 34.42 Total Runoff Volume (ac-ft) 50.46 50.46 6.77 57.83 9.24 910.6 910.6 13.0 923.7 0.4 Sediment (tons) Peak Sediment Conc. (mg/l) 20,886 20,886 2,305 20,289 63 Peak Settleable Conc. (ml/l) 2.06 2.06 0.40 2.02 0.00 1.30 1.30 0.25 1.16 0.00 24VW (ml/l)

Filename: Pond 2 S 100-6 rev 2-5-10.sc4

76

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

7

Structure Detail:
Structure #3 (Erodible Channel) Southern Ditch
Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 4.0:1 Right Sideslope Ratio 4.0:1 Slope (%) 0.5 Manning's n 0.0300 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 313.33 cfs 2.67 ft 33.39 ft 5.16 fps 60.69 sq ft 1.782 ft 0.67 2.97 ft 35.79 ft w/ Freeboard

Structure #4 (Culvert) CC #5
Culvert Inputs:
Length (ft) 132.00 Slope (%) 1.50 Manning's n 0.0240 Max. Headwater (ft) 10.20 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 313.33 cfs Minimum pipe diameter: 1 - 72 inch pipe(s) required

Structure #2 (Culvert) Northern Ditch and CC #4
Culvert Inputs:

Filename: Pond 2 S 100-6 rev 2-5-10.sc4

77

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

8
Slope (%) 1.00 Manning's n 0.0240 Max. Headwater (ft) 9.60 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Length (ft) 135.00

Culvert Results: Design Discharge = 76.74 cfs Minimum pipe diameter: 1 - 42 inch pipe(s) required

Structure #1 (Pond) Emergency Spillway
Pond Inputs:
Initial Pool Elev: Initial Pool: *Sediment Storage: Dead Space: 2,502.75 ft 2.65 ac-ft 1.23 ac-ft 0.00 %

*Sediment capacity based on Average Annual R of 50.0 for 3 year(s)

Emergency Spillway
Spillway Elev 2,511.80 Crest Length (ft) 30.00 Left Sideslope 3.00:1 Right Sideslope 3.00:1 Bottom Width (ft) 20.00

Pond Results:
Peak Elevation: H'graph Detention Time: Pond Model: Dewater Time: Trap Efficiency: 2,512.64 ft 4.03 hrs CSTRS 0.79 days 99.96 %

Dewatering time is calculated from peak stage to lowest spillway

Elevation-Capacity-Discharge Table
Elevation 2,502.24 2,502.35 2,502.40 2,502.50 2,502.75 2,503.00 2,503.50 2,504.00 Filename: Pond 2 S 100-6 rev 2-5-10.sc4 Area (ac) 5.168 5.172 5.173 5.177 5.185 5.193 5.210 5.227 Capacity (ac-ft) 0.000 0.574 0.832 1.350 2.645 3.942 6.543 9.153 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Dewater Time (hrs) Top of Sed. Storage

78

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

9
Area (ac) 5.244 5.260 5.277 5.294 5.311 5.328 5.345 5.362 5.379 5.396 5.413 5.430 5.525 5.621 5.718 5.777 5.816 5.915 5.942 6.014 6.114 6.215 6.317 6.420 Capacity (ac-ft) 11.770 14.396 17.031 19.673 22.325 24.984 27.653 30.329 33.015 35.708 38.410 41.121 43.860 46.647 49.482 51.206 52.365 55.298 56.115 58.280 61.312 64.395 67.528 70.712 Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.554 22.942 34.417 64.824 123.820 195.344 286.475 396.619 15.35 2.80 0.85 Peak Stage Spillway #1 Dewater Time (hrs)

Elevation 2,504.50 2,505.00 2,505.50 2,506.00 2,506.50 2,507.00 2,507.50 2,508.00 2,508.50 2,509.00 2,509.50 2,510.00 2,510.50 2,511.00 2,511.50 2,511.80 2,512.00 2,512.50 2,512.64 2,513.00 2,513.50 2,514.00 2,514.50 2,515.00

Detailed Discharge Table
Combined Elevation (ft) Emergency Spillway (cfs) Total Discharge (cfs) 2,502.24 2,502.35 2,502.40 2,502.50 2,502.75 2,503.00 2,503.50 2,504.00 2,504.50 2,505.00 2,505.50 2,506.00 Filename: Pond 2 S 100-6 rev 2-5-10.sc4 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Printed 09-09-2010

79

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

10
Combined Elevation (ft) Emergency Spillway (cfs) Total Discharge (cfs) 2,506.50 2,507.00 2,507.50 2,508.00 2,508.50 2,509.00 2,509.50 2,510.00 2,510.50 2,511.00 2,511.50 2,511.80 2,512.00 2,512.50 2,513.00 2,513.50 2,514.00 2,514.50 2,515.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.554 22.942 64.824 123.820 195.344 286.475 396.619 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.554 22.942 64.824 123.820 195.344 286.475 396.619

Filename: Pond 2 S 100-6 rev 2-5-10.sc4

80

Printed 09-09-2010

SEDCAD 4.0
Copyright 1998-2002 Pamela J. Schwab Civil Software Design

1

S Heart CC#5 Alternative Culvert Sizing 100-6 Storm 313.33 cfs - (2) 60" Culverts
Culvert Inputs:
Length (ft) 132.00 Slope (%) 1.50 Manning's n 0.0240 Max. Headwater (ft) 6.50 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Minimum pipe diameter: 1 - 60 inch pipe(s) required

Detailed Performance Curves
Design Discharge = 156.67 cfs Maximum Headwater = 6.50 ft (BOLD indicates design pipe size)
Headwater (ft) 0.65 1.30 1.95 2.60 3.25 3.90 4.55 5.20 5.85 6.50 7.15 7.80 8.45 9.10 9.75 Discharge (cfs) ( 54 in) 4.94 13.97 25.66 39.50 55.21 72.57 91.45 99.53 127.82 141.29 150.83 159.82 168.31 176.39 184.14 Discharge (cfs) ( 60 in) 5.49 15.52 28.51 43.89 61.34 80.63 101.61 124.14 136.58 166.35 184.07 196.67 207.91 218.58 228.75 Discharge (cfs) ( 66 in) 6.04 17.07 31.36 48.28 67.47 88.70 111.77 136.56 162.95 180.73 188.14 231.63 249.79 263.52 276.56

SEDCAD Utility Run

81

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

Explosives Storage Area
Bermed Small Area Exemption

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: Explosives Storage 100-24.sc4

82

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 24 hr 4.500 inches

Filename: Explosives Storage 100-24.sc4

83

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Channel Stru # #1 (flows into) ==> Stru # End Musk. K (hrs) 0.000 Musk. X Description 0.000 berm

#1 Chan'l

Filename: Explosives Storage 100-24.sc4

84

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #1 5.420 Total Contributing Area (ac) 5.420 Peak Discharge (cfs) 17.82 Total Runoff Volume (ac-ft) 1.67

Filename: Explosives Storage 100-24.sc4

85

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Detail:
Structure #1 (Erodible Channel) berm
Trapezoidal Erodible Channel Inputs: Material: Alluvial silts colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 5.0 Manning's n 0.0250 Freeboard Depth (ft) 0.50 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 17.82 cfs 0.26 ft 13.59 ft 5.26 fps 3.39 sq ft 0.248 ft 1.86 0.76 ft 16.59 ft w/ Freeboard

Filename: Explosives Storage 100-24.sc4

86

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6

Subwatershed Hydrology Detail:
Stru # #1 SWS # 1 SWS Area (ac) 5.420 5.420 Time of Conc (hrs) 0.100 Musk K (hrs) 0.000 Musk X 0.000 Curve Number 93.000 UHS M Peak Discharge (cfs) 17.82 17.82 Runoff Volume (ac-ft) 1.673 1.673

Σ

Subwatershed Time of Concentration Details:
Stru # #1 SWS # 1 Land Flow Condition 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #1 1 Time of Concentration: Slope (%) 33.00 2.14 Vert. Dist. (ft) 28.05 22.00 Horiz. Dist. (ft) 85.00 1,026.00 Velocity (fps) 5.740 2.940 Time (hrs) 0.004 0.096 0.100

Filename: Explosives Storage 100-24.sc4

87

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

OVB-1

Bermed Small Area Exemption 2014-2015

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: OVB-1 100-24.sc4

88

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 24 hr 4.500 inches

Filename: OVB-1 100-24.sc4

89

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Channel Channel Channel Culvert Channel Stru # #1 #2 #3 #4 #5 (flows into) ==> ==> ==> ==> ==> Stru # End #1 #4 #5 #1 Musk. K (hrs) 0.000 0.000 0.000 0.000 0.000 Musk. X Description 0.000 Null 0.000 N Side of OBD Pile 0.000 SW 0.000 Culvert below ramp 0.000 SWS above ramp & SE

#3 Chan'l #4 Culvert #5 Chan'l #2 Chan'l #1 Chan'l

Filename: OVB-1 100-24.sc4

90

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #3 #4 #5 #2 #1 4.350 0.000 4.310 17.890 0.000 Total Contributing Area (ac) 4.350 4.350 8.660 17.890 26.550 Peak Discharge (cfs) 9.47 9.47 20.01 29.05 45.82 Total Runoff Volume (ac-ft) 1.11 1.11 2.25 4.53 6.78

Filename: OVB-1 100-24.sc4

91

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Detail:
Structure #3 (Erodible Channel) SW
Trapezoidal Erodible Channel Inputs: Material: Alluvial silts colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.2 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 9.47 cfs 0.47 ft 14.83 ft 1.50 fps 6.32 sq ft 0.422 ft 0.40 0.77 ft 16.63 ft w/ Freeboard

Structure #4 (Culvert) Culvert below ramp
Culvert Inputs:
Length (ft) 30.00 Slope (%) 0.20 Manning's n 0.0240 Max. Headwater (ft) 2.00 Tailwater (ft) 1.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 9.47 cfs Minimum pipe diameter: 1 - 24 inch pipe(s) required

Structure #5 (Erodible Channel) SWS above ramp & SE
Trapezoidal Erodible Channel Inputs: Material: Alluvial silts colloidal

Filename: OVB-1 100-24.sc4

92

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6
Right Sideslope Ratio 3.0:1 Slope (%) 5.7 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Bottom Width (ft) 14.00

Left Sideslope Ratio 3.0:1

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 20.01 cfs 0.25 ft 15.50 ft 5.44 fps 3.68 sq ft 0.236 ft 1.97 0.55 ft 17.30 ft w/ Freeboard

Structure #2 (Erodible Channel) N Side of OBD Pile
Trapezoidal Erodible Channel Inputs: Material: Alluvial silts colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.2 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 29.05 cfs 0.90 ft 17.40 ft 2.20 fps 13.23 sq ft 0.748 ft 0.44 1.20 ft 19.20 ft w/ Freeboard

Structure #1 (Erodible Channel) Null
Trapezoidal Erodible Channel Inputs: Material: Alluvial silts colloidal

Filename: OVB-1 100-24.sc4

93

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

7
Right Sideslope Ratio 3.0:1 Slope (%) 0.2 Manning's n 0.0250 Freeboard Depth (ft) 0.30 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Bottom Width (ft) 12.00

Left Sideslope Ratio 3.0:1

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 45.82 cfs 1.16 ft 18.98 ft 2.54 fps 18.03 sq ft 0.931 ft 0.46 1.46 ft 20.78 ft w/ Freeboard

Filename: OVB-1 100-24.sc4

94

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

8

Subwatershed Hydrology Detail:
Stru # #3 SWS # 1 SWS Area (ac) 4.350 4.350 4.350 1 2 0.660 3.650 8.660 1 17.890 17.890 26.550 0.689 0.000 0.000 94.000 M 0.011 0.249 0.241 0.000 0.245 0.000 94.000 94.000 M M Time of Conc (hrs) 0.337 Musk K (hrs) 0.000 Musk X 0.000 Curve Number 94.000 UHS M Peak Discharge (cfs) 9.47 9.47 9.47 2.20 8.40 20.01 29.05 29.05 45.82 Runoff Volume (ac-ft) 1.107 1.107 1.107 0.209 0.932 2.248 4.530 4.530 6.778

Σ
#4 #5

Σ Σ

#2

Σ
#1

Σ

Subwatershed Time of Concentration Details:
Stru # #2 SWS # 1 Land Flow Condition 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #2 #3 1 1 Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #3 #5 #5 #5 1 1 1 2 Time of Concentration: 7. Paved area and small upland gullies Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies #5 2 Time of Concentration: 43.63 0.20 5.85 0.20 89.00 0.99 10.00 0.51 204.00 498.00 171.00 256.00 6.600 0.900 4.860 0.900 22.70 89.00 392.00 9.590 50.00 0.20 89.00 2.14 178.00 1,074.00 7.070 0.900 Slope (%) 50.00 0.20 Vert. Dist. (ft) 89.00 4.43 Horiz. Dist. (ft) 178.00 2,215.80 Velocity (fps) 7.070 0.900 Time (hrs) 0.006 0.683 0.689 0.006 0.331 0.337 0.011 0.011 0.008 0.153 0.009 0.079 0.249

Subwatershed Muskingum Routing Details:
Filename: OVB-1 100-24.sc4

95

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

9
Slope (%) 0.20 5.85 0.20 Vert. Dist. (ft) 0.99 10.00 0.51 Horiz. Dist. (ft) 498.00 171.00 256.00 Velocity (fps) 0.900 4.860 0.900 Time (hrs) 0.153 0.009 0.079 0.241

Stru # #5

SWS # 1

Land Flow Condition 7. Paved area and small upland gullies 7. Paved area and small upland gullies 7. Paved area and small upland gullies

#5

1

Muskingum K:

Filename: OVB-1 100-24.sc4

96

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

SOVB 10

Bermed Small Area Exemption 2019-2022

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: SOVB_10 10-24.sc4

97

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 24 hr 4.500 inches

Filename: SOVB_10 10-24.sc4

98

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Channel Stru # #1 (flows into) ==> Stru # End Musk. K (hrs) 0.000 Musk. X Description 0.000 berm

#1 Chan'l

Filename: SOVB_10 10-24.sc4

99

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #1 5.420 Total Contributing Area (ac) 5.420 Peak Discharge (cfs) 17.82 Total Runoff Volume (ac-ft) 1.67

Filename: SOVB_10 10-24.sc4

100

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Detail:
Structure #1 (Erodible Channel) berm
Trapezoidal Erodible Channel Inputs: Material: Alluvial silts colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 5.0 Manning's n 0.0250 Freeboard Depth (ft) 0.50 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 17.82 cfs 0.26 ft 13.59 ft 5.26 fps 3.39 sq ft 0.248 ft 1.86 0.76 ft 16.59 ft w/ Freeboard

Filename: SOVB_10 10-24.sc4

101

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6

Subwatershed Hydrology Detail:
Stru # #1 SWS # 1 SWS Area (ac) 5.420 5.420 Time of Conc (hrs) 0.100 Musk K (hrs) 0.000 Musk X 0.000 Curve Number 93.000 UHS M Peak Discharge (cfs) 17.82 17.82 Runoff Volume (ac-ft) 1.673 1.673

Σ

Subwatershed Time of Concentration Details:
Stru # #1 SWS # 1 Land Flow Condition 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #1 1 Time of Concentration: Slope (%) 33.00 2.14 Vert. Dist. (ft) 28.05 22.00 Horiz. Dist. (ft) 85.00 1,026.00 Velocity (fps) 5.740 2.940 Time (hrs) 0.004 0.096 0.100

Filename: SOVB_10 10-24.sc4

102

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

SPGM 9 &10

Bermed Small Area Exemption 2014-2016

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: SPGM910 100-24.sc4

103

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 24 hr 4.500 inches

Filename: SPGM910 100-24.sc4

104

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Channel Stru # #1 (flows into) ==> Stru # End Musk. K (hrs) 0.000 Musk. X Description 0.000 berm

#1 Chan'l

Filename: SPGM910 100-24.sc4

105

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #1 6.329 Total Contributing Area (ac) 6.329 Peak Discharge (cfs) 21.05 Total Runoff Volume (ac-ft) 2.01

Filename: SPGM910 100-24.sc4

106

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Detail:
Structure #1 (Erodible Channel) berm
Trapezoidal Erodible Channel Inputs: Material: Alluvial silts colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 3.8 Manning's n 0.0250 Freeboard Depth (ft) 0.50 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 21.05 cfs 0.32 ft 13.90 ft 5.13 fps 4.11 sq ft 0.293 ft 1.66 0.82 ft 16.90 ft w/ Freeboard

Filename: SPGM910 100-24.sc4

107

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6

Subwatershed Hydrology Detail:
Stru # #1 SWS # 1 SWS Area (ac) 6.329 6.329 Time of Conc (hrs) 0.122 Musk K (hrs) 0.000 Musk X 0.000 Curve Number 94.000 UHS M Peak Discharge (cfs) 21.05 21.05 Runoff Volume (ac-ft) 2.011 2.011

Σ

Subwatershed Time of Concentration Details:
Stru # #1 SWS # 1 Land Flow Condition 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #1 1 Time of Concentration: Slope (%) 50.00 3.80 Vert. Dist. (ft) 32.00 64.60 Horiz. Dist. (ft) 64.00 1,700.00 Velocity (fps) 7.070 3.920 Time (hrs) 0.002 0.120 0.122

Filename: SPGM910 100-24.sc4

108

Printed 09-09-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

SPGM 13

Bermed Small Area Exemption 2018-2020

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: SPG_13 100-24.sc4

109

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 24 hr 4.500 inches

Filename: SPG_13 100-24.sc4

110

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Channel Stru # #1 (flows into) ==> Stru # End Musk. K (hrs) 0.000 Musk. X Description 0.000 berm

#1 Chan'l

Filename: SPG_13 100-24.sc4

111

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #1 2.570 Total Contributing Area (ac) 2.570 Peak Discharge (cfs) 8.22 Total Runoff Volume (ac-ft) 0.75

Filename: SPG_13 100-24.sc4

112

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Detail:
Structure #1 (Erodible Channel) berm
Trapezoidal Erodible Channel Inputs: Material: Alluvial silts colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 5.0 Manning's n 0.0250 Freeboard Depth (ft) 0.50 Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.0

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 8.22 cfs 0.17 ft 13.00 ft 3.93 fps 2.09 sq ft 0.160 ft 1.73 0.67 ft 16.00 ft w/ Freeboard

Filename: SPG_13 100-24.sc4

113

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6

Subwatershed Hydrology Detail:
Stru # #1 SWS # 1 SWS Area (ac) 2.570 2.570 Time of Conc (hrs) 0.072 Musk K (hrs) 0.000 Musk X 0.000 Curve Number 91.000 UHS M Peak Discharge (cfs) 8.22 8.22 Runoff Volume (ac-ft) 0.748 0.748

Σ

Subwatershed Time of Concentration Details:
Stru # #1 SWS # 1 Land Flow Condition 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #1 1 Time of Concentration: Slope (%) 33.00 1.59 Vert. Dist. (ft) 27.72 10.00 Horiz. Dist. (ft) 84.00 627.00 Velocity (fps) 5.740 2.540 Time (hrs) 0.004 0.068 0.072

Filename: SPG_13 100-24.sc4

114

Printed 06-01-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

CC#8

Explosives Storage Access Road East Culvert 10-year 24-hour Storm

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: E Explo Stor Cvt #8 10-24.sc4

115

Printed 02-16-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 10 yr - 24 hr 3.100 inches

Filename: E Explo Stor Cvt #8 10-24.sc4

116

Printed 02-16-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Culvert Stru # #1 (flows into) ==> Stru # End Musk. K (hrs) 0.000 Musk. X 0.000 Description

#1 Culvert

Filename: E Explo Stor Cvt #8 10-24.sc4

117

Printed 02-16-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #1 40.590 Total Contributing Area (ac) 40.590 Peak Discharge (cfs) 56.33 Total Runoff Volume (ac-ft) 5.88

Filename: E Explo Stor Cvt #8 10-24.sc4

118

Printed 02-16-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Detail:
Structure #1 (Culvert)
Culvert Inputs:
Length (ft) 25.00 Slope (%) 2.00 Manning's n 0.0240 Max. Headwater (ft) 3.70 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 56.33 cfs Minimum pipe diameter: 1 - 48 inch pipe(s) required

Filename: E Explo Stor Cvt #8 10-24.sc4

119

Printed 02-16-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6

Subwatershed Hydrology Detail:
Stru # #1 SWS # 1 SWS Area (ac) 40.590 40.590 Time of Conc (hrs) 0.194 Musk K (hrs) 0.247 Musk X 0.339 Curve Number 91.000 UHS M Peak Discharge (cfs) 59.11 56.33 Runoff Volume (ac-ft) 5.875 5.875

Σ

Subwatershed Time of Concentration Details:
Stru # #1 SWS # 1 Land Flow Condition 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #1 1 Time of Concentration: Slope (%) 4.61 2.52 Vert. Dist. (ft) 20.00 40.00 Horiz. Dist. (ft) 434.00 1,590.00 Velocity (fps) 2.140 3.190 Time (hrs) 0.056 0.138 0.194

Subwatershed Muskingum Routing Details:
Stru # #1 SWS # 1 Land Flow Condition 7. Paved area and small upland gullies 7. Paved area and small upland gullies #1 1 Muskingum K: Slope (%) 11.11 2.22 Vert. Dist. (ft) 52.00 55.00 Horiz. Dist. (ft) 468.00 2,472.00 Velocity (fps) 6.700 3.000 Time (hrs) 0.019 0.228 0.247

Filename: E Explo Stor Cvt #8 10-24.sc4

120

Printed 02-16-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

CC#9

Explosives Storage Access Road West Culvert 10-year 24-hour Storm

C BEGEJ Norwest Corporation 950 S. Cherry Suite 800 Denver, CO 80246 Phone: 303-782-0164 Email: cbegej@norwestcorp.com

Filename: W Explo Stor Cvt #9 10-24.sc4

121

Printed 02-16-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 10 yr - 24 hr 3.100 inches

Filename: W Explo Stor Cvt 10-24.sc4

122

Printed 02-12-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Culvert Stru # #1 (flows into) ==> Stru # End Musk. K (hrs) 0.000 Musk. X 0.000 Description

#1 Culvert

Filename: W Explo Stor Cvt 10-24.sc4

123

Printed 02-12-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #1 113.443 Total Contributing Area (ac) 113.443 Peak Discharge (cfs) 148.49 Total Runoff Volume (ac-ft) 15.69

Filename: W Explo Stor Cvt 10-24.sc4

124

Printed 02-12-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Detail:
Structure #1 (Culvert)
Culvert Inputs:
Length (ft) 25.00 Slope (%) 2.00 Manning's n 0.0240 Max. Headwater (ft) 5.50 Tailwater (ft) 0.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 148.49 cfs Minimum pipe diameter: 1 - 66 inch pipe(s) required

Filename: W Explo Stor Cvt 10-24.sc4

125

Printed 02-12-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6

Subwatershed Hydrology Detail:
Stru # #1 SWS # 1 2 SWS Area (ac) 10.933 102.510 113.443 Time of Conc (hrs) 0.060 0.267 Musk K (hrs) 0.247 0.000 Musk X 0.339 0.000 Curve Number 74.000 91.000 UHS M M Peak Discharge (cfs) 12.09 138.71 148.49 Runoff Volume (ac-ft) 0.885 14.804 15.689

Σ

Subwatershed Time of Concentration Details:
Stru # #1 SWS # 1 Land Flow Condition 6. Grassed waterway 7. Paved area and small upland gullies #1 #1 1 2 Time of Concentration: 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies #1 2 Time of Concentration: 11.11 2.22 52.00 55.00 468.00 2,472.00 3.330 3.000 Slope (%) 8.89 10.19 Vert. Dist. (ft) 57.00 50.00 Horiz. Dist. (ft) 641.00 490.60 Velocity (fps) 4.470 6.420 Time (hrs) 0.039 0.021 0.060 0.039 0.228 0.267

Subwatershed Muskingum Routing Details:
Stru # #1 SWS # 1 Land Flow Condition 7. Paved area and small upland gullies 7. Paved area and small upland gullies #1 1 Muskingum K: Slope (%) 11.11 2.22 Vert. Dist. (ft) 52.00 55.00 Horiz. Dist. (ft) 468.00 2,472.00 Velocity (fps) 6.700 3.000 Time (hrs) 0.019 0.228 0.247

Filename: W Explo Stor Cvt 10-24.sc4

126

Printed 02-12-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

Culvert 70+51 DD-2 and DD-3

C Begej

Filename: 2010 Culvert CVT70+51 and DD-2&3.sc4

127

Printed 06-14-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 6 hr 4.500 inches

Filename: 2010 Culvert CVT70+51 and DD-2&3.sc4

128

Printed 06-14-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Channel Channel Culvert Stru # #1 #2 #3 (flows into) ==> ==> ==> Stru # #2 #3 End Musk. K (hrs) 0.188 0.000 0.000 Musk. X Description 0.317 SW1 &DD3 0.000 SW2 & DD2 0.000 Culvert CVT70+51

#1 Chan'l #2 Chan'l #3 Culvert

Structure Routing Details:
Stru # #1 #1 Land Flow Condition 8. Large gullies, diversions, and low flowing streams Muskingum K: Slope (%) 0.97 Vert. Dist. (ft) 19.44 Horiz. Dist. (ft) 2,005.00 Velocity (fps) 2.95 Time (hrs) 0.188 0.188

Filename: 2010 Culvert CVT70+51 and DD-2&3.sc4

129

Printed 06-14-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #1 #2 #3 796.440 158.540 0.000 Total Contributing Area (ac) 796.440 954.980 954.980 Peak Discharge (cfs) 406.93 449.05 449.05 Total Runoff Volume (ac-ft) 125.54 146.28 146.28

Filename: 2010 Culvert CVT70+51 and DD-2&3.sc4

130

Printed 06-14-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Detail:
Structure #1 (Erodible Channel) SW1 &DD3
Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.3 Manning's n 0.0300 Freeboard Depth (ft) Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 406.93 cfs 3.56 ft 33.39 ft 5.03 fps 80.88 sq ft 2.342 ft 0.57 w/ Freeboard

Structure #2 (Riprap Channel) SW2 & DD2
Trapezoidal Riprap Channel Inputs: Material: Riprap
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.9 Freeboard Depth (ft) Freeboard % of Depth Freeboard Mult. x (VxD)

Riprap Channel Results: PADER Method - Mild Slope Design
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Filename: 2010 Culvert CVT70+51 and DD-2&3.sc4 449.05 cfs 3.18 ft 31.10 ft 6.55 fps 68.60 sq ft w/ Freeboard

131

Printed 06-14-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6
w/o Freeboard Hydraulic Radius: Froude Number: Manning's n: Dmin: D50: Dmax: 2.135 ft 0.78 0.0360 3.00 in 6.00 in 9.00 in w/ Freeboard

Structure #3 (Culvert) Culvert CVT70+51
Culvert Inputs:
Length (ft) 132.00 Slope (%) 0.30 Manning's n 0.0240 Max. Headwater (ft) 11.50 Tailwater (ft) 2.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 449.05 cfs Minimum pipe diameter: 1 - 96 inch pipe(s) required

Filename: 2010 Culvert CVT70+51 and DD-2&3.sc4

132

Printed 06-14-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

7

Subwatershed Hydrology Detail:
Stru # #1 SWS # 1 2 SWS Area (ac) 782.040 14.400 796.440 1 2 144.240 14.300 954.980 954.980 1.306 0.373 0.188 0.000 0.317 0.000 74.000 74.000 M M Time of Conc (hrs) 2.905 0.354 Musk K (hrs) 0.311 0.000 Musk X 0.251 0.000 Curve Number 79.000 79.000 UHS M M Peak Discharge (cfs) 406.54 28.03 406.93 109.43 22.44 449.05 449.05 Runoff Volume (ac-ft) 123.256 2.281 125.537 18.871 1.873 146.281 146.281

Σ
#2

Σ
#3

Σ

Subwatershed Time of Concentration Details:
Stru # #1 SWS # 1 Land Flow Condition 3. Short grass pasture 6. Grassed waterway 8. Large gullies, diversions, and low flowing streams #1 #1 1 2 Time of Concentration: 3. Short grass pasture 8. Large gullies, diversions, and low flowing streams #1 #2 2 1 Time of Concentration: 3. Short grass pasture 6. Grassed waterway 8. Large gullies, diversions, and low flowing streams 8. Large gullies, diversions, and low flowing streams #2 #2 1 2 Time of Concentration: 3. Short grass pasture 8. Large gullies, diversions, and low flowing streams #2 2 Time of Concentration: 1.98 0.33 4.00 6.61 202.00 2,005.00 1.120 1.720 9.01 2.78 0.28 0.20 78.19 82.10 10.00 2.39 868.00 2,951.00 3,598.41 1,195.00 2.400 2.500 1.580 1.340 2.61 0.33 12.60 5.11 483.30 1,550.00 1.290 1.720 Slope (%) 2.34 0.58 0.33 Vert. Dist. (ft) 75.10 44.90 6.17 Horiz. Dist. (ft) 3,205.70 7,690.99 1,872.00 Velocity (fps) 1.220 1.140 1.720 Time (hrs) 0.729 1.874 0.302 2.905 0.104 0.250 0.354 0.100 0.327 0.632 0.247 1.306 0.050 0.323 0.373

Subwatershed Muskingum Routing Details:
Stru # #1 SWS # 1 Land Flow Condition 8. Large gullies, diversions, and low flowing streams Slope (%) 0.33 Vert. Dist. (ft) 6.36 Horiz. Dist. (ft) 1,930.00 Velocity (fps) 1.720 Time (hrs) 0.311

Filename: 2010 Culvert CVT70+51 and DD-2&3.sc4

133

Printed 06-14-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

8
Slope (%) Vert. Dist. (ft) Horiz. Dist. (ft) Velocity (fps) Time (hrs) 0.311 0.97 19.44 2,005.00 2.950 0.188 0.188

Stru # #1 #2 #2

SWS # 1 1 1

Land Flow Condition Muskingum K: 8. Large gullies, diversions, and low flowing streams Muskingum K:

Filename: 2010 Culvert CVT70+51 and DD-2&3.sc4

134

Printed 06-14-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

1

Culvert 55+75 and West Tributary Diversion DD-1

C Begej

Filename: 2010 CC55-70_DD-1 100-6 rev.sc4

135

Printed 06-15-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

2

General Information

Storm Information:
Storm Type: Design Storm: Rainfall Depth: NRCS Type II 100 yr - 6 hr 4.500 inches

Filename: 2010 CC55-70_DD-1 100-6 rev.sc4

136

Printed 06-15-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

3

Structure Networking:
Type Null Null Culvert Channel Channel Stru # #1 #2 #3 #4 #5 (flows into) ==> ==> ==> ==> ==> Stru # #2 #3 #4 #5 End Musk. K (hrs) 0.370 0.139 0.336 0.780 0.000 Musk. X Description 0.285 Western Block W & E 0.254 Central Pit Area 0.220 Area above culvert 0.279 DD-1B 0.000 DD-1A

#1 Null #2 Null #3 Culvert #4 Chan'l #5 Chan'l

Structure Routing Details:
Stru # #1 #1 #2 #2 #3 #3 #4 #4 Land Flow Condition 8. Large gullies, diversions, and low flowing streams Muskingum K: 8. Large gullies, diversions, and low flowing streams Muskingum K: 8. Large gullies, diversions, and low flowing streams Muskingum K: 8. Large gullies, diversions, and low flowing streams Muskingum K: 0.51 30.65 6,011.00 2.14 0.20 3.25 1,625.00 1.34 0.34 3.00 876.00 1.75 Slope (%) 0.57 Vert. Dist. (ft) 17.00 Horiz. Dist. (ft) 3,000.00 Velocity (fps) 2.25 Time (hrs) 0.370 0.370 0.139 0.139 0.336 0.336 0.780 0.780

Filename: 2010 CC55-70_DD-1 100-6 rev.sc4

137

Printed 06-15-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

4

Structure Summary:
Immediate Contributing Area (ac) #1 #2 #3 #4 #5 1,041.020 229.600 56.500 0.000 28.200 Total Contributing Area (ac) 1,041.020 1,270.620 1,327.120 1,327.120 1,355.320 Peak Discharge (cfs) 649.89 712.91 721.22 697.99 672.12 Total Runoff Volume (ac-ft) 165.28 196.57 203.97 203.97 207.82

Filename: 2010 CC55-70_DD-1 100-6 rev.sc4

138

Printed 06-15-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

5

Structure Detail:
Structure #1 (Null) Western Block W & E Structure #2 (Null) Central Pit Area Structure #3 (Culvert) Area above culvert
Culvert Inputs:
Length (ft) 132.00 Slope (%) 0.30 Manning's n 0.0240 Max. Headwater (ft) 11.50 Tailwater (ft) 2.00 Entrance Loss Coef. (Ke) 0.90

Culvert Results: Design Discharge = 721.22 cfs Minimum pipe diameter: 1 - 120 inch pipe(s) required

Structure #4 (Erodible Channel) DD-1B
Trapezoidal Erodible Channel Inputs: Material: Graded silts to cobbles when colloidal
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.2 Manning's n 0.0300 Freeboard Depth (ft) Freeboard % of Depth Freeboard Mult. x (VxD) Limiting Velocity (fps) 5.5

Erodible Channel Results:
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: 697.99 cfs 5.22 ft 43.33 ft 4.83 fps 144.46 sq ft 3.208 ft 0.47 w/ Freeboard

Filename: 2010 CC55-70_DD-1 100-6 rev.sc4

139

Printed 06-15-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

6

Structure #5 (Riprap Channel) DD-1A
Trapezoidal Riprap Channel Inputs: Material: Riprap
Bottom Width (ft) 12.00 Left Sideslope Ratio 3.0:1 Right Sideslope Ratio 3.0:1 Slope (%) 0.5 Freeboard Depth (ft) Freeboard % of Depth Freeboard Mult. x (VxD)

Riprap Channel Results: PADER Method - Mild Slope Design
w/o Freeboard Design Discharge: Depth: Top Width: Velocity: X-Section Area: Hydraulic Radius: Froude Number: Manning's n: Dmin: D50: Dmax: 672.12 cfs 4.23 ft 37.37 ft 6.44 fps 104.39 sq ft 2.694 ft 0.68 0.0320 2.00 in 3.00 in 4.50 in w/ Freeboard

Filename: 2010 CC55-70_DD-1 100-6 rev.sc4

140

Printed 06-15-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

7

Subwatershed Hydrology Detail:
Stru # #1 SWS # 1 2 SWS Area (ac) 325.000 716.020 1,041.020 1 229.600 1,270.620 1 56.500 1,327.120 1,327.120 1 28.200 1,355.320 0.211 0.000 0.000 75.000 M 0.842 0.000 0.000 74.000 M 0.515 0.000 0.000 75.000 M Time of Conc (hrs) 0.421 4.034 Musk K (hrs) 0.727 0.000 Musk X 0.287 0.000 Curve Number 79.550 79.000 UHS M M Peak Discharge (cfs) 602.88 288.85 649.89 323.52 712.91 57.30 721.22 697.99 55.53 672.12 Runoff Volume (ac-ft) 52.436 112.843 165.280 31.290 196.570 7.398 203.968 203.968 3.850 207.818

Σ
#2

Σ
#3

Σ
#4 #5

Σ Σ

Subwatershed Time of Concentration Details:
Stru # #1 SWS # 1 Land Flow Condition 3. Short grass pasture 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies 8. Large gullies, diversions, and low flowing streams #1 #1 1 2 Time of Concentration: 3. Short grass pasture 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies 8. Large gullies, diversions, and low flowing streams #1 #2 2 1 Time of Concentration: 3. Short grass pasture 5. Nearly bare and untilled, and alluvial valley fans 7. Paved area and small upland gullies 8. Large gullies, diversions, and low flowing streams Filename: 2010 CC55-70_DD-1 100-6 rev.sc4 6.20 8.14 1.81 0.88 40.00 25.00 40.00 15.00 645.65 307.20 2,210.00 1,711.00 1.990 2.850 2.700 2.800 2.53 3.11 2.13 0.13 20.00 50.00 40.00 18.00 792.00 1,609.55 1,876.00 13,461.00 1.270 1.760 2.930 1.090 Slope (%) 3.98 5.79 1.91 1.36 Vert. Dist. (ft) 10.00 35.00 35.00 22.00 Horiz. Dist. (ft) 251.00 604.00 1,831.00 1,612.00 Velocity (fps) 1.590 2.400 2.780 3.500 Time (hrs) 0.043 0.069 0.182 0.127 0.421 0.173 0.254 0.177 3.430 4.034 0.090 0.029 0.227 0.169

141

Printed 06-15-2010

SEDCAD 4 for Windows
Copyright 1998 -2007 Pamela J. Schwab Civil Software Design, LLC

8
Slope (%) Vert. Dist. (ft) 18.00 22.00 Horiz. Dist. (ft) 704.60 2,380.00 Velocity (fps) 1.270 0.960 Time (hrs) 0.515 2.55 0.92 0.154 0.688 0.842

Stru # #2 #3

SWS # 1 1

Land Flow Condition Time of Concentration: 3. Short grass pasture 5. Nearly bare and untilled, and alluvial valley fans

#3

1

Time of Concentration:

Subwatershed Muskingum Routing Details:
Stru # #1 #1 SWS # 1 1 Land Flow Condition 8. Large gullies, diversions, and low flowing streams Muskingum K: Slope (%) 0.58 Vert. Dist. (ft) 35.00 Horiz. Dist. (ft) 6,000.00 Velocity (fps) 2.290 Time (hrs) 0.727 0.727

Filename: 2010 CC55-70_DD-1 100-6 rev.sc4

142

Printed 06-15-2010