Detailed Statement of Findings and Decision on Petition Requesting that the Streambeds of Anadromous Waterbodies and Associated Riparian Areas in the Chuitna River Watershed be Designated as Lands Unsuitable for All Types of Surface Coal Mining Operations
SUMMARY AND BACKGROUND OF THE PETITION On January 21, 2010, Trustees for Alaska (Trustees), on behalf of two organizations, submitted a petition (referenced herein as the “petition,” or where context is required, the “2010 Petition”) to the Commissioner of the Department of Natural Resources (DNR), requesting that certain lands within the Chuitna River 1 watershed (Chuitna watershed) be designated unsuitable for all types of surface coal mining operations. Trustees submitted the petition on behalf of the Chuitna Citizens Coalition and Cook InletKeeper. Both groups are collectively referenced herein as petitioners. The present action is one in a continuing series of attempts dating back to the 1980s to prohibit surface coal mining operations in the Chuitna watershed. More recently, this is the second time in three years that petitioners have filed a petition requesting that DNR find the Chuitna watershed unsuitable for surface coal mining operations. In the 2007 Petition, these petitioners alleged that reclamation was not technologically feasible; the petition was litigated, and the appeal was eventually dismissed with prejudice. This procedural history and the state and federal decisions denying earlier attempts to prohibit surface coal mining are integral to the present decision. The 2010 Petition raises many of the same arguments and reads much like the 2007 Petition. More specifically, the 2010 Petition requests that streambeds underlying anadromous water bodies and their associated riparian areas within the Chuitna watershed be designated unsuitable for surface coal mining.

1

The river is also commonly referred to, including by petitioners, as the Chuit River.

10/24/11 Page 2 of 109

This petition is based on the Alaska Surface Coal Mining Control and Reclamation Act, which authorizes the DNR Commissioner to designate state lands as off-limits for all surface coal mining operations if scientifically sound data and information justifies a finding that state lands are unsuitable for surface coal mining operations. The State of Alaska has never granted a “lands unsuitable” petition. The result of granting such a petition for the Chuitna watershed would be that the petition area would be preemptively closed for all surface coal mining operations. Thus, entities with a property interest in the land would be precluded from even applying for a permit to mine coal from the Chuitna watershed. For that reason, three different entities -- Alaska Mental Health Trust Land Office, Tyonek Native Corporation, and PacRim Coal, LP (intervenors) -- have sought to intervene to protect their property interests and requested that DNR deny the 2010 Petition, which, if granted, would have substantial negative impacts on their property interests and on potential economic developments in the region. Tyonek Native Corporation (TNC) explained that it opposes the 2010 Petition because the petition “seeks to end most development of the coal reserves in the region where TNC’s lands are located and mostly TNC shareholders reside. Such a determination would frustrate TNC’s efforts to increase local employment opportunities for its shareholders, who are the Native people and the majority of the population of the region. Developing the region’s substantial coal resources is critical to economic growth.” Similarly, Alaska Mental Health Trust Land Office, which is a state corporation that administers the Alaska Mental Health Trust for the benefit of individuals with mental illness, developmental disabilities, chronic alcoholism and Alzheimer’s disease and related dementia, 2 stated: “The Trust is the predominant landowner within the Chuitna River Watershed, and lessor of the coal resources located within the areas subject to the petition. As the owner of the coal resources proposed for development pursuant to the existing coal leases held by PacRim Coal, LP (PRC) in the subject area, The Trust has a significant stake in the outcome of the petition proceeding. . . . To allow [the petition] to go forward would significantly affect the ability of The Trust and its lesee to develop this resource and would result in a major negative economic

2

http://www.mhtrust.org/layouts/mhtrust/files/documents/about_aboutdocs/Trust_Overview _update2011.pdf.

10/24/11 Page 3 of 109

impact to The Trust and its beneficiaries.” The Alaska Mental Health Trust Land Office has taken this position because it is obliged to manage the Trust’s assets for the “maximization of long-term revenue from trust land,” “protection and enhancement of the long-term productivity of trust land,” and “encouragement of a diversity of revenue-producing uses of trust land.”3 SUMMARY OF THE DECISION Alaska Surface Coal Mining Control and Reclamation Act4 (ASCMCRA), which is modeled after the federal Surface Mining Control and Reclamation Act5 (SMCRA), authorizes DNR to preemptively disallow any surface coal mining operations and project development in a particular area by granting a “lands unsuitable” petition. State law authorizes the DNR Commissioner to grant such a petition if the Commissioner finds that: reclamation is not technologically feasible; surface coal mining operations would have long-lasting damage to the ecosystem or harm important cultural or aesthetic values; or mining operations would take place in an area prone to natural hazards that could substantially endanger life and property. 6 To support a lands unsuitable petition, a petitioner must assume “that contemporary mining practices required under AS 27.21 and this chapter would be followed if the area were mined.” 7 Thus, a petitioner may not base a petition on the

3 4 5 6

11 AAC 90.020(c). AS 27.21.010, et seq. 30 U.S.C. § 1202, et seq.

Specifically, AS 27.21.260(c) provides the “commissioner (1) shall designate an area as unsuitable for all or certain types of surface coal mining operations if the commissioner determines that reclamation in accordance with this chapter and regulations adopted under it is not technologically feasible in the area; (2) may designate an area as unsuitable for all or certain types of surface coal mining operations if the commissioner determines that the operations in the area will may designate an area as unsuitable for all or certain types of surface coal mining operations if the commissioner determines that the operations in the area will (A) be incompatible with existing state or local land use programs; (B) affect fragile or historic land in which the operations could result in significant damage to important historic, cultural, scientific, and aesthetic values and natural systems; (C) affect aquifer recharge areas or other renewable resource land in which the operations could result in a substantial loss or reduction of long-range productivity of water supply or food or fiber products; or (D) affect areas subject to frequent flooding and areas of unstable geology, or other natural hazard land in which the operations could substantially endanger life and property.” 11 AAC 90.701(a)(5). See also AS 27.21.210 (stating that all permits issued under the Act shall require that surface coal mining and reclamation must comply with environmental performance standards). The federal Office of Surface Mining (OSM) has also stated that a
7

10/24/11 Page 4 of 109

assumption that adverse mining impacts will occur that otherwise would be prevented by the environmental protection requirements mandated by ASCMCRA or other state regulations.8 Indeed, the federal Office of Surface Mining (OSM) has stated that a petition that simply assumes non-compliance with state law is a meritless petition that should be rejected.9 Also embedded in SMCRA and ASCMCRA is the recognition that coal mining will significantly impact an area. 10 Indeed, state and federal law authorize surface coal mining despite its effects on the environment. Both Congress and the Alaska Legislature, in respectively enacting SMCRA and ASCMCRA, anticipated that impacts will necessarily occur during construction and coal mining. The provisions contained in SMCRA and ASCMCRA also recognize that coal mining will have adverse impacts to surface and groundwater within the disturbed mining area and that a balancing of responsible resource development and environmental protection is necessary.11 The extensive permitting and litigation history that preceded the 2010 Petition provides a critical backdrop to this decision. Trustees, along with other entities, opposed a coal mining project in the Chuitna watershed in the 1980s that underwent extensive regulatory review and received permit approvals from several state and federal agencies (including DNR, the Alaska Department of Fish and Game (ADF&G), and the U.S. Environmental Protection Agency (EPA)). After this coal project received state permitting approvals, Trustees sued the state and appealed the Cowper Administration’s permitting decision to the Alaska Superior Court. One of the major issues in that appeal, which is also one of the key issues in the present petition, centered on former DNR Commissioner Judith Brady’s determination that reclamation was, in fact, feasible. The Superior Court rejected Trustees’ claim that DNR erred in making this finding. Trustees then appealed to the

petitioner “must assume that contemporary mining practices required under the applicable regulatory program will be followed.” 48 Fed. Reg. 41312, 41328-29 (Sept. 14, 1983). Accord In re Permanent Surface Mining Regulation Litigation, 620 F. Supp. 1519 (D.D.C. 1985).
8 9 10 11

48 Fed. Reg. at 41328-29. Id. 30 U.S.C. § 1202; AS 27.21.010. 30 U.S.C. § 1202; AS 27.21.010.

10/24/11 Page 5 of 109

Alaska Supreme Court. In Trustees for Alaska v. Gorsuch,12 the Supreme Court upheld DNR’s decision concerning the feasibility of reclamation in the Chuitna watershed area. Specifically, in addressing the contention that DNR erred in approving the proposed plan for restoration, the Gorsuch Court held that DNR had properly found that the proposed reclamation and wetlands restoration plans for the leased lands were “sufficient to restore the disturbed area to a condition capable of supporting fish and wildlife.”13 On this point, the Court was unanimous. The EPA also conducted an environmental review of the same proposed coal mine in the Chuitna watershed through its 1990 Final Environmental Impact Statement (FEIS) and issued a 1990 Record of Decision (ROD) approving the project proposal. Thereafter, the EPA issued a National Pollutant Discharge Elimination System (NPDES) permit for the mine’s wastewater discharges. This proposed coal mining project eventually stalled in the 1990s due to market conditions. Since the mid-2000s, however, the Chuitna area has seen renewed development efforts. In response to this renewed interest, Trustees, on behalf of petitioners, filed a lands unsuitable petition in 2007 (2007 Petition). The 2007 Petition sought to have the entire Chuitna watershed deemed unsuitable for surface coal mining activities. Petitioners raised concerns regarding the feasibility of reclamation in the Chuitna watershed disturbed by coal mining, as well as allegations that essentially unjustifiable significant harm would occur. Former DNR Commissioner Tom Irwin rejected the 2007 Petition, finding that the petition was incomplete and without merit. 14 Trustees appealed Commissioner Irwin’s decision to the Superior Court. 15 The Commissioner and petitioners later settled the litigation, and with the exception of one issue (discussed below) no other aspect of Commissioner Irwin’s decision on the 2007 Petition was withdrawn or changed, and Trustees’ appeal to the Superior Court was dismissed with prejudice.

12 13 14 15

835 P.2d 1239 (Alaska 1992). Id. at 1249. July 16, 2007 Petition Decision, at 1. Chuitna Citizens NO-COALition, Inc., v. Irwin, et al., Case No. 3AN-08-6009CI.

10/24/11 Page 6 of 109

On January 21, 2010, Trustees, on behalf of petitioners, once again submitted a new petition (2010 Petition) under ASCMCRA. To support the 2010 Petition, petitioners essentially recycle the two central claims raised in the 2007 Petition: first, that reclamation of the petition area in accordance with the ASCMCRA 16 is not technologically feasible; and second, that surface coal mining operations will destroy habitat and adversely impact fragile lands resulting in significant damage to important cultural, scientific, and aesthetic values and natural systems within the watershed. The evidence contained in the administrative record does not support the designation of any of the petition area as lands unsuitable for surface coal mining operations. The evidence in the administrative record provided by the petitioners and intervenors, and compiled by DNR, demonstrates that reclamation throughout the Chuitna watershed is, in fact, technologically feasible. Moreover, there is not sufficient evidence to support a finding that surface coal mining operations -- that comply with the applicable statutes and regulations -- will adversely affect the environment in such a manner that would justify granting this petition. In particular, there is insufficient evidence to suggest that prior permitting decisions issued by the state and federal government wrongly concluded that reclamation was feasible. For example, in DNR’s 1987 Permitting Decision determining that the restoration and reclamation plans were sufficient (including to restore disturbed fish and wildlife habitats), DNR found “that reclamation as required by AS 27.21 and 11 AAC 90 can be accomplished under the reclamation plan,” subject to DNR-required modifications. 17 As mentioned above, this finding was upheld by the Alaska Supreme Court in Trustees for Alaska v. Gorsuch, and is also consistent with EPA’s 1990 findings that reclamation was feasible. While the petitioners provide a few new studies to support the 2010 Petition, this information does not contradict DNR’s earlier findings with respect to reclamation and restoration of wetlands and fish and wildlife habitat. Nor does it overcome the significant evidence in the record -- discussed in detail below -- which demonstrates that reclamation is technologically feasible. Nevertheless, as this lengthy statement of

16 17

AS 27.21.010, et seq.

August 21, 1987 Decision (1987 Permitting Decision) on the Diamond Shamrock Chuitna Coal Project, issued by J.M. Brady, at 125 and at 326-361.

10/24/11 Page 7 of 109

findings and decision shows, DNR has again undertaken a comprehensive review of these issues and will continue to do so as the permitting process continues. More broadly, petitioners’ arguments also suffer from thematic flaws repeated throughout the petition. First, petitioners do not give appropriate weight to previous federal and state decisions, including the Alaska Supreme Court Gorsuch decision, which found that reclamation in the Chuitna watershed is feasible. When petitioners do cite some of these decisions, they often do so by selectively quoting portions of the decision to leave a misleading impression that the decisions support their allegations. Second, petitioners make many of the same allegations, often verbatim, that were raised in the 2007 Petition, which was dismissed with prejudice by the Alaska Superior Court. A dismissal with prejudice “is treated as a dismissal on the merits and is, therefore, a final judgment on the merits … operating as res judicata.” Smith v. CSK Auto, Inc., 132 P.3d 818, 820 (Alaska 2006). Res judicata (claim preclusion) and collateral estoppel (issue preclusion) “bind the parties and their privies to factual findings, as well as legal conclusions, that have been the subject of prior litigation,” and “administrative agency decisions can have preclusive effect on later court proceedings, so that if a party participates in an administrative adjudication, … the adjudication may foreclose the possibility of a later lawsuit on the same factual issues.” Alaska Public Interest Group v. State, 167 P.3d 27, 44 (Alaska 2007). Third, petitioners assume that DNR will permit a surface coal mine that cannot comply with ASCMRCA and other state laws, and they assume that if a mine is permitted, a mining operator will not be able to comply with such laws and regulations. As discussed above, these assumptions conflict with the requirements of an ASCMCRA lands unsuitable petition.18 And, as the OSM has stated, a petition that simply assumes non-compliance with state law is meritless.19 The 2010 Petition also fails to consider other important policy objectives of ASCMCRA including: assuring “that the coal supply essential to the nation’s energy requirements and to its economic and social well-being is provided and to strike a balance
 
18 19

11 AAC 90.701(a)(5). 48 Fed. Reg. at 41328-29.

10/24/11 Page 8 of 109

between protection of the environment and other uses of the land and the need for coal as an essential source of energy;” 20 and assuring “that reclamation of land on which surface coal mining takes place is accomplished as contemporaneously as practicable with the surface coal mining, recognizing that the responsible extraction of coal by responsible mining operators is an essential and beneficial economic activity.” 21 Notably, as discussed by the intervenors and set out in detail below, this decision recognizes that the majority of landowners in the Chuitna watershed selected their lands because of the presence of significant coal resources and the financial prosperity, employment opportunities, and enhanced social well-being that development of those lands would bring, not just to private industry, but to Native corporation shareholders and Mental Health Trust beneficiaries, as well as local residents and the public at large. Thus, to the extent that any landowner or lessee in the area may propose a surface coal mining project capable of demonstrating compliance with applicable state, federal, and local requirements, and that such operations can be responsibly conducted, then such operations would further these important statutory directives. Although this decision addresses the merits of all of petitioners’ allegations, this decision expressly preserves, and in no way holds contrary to, the final findings of former DNR Commissioner Irwin on the evidence and allegations that Trustees asserted in the 2007 Petition and which petitioners now reassert, in many places verbatim, in the 2010 Petition. Today’s decision also expressly preserves the defenses of res judicata and collateral estoppel for Commissioner Irwin’s final findings for purposes of any future litigation that may be brought on the 2010 Petition because many of the allegations and arguments raised in the 2007 Petition, and repeated here, were dismissed with prejudice by the Alaska Superior Court. Finally, it is worth noting that petitioners raise some reasonable concerns regarding the impact of surface coal mining operations on water quality, wetlands, the hydrologic balance of the larger Chuitna watershed, and fish and wildlife habitat.
20 21

AS 27.21.010(b)(7). AS 27.21.010(b)(5).

 

10/24/11 Page 9 of 109

These concerns are, however, more effectively and appropriately addressed during the permitting phase of any proposed project. Accordingly, it is important to note that this decision to not designate the petition area as unsuitable for all or certain types of coal mining activities does not mean that surface coal mining will automatically be approved in this area for a specific project. The lands unsuitable designation process is independent of the permitting and mine planning processes that are subject to multi-agency regulatory reviews by several state, federal and local agencies, and these processes may prohibit, curtail, or modify coal mining activities depending on the project proposal. Moreover, DNR will not issue a permit for a specific project unless a specific coal mining proposal demonstrates the capacity to comply with all applicable legal requirements. THE PETITION PROCESS, STANDARDS FOR REVIEWING PETITIONS, AND OTHER APPLICABLE AUTHORITIES The Alaska Surface Coal Mining Control and Reclamation Act (ASCMCRA) 22 authorizes the DNR Commissioner to determine if certain lands are unsuitable for surface coal mining operations. 23 Under ASCMCRA, a person or a municipality adversely affected by potential surface coal mining operations may file a petition asking the Commissioner to designate lands unsuitable for mining. 24 A petition “must contain allegations of facts with supporting evidence that would tend to establish the allegations.”25 Because ASCMCRA is modeled after the federal Surface Mining Control and Reclamation Act (SMCRA),26 both congressional and federal regulatory commentary on the federal act informs the petition review process. In discussing Section 522(a) of SMCRA, 27 the House Committee on Interior and Insular Affairs stated that the petition process “is structured to be applied on an area basis, rather than a site-by-site
22 23 24 25 26

AS 27.21.010, et seq. AS 27.21.260(a). AS 27.21.260(b). Id.

ASCMCRA, the state counterpart to SMCRA, was enacted in 1982. Ch. 29, § 1, SLA 1982. The State of Alaska subsequently obtained federal approval in 1983 to exercise exclusive jurisdiction over surface coal mining and reclamation under ASCMCRA, which act is based on its federal counterpart, SMCRA, 30 U.S.C. §§ 1201-1328.
27

30 U.S.C. § 1272.

10/24/11 Page 10 of 109

determination, which presents issues more appropriately addressed in the permit application process.” 28 The committee also stated that the petition process, whether administered by a federal or state regulatory authority, “does not require the designation of areas as unsuitable for surface mining” unless “it is demonstrated that reclamation of an area is not physically or economically feasible under the standards of the act. The other criteria for designation … are discretionary.”29 In considering a lands unsuitable petition under state law, the Commissioner “shall use competent and scientifically sound data and information in order to make objective decisions as to which areas of land are unsuitable for all or certain types of surface coal operations.” 30 Such decisions shall also include consideration of “the planning activities of federal, state, and municipal governments.” 31 The petition decision shall “use a data base and inventory system that will permit the evaluation of areas of the state to support and permit reclamation for surface coal mining operations.” 32 In reaching a decision on a petition, the Commissioner will use (1) relevant information from the data base and inventory system, (2) relevant information and analysis submitted during the comment period, and (3) relevant information provided by other governmental entities.33 The Commissioner shall include a statement of reasons for the Commissioner’s decision.34 Before designating an area as unsuitable, the Commissioner shall prepare “a detailed statement of potential coal resources in the area, the demand for coal resources, and the impact of the designation on the environment, the economy, and the supply of coal.”35 Any potential designation must consider “present and future land use planning and regulation processes at the federal, state, and local levels.”36 In response to a petition, the Commissioner may determine to designate the entire
28 29 30 31 32 33 34 35 36

House Committee Report No. 95-218 (1977), at 630. Id. AS 27.21.260(a). AS 27.21.260(a)(1). AS 27.21.260(a)(2). 11 AAC 90.711(a). 11 AAC 90.711(b). AS 27.21.260(e). AS 27.21.260(f).

10/24/11 Page 11 of 109

petition area unsuitable for all or certain types of surface coal mining operations, designate only certain portions of the petition area as unsuitable for all or certain types of surface coal mining operations, deny the petition in its entirety, or direct that future permits issued in the petition area “contain specific requirements for mitigating the impact of operations on the feature that was the subject of the petition.” 37 Federal and state coal mining laws provide a plan for assuring that surface coal mining will be conducted in such a manner as to minimize the adverse impact of coal mining, while assuring the nation an adequate supply of coal. 38 These laws and their attendant regulations contain requirements regarding contemporary coal mining practices, including “performance standards” for mine operations and reclamation. 39 What is critical to underscore is that a petition requesting that lands be designated as unsuitable for surface coal mining operations must assume “that contemporary mining practices required under AS 27.21 and this chapter would be followed if the area were mined.” 40 These practices include the performance standards provided at 11 AAC 90.301 – 90.501. Thus, any mine would have to meet the requirements of the state and federal law and a petitioner may not assume mining impacts will occur that would be prevented by the environmental protection requirements mandated by the such laws and other state regulations.41 Indeed, the federal Office of Surface Mining (OSM) has stated that a petition that simply assumes non-compliance with state law is meritless.42

37 38

AS 27.21.260(c); 11 AAC 90.711(c). See, e.g., Prager v. Hodel, 793 F.2d 730 (5th Cir. 1986), cert. den. 479 U.S. 988 (1986).

39 Performance standards provide a basic level of compliance during coal mining and reclamation. See generally 11 AAC 90.301 – 90.501. These standards ensure that the environment and the public are protected during mining by requiring avoidance and mitigation of impacts, and the requirement that all land disturbed by mining is restored to a productive postmining land use. Alaska Coal Mining and the Law (DNR, March 2007). 40 11 AAC 90.701(a)(5). See also AS 27.21.210 (stating that all permits issued under the Act shall require that surface coal mining and reclamation must comply with environmental performance standards). The federal Office of Surface Mining (OSM) has also stated that a petitioner “must assume that contemporary mining practices required under the applicable regulatory program will be followed.” 48 Fed. Reg. 41312, 41328-29 (Sept. 14, 1983). Accord In re Permanent Surface Mining Regulation Litigation, 620 F. Supp. 1519 (D.D.C. 1985). 41 42

48 Fed. Reg. at 41328-29. Id.

10/24/11 Page 12 of 109

Beyond the statutes and regulations specifically dealing with the petition process, the review of a petition includes consideration of ASCMCRA’s primary purposes. These include, but are not limited to, the following: assuring “that surface coal mining operations are conducted in a manner that will prevent unreasonable degradation of land and water resources;” 43 assuring “that surface coal mining operations are not conducted where reclamation required by this chapter and the regulations adopted under it is not feasible;” 44 assuring “that reclamation of land on which surface coal mining takes place is accomplished as contemporaneously as practicable with the surface coal mining, recognizing that the responsible extraction of coal by responsible mining operators is an essential and beneficial economic activity;”45 assuring “that the coal supply essential to the nation’s energy requirements and to its economic and social well-being is provided and to strike a balance between protection of the environment and other uses of the land and the need for coal as an essential source of energy.”46 Additionally, a critical component of DNR’s mandate, which has been promulgated by the Alaska Legislature and is derived from the Alaska Constitution, is to allow responsible resource development. This duty flows from article VIII of the Alaska Constitution. Section 1 states that “[i]t is the policy of the State to encourage the settlement of its land and the development of its resources by making them available for the maximum use consistent with the public interest.” Section 2 provides that the legislature shall provide for the
       
43 44 45 46

AS 27.21.010(b)(3). AS 27.21.010(b)(4). AS 27.21.010(b)(5). AS 27.21.010(b)(7).

10/24/11 Page 13 of 109

utilization, development and conservation of all natural resources belonging to the State, including land and waters, for the maximum benefit of its people.” The Legislature has, in turn, charged DNR with administering state lands for the “conservation and development of natural resources, including forests, parks, and recreational areas, land, water, agriculture, soil conservation, and minerals including petroleum and natural gas.” 47 As former Commissioner Tom Irwin stated in a July 16, 2007 decision on the previous lands unsuitable petition filed by Trustees for the entire Chuitna watershed, both the federal and state statutory regimes “reflect the goal of allowing, where possible, multiple uses of coal bearing lands, and that balanced consideration would be given to regulated coal mining operations and other uses/resources.”48 The ASCMCRA goals complement the state’s economic development, energy, and mineral policies, as declared by the legislature, including the proper conservation and development of mineral resources such as coal for the “further economic development of the state, to maintain a sound economy and stable employment, and to encourage responsible economic development within the state for the benefit of present and future generations.”49 DETAILED STATEMENT OF FINDINGS AND CONCLUSIONS Having considered the administrative record in this matter, including the petition and supporting materials, public comments, as well as intervenors’ submittals, the following is a detailed statement of findings relative to the petition, along with conclusions on the petition, including reasons for those conclusions, pursuant to AS 27.21.260 and 11 AAC 90.711, and other applicable authorities. Background on the 2010 Petition and Prior Related Decisions

1.

The petition area is 45 miles west of Anchorage, on the west side of Cook

Inlet. The petition area is 3,560 acres (5.5 square miles): streams in the petition area total approximately 118 miles in length in the larger Chuitna watershed. The Chuitna
47 48

AS 44.37.025(a).

Commissioner Tom Irwin’s July 16, 2007 Decision on Petition Requesting that the Chuitna River Watershed be Determined Lands Unsuitable for Surface Coal Mining, at 13 (citing 30 U.S.C. §§ 1201-1202; AS 27.21.010(b)).
49

AS 44.99.110 (mineral policy); accord AS 44.99.100 (economic policy) and AS 44.99.115 (energy policy).

10/24/11 Page 14 of 109

watershed is subject to multiple uses, including residential, subsistence, recreational, and industrial uses. The communities of Tyonek Native Village and Beluga are adjacent to the watershed and the petition area. A variety of mammals, fish (including salmon), and bird species occur in the petition area.

2.

The petition area, and the Chuitna watershed throughout which the

petition area pervades, falls within the Susitna/Beluga Coal Field, which is one of the most significant coal fields in Alaska.50 Since at least statehood in 1959, 51 as well as after enactment of the Alaska Native Claims Settlement Act (ANCSA) in 1971, 52 lands within the area were selected for their mineral, coal, and oil and gas resource potential. Many of the landowners and state and local land use plans identify these areas for coal resource development.

3.

Exploration on at least two separate projects in the area has been

conducted for decades. One proposed project, the Diamond Shamrock Chuitna Coal Project, underwent extensive regulatory review by several state and federal agencies (including DNR, the Alaska Department of Fish and Game (ADF&G), and the U.S. Environmental Protection Agency (EPA)), from the mid-1980s until the early 1990s.

4.

Based on the ASCMCRA permit application submitted on the Diamond

Shamrock Chuitna Coal Project, DNR, under the Cowper Administration, issued a permitting decision in 1987 approving the construction and operation of the proposed coal mine. The findings supporting DNR’s approval are recorded in (i) a March 5, 1987, “Conditions of Decision and Findings of Compliance for the Diamond Chuitna Mine” and (ii) an August 21, 1987, “Decision to Issue a Surface Mining Permit Diamond Shamrock Chuitna Coal Joint Venture Diamond Chuitna Mine.” These documents were later combined into a single document referenced herein as the “1987 Permitting Decision.” DNR made a number of key findings in these documents regarding reclamation and hydrologic impacts:

The Beluga Coal Field has the largest identified resource of any coal field in Alaska, south of the Brooks Range. Merritt, R.D. and Hawley, C.C., 1986, Map of Alaska coal resources, 1:2,500,000: Alaska DGGS Special Report No. 37, Table 2.
50 51 52

72 Stat. 339 Public Law 85-508 (1958). 43 U.S.C. § 1601, et seq.

10/24/11 Page 15 of 109

Diamond Shamrock’s Wetland Revegetation Plan satisfactorily addressed DNR’s initial concerns about whether wetland habitat could be restored. The agency noted, however, that the plan would be subject to continuing DNR review and that, if appropriate, changes could be made to the plan during actual mine operation.53 The project was subject to several DNR stipulations relative to reclamation measures and activities that would be required contemporaneous with mining. These included measures for sediment and drainage control (including sediment control ponds), 54 and measures for protecting surface and groundwater hydrology (including additional hydrologic monitoring). 55 In accordance with AS 27.21.180(c)(2), Diamond Shamrock had “demonstrated that reclamation as required by AS 27.21 and 11 AAC 90 can be accomplished under the reclamation plan,” subject to DNRrequired modifications.56 In accordance with AS 27.21.180(c)(3), “an assessment of the probable cumulative impact of all anticipated mining in the area on the hydrologic balance has been made and the proposed operation has been designed to prevent material damage to the hydrologic balance outside the permit area.”57 Regarding stream restoration, DNR -- while acknowledging that “postmining baseflows will take ten to fifteen years to reach pre-mining levels and that it was important that enhancement techniques be maintained until the pre-mining flows are reached” -- found that the application

53 August 21, 1987 Decision (1987 Permitting Decision) on the Diamond Shamrock Chuitna Coal Project, issued by J.M. Brady, at 33-34. 54

Id. at 40-42, and at 53-92 (consisting of an August 16, 1987 report prepared for DNR by Arctic Hydrologic Consultants that provides a technical review on the proposed Sediment and Drainage Control Plan). Id. at 44-48. Id. at 125, and at 326-361 (containing Section IV findings). Id. at 125, and at 362-404 (containing Section V findings).

55 56 57

         

10/24/11 Page 16 of 109

complied with 11 AAC 90.327 (Stream Channel Diversion) for the initial permit term. 58

5.

On June 28, 1988, then DNR Commissioner Judith Brady adopted, with

minor modifications, the Hearing Officer’s May 21, 1988, proposed decision (1988 Administrative Appeal Decision) on the consolidated administrative appeals brought on the 1987 Permitting Decision by Trustees for Alaska, the project proponent Diamond Shamrock, and others. The Hearing Officer’s proposed decision recommended certain modifications to the permitting decision, including lengthening the permit term from five to ten years.59 Based on the administrative record, the Hearing Officer also found that “Diamond’s reclamation plan, including its wetlands restoration plan, is sufficient to restore the disturbed area to a condition that is capable of supporting fish and wildlife.”60 With this 1988 Administrative Appeal Decision, Commissioner Brady affirmed the 1987 Permitting Decision.

6.

EPA also conducted an environmental review of the proposed coal mine

through its 1990 FEIS and issued a 1990 ROD approving the proposal. Thereafter, EPA issued an NPDES permit for the mine’s wastewater discharges. In the twovolume 1990 FEIS and the 1990 ROD, EPA considered several factors and made a number of key findings: EPA considered numerous impacts the project potentially could have on the environment, including possible impacts to wetlands, subsistence, fish and wildlife, and associated habitat impacts. 61 EPA concluded that the area in which the project was to be located was not pristine. For example, it had been previously entered for logging and oil and gas purposes.62 EPA stated the following regarding potential impacts to wetlands:
     
58 59 60 61 62

Id. at 202. 1988 Administrative Appeal Decision at 5-7. Id. at 33-35. 1990 FEIS at 5-11, 5-16, and 5-75. Id. at 5-136.

10/24/11 Page 17 of 109

The acidic, muskeg-type wetlands which are widely dispersed throughout the area are not highly productive and the net primary productivity of replacement communities could be as high or higher than the communities that now exist. Therefore, adverse impacts to primary wetland productivity would not be significant on a regional scale. Food webs would be interrupted in the immediate vicinity of pre-mining wetland areas, but such interruption would probably not be significant on a regional basis because of the isolated nature of most area wetlands and the large extent of similar wetlands outside the project area.63 EPA noted that the wetlands within the Diamond Shamrock Chuitna Coal Project area were similar to wetlands found outside the project area (i.e., the Chuitna watershed/drainage).64 In the ROD, EPA stated that the authorizing agencies, including EPA and DNR, anticipated that reclamation within the project area would be undertaken in accordance with specific requirements, and therefore feasible.65
   

7.

After the commissioner upheld DNR’s permitting decision upon appeal,

multiple plaintiffs, including Trustees for Alaska, appealed the commissioner’s decision in the Gorsuch litigation.66 With the exception of one modification, which required a separate ASCMCRA permit for an eleven mile access/haul road from the mine site, the Alaska Superior Court upheld the permitting decision. Upon Trustees’ appeal of the Superior Court’s decision, the Alaska Supreme Court -- while remanding the decision to DNR for further consideration of cumulative effects of activities associated with the permit, and reconsideration of the reclamation bond amount -addressed Trustees’ contention that DNR erred in approving the proposed plan for restoration of ecological functions and revegetation. Among other things, the Court held:

63 64 65 66

Id. at Appendix F, at 2-3. Id. at 3. 1990 ROD at 6, and at 9-12. See also 1990 FEIS, at 2-31 to 2-34. 835 P.2d at 1239.

10/24/11 Page 18 of 109

that DNR had found that the proposed reclamation and wetlands restoration plans for the leased lands were “sufficient to restore the disturbed area to a condition capable of supporting fish and wildlife.”67 that DNR acted reasonably in accepting the restoration plan, because the plan describes how wildlife habitat will be recreated by constructing peat-filled depressions which will be planted with various plant species. In addition, three sediment ponds will be inoculated with plant and insect life forms, and seedlings will be planted to provide a vegetation canopy layer for the benefit of wildlife.68

8.

stalled due to market conditions.

9.

and the former Diamond Shamrock Chuitna Coal Project is now simply referred to as the Chuitna Coal Project. The current proponent of the project, PacRim Coal, is developing baseline information and coordinating with state and federal agencies, with the expectation that permit applications for the project will be submitted in the next year.

10.

have the entire Chuitna watershed be deemed lands unsuitable for surface coal mining activities. In this petition, petitioners’ counsel, Trustees for Alaska, raised concerns regarding the feasibility of reclaiming areas disturbed by coal mining, as well as allegations that essentially unjustifiable significant harm would occur.

11.

returned the 2007 Petition to petitioners, finding that the petition was incomplete and without merit. 69 In that decision, which contained multiple findings of fact and law, Commissioner Irwin informed petitioners that they could submit a new petition, and described the types of evidence which would be needed to support the petition, so that

67 68 69

Id. at 1249. Id. July 16, 2007 Petition Decision, at 1.

   

Diamond Shamrock Chuitna Coal Project project, however, ultimately

Since the mid-2000s, the area has seen renewed development efforts,

The petitioners submitted a petition in 2007 (2007 Petition) seeking to

In a decision issued on July 16, 2007, then-Commissioner Tom Irwin

10/24/11 Page 19 of 109

it could be reviewed on the merits.70 Commissioner Irwin also informed petitioners, in accordance with 11 AAC 90.701(a)(5), that the petition needed to assume that contemporary mining practices, required under AS 27.21 and this chapter, would be followed if the area were mined, and that the 2007 Petition failed to do that. 71

12.

In a letter dated February 14, 2008, Commissioner Irwin upheld his

decision upon petitioners’ request for reconsideration. Petitioners appealed Commissioner Irwin’s decision on the 2007 Petition to the Superior Court. 72 The Commissioner and petitioners later settled the litigation, and with the exception of one issue (see discussion of Allegation V, below), no other aspect of Commissioner Irwin’s decision on the 2007 Petition was withdrawn or changed, and the petitioners’ appeal to the Superior Court was dismissed with prejudice. 73

13.

On January 21, 2010, Trustees submitted a new petition (2010 Petition)

under AS 27.21.260 on behalf of Chuitna Citizens Coalition and Cook Inlet Keeper.

14.

Petitioner Chuitna Citizens Coalition is an organization whose members

are “full-time and part-time residents of Beluga,” a small community located near the petition area. The petitioner describes three of its members’ interest in the recreational, fish and wildlife, and subsistence values of the petition area. Two of its members, Judy and Larry Heilman, are residents of Beluga, and state they use the watershed for hunting and fishing opportunities, but do not describe where in the petition area they specifically conduct their activities. Another member, Terry Jorgenson, engages in commercial fishing in the marine waters/Ladd Landing area in Cook Inlet. Ladd Landing is adjacent, rather than within, the petition area. Ladd Landing has been proposed as a potential transfer site for the Chuitna Coal Project for loading coal to freighters for marine shipping.74

15.

Petitioner Cook Inlet Keeper “is a community-based nonprofit

organization that combines advocacy, education and science towards its mission to

70 71 72

Id. at 5-15. Id. Chuitna Citizens NO-COALition, Inc., v. Irwin, et al., Case No. 3AN-08-6009CI.

73 For this reason, arguments in the 2010 Petition consistent with the arguments made in the 2007 Petition are likely barred by res judicata and collateral estoppel. 74

Petition at 12-13.

10/24/11 Page 20 of 109

protect Alaska’s Cook Inlet Watershed and the life it sustains.” 75 Cook Inlet Keeper asserts that it has members living in the petition area “that would be adversely affected by surface coal mining operations in the Chuitna River watershed,” including with respect to members’ subsistence activities.76

16.

The 2010 Petition was more refined than the 2007 Petition because it

requests that streambeds underlying anadromous water bodies and their associated riparian areas within the Chuitna watershed be designated unsuitable for surface coal mining as opposed to the broader request in 2007 to have the entire watershed deemed lands unsuitable for surface coal mining. Nonetheless, Petitioners submitted essentially the same evidentiary information that was provided with the 2007 Petition, and only included a handful of additional new documents as evidence to support the petition’s allegations. Thus, many of the allegations and supportive materials cited by the petitioners in their 2010 Petition are the same as those that petitioners cited in their 2007 Petition and are also similar to the issues litigated in the Gorsuch case.77

17.

While this more focused specification of the petition area might initially

be viewed as a reduction in the area that was sought for designation under the 2007 Petition, the practical effect of the designation would not be so limited, given the geographical reach of the petition area. The specified streambeds and riparian areas have a wide-ranging, meandering trace throughout the Chuitna watershed, 78 repeatedly crossing over the coal resources that likewise pervade throughout the watershed. The designation of the petition area would therefore have a fragmenting effect on the coal resources, jeopardizing the feasibility and extraction of any of the coal resources present in the watershed, even if those resources are not within the petitioners’ identified petition area.

18.

On February 22, 2010, former Commissioner Tom Irwin found the 2010

Petition to be administratively complete under 11 AAC 90.703(a), and that it contained

75 76

Id. at 13. Id. at 13-14.

77 Petitioners in this 2010 petition, Chuitna Citizens Coalition (formerly Chuitna Citizens NOCOALition) and Cook Inlet Keeper, were among the petitioners listed in the 2007 Petition. 78

See Figure 1 and “Description of the Petition Area.”

10/24/11 Page 21 of 109

the information required under 11 AAC 90.701(a). At the time, the commissioner made no other determinations as to the adequacy of the petition.

19.

The petition alleges in Allegation I that reclamation of impacts from any

type of surface coal mining operations in the petition area (i.e., the streambeds of anadromous streams and their riparian areas), as well as the streams that overlie the delineated area, is not technologically feasible in accordance with ASCMCRA. 79 The petition specifically states that: surface coal mining would irreparably harm the area’s hydrologic balance, including scrub/sweetgale fen and peat soils ecosystems for which few examples of successful reclamation exist;80 reclamation would not restore the groundwater recharge capacity in the area, violating the performance standards requiring such restoration;81 reclamation would not restore aquatic productivity to premining levels, altering highly productive spawning, migratory, and rearing habitat; 82 and surface coal mining on the identified lands cannot be designed and operated to minimize changes in water quality and hydrology enough to ensure no adverse effects to fish and wildlife habitat.83
       

20.

The petition alleges in Allegation II that all types of surface coal mining

operations will affect fragile land within the meaning of the ASCMCRA regulations and would result in significant damage to important cultural, scientific, and aesthetic values and natural systems.84

79 80 81 82 83 84

Id. at 14-16. Id. at 16-24. Id. at 24-25. Id. at 25-29. Id. at 29-33. Id. at 33-45.

10/24/11 Page 22 of 109

21.

The petition alleges in Allegation III that all types of surface coal mining

operations will affect renewable resource land which could result in a substantial loss or reduction of long-range productivity of water supply or food or fiber products.85

22.

The petition alleges in Allegation IV that all types of surface coal mining

operations could substantially endanger life and property because these operations will occur in areas of unstable geology and where other natural hazards are present. This would include local faults which experience frequent seismic activity, the possibility of volcanic eruptions, strong currents and severe winter ice conditions that would make transport dangerous and spills more likely, and strong winds that would contribute to coal dust being blown offsite. 86

23.

The petition alleges in Allegation V that all of the delineated petition area,

including streambeds underlying anadromous water bodies and associated riparian areas that occur within Logical Mining Unit-1 (LMU-1),87 must be considered in a decision on the petition, and that none of the delineated petition area is exempt from petition review, asserting that there were no substantial legal or financial commitments for an operation in this area before January 4, 1977.

24.

In support of the 2010 Petition, the petitioners cite earlier reviews and

decisions that were issued in the late 1980s and early 1990s by DNR, the EPA, and other agencies when the project was identified as the Diamond Shamrock Chuitna Coal Project. The petitioners cite DNR’s August 21, 1987, permitting decision (1987 Permitting Decision) approving the project; the 1988 administrative appeal decision (1988 Administrative Appeal Decision) affirming that decision; EPA’s 1990 final environmental impact statement (1990 FEIS) and 1990 Record of Decision (ROD) on the project;88 and Trustees for Alaska v. Gorsuch,89 a 1992 Alaska Supreme Court

85 86

Id. at 45-46. Id. at 46-48.

87 LMU-1 is the area which was proposed for permitting in the Diamond Shamrock Chuitna Coal Project. This area is now held by PacRim, and is promoted as the “Chuitna Coal Project.” 88 The FEIS was actually issued in late 1989, but because EPA’s ROD was issued in 1990, and because the petitioners, intervenors, and commenters identify it as the 1990 FEIS, this decision does so as well, for ease of reference. 89

835 P.2d 1239 (Alaska 1992).

10/24/11 Page 23 of 109

decision involving Trustees for Alaska’s challenge on DNR’s 1987 Permitting Decision that authorized the Diamond Shamrock Chuitna Coal Project.

25.

Petitioners also submitted a few more recent reports that had not been

submitted with the petitioners’ 2007 Petition. They submitted reports by Palmer M.A., Trasky L., and Wipfli M.S., which are reports based on a review of draft aquatic baseline studies and PacRim’s draft Fish and Wildlife Protection plan associated with the Chuitna Coal Project. Petitioners also submitted a report on Valley Fills in Appalachia, Mountaintop Mining Consequences, 90 in which the report discusses the burial of headwater streams by overburden during coal mining, along with the reports cited by Palmer, et al., and quoted in the 2010 Petition. And petitioners submitted a report that discusses the development of Circumarctic peatlands, Rapid Early Development of Circumarctic Peatlands and Atmosphere CH4 and CO2 Variations. 91

26.

Thus, other than the refinements to the petition area, portions of the

narrative that reclamation would not be technologically feasible, and the submittal of the above-referenced reports, the allegations and referenced materials in the 2010 Petition are largely the same, even verbatim, to that set forth in the 2007 Petition.

27.

Under AS 27.21.260(b) and 11 AAC 90.709(a), the Commissioner may, in

his or her discretion, extend the time for holding a hearing for “up to five additional months if the delay is necessary to provide a field season and a reasonable period of time to review the results of field season surveys.” This option was exercised, and during the summer and fall of 2010, DNR conducted field work within the Chuitna River watershed in order to adequately review the petition. Field work consisted of multiple full day trips, conducted throughout the summer and fall of 2010, to different portions of the watershed. Field work included aerial and ground investigation of stream and riparian areas, as well as a review of the condition of reclaimed bulk coal sample sites within the 2003 and Lone Creek watersheds that are within the PacRim Chuitna Coal Project area. The additional time also allowed for the collection of additional surface and ground water information and fish population estimates by third party contractors working on the proposed Chuitna Coal Project. This information was used to more fully understand and address the potential impacts to
90 91

Palmer, Margaret A., et al., 327 Science 148 (2010). MacDonald, Glen M., et al., 312 Science 385 (2006).

10/24/11 Page 24 of 109

resources within the watershed from surface coal mining activities as they related to petitioners’ allegations.

28.

The following entities sought and were granted intervenor status under

11 AAC 90.705(e) in opposition to the petition: (a) Alaska Mental Health Trust Land Office (“the Trust”) by Gregory Jones, Executive Director 718 L Street Suite 202 Anchorage, Alaska 99501 (b) PacRim Coal, LP (“PacRim”) by Joe Lucas 1007 W 3rd Ave, Suite 304 Anchorage, AK 99501 (c) Tyonek Native Cooperation (“TNC”) by Michaelene Stephan, President 1689 C Street, Suite 219 Anchorage, Alaska 99501

29.

No person or entity sought intervenor status under 11 AAC 90.705(e) in

support of the petition.

30.

Intervenors PacRim, TNC and the Trust all strongly oppose an

unsuitability designation based on the petition, and request that it be denied.

31.

Both TNC and the Trust are substantial landowners in the petition area.

They both submitted letters regarding their land interests and expressing their significant economic interests associated with the coal resources located within the petition area.92 TNC specifically stated that the petition “seeks to end most development of the coal reserves in the region where TNC’s lands are located and mostly TNC shareholders reside. Such a determination would frustrate TNC’s efforts to increase local employment opportunities for its shareholders, who are the Native people and the majority of the population of the region. Developing the region’s substantial coal resources is critical to economic growth.”

92

See, e.g., TNC comment letter on the petition, dated January 5, 2011, at 4; Trust comment letter on the petition, dated January 5, 2011, at 2.

10/24/11 Page 25 of 109

32.

The Trust wrote: “The Trust is the predominant landowner within the

Chuitna River Watershed, and lessor of the coal resources located within the areas subject to the petition. As the owner of the coal resources proposed for development pursuant to the existing coal leases held by PacRim Coal, LP (PRC) in the subject area, The Trust has a significant stake in the outcome of the petition proceeding. . . . To allow it [the petition] to go forward would significantly affect the ability of The Trust and its lesee to develop this resource and would result in a major negative economic impact to The Trust and its beneficiaries.”

33. 34.

PacRim, a leaseholder, also submitted similar letters. 93 On January 19, 2011, DNR held a public hearing in Kenai, Alaska. One

hundred and fifty individuals signed in attendance, representing many Southcentral Alaska communities. Fifty-seven individuals provided oral comments, with some individuals getting up a second time during the course of the proceedings to provide additional comments. Nearly all of the comments were in support of the petition, with one individual speaking against the petition.

35.

On February 19, 2011, DNR held another public hearing in the Village of

Tyonek. This second hearing was primarily scheduled to allow oral comments from those people who were unable to attend the January 19th hearing in Kenai due to adverse weather in Tyonek. Approximately 60 individuals attended the hearing, including individuals from Anchorage. Approximately eighteen people provided comments at the hearing. Nearly all of the comments were in support of the petition.

36.

Public Comments: DNR received a total of approximately 550 comment

submittals (letters, comment forms, e-mails and other oral comments documented in the hearing transcripts) during the petition review. Comments addressed both the petition and permitting issues directly relating to PacRim’s proposed Chuitna Coal Project. Of the approximately 550 comments submitted, approximately 525 came from private individuals. Fifteen resolutions were submitted by trade organizations (fishery councils). Seven comment letters were from non-Governmental organizations; one comment letter came from a community council, and three comment letters were from Native Corporations. Eight papers supporting the petition were submitted.

93

See, e.g., PacRim’s January 5 and 19, 2011, comment letters on the petition.

10/24/11 Page 26 of 109

Approximately 30 comments favored dismissing the petition, while approximately 500 comments supported the petition. Comments received on the petition that were within the scope of and relevant to the petition process were considered in reviewing the petition and the formulation of this decision, and these comments and DNR’s summary of comments and responses thereto are part of the agency’s administrative record relative to the petition, and those written responses are expressly incorporated into this decision by reference. 94 Many of the comments focused on the Chuitna Coal Project -- both the project’s location and PacRim’s more recent efforts in seeking permits, environmental reviews and project development.

37.

In accordance with AS 27.21.260(a), 11 AAC 90.701(a)(6), and 11 AAC

90.711, DNR has compiled information and data relating to the petition area and the petition’s allegations (including detailed site-specific data required from companies as part of their permit applications) in order to develop this detailed statement and to render this decision. Detailed and relevant information regarding any petition area, including detailed soils and hydrologic data for the petition area is, as a practical matter, iterative and acquired over a period of several years. Among the key documents containing relevant, competent and scientifically sound data and information regarding the condition and environment of the Chuitna watershed are the 1990 FEIS, 1990 ROD, the 1987 Permitting Decision, and the Alaska Supreme Court Gorsuch decision. Description of the Petition Area

38.

The petition area is located in Southcentral Alaska, approximately 45

miles west of Anchorage (see Figure 1). The lands for which petitioners seek an unsuitability determination involve 3,560 acres (5.5 square miles), and cover stream reaches totaling approximately 118 miles (Chuitna watershed) (see Figures 2 and 3). As such, the streambeds and riparian areas do not occur in one or two confined areas on the west side of Cook Inlet, but rather meander and spread throughout the larger Chuitna watershed area. The Chuitna watershed is very large, encompassing approximately 95,600 acres (~150 square miles) and containing approximately 200 miles of streams. The main stem of the Chuitna River is approximately 25 miles in length, and courses from its headwaters at the base of the Alaska Range to the point
94

11 AAC 90.711(a).

10/24/11 Page 27 of 109

where it empties into Cook Inlet between the communities of Tyonek (population 171 95) and Beluga (population 20 96). The Chuitna watershed is situated within the Beluga Plateau and consists of streams cutting through the underlying Tertiary sedimentary strata creating moderate relief, with elevations ranging up to 1400 feet.

39.

The Beluga Plateau is characterized as having typical glacial moraine-

controlled topography of irregular ridges and depressions. To the northwest of the watershed are higher plateaus and foothills leading to the Alaska Range. Approximately 30 miles west is Mt. Spurr, a volcano active since at least the Tertiary period, and to the southwest, the estuarine and alluvial lowlands of the Chakachatna embayment, and Cook Inlet borders the area to the south. The plateau is described as a “sedimentary plateau mantled by Quaternary glacial deposits.”97

40.

The general geology of the watershed consists of semi-consolidated, coal-

bearing sedimentary rocks of the Tyonek Formation, overlain by a mantle of younger, unconsolidated sediments that include glacial deposits and alluvium located along stream reaches.98 The Tyonek Formation is a sequence of fluvial and deltaic silts, clays, and sands with occasional gravel beds and coal seams.” 99 The formation has been fairly compacted after burial and is poorly cemented.100

41.

The hydrostratigraphic units within the watershed 101 consist of recent

alluvium, glacial deposits, coals of the Tyonek Formation and the Sub-Red 1 Sands

Dept. of Commerce Community Database, http://www.commerce.state.ak.us/dca/commdb/CF_BLOCK.cfm?Comm_Boro_Name=Tyonek &Data_Type=2010Census&submit2=Get+Data
95 96

Dept. of Commerce Community Database Online at http://www.commerce.state.ak.us/dca/commdb/CF_BLOCK.cfm?Comm_Boro_Name=Beluga& Data_Type=2010Census&submit2=Get+Data
97

PacRim Coal, L.P., Chuitna Coal Project Geology Baseline Information (August 2006), at 3; 27

p. Wahrhaftig, et al., Coal in Alaska, in The Geology of Alaska, Plafker and Berg editor (1994), pp 937-78, at 953.
98 99 100 101

1987 Permitting Decision at 366. Id.

The detailed studies and information of the hydrogeology and the hydrology for the watershed are limited, and much of the information used to process the 2010 petition is specifically focused upon the area within and around the proposed Chuitna Coal Project. Because similar lithologies are observed present throughout the watershed, this information has been used to provide a general description of the hydrology of the larger Chuitna

10/24/11 Page 28 of 109

within the Tyonek Formation. 102 Alluvium consists of the sands and gravels within the course of present day stream channels. Glacial deposits consist of unconsolidated sediments characterized as unsorted mixtures of clay to boulder-sized material with lenticular bodies of well-sorted sands and gravels.103 Coals consist of the Blue Coal, Red 3, Red 2, and Red 1 seams.104 The interburden between the coal seams consists of interbedded and interfingering sequences of poorly consolidated and weakly cemented sandstones, siltstones, and mudstones.105 This interburden material between coal seams and the overlying glacial deposit generally acts as an aquitard. 106 The Sub Red 1 aquifer is a fine to medium grained sandstone that underlies portions of the Chuitna watershed.107 Coal seams within the Tyonek formation also occur below the Sub Red 1 sands. 108

42.

The near surface groundwater table generally mimics the surface

topography, with flow towards streams and tributaries. This topography provides for surface-water collection and for ground-water recharge into the alluvium, coal seams, and overburden. 109 With these units, groundwater generally flows from higher elevations to lower elevations where it discharges as seeps or to the stream channels where the channel is below the local groundwater’s piexometric surfaces.110

43.

Recharge to the glacial deposits is by direct infiltration of precipitation

(rain or snowmelt), infiltration from muskeg bogs in depressions, and from stream

watershed, but it is important to note that certain areas within the watershed may be markedly different from the available information due to erosion of the Tyonek Formation and/or displacement of lithologies due to faulting.
102

Chuitna Coal Project Hydrology Component Baseline Report Historical Data Summary, Riverside Technology Inc. 2007, at 5-5. Id. 1990 FEIS at 4-24.

103 104 105

Chuitna Coal Project Hydrology Component Baseline Report Historical Data Summary, Riverside Technology Inc. 2007 at 5-5. Id. at 5-6. Id.

106 107 108

Wahrhaftig, et al., Coal in Alaska, in The Geology of Alaska, Plaker and Berg editor (1994), pp 937-78, at 953. 1987 Permitting Decision at 366-67. 1990 FEIS at 4-25 to 4-26.

109 110

10/24/11 Page 29 of 109

channels that are above the water table.111 Overall, the storage capacity of the glacial deposits is relatively large compared to the other units, and the glacial material is the main source of recharge to the underlying coal and sand aquifers of the Tyonek Formation.

44.

The groundwater direction in the upper portions of the Tyonek Formation

is predominantly from west to east.112 Groundwater flow direction is controlled locally by the presence of faulting and folding within the formation.113 Within the watershed, the coal seams and the Sub Red 1 sands may interact with streams where these units outcrop or subcrop in the streams or alluvium. 114 This interaction with the streams may be in the form of upwelling to the stream or local recharge from the stream, depending on local structures influencing groundwater flow.115

45.

Recharge to the coal seams occurs by direct infiltration on outcrops,

downward flow from saturated glacial deposits, and by diffuse leakage through confining interburden layers.116 Within the glacial deposits there is a small amount of vertical leakage which contributes to the recharge of the interburden, coal seams, and the Sub Red 1 sands. 117 Recharge for the Sub Red 1 sands can be inferred from well data to occur predominately at higher elevations in the western most part of the watershed and beyond. 118

46.

Discharge of groundwater into streams as baseflow contributes up to 30

percent of the total stream flow in streams in the Chuitna watershed. 119 Contributions to baseflow from the glacial deposits and aquifers in the Tyonek

111 112 113 114

1987 Permitting Decision at 367. 1990 FEIS at 4-26. Id. at 4-25.

Chuitna Coal Project Hydrology Component Baseline Report Historical Data Summary, Riverside Technology Inc., 2007, at 5-4. Id. 1987 Permitting Decision at 367. Addendum D12-B Groundwater Model, Chuitna Coal Project, August 2007, at 6-7.

115 116 117

118 Chuitna Coal Project Hydrology Component Baseline Report Historical Data Summary, Riverside Technology Inc. 2007, at 5-16. 119

Id. at 3-27.

10/24/11 Page 30 of 109

Formation are estimated to be approximately 89 percent and 11 percent, respectively.120

47.

Poorly drained organic soils dominate much of the Chuitna Coal Project

area, and materials underlying the surface consist primarily of alluvium, peat, glacial deposits and minor amounts of loess and volcanic ash.121 The vegetation in the area is generally characterized as a combination of the following: closed spruce-hardwood forest, bottomland spruce-poplar forest, high brush communities and wet tundra.122 Alder thickets and willow stands form a large portion of the Chuitna watershed. 123 No threatened or endangered plant species are known to exist in the area.124 Of the wetland communities, open low shrub grass fen is the most common.125

48.

A number of mammals exist in the region, most notably moose, beaver,

and brown and black bear. Avian surveys have noted waterfowl, shorebirds, and raptors, though the habitat for birds is considered relatively poor in comparison to the Trading Bay and Susitna Flats State Game Refuges blanketing the area to the south and east, respectively.126

49.

The waterbodies in the area support an array of primary, secondary, and

tertiary producers (algae, invertebrates, and vertebrates).127 These streams can be characterized as clear-water streams with moderate to high organic staining, stable channels and flows, good benthic productivity, and good to excellent fish habitat. 128

50.

Freshwater habitats in the project area support abundant resident and

anadromous fish populations that have significant subsistence, commercial, and sport value. The entire main stem of the Chuitna River is accessible to adult anadromous

120 121 122 123 124 125 126 127 128

1987 Permitting Decision at 386. 1990 FEIS at 4-7. Id. HDR, 2007 Baseline Report for Vegetation and Wetlands, at 7. Id. 1990 FEIS at 4-7. 1990 FEIS at 4-14. Id. at 4-10. Id. at 4-41.

10/24/11 Page 31 of 109

fish and is also utilized by juveniles for rearing and by resident fish populations.129 By far the greatest fishery value of the Chuitna River system is represented by the production of Pacific salmon, especially Chinook, and coho. 130 Pink, chum, and red (sockeye) salmon are also present.131 Important resident species include rainbow trout, arctic lamprey, slimy sculpin, coastrange sculpin, and threespine stickleback.132 Pacific lamprey and Dolly Varden are also present within the Chuitna watershed.133 Spawning activity was noted as far upstream as 11.4 km (7.2 mi) above the mouth of Stream 2003. In Lone Creek, pinks were seen as far up as 14.6 km (9.1 mi) above the mouth (at the confluence of Stream 2002). 134 Below Stream 2003, the Chuitna River was rated as very high in habitat values for Chinook and high for all other species. 135

51.

No threatened or endangered fish or wildlife species are known to be

present within the petition area. The federal National Marine Fisheries Service (NMFS), with the National Oceanic and Atmospheric Administration (NOAA), has designated Cook Inlet beluga whales as depleted under the Marine Mammal Protection Act (MMPA), and as endangered under the Endangered Species Act (ESA). NMFS has also designated critical habitat for the Cook Inlet beluga whale within the waters of Cook Inlet.136 The federally designated critical habitat is directly adjacent to the far east end of the petition area.

52.

Recreational uses of the area include sport hunting, trapping, and

fishing. The primary target for hunters in the area is moose. A limited number of brown and black bear are also taken.137 In the fall and winter, waterfowl, spruce grouse, and ptarmigan are hunted. Trapping is limited to the fall and winter months,

129 130 131 132 133 134 135 136

Id. at 4-40. OASIS Environmental Inc., 2007 Freshwater Aquatic Biology Study Program, at xiv. Id. 1990 FEIS at 4-41. Id. Id. Id. at 50.

More information is provided at the following link: http://www.nmfs.noaa.gov/pr/species/mammals/cetaceans/belugawhale.htm
137

OASIS Environmental Inc., Land Use Baseline Summary Report for the Chuitna Coal Project, (October 2006).

10/24/11 Page 32 of 109

and targets fur bearers such as beaver, river otter, lynx, marten, and wolverine. 138 Sport fishing in the Chuitna River is primarily for Chinook and coho salmon. 139

53.

The region was initially settled by the Dena’ina (Tanaina) people who

lived along the coast near the present day settlement of Tyonek.140 The Moquawkie Indian Reservation was established in 1915, and in 1970, the members elected to participate as a village corporation under the Alaska Native Claims Settlement Act (ANCSA). 141 Oil, gas, and coal exploration began in the area in the early 1960s, and the Chugach Electric Association's natural gas power plant at Beluga began operations in 1968.142 In the mid-1970s, the state sold salvage rights to the beetlekilled spruce in the area and the resultant logging operations created a network of roads throughout the area.143 A lumber mill was built at Tyonek in 1973, where lumber was chipped and exported. Logging occurred both south and north of the Chuitna River.144

54.

Subsistence use of the petition area and the larger Chuitna watershed

area through which the petition area meanders is similar to the recreational uses.145 A report by the Alaska Department of Fish and Game on subsistence harvest in the Chuitna watershed area stated that “[s]almon made up the largest portion of harvests for home use in the study communities, but harvests of large land mammals, other fish, small game such as birds and furbearers, marine invertebrates, and wild plants

138 139 140 141 142 143 144

Id. Id. Id. at 4-1. Id. Id. Id. at 4-3.

1990 FEIS at 4-3 and 4-10. Environmental Research and Technology, Inc., Diamond Chuitna Project, Mine Component Vegetation Baseline Report, prepared for Diamond ShamrockChuitna Coal Joint Venture, Anchorage, AK, at 23 (February 1985).
145

Stanek, Ronald T., and Holen, Davin L., Update of Wild Resource Harvest And Use Information For Tyonek and Beluga, Alaska, Technical Paper 321, 2005/2006, 2006.

10/24/11 Page 33 of 109

were also important. Marine mammal harvests were important in Tyonek.” 146 Subsistence uses also include a collection of edible plants and berries.147 Potential Coal Resources in the Petition Area and the Effect on the Demand for and Supply of Alaska Coal

55.

The petition area meanders throughout the Chuitna watershed. The

watershed is within the Susitna/Beluga Coal Field. This coal field is one of the most significant coal fields in Alaska, 148 containing a resource estimated at 2.2 billion metric tonnes (MT) of low-sulfur coal.149 The occurrence of coal seams in the west Cook Inlet area has been known for decades and large exposures of coal occur in the Chuitna River valley. These coal seams or coal measures are readily observed outcroppings in the Chuitna River itself and on banks and bluffs at many locations in the watershed. Evaluation of the coal resources in the area show that it has a lowsulfur content, and this resource would provide a cleaner burning fuel than many other coal resources currently in production in the United States.150

56.

The lands in the Susitna/Beluga Coal Field are owned by various private

and public entities, including the State of Alaska, the Mental Health Trust, Tyonek Native Corporation, Cook Inlet Region, Inc. (CIRI), and the Kenai Peninsula Borough.151 Since statehood in 1959, 152 as well as following enactment of ANCSA in 1971,153 many of the lands within the area were selected by the state and third parties

146

Stanek, Ronald T., and Holen, Davin L., Update of Wild Resource Harvest And Use Information For Tyonek and Beluga, Alaska, Technical Paper 321, 2005/2006, 2006. Id.

147 148

In terms of identified resources, the Beluga coal field is slightly larger than the total of the coal fields of the Nenana Province near Healy, Alaska. Merritt, R.D. and Hawley, C.C., 1986, Map of Alaska coal resources, 1:2,500,000: Alaska DGGS Special Report No. 37, Table 2.

149

DDS-77, Alaska Coal Geology, Resources, and Coalbed Methane Potential by Romeo M. Flores, Gary D. Stricker, and Scott A. Kinney, 2004.

150

Acid Rain Program Benefits Exceeds Expectation, USEPA Clean Ai Market Programs: http://www.epa.gov/capandtrade/documents/benefits.pdf , and Considerations For Low Sulfur Coal Blending At B. L. England Station, Russell, et al. See Figure 1. 72 Stat. 339 Public Law 85-508 (1958). 43 U.S.C. § 1601, et seq.

151 152 153

10/24/11 Page 34 of 109

based upon the coal resources present in the area. 154 For example, the core townships in the Chuitna watershed are original Mental Health Land Trust selections, filed in 1960 with patent received in 1966. 155 The Trust selections were made on known resource lands containing large deposits of coal, sand and gravel, heavily timbered areas, and areas with significant oil and gas potential. It was anticipated that resource development leases on the lands would provide rental and royalty income for the Trust over the long term. 156 DNR estimates that an aggregate of at least $127 million has been expended on coal exploration and potential development within the Chuitna watershed.

57.

In the 1970s, exploration drilling was conducted by the Diamond Alaska

Coal Company157 and the Beluga Coal Company. 158 This exploration continued into the late 1980s, with over 200 holes being drilled and four test pits being mined in the watershed. The exploration permits associated with these activities (Beluga-Center Ridge Exploration Permit No. 01-84-795 and Chuitna Exploration Permit Nos. 01-85795 and 02-83-795) have been maintained and renewed continuously since first being issued.

58.

The coal leases currently issued to PacRim (ADLs 36911, 36913, 36914,

37002, and 59502) were originally issued as Coal Prospecting Permits (CPPs) in early 1968. These CPPs were converted to Coal Leases in May of 1972 and 1978. The coal leases issued to the Barrick/Beluga Coal Company (ADLs 33795, 36282, 37471, 56982, 79816, 56982, and 79816) were issued as CPPs in 1967 and 1968, and converted to Coal Leases over a period between 1971 and 1976.

59.

The State of Alaska and the Kenai Peninsula Borough have long

recognized the potential importance of this resource to the people of Alaska. Land use plans, specifically the 2000 Kenai Area Plan,159 and -- although no longer controlling --

154

Alaska Department of Natural Resources, 1996, 1990s land selection project, final State of Alaska land selection from federal public domain lands, final report draft: ADNR Division of Land, Resource Assessment Section (May 29, 1996), 164p. DNR case file abstracts. Mental Health Annotated Chronology (updated July, 1991), at 1. PacRim comment letter January 19, 2010, at 3. Beluga (Center Ridge) Exploration Permit # 01-84-795. 2000 Kenai Area Plan at 3-296 to 3-298, 3-308, and 3-313.

155 156 157 158 159

10/24/11 Page 35 of 109

the area’s predecessor plan, the 1985 Susitna Area Plan for Management Unit 3,160 identified and designated state land in the petition area for coal mineral development and activities. The planning processes for these two area plans were subject to extensive public review and comment. The Kenai Peninsula Borough’s 2005 Comprehensive Plan and the 1988 Chuitna Area Resource Development Plan recognize coal as an economic resource within the Chuitna watershed.161 The 2000 Kenai Area Plan states that these resources should “[c]ontribute to Alaska’s economy by making subsurface resources available for development, which will provide job opportunities, stimulate economic growth, and establish a source of state revenues.” 162

60.

Within the watershed there are currently two active coal exploration

projects, PacRim’s Chuitna Coal Project and Beluga Coal Company/Barrick’s Beluga Coal Project. Coal reserves in the Chuitna River basin are estimated at 2.2 billion MT. 163 Estimated reserves within the Pac Rim Coal Leases are reported to be 771 million MT. 164 Areas leased as part of Beluga Coal Project are estimated to hold 600 million MT. 165 These project estimates do not include significant reserves located on CIRI lands and Trust lands not currently under lease within the watershed.

61.

Work on the Diamond Shamrock Chuitna Coal Project (predecessor to

PacRim’s Chuitna Coal Project) intensified in the early to mid-1980s, with compilation of environmental baseline studies, preparation of mine engineering plans, market studies, and measurement of coal reserves, as well as applications for permits. In 1985, the Diamond Shamrock Chuitna Coal Project applied to the state for a permit to mine and DNR issued a permitting decision in 1987 approving the project, which then DNR Commissioner Judith Brady affirmed, with minor modifications, upon

160 161 162 163

1985 Susitna Area Plan at 295-97. 2000 Kenai Area Plan at 3-296 to 3-298, 3-308, and 3-313. 2000 Kenai Area Plan at 2-34.

DDS-77, Alaska Coal Geology, Resources, and Coalbed Methane Potential by Romeo M. Flores, Gary D. Stricker, and Scott A. Kinney, 2004. ALASKA’S MINERAL INDUSTRY 2007: A SUMMARY, D.J. Szumigala and R.A. Hughes, at

164

11.
165

DDS-77, Alaska Coal Geology, Resources, and Coalbed Methane Potential by Romeo M. Flores, Gary D. Stricker, and Scott A. Kinney, 2004.

10/24/11 Page 36 of 109

reconsideration in 1988. 166 The EPA prepared the 1990 FEIS and issued its 1990 ROD in accordance with the National Environmental Policy Act (NEPA),167 along with a national pollutant discharge elimination system permit (NPDES or wastewater discharge permit) 168 for the project. ADF&G issued Fish Habitat Permits for in-stream mining in one of the area streams (Stream 2003) and approved the sedimentation pond construction in the same vicinity. Subsequently, Diamond Shamrock did not proceed with the project due to economic conditions.

62.

More recently, during the early to mid-2000s, coal prices began to rise

and PacRim has renewed efforts to develop the project as the Chuitna Coal Project. PacRim applied for an NPDES permit triggering the need for a Supplemental EIS (SEIS) in 2006 that is in ongoing preparation. PacRim is also preparing new mine applications for an updated and reconfigured operation.

63.

DNR has determined that, from a logistical and operational standpoint,

because of the area that petitioners have delineated for a lands unsuitable determination, designation of those lands as unsuitable for surface coal mining operations would significantly fragment the coal resource within the watershed. This conclusion is based on simple geometry; the mosaic that would be created by the petition and overlay the footprint of the proposed Chuitna coal mine would leave almost no place for such a mine to fit and produce at an economic level. 169 Thus, it is DNR’s opinion that this designation and the resulting fragmentation of the coal resource would negatively impact the economics of coal development on undesignated lands within the watershed.

64.

The demand for coal in the United States and foreign markets has

steadily increased over the last 50 years and coal is expected to remain an important

166

Environmental groups administratively appealed DNR’s 1987 Permitting Decision, which was ultimately litigated in state court, with Alaska Supreme Court issuing a decision in 1992. Trustees for Alaska v. Gorsuch, 835 P.2d 1239. 42 U.S.C. § 4321, et seq. 33 U.S.C. § 1342. See, e.g., Figure 4 attached to this decision.

167 168 169

10/24/11 Page 37 of 109

energy source into the future.170 The U.S. Department of Energy has projected national coal consumption through 2035.171 Even so, coal energy faces competition from other energy sources, such as natural gas and oil, as well as the evolving solar and wind energy sectors.172 This competition will affect market demand for coal in domestic and foreign markets, but it will not eliminate coal as one of the world’s principal energy resources.173 The U.S. Energy Information Administration predicts that coal use will continue to grow, with most of it destined to generate electricity and the production of synthetic liquids.174 The report predicts that coal will remain the largest source of electrical generation through 2035.175

65.

In 2010, the United States produced approximately 984 million MT of

coal. 176 Of that amount, approximately 74 million MT were exported to foreign markets.177 In 2010, the primary destination for U.S. coal exports was the European market, with approximately 38 million MT delivered to various European countries.178 The European market was followed by markets in Asia, North America, South America, and Africa, in order of decreasing imports of US coal.179 Within the United States, the primary destination in 2010 of all coal produced is for electrical generation (885 MT); the other use is for steel production. 180

66.

Regarding the demand for, and supply of, Alaska coal, there is currently

one active producer in Alaska, Usibelli Coal Mine in Healy, Alaska. In 2010, Usibelli

J. Fallows, Dirty Coal, Clean Future, The Atlantic Magazine (noting that coal produces approximately 46% of U.S. electricity), http://www.theatlantic.com/magazine/archive/2010/12/dirty-coal-clean-future/8307/ .
170 171 172 173 174 175 176

Id. Id. Id. Annual Energy Outlook 2011, U.S. Energy Information Administration, April 2011, at 85. Id. at 49.

U.S. Coal Summary Statistics; U.S. Energy Information Administration January 2011, http://www.eia.gov/cneaf/coal/quarterly/html/tes1p01p1.html .
177 178 179 180

Id. U.S. Coal Supply and Demand: 2010 Year in Review by Watson, et al. Id. Id.

10/24/11 Page 38 of 109

produced approximately two million MT of coal.181 Approximately half of this was shipped to overseas markets including Chile, South Korea, and Japan. The rest of the coal produced by Usibelli is used at power plants located in Interior Alaska. The amount of coal used at six interior power plants is approximately a million tonnes a year and is not expected to increase in the near future. 182 The demand from overseas markets for Usibelli coal has been steadily increasing. Usibelli reported a 24% increase in exports over the same period in 2009.183 Statewide, DNR has observed an increased interest by companies looking at Alaska coal for overseas markets as seen by an increase in requests to DNR for information on coal resources, particularly those in Southcentral Alaska. Also, “Alaskan coals have a lower sulfur content (averaging 0.3 percent) than most coals in the conterminous United States and are within or below minimum sulfur value mandated by the Clean Air Act amendments” 184, thus making Alaska coal an environmentally attractive fuel source.

67.

There are two other projects approaching development and actively

developing information to acquire permits. The first is the proposed Chuitna Coal Mine, through which some of the petition area crosses. At full production, this project is estimated to produce 12 million MT of coal per year, with an estimated mine life of 25 years.185 Any coal produced from this project is expected to be exported to overseas markets. The other coal project in Southcentral Alaska that may start production in the relatively near future is Usibelli’s Wishbone Hill Project. The potential minable reserves at this project are estimated at 14 million MT. 186 This

181 182

Usibelli 2010 Coal Sales Set New Record (North of 60 Mining News Dec 2010).

This statement does not include the Healy Clean Coal Plant becoming operational in the next several years. Golden Valley Electric Association is currently exploring the possibility to bring this power plant online. If so, it would require approximately 200,000 tons of coal a year to produce 50 megawatts of power. Usibelli 2010 Coal Sales Set New Record (North of 60 Mining News Dec 2010).

183

184 Flores, et al., Alaska Coal Geology, Resources, and Coalbed Methane Potential (Nov. 2005), at USGS website: http://pubs.usgs.gov/dds/dds-077/ .

Applicant’s Proposed Project (as of April 2011), at 2, EPA’s website for Proposed Chuitna Supplemental Environmental Impact Statement (SEIS), http://www.chuitnaseis.com/seisprocess.html .
185 186

Usibelli Coal Mine website: http://www.usibelli.com/Coal_leases.asp .

10/24/11 Page 39 of 109

project is proposed to produce less than a million MT a year of coal for the export market.187

68.

Regarding the economy of Alaska and its coal mining regions, the

estimated value of Alaska coal in 2009 was approximately $65 million.188 Based on the 2007-2009 values, the estimated value of coal produced in 2010 will be over $75 million.189 The currently active Usibelli Coal Mine provides 130 full time jobs.190 This number does not include additional jobs provided by support services and vendors. Using the most recently available information for the value of coal produced at Usibelli Coal Mine, the value of the coal produced at the proposed Chuitna coal project at full production would be approximately $430 million a year. According to the project description for the proposed Chuitna Coal mine, the project would employ up to 250 workers. 191 Petitioners’ Interests and Standing

69.

Based on the petition, it appears that the Chuitna Citizens Coalition has

provided sufficient information to support that at least three of its members -- Judy Heilman, Larry Heilman, and Terry Jorgensen -- have interests that could be adversely affected if surface coal mining operations occurred on some portion of the petition area, and that Chuitna Citizens Coalition, by virtue of these members’ interests, therefore has standing to seek this merits review of the petition under AS 27.21.260. The Heilmans are residents of Beluga, one of two communities adjacent to the lowest reaches of the petition area,192 and they use the petition area for various fish and game opportunities, though it is unclear where within the petition area they conduct these uses. Mr. Jorgenson routinely conducts commercial fishing activities near Ladd Landing in Cook Inlet, in a location approximately one mile from the mouth of the

187

Usibelli Coal Mine, Inc., 2011 Wishbone Hill Mine, information and frequently asked questions, website: http://www.usibelli.com/wishbone-brochure-web.pdf .

188

Szumigala, D.J., Harbo, L.A., and Hughes, R., Alaska’s Mineral Industry 2009, Alaska Division of Geological and Geophysical Surveys Special Report 64, at 28, 82p. Id. The Economic Benefits of Alaska Mining Industry January 2010, Alaska Miners Association.

189 190

191 Applicant’s Proposed Project (as of April 2011), at 6, http://www.chuitnaseis.com/seisprocess.html . 192

See Figures 1 and 2.

10/24/11 Page 40 of 109

Chuitna River at its confluence with Cook Inlet. All three express general environmental concerns about potential impacts from coal mining operations in the watershed and how those operations might affect their interests, but they provide little other detail in describing their interests. 193

70.

It is not clear that these members’ interests would be affected by mining

activities that might occur throughout the entire petition area. Former Commissioner Irwin had urged petitioners in his decision on the 2007 Petition to provide “evidence that supports the scope of the lands requested for designation bears some reasonable correlation to the asserted allegations [and] petitioners’ interests.” 194 In his decision, Commissioner Irwin also cited and quoted a 2006 OSM decision involving a large petition area that echoed his concern: Even though there is no specific size limit for a petition area, a basic regulatory criterion is that the petitioner must present “allegations of fact and supporting evidence, covering all lands in the petition area, which tend to establish that the area is unsuitable for all or certain types of surface coal mining operations” [30 CFR 764.13(b)(1)(v)]. Therefore, the large size of the petition area means that it is unlikely that the evidence presented can relate to the criteria for designation throughout the entire petition area. This is consistent with OSM’s comments in the 1983 preamble that “OSM has found that under the previous regulation, very large areas for which no evidence was presented were included in petitions (Alton petition, Tongue River petition), thus requiring significant efforts by OSM and other interested parties on issues of questionable merit,” 48 FR 41329 (September 14, 1983). 195

71.

While there are concerns that petitioners still have not provided, with

this new petition, the evidence to sustain a review of the entire area for which they seek designation, and that these specific members’ interests are actually more
193 194

Petition at 12-13.

July 16, 2007 decision on 2007 petition. See also, id., at 6, 9, 10, 11, and 12 (stating, e.g., that “petitioners have failed to sufficiently describe how any of the allegations and any particular type of coal mining activities that might occur on the petitioned lands would adversely affect petitioners’ various interests”). And, as the Trust points out, a good deal of the land which the petition area traverses, such as Stream 2003 across the LMU-1 land leased by PacRim Coal, is 10 miles away from the Beluga community, and is “remote and inaccessible without written authority from TLO,” and not located within any residential viewshed. Trust’s January 5, 2011 comment letter on the petition, at 5.

195

July 16, 2007 Decision, at 13-14, n. 11 (emphasis added), quoting OSM’s January 13, 2006 Statement of Reasons for Determination of Completeness for the New River Lands for Mining Petition, at 12, in which OSM returned the petition to petitioners as incomplete and without merit. The OSM statement on the New River petition is available on OSM’s website, http://www.osmre.gov/resources/newsroom/News/Archive/2006/011306.pdf .

10/24/11 Page 41 of 109

narrowly concerned with the site-specific Chuitna Coal Project, this decision nonetheless reflects consideration of the entire petition area, and not just areas where coal mining might affect the community of Beluga and nearby lands, or the proposed Ladd Landing location (which proposed site is also actually outside the delineated petition area).

72.

Cook Inlet Keeper, the second organizational petitioner, stated that it

“combines advocacy, education, and science toward its mission to protect Alaska’s Cook Inlet watershed and the life it sustains.” 196 It cites the goals of preserving clean water, abundant fish and wildlife, and other policies “that are necessary to sustain healthy communities and strong local economies.” 197 Cook Inlet Keeper asserts that it has members who live and undertake activities and work throughout Cook Inlet, and that it has members in the area that would be directly and adversely affected by mining activities in the Chuitna watershed.198

73.

The statutory standing requirements require a sufficient description of

how a petitioner’s interests would be adversely affected with respect to both the potential coal mining activities, as well as to the lands for which designation of unsuitability is sought. 199 General assertions regarding an organization’s goals or mission do not, alone, establish that a person (in the organization’s case, a member) is adversely affected,” nor does the general assertion that members are “directly affected,” without more evidence demonstrating direct affects, necessarily support standing.200

74.

While it is questionable whether Cook Inlet Keeper has provided

adequate information to show its members’ interests could be adversely affected by coal mining activities anywhere within the petition area, Chuitna Citizens Coalition has substantiated that at least three of its members’ hold such interests, at least for portions of the petition area, and therefore the petition is subject to this merit review.

196 197 198 199 200

Petition at 13. Id. Id. AS 27.21.260(b).

Sisters of Providence in Washington, Inc. v. Department of Health and Social Services, 648 P.2d 970 (Alaska 1982).

10/24/11 Page 42 of 109

Intervenors’ Interests

75.

The three intervenors on the petition hold unique interests, including

significant property interests, which could be adversely affected if the petition area is designated unsuitable for surface coal mining.

76.

In accordance with the land conveyance system established under

ANCSA, 201 the surface estate of 47,000 acres in the Chuitna watershed have been conveyed to the local Village Corporation, TNC, and the subsurface estate for that acreage was conveyed to a Regional Corporation, in this instance CIRI. TNC asserts that responsible coal mining in the Chuitna watershed, throughout which the delineated petition area meanders, would bring economic development, infrastructure projects, and job opportunities for the benefit of its shareholders, approximately 200 of whom live in the Village of Tyonek. TNC describes that at present this is especially true with respect to PacRim’s Chuitna Coal Project, and TNC has entered into contracts with PacRim which relate to development of the project. The same benefits for TNC shareholders could also be realized through contractual relationships if CIRI were to pursue coal mining in the future. In addition, were CIRI to develop coal resources in the Chuitna watershed, all shareholders of Alaska Native Corporations, including TNC shareholders, will receive dividends and other potential benefits through revenue-sharing required under ANCSA. 202 TNC also cites other non-coal economic development plans that it wishes to undertake, but those plans are predicated on development of coal mining activities in the petition area. If the petition area is designated unsuitable for surface coal mining, TNC expects the designation will frustrate or deprive TNC’s ability to secure economic benefits for its shareholders. 203

77.

The Trust owns a large portion of the lands in the petition area, and

efforts to obtain that ownership go back to 1960. 204 The Trust Land Office (TLO) manages Trust lands, and its “primary responsibility is to maximize revenue from Trust land over time and to protect and enhance the value of Trust land … on behalf

201 202 203 204

43 U.S.C. § 1613. 43 U.S.C. § 1606(i) and (j). TNC’s January 5, 2011 comment letter on the petition. DNR Land Administration System case file abstracts.

10/24/11 Page 43 of 109

of Trust beneficiaries.”205 The Trust is a state corporation that administers the Alaska Mental Health Trust, whose beneficiaries include individuals with mental illness, developmental disabilities, chronic alcoholism and Alzheimer’s disease and related dementia.206 The TLO is obliged to consider a number of trust management principals in managing the Trust’s assets, including “maximization of long-term revenue from trust land,” “protection and enhancement of the long-term productivity of trust land,” and “encouragement of a diversity of revenue-producing uses of trust land.”207 Many of these lands are coal-bearing, and a significant subset of these lands is leased to PacRim Coal, including the Chuitna Coal Project area (e.g., LMU-1). If coal production at the Chuitna Coal Project occurs, TLO estimates that it will provide significant revenue to the Trust over time, generating a 5% royalty that would equate to $300 million dollars over the 25-year projected life of the mine. If the petition area is designated unsuitable for surface coal mining and the effect of that designation deters coal mining at the Chuitna Coal Project, TLO will not be able to attain these royalties for mental health programs that support Trust beneficiaries.208

78.

PacRim holds the leases for coal deposits in the petition area. These

leases originated more than 30 years ago.209 As noted earlier, many of the petition’s allegations, supporting evidence, as well as public comment, focus on PacRim’s efforts to develop the Chuitna Coal Project. PacRim has made a significant financial investment in its efforts to develop the project. 210 As PacRim notes, the predecessor Diamond Shamrock Chuitna Coal Project was designed and permitted in the late 1980s and early 1990s, but due to market conditions, the project did not go forward. PacRim has restarted efforts to obtain new permits for the Chuitna Coal Project, and is working with the federal agencies on preparation of a SEIS. PacRim’s more recent

205

Trust’s January 5, 2011 comment letter on the petition, at 2.

206 Trust website, http://www.mhtrust.org/layouts/mhtrust/files/documents/about_aboutdocs/Trust_Overview _update2011.pdf . 207 208 209 210

11 AAC 90.020(c). Id. PacRim’s January 19, 2011 comment letter on the petition, at 2. PacRim’s January 5, 2011 comment letter on the petition, at 1.

10/24/11 Page 44 of 109

efforts have been underway since 2005.211 Thus, if the petition were granted, PacRim’s property interests would be adversely impacted.

79.

Attached Figure 2 delineates surface estate ownership within the

Chuitna watershed. With the exception of TNC, all of the entities listed also own the subsurface estates, including the right to any coal resources and the financial returns from the extraction and sale of that coal. As noted earlier, CIRI owns the subsurface estate to TNC’s lands. And, as Figure 2 shows, the petition area meanders throughout the larger Chuitna watershed area. Consequences Associated with Granting, Granting in Part, or Denying the Requested Unsuitability Designation

80.

In rendering a decision on a petition, a number of alternative outcomes

can be reached, and with each come certain consequences. These outcomes include: designating the petition area in its entirety as unsuitable for surface coal mining operations; designating only a portion of the petition area as unsuitable; denying any of the petition area as unsuitable; or denying to designate any of the petition area as unsuitable but setting forth conditions to apply to future coal mine permitting. Each option is discussed below. A. Consequences of Designating the Petition Area in its Entirety as Unsuitable for All Types of Surface Coal Mining Operations In order to designate the petition area in its entirety, the Commissioner

81.

would have to find from a review and evaluation of the petition’s allegations that the mandatory or discretionary criteria applicable to the allegations are supported by competent and scientifically sound data and information, and consider planning activities of federal, state, and local governments. 212 From an on-the-ground disturbance perspective, designation of the entire delineated petition area as unsuitable for all types of surface coal mining operations (including activities to extract the coal and to transport the coal from the deposit site to Cook Inlet shore facilities), as the petition requests, would essentially eliminate the potential future impacts of those operations to the petition area’s current environmental condition.

211 212

PacRim’s January 19, 2011 comment letter on the petition, at 2. AS 27.21.260(a) and AS 27.21.260(c).

10/24/11 Page 45 of 109

82.

However, the actual consequences of granting the requested designation

would likely have farther-reaching geographical ramifications beyond the identified streambed and riparian land features delineated by petitioners in the petition. While coal exploration could still occur in the designated area,213 and coal mining could theoretically occur outside the petition area within the Chuitna watershed, it is DNR’s judgment that the designation would likely render most, if not all, coal mining in the watershed economically unfeasible to efficiently extract and transfer coal out of the watershed, given the fragmenting effect that the designation would have on the watershed’s coal resources. This conclusion is based on simple geometry; the mosaic that would be created by the petition and (at the same scale) overlay the footprint of the proposed Chuitna coal mine, existing Usibelli coal mine, or the proposed Wishbone Hill mine, there is almost no place where such a mine could fit and produce at an economic level.

83.

Thus, if the petition area were designated in its entirety for all types of

surface coal mining operations, it is likely that the larger Chuitna watershed, i.e., the petition area’s streambeds and associated riparian areas, as well as other lands, vegetation, soils, hydrological regime, and the areas used by fish and wildlife surrounding the petition area, would not be impacted by coal mining development and operations. In the absence of feasible mining projects, and absent any changes to land management plans or uses, an area more expansive than the petition area -quite likely the 96,000 acres of the Chuitna watershed -- would essentially remain as it is today. The area would only reflect impacts from those activities that variably have occurred in the area over the past several decades, activities which include coal exploration, recreational and subsistence uses, fishing and hunting, fulltime and seasonal residential use, episodic road building, natural gas exploration and production projects, and logging activities. 214

84.

The requested designation, if granted, and the ramifications perceived

from that designation for surface coal mining in the greater Chuitna watershed, would mean that up to 2.2 billion MT of low sulfur, cleaner burning coal present in the

213 214

AS 27.21.260(h).

OASIS Environmental Inc., Land Use Baseline Summary Report for the Chuitna Coal Project, (October 2006).

10/24/11 Page 46 of 109

Chuitna watershed, could not be extracted and used for power generation. Land owners in the area would not be able to realize -- for themselves or for those members on whose behalf they manage the coal resource in trust -- financial gains and program benefits from the extraction and sale of that resource. No local employment (such as the potential 250 direct jobs relating to the Chuitna Coal Project) would be realized from surface coal mining activities. Future surface coal mining in the area could only be conducted if the unsuitability designation were terminated through a petition. 215 The possibility of terminating a designation means that the coal resource is not irreversibly lost.

85.

Based on Department of Energy data, while national coal consumption

should not, at least in the foreseeable future, be limited by supply constraints caused by a designation of the petition area, the low-sulfur content of the watershed’s coal resources and its resultant cleaner-burning fuel emissions provide incentive for seeking to develop this coal resource. B. Consequences of Designating Parts of the Petition Area as Unsuitable for All or Certain Types of Surface Coal Mining Operations The petitioners have not requested, as an alternative, that only certain

86.

portions of the petition area be designated as unsuitable, nor have they specified a narrower range of types of surface coal mining operations that could be prohibited, while other operations could be permitted. Nonetheless, the Commissioner has the authority, based on a review of a petition, to designate a more discrete portion or portions of the petition area as unsuitable for surface coal mining operations, or to prohibit some rather than all types of surface coal mining activities if he or she finds such action is warranted, and in accordance with applicable statutory and regulatory criteria. In order to designate any portion of the petition area as unsuitable for surface coal mining operations, the Commissioner would have to find from a review and evaluation of the petition’s allegations that the mandatory or discretionary criteria applicable to the allegations are supported by competent and scientifically sound data and information, and take into consideration planning activities of federal, state, and local governments. 216

215 216

AS 27.21.260(b). AS 27.21.260(a) and AS 27.21.260(c).

10/24/11 Page 47 of 109

87.

For more discrete portions of the petition area that may, as a

consequence of the evaluation, be designated by the Commissioner as unsuitable for all or certain types of surface coal mining, the on-the-ground consequences would generally be similar to those if the entire petition area were designated, except not on a watershed-wide scale. For example, if only streambeds and riparian areas within the LMU-1 lands were designated as unsuitable, while that, due to feasibility factors, would likely preclude any mining at all for the LMU-1 lands as part of the Chuitna Coal Project, it probably would not preclude surface coal mining operations elsewhere in the larger Chuitna watershed -- although those other operations may have fewer infrastructure options (e.g., potential shared port facility) in the absence of the Chuitna Coal Project. It is likely that the partial designations would mean that streambeds, associated riparian areas, wetlands, vegetation, soils, hydrological regime, and the areas used by fish and wildlife through which the petition area crosses would not be impacted by coal mine development and operations.

88.

Partial designation also would likely mean that coal resources for those

designated areas would not be extracted or sold, due to feasibility factors. For example, if streambeds and riparian areas within the LMU-1 lands were designated, it is unlikely that it would be feasible to mine the LMU-1 area, and that would mean that at least 300 million MT of low sulfur, cleaner burning coal present in the area would not be extracted and used for power generation. The Trust land owner would not realize -- for the benefit of those beneficiaries on whose behalf the TLO manages the coal resource -- financial gains and mental health program improvement from the extraction and sale of that resource, and that unrealized gain, based on a 5% royalty, could equate to as much as $300 million dollars. Local employment anticipated from the potential 250 jobs relating to the Chuitna Coal Project would not be realized. Future surface coal mining in the designated portion could only be conducted if the unsuitability designation were terminated through a petition.217 The possibility of terminating a designation means that the coal resource is not irreversibly lost.

89.

Based on Department of Energy data, while national coal consumption

should not, at least in the foreseeable future, be limited by supply constraints caused by a designation of a portion or portions of the petition area, the low-sulfur content of

217

AS 27.21.260(b).

10/24/11 Page 48 of 109

the watershed’s coal resources and its resultant cleaner-burning fuel emissions provide incentive for seeking to develop this coal resource. C. Consequences of Denying Designation of the Petition Area in its Entirety The Commissioner may find that there is insufficient evidence to support

90.

the allegations and deny the designation of the petition area in its entirety. Nevertheless, and this point must be emphasized, such denial would not constitute approval of surface coal mining operations in the petition area, and those approvals would still need to be gained through project-specific permitting processes conducted by multiple state and federal agencies.

91.

Because denial to designate any portion of the petition area would mean

that the area is not closed to potential future coal mining, this decision would leave open the possibility of coal development, including the realization of potential financial and employment associated with coal mining activities, as well as the opportunity to develop low sulfur coal as a fuel burning resource on national and international markets.

92.

At the same time, however, potential impacts to fish and wildlife,

subsistence or recreational uses, water resources, air quality, soils, cultural resources, and esthetics (visual and noise), associated with surface coal mining activities may occur or be observed. The significant scale of those impacts would depend on a variety of factors, including the following: permit conditions placed on any specific coal mining operation; the scale of the coal mining operations (its footprint/size) and the anticipated mine life; the postmining land use; the viewshed(s) involved; and whether subsistence or recreational users have access or authority to access lands in a given project area. D. Consequences of Denying Designation of the Petition Area, But Setting Forth Certain Requirements to Apply to Future Permits As a consequence of evaluating the petition and a determination not to

93.

designate a petitioned area as unsuitable, the Commissioner may determine that certain requirements should routinely apply to coal mining permits issued in the future in order to mitigate potential impacts of any project-specific operations to the

10/24/11 Page 49 of 109

land and resources in the petition area.218 However, the administrative record, including petitioner’s allegations and evidence, would need to provide a basis for determining the need for any requirements that might be delineated in advance of project-specific permitting. Having evaluated the 2010 Petition and the administrative record, I do not find any evidence that would cause me to impose any mitigation requirements for coal mining operations in advance of project-specific permitting that may be proposed for the petition area. The Petition’s Allegations Petitioners’ Allegation I: For surface coal mining operations in the petition area, reclamation in accordance with ASCMCRA is not technologically feasible.

94.

Under AS 27.21.260(c)(1), the Commissioner “shall designate an area as

unsuitable for all or certain” coal mining activities “if the commissioner determines that reclamation in accordance with this chapter and regulations adopted under it is not technologically feasible.” This provision is considered mandatory, that is, the Commissioner must designate lands as unsuitable if the Commissioner determines that reclamation in accordance with the applicable authorities is not technologically feasible.

95.

At the outset of Allegation I, petitioners argue that reclamation is not

technologically feasible under ASCMCRA. To support this argument, petitioners assert: (i) reclamation means that the disturbed areas are restored in a timely manner to conditions that support pre-mining land uses or “higher and better uses”; (ii) there is no “higher and better” use of this area than its pre-mining use as high quality fish and wildlife habitat; (iii) surface coal mining will “cause irreversible damage to fish and wildlife habitat;” (iv) reclamation cannot return the disturbed areas to pre-mining condition; and (v) therefore reclamation is not technologically feasible.219 In essence, this is a syllogism. Coupled with this syllogism, petitioners argue that reclamation is not technologically feasible because mining operations cannot meet the state’s “performance standards.”220 These arguments, which for reasons that are discussed in

218 219 220

11 AAC 90.711(c). Id. at 14-16. Id. at 15-16.

10/24/11 Page 50 of 109

detail below, misstate and misapply the applicable law, and are constant themes threaded throughout Allegation I.

96.

From this mistaken premise, petitioners’ Allegation I makes four specific

arguments to support their contention that reclamation of impacts from surface coal mining activities in the petition area would not be technologically feasible. 221 These arguments are: construction and operation of a surface coal mine on the identified lands would irreparably harm the area’s hydrologic balance; reclamation would not restore groundwater recharge capacity in the area; reclamation would not restore aquatic productivity to pre-mining levels; and surface coal mining in the identified lands cannot be designed and operated to minimize changes in water quality and quantity and hydrology enough to ensure no adverse effects to fish and wildlife habitat.
       

97.

In reviewing petitioners’ allegation that reclamation of impacts from

surface coal mining activities in the petition area would not be technologically feasible, consideration was given to DNR’s 1987 Permitting Decision on the Diamond Shamrock Chuitna Coal Project, the 1988 Administrative Appeal Decision affirming the 1987 Permitting Decision, EPA’s 1990 FEIS and ROD on the same project, and the Alaska Supreme Court’s Gorsuch decision on DNR’s 1987 Permitting Decision. Additional background relative to these documents is required to understand why they are relevant to an analysis of petitioners’ allegations that reclamation in the petition area in accordance with ASCMCRA is not technologically feasible. Significantly, these documents all contained findings, or affirmed findings, that reclamation in the petition area would be technologically feasible.

98.

Based on the ASCMCRA permit application submitted on the Diamond

Shamrock Chuitna Coal Project, DNR issued a permitting decision in 1987, approving the construction and operation of the proposed coal mine. The findings supporting DNR’s approval are recorded in (1) a March 5, 1987, “Conditions of Decision and
221

Petition, Allegation I, subparts A-D, at 14-33.

10/24/11 Page 51 of 109

Findings of Compliance for the Diamond Chuitna Mine” and (2) an August 21, 1987, “Decision to Issue a Surface Mining Permit Diamond Shamrock Chuitna Coal Joint Venture Diamond Chuitna Mine.” These documents were later combined into a single document referenced herein as the “1987 Permitting Decision.” While the petitioners and intervenors cite the permitting approval in general ways, DNR made a number of key findings in these documents regarding reclamation and hydrologic impacts: Diamond Shamrock’s Wetland Revegetation Plan satisfactorily addressed DNR’s initial concerns about whether wetland habitat could be restored. The agency noted, however, that the plan would be subject to continuing DNR review and that, if appropriate, changes could be made to the plan during actual mine operation. 222 The project was subject to several DNR stipulations relative to reclamation measures and activities that would be required contemporaneous with mining. These included measures for sediment and drainage control (including sediment control ponds),223 and measures for protecting surface and groundwater hydrology (including additional hydrologic monitoring).224 In accordance with AS 27.21.180(c)(2), Diamond Shamrock had “demonstrated that reclamation as required by AS 27.21 and 11 AAC 90 can be accomplished under the reclamation plan,” subject to DNRrequired modifications.225 In accordance with AS 27.21.180(c)(3), “an assessment of the probable cumulative impact of all anticipated mining in the area on the hydrologic balance has been made and the proposed operation has been designed to
       
222 223 224 225

August 21, 1987 Decision (1987 Permitting Decision) on the Diamond Shamrock Chuitna Coal Project, issued by J.M. Brady, at 33-34.

Id. at 40-42, and at 53-92 (consisting of an August 16, 1987 report prepared for DNR by Arctic Hydrologic Consultants that provides a technical review on the proposed Sediment and Drainage Control Plan). Id. at 44-48. Id. at 125, and at 326-361 (containing Section IV findings).

10/24/11 Page 52 of 109

prevent material damage to the hydrologic balance outside the permit area.”226 Regarding stream restoration, DNR -- while acknowledging that “postmining baseflows will take ten to fifteen years to reach pre-mining levels and that it was important that enhancement techniques be maintained until the pre-mining flows are reached” -- found that the application complied with 11 AAC 90.327 (Stream Channel Diversion) for the initial permit term. 227
 

99.

On June 28, 1988, then DNR Commissioner Judith Brady adopted, with

minor modifications, the Hearing Officer’s May 21, 1988, proposed decision (1988 Administrative Appeal Decision) on the consolidated administrative appeals brought on the 1987 Permitting Decision by Trustees for Alaska, the project proponent Diamond Shamrock, and others. The Hearing Officer’s proposed decision recommended certain modifications to the permitting decision, including lengthening the permit term from five to ten years.228 Based on the administrative record, the Hearing Officer also found that “Diamond’s reclamation plan, including its wetlands restoration plan, is sufficient to restore the disturbed area to a condition that is capable of supporting fish and wildlife.”229 With this 1988 Administrative Appeal Decision, Commissioner Brady affirmed the 1987 Permitting Decision.

100. EPA also conducted an environmental review of the proposed coal mine
through its 1990 FEIS and issued a 1990 ROD approving the proposal. Thereafter, EPA issued an NPDES permit for the mine’s wastewater discharges. In the twovolume 1990 FEIS and the 1990 ROD, EPA considered several factors and made a number of key findings:

226 227 228 229

Id. at 125, and at 362-404 (containing Section V findings). Id. at 202. 1988 Administrative Appeal Decision at 5-7. Id. at 33-35.

10/24/11 Page 53 of 109

EPA considered numerous impacts the project potentially could have on the environment, including possible impacts to wetlands, subsistence, fish and wildlife, and associated habitat impacts. 230 EPA concluded that the area in which the project was to be located was not pristine. For example, it had been previously entered for logging and oil and gas purposes.231 EPA stated the following regarding potential impacts to wetlands: The acidic, muskeg-type wetlands which are widely dispersed throughout the area are not highly productive and the net primary productivity of replacement communities could be as high or higher than the communities that now exist. Therefore, adverse impacts to primary wetland productivity would not be significant on a regional scale. Food webs would be interrupted in the immediate vicinity of pre-mining wetland areas, but such interruption would probably not be significant on a regional basis because of the isolated nature of most area wetlands and the large extent of similar wetlands outside the project area.232 EPA noted that the wetlands within the Diamond Shamrock Chuitna Coal Project area were similar to wetlands found outside the project area (i.e., the Chuitna watershed/drainage).233 In the ROD, EPA stated that the authorizing agencies, including EPA and DNR, anticipated that reclamation within the project area would be undertaken in accordance with specific requirements, and therefore feasible.234

101. After the Commissioner upheld DNR’s permitting decision upon appeal,
multiple plaintiffs, including Trustees for Alaska, appealed the Commissioner’s

230 231 232 233 234

1990 FEIS at 5-11, 5-16, and 5-75. Id. at 5-136. Id. at Appendix F, at 2-3. Id. at 3. 1990 ROD at 6, and at 9-12. See also 1990 FEIS, at 2-31 to 2-34.

         

10/24/11 Page 54 of 109

decision.235 With the exception of one modification, which required a separate ASCMCRA permit for an eleven mile access/haul road from the mine site, the superior court upheld the permitting decision. Upon Trustees’ appeal of the superior court’s decision, the Alaska Supreme Court -- while remanding the decision to DNR for further consideration of cumulative effects of activities associated with the permit, and reconsideration of the reclamation bond amount -- addressed Trustees’ contention that DNR erred in approving the proposed plan for restoration of ecological functions and revegetation. Among other things, the Court held: that DNR had found that the proposed reclamation and wetlands restoration plans for the leased lands were “sufficient to restore the disturbed area to a condition capable of supporting fish and wildlife.”236 that DNR acted reasonably in accepting the restoration plan, because the plan describes how wildlife habitat will be recreated by constructing peat-filled depressions which will be planted with various plant species. In addition, three sediment ponds will be inoculated with plant and insect life forms, and seedlings will be planted to provide a vegetation canopy layer for the benefit of wildlife.237
   
235 236 237

102. The petitioners fail to provide convincing evidence with their petition to
suggest that anything has changed since DNR’s 1987 Permitting Decision determining that the restoration and reclamation plans were sufficient (including to restore disturbed fish and wildlife habitats), EPA’s 1990 findings that reclamation was feasible, and the Gorsuch decision, in which the Alaska Supreme Court upheld DNR’s decision concerning the feasibility of reclamation. Nor is there any evidence in the administrative record, or in the petition, that justifies issuing a finding that contradicts these earlier decisions.

103. The findings and other information contained in the foregoing documents
provide an important backdrop for the following discussion. Allegation I relies on a number of faulty premises, speculative information, misinterpretation of regulatory
Gorsuch, 835 P.2d at 1239. Id. at 1249. Id.

10/24/11 Page 55 of 109

requirements and performance standards, a failure to assume that contemporary coal mining practices will be followed, as well as selective citation to information that, as a whole, does not support the contention that reclamation in accordance with ASCMCRA is not technologically feasible. Indeed, with respect to each of the petitioners’ allegations (I, II, III, and IV), rather than assuming that contemporary mining practices will be followed and that any approved site-specific project must show it will comply with performance standards or the project will not be approved, the petitioners essentially assume that these practices and standards will not be met. That is not the basis upon which an unsuitability petition is reviewed and decided. 238 A. Petitioner’s overarching assertion that reclamation requires restoration of the petition area to the premining condition and that there is no higher and better use of the area than for fish and wildlife habitat.

104. Petitioners’ overarching assumption in Allegation I is that the petition
area must be returned to its premining condition and that “there is no higher and better use” of anadromous water bodies and the riparian areas than to support fish and wildlife habitat. 239 This allegation calls into play the state’s postmining land use regulation at 11 AAC 90.481, which states, in relevant part, the following: (a) All disturbed areas must be restored in a timely manner to conditions that are capable of supporting (1) the uses which they were capable of supporting before any mining; or (2) higher or better uses achievable under the provisions of this section.

105. Petitioners are mistaken that the petition area must be returned to its
pre-mining condition for at least five primary reasons. First, as an initial matter, embedded in SMCRA and ASCMCRA is the recognition that coal mining will
11 AAC 90.701(a)(5)(a petition must assume “that contemporary mining practices required under AS 27.21 and this chapter would be followed if the area were mined”). See also AS 27.21.210 (stating that all permits issued under the Act shall require that surface coal mining and reclamation must comply with environmental performance standards). OSM has also stated that a petitioner “must assume that contemporary mining practices required under the applicable regulatory program will be followed.” 48 Fed. Reg. 41312, 41328-29 (Sept. 14, 1983). Accord In re Permanent Surface Mining Regulation Litigation, 620 F. Supp. 1519 (D.D.C. 1985).
238 239

Petition at 15.

10/24/11 Page 56 of 109

significantly impact an area.240 Thus, state and federal law authorize surface coal mining despite its effects on the environment.

106. Second, petitioners’ argument related to the appropriate postmining land
use is premature. Under state law, determining the “higher or better” postmining use will be addressed during the permitting phase when the operator must present a postmining reclamation plan, which “must contain a detailed description of the proposed use, following reclamation, of the land to be affected by surface operations or facilities.”241

107. Third, a petition must assume that “that contemporary mining practices
required under AS 27.21 and this chapter would be followed if the area were mined.”242 DNR’s regulation is consistent with federal law, where the OSM has also stated that a petitioner “must assume that contemporary mining practices required under the applicable regulatory program will be followed.”243 Yet petitioners turn this standards on its head -- i.e., Trustees argues that “in order for reclamation in accordance with SMCRA and ASCMCRA to be considered feasible, it must meet the performance standards that the DNR has established to . . . . Surface coal mining and reclamation on lands within the Chuit River watershed . . . would be incapable of meeting a number of these performance standards[.]’”244 Consequently, petitioners, by assuming that any mine in the Chuitna watershed will not be able to comply with DNR’s performance standards, have misconstrued the petition process.

108. Fourth, petitioners fail to acknowledge that a mine operator will not
receive the requisite permits if it cannot satisfy the performance standards set out in 11 AAC 90.481. Thus, to the extent that an operator cannot meet the performance standard cited by petitioners (11 AAC 90.481), it will not receive the requisite permits.

240 241 242

30 U.S.C. § 1202; AS 27.21.010. This issue is discussed in more detail below. 11 AAC 90.087. 11 AAC 90.701(a)(5).

243 48 Fed. Reg. 41312, 41328-29 (Sept. 14, 1983).
244

Petition at 16.

10/24/11 Page 57 of 109

109. And fifth, petitioners assume inaccurately that an area’s premining uses
must dictate the appropriate postmining uses. 245 But one cannot simply assume that the premining land use is the “higher and better use” for an area. Instead, as discussed below, the landowner and the regulatory authorities determine the appropriate postmining land use.

110. More specifically, petitioners’ arguments related to the “higher and better
use” of these lands must be considered in connection with several other applicable provisions, including 11 AAC 90.481(c) and 11 AAC 90.087, area management plans, 246 as well as in consultation with the affected landowner.

111. State regulation defines “higher and better uses” as those “postmining
land uses that have a higher value or other benefit to the landowner or community than the premining land use.” 247 Determination of the postmining land use may be generally identified by the land owner prior to any coal mining activity, and then with more specificity in the permitting phase. Thus, there is no presumption, as petitioners assert, that the “higher and better” postmining land use for the petition area is the support of fish and wildlife habitat, although those uses would certainly be considered at the appropriate time. And under 11 AAC 90.481(c), when considering higher and better use, the Commissioner would consider measures to prevent or mitigate adverse effects on fish, wildlife, and related environmental values and threatened or endangered plants as identified and incorporated into the postmining land use plan, if appropriate.

112. As noted previously, ownership of land within the petition area and the
larger Chuitna watershed is mixed, and consists of the following: State lands, private lands (with the surface estate belonging to Tyonek Native Corporation), CIRI lands, Kenai Peninsula Borough lands, Trust lands (managed by the Trust Land Office (TLO)), and parcels owned by private individuals. For those lands lying in the petition area, as well as for any areas in the larger Chuitna watershed, “higher and better uses” of these lands would be determined after consultation with the relevant land holders during the permitting phase of a specific coal mining project.
245 246 247

Petition at 15. AS 27.21.260(a)(1). 11 AAC 90.911(50).

10/24/11 Page 58 of 109

113. In its January 5, 2011, letter commenting on the petition, the TLO
correctly points out some of the regulatory requirements applied in considering postmining uses: While fish and wildlife habitat may be an ancillary use of this land, the TLO is obligated to consider any viable use of this land in the future that could be (sic) produce benefits to The Trust and its beneficiaries. The TLO fully anticipates having input into the reclamation plan to enhance the value of this land for future uses. The provisions of 11 AAC 90.087 and 11 AAC 90.481 address post mining land use and provide that consideration be given to making the proposed operation consistent with surface owner plans and creating conditions that are capable of supporting higher and better land uses.248 Thus, for the Chuitna Coal Project, TLO is the landowner that has a major stake in determining, in consultation with regulatory authorities, the postmining land use for this specific project’s affected area.

114. Moreover, as required by AS 27.21.260(a)(1), reviews of available land
planning documents for the Chuitna watershed, through which the petition area meanders, have been conducted. Area plans provide a useful tool to guide permitting decisions both before and after mining.

115. The primary guide for state decisions on state land in the petition area is
the 2000 Kenai Area Plan. This plan specifically excludes federal, borough, private, Native Corporation, and Trust Lands.249 Prior to the transfer of landownership of the PacRim Chuitna coal leases to the Trust, those leased lands were owned by the State. Coal development was one of the primary uses designated for the area under both the 2000 Kenai Area Plan (specifically indentifying the “Chuitna Area Coal Leases”)250 and the previously applicable 1985 Susitna Area Plan. 251 The Kenai Area Plan anticipates mining of fish streams and fish habitat by noting that when DNR issues a permit for mining in or adjacent to a fish stream, the activity will be conditioned by the permit to be protective of fish, and noting that mining in fish streams requires permits from DEC and ADF&G.252 The 2000 Kenai Area Plan also states that the postmining land

248 249 250 251 252

January 5, 2011 Trust letter at 4. 2000 Kenai Area Plan at 1-9. Id. at 3-308. 1985 Susitna Area Plan at 295-96. 2000 Kenai Area Plan at 2-34.

10/24/11 Page 59 of 109

use is to “provide high value habitat for moose and provide water quality for downstream fisheries.” 253 With the transfer of ownership of the lands, identification of postmining land uses are subject to the Trust’s discretion.254

116. Review of the Kenai Peninsula Borough’s 2005 Comprehensive Plan
shows that it recognizes coal as an economic resource within the borough, but does not specifically discuss land use plans within the watershed. The 1988 Chuitna Area Resource Development Plan discusses the borough’s “keen interest in potential large scale development of coal” 255 in the Chuitna watershed, including roads, conveyors, and ports, but does not discuss postmining land use. Instead, it relies on the State’s planning documents to guide land use. The remainder of the land is either Native Corporation or Mental Health Trust lands which are guided by their own planning and development strategies, and these landowners support responsible coal mining operations.

117. For the foregoing reasons, the petitioners’ allegation rests on a
misinterpretation of the regulatory requirements and the misapplication of these requirements. The above discussion shows that the determination of the postmining land use is at the discretion of the landowner, with some input and approval necessary by the regulatory authority, and that, as a practical matter, postmining land uses are more formally fashioned during the permitting phase of a specific proposed coal mining operation. Therefore, declaring that there can only be one higher and better use at this stage is premature. B. Petitioners’ allegation that construction and operation of a surface coal mine in the petition area would irreparably harm the area’s hydrological balance.

118. Petitioners’ contend that surface coal mining would irreparably harm the
area’s hydrological balance, destroying streams, riparian areas and wetlands in the

253 254

Id. at 3-307.

Transfer of ownership of lands within the petition area, including the PacRim leased lands, to the Trust, had actually been contemplated since 1956, but delayed due to litigation. Transfer of the lands was finalized in 2010. Case abstracts for ADLs 36911, 36913, 36914, 37002, and 59502.
255

Kenai Peninsula Borough’s 2005 Comprehensive Plan at I-1.

10/24/11 Page 60 of 109

Chuitna watershed, and dramatically affecting the local hydrology. 256 To support this argument, petitioners cite one performance standards (11 AAC 90.321) that protects the area’s hydrologic balance and claim that a coal mine in the petition area cannot meet this standard.

119. The petitioners’ argument is unavailing because they (i) take the
apparent position that coal mining operations can have no adverse impacts on areas where mining activities occur; (ii) improperly assume that performance standards will not be followed; and (iii) ignore several other performance standards that would apply to any coal mining operations in the area to protect the Chuitna watershed’s hydrological balance.257

120. Both Congress and the Alaska Legislature, in respectively enacting
SMCRA and ASCMCRA, anticipated that adverse impacts will necessarily occur during construction and coal mining. Indeed, the provisions contained in SMCRA and ASCMCRA recognize that coal mining will have impacts to surface and groundwater within the disturbed mining area and that a balancing of resource development and environmental protection is necessary.258 The legislative history and discussion related to hydrologic balance assumes that there will be significant impacts within the mine area itself: “The total prevention of adverse hydrologic effects from mining is impossible and thus the bill sets attainable standards to protect the hydrologic balance of impacted areas within the limits of feasibility.”259 Put simply, the standard for a lands unsuitable petition and a mandatory designation is not whether operations will have substantial impacts as petitioners allege at times, but rather whether there will be irreparable harm that makes reclamation in accordance with ASCMCRA technologically infeasible.

256 257

Petition at 16-29.

These include the following regulations set out in Article 11, Chapter 90, of the Alaska Administrative Code: .311, .313, and .315, regarding removal, conservation and storage, and reapplication of top soil; .343, .085, regarding preventative practices that must be taken to prevent long-term adverse changes to area hydrology; .451, .453, .455, and .457 regarding measures for revegetation during reclamation. 30 U.S.C. § 1202; AS 27.21.010.

258 259

H.R. REP. No. 218, 95th Cong. 1st Sess. 109 (H.R. 2 April 22, 1977). Elements of mine regulation program; Mining impacts on hydrologic balance, OSMRE COALEX Report at 235.

10/24/11 Page 61 of 109

121. To reduce, reclaim, and avoid coal mining’s adverse impacts, state law
imposes performance standards and reclamation requirements. For purposes of the petition, we must assume the performance standards will be followed.260 11 AAC 90.321 (Hydrologic Balance) provides performance standards that, among other things, require that “[o]perations must be planned and conducted to prevent long-term adverse changes in the hydrologic balance in both the permit area and adjacent areas.” 261 The regulation also provides that “[c]hanges in water quality and quantity, in the depth and flow patterns of ground water, and in the location of surface and subsurface drainage channels must be minimized so that the approved postmining land use of the permit area is not adversely affected.”262 Further, an “operator shall comply with all applicable federal and state water quality statutes and regulations.” 263 A recurring flaw in the petitioners’ argument is the assumption that a permitted project would not be held to these performance standards. 264 This position directly conflicts with what the law requires, which is the presumption “that contemporary mining practices required under AS 27.21 and this chapter would be followed if the area were mined.”265

122. The petition correctly states that reclamation consists of those actions
taken to restore mined land as required by AS 27.21 and 11 AAC 90. But petitioners presume that restoration must be to the premining use. As discussed above, such a standard is not supported by statute or regulation.

123. The petitioners state that some of the wetland types within the Chuitna
watershed (not just the petition area), specifically fen and bog wetlands, are difficult, if not impossible, to restore.266 The argument that there should be no impacts to wetlands or that the same type of wetland needs to be reclaimed is not supported by

260 261 262 263 264

AS 27.21.210; 11 AAC 90.701(a)(5). 11 AAC 90.321(a) (emphasis added). 11 AAC 90.321(b). 11 AAC 90.321(c). See, e.g., Petition at 16.

265 11 AAC 90.701(a)(5). See also AS 27.21.210 (stating that all permits issued under the Act shall require that surface coal mining and reclamation must comply with environmental performance standards). 266

Petition at 20-25.

10/24/11 Page 62 of 109

the applicable law. Instead, the reestablishment of wetlands is based on the approved postmining land use and any proposed project meeting the requirements of 11 AAC 90.337 – 317 dealing with topsoil, 11 AAC 90.321 dealing with the protection of hydrologic balance, 11 AAC 90.451 dealing with revegetation, and 11 AAC 90.451 dealing with standards for assessing revegetation success.

124. Petitioners’ argument also overlooks the fact that state and federal
agencies have made findings that reclamation in this area is technologically feasible. In the 1990 FEIS on the Diamond Shamrock Chuitna Coal Project, EPA stated that “[r]eclamation of the mine area would at least partly reverse the ground-water impacts from mining. After removal of the surface-water diversion systems, surface water together with incident precipitation would recharge the underlying spoil materials and with time result in the reestablishment of a ground-water regime similar but not identical to the premining condition.”267 DNR also found in its 1987 Permitting Decision that reclamation of the activities proposed for the Diamond-Shamrock Chuitna Coal Project was technologically feasible and that the Reclamation Plan met the requirements of 11 AAC 90.268 Thus, the findings in both the 1990 FEIS and DNR’s 1987 Permitting Decision contradict the petitioners’ allegation that reclamation, including of wetlands, is not feasible.

125. Nonetheless, the petitioners selectively cite portions of the 1990 FEIS to
assert that reclamation of wetlands and riparian areas is not technologically feasible. The petitioners cite statements that, at first blush, appear to support their allegations, but omit other statements that discuss potential impacts and proposed reclamation that ultimately negate the contention that reclamation of coal mining activities is not technologically feasible. For example, petitioners quote the following from the 1990 FEIS regarding impacts to groundwater: “Impacts to groundwater regime as a result of mining operations would be substantial and would affect recharge and discharge relationships; quantity, quality, and direction of groundwater flows; and quantity and quality of surface water.” 269 However, petitioners fail to mention two other key

267 268 269

1990 FEIS at 5-20. 1987 Permitting Decision at 125. 2010 Petition at 25 (quoting 1990 FEIS at 5-16).

10/24/11 Page 63 of 109

observations EPA reached: “These impacts are unavoidable; however, with proper planning, the impacts can be minimized.”270

126. Petitioners also selectively cite the 1990 FEIS to support their contention
that reclamation is not technologically feasible: Because of the long period required for soil formation, soils in the Diamond Chuitna mine area are highly susceptible to irreversible, disruptive impacts from surface mining. A major long-term disturbance would result from the removal of soils and overburden to reach the coal seams.271

127. Perhaps more importantly, petitioners omit what EPA concluded
regarding feasibility of reclamation: “The initial construction impact to soils would be eventually mitigated by implementation of the reclamation plan and successful revegetation.”272

128. In addition, EPA concluded in the 1990 FEIS that the reclamation plan
was consistent with legal requirements: The project reclamation plan, as required by the State Surface Coal Mining Permit, includes a plan for the restoration of wetlands in the mining area. This plan provides for the enhancement of wetlands development throughout the reclaimed mine area, and the rehabilitation of certain sediment control ponds. The permit also requires construction of a minimum of four 1/2 acre coho salmon rearing ponds. These requirements are subject to review and possible revisions as necessary with the goal of achieving the desired restoration of wetland functions. The wetland restoration measures would reduce net wetland losses expected as a result of the project. Post reclamation wildlife habitat value could be less than premining conditions due to reductions in habitat diversity now contributed by the interspersed wetland/upland areas; however, this diversity is expected to re-establish over the long-term. An extensive sediment pond system is planned, which is expected to reduce the hydrologic and water quality impacts associated with the direct loss of wetlands during the period of mining, as reclamation proceeds. 273

129. Significantly, in 1987, DNR, in its review of the Diamond Shamrock
surface coal mining permit application for the Chuitna Coal project, found that the mining and reclamation plans met the requirements of 11 AAC 90.083, 11 AAC

270 271 272 273

1990 FEIS at 5-16. 1990 FEIS at 5-4. Id. 1990 FEIS, App. F, at 2-3.

10/24/11 Page 64 of 109

90.085, 11 AAC 90.321, 11 AAC 90.323, and 11 AAC 90.335 - 90.353, and were protective of the hydrologic balance within the proposed mining area. 274

130. In 1990, while remanding the permitting decision on other grounds, the
Alaska Supreme Court upheld DNR’s decision concerning reclamation.275 The Supreme Court stated: In our view, DNR’s acceptance of the plan meets the reasonable basis standard. The plan describes how wildlife habitat will be recreated by constructing peat-filled depressions which will be replanted with various plant species. In addition, three sediment ponds will be inoculated with plant and insect life forms, and seedlings will be planted to provide a vegetation canopy layer for the benefit of wildlife. In light of the complexity of the subject matter, we will defer to DNR's conclusion that these measures will be adequate to restore wildlife habitat.276

131. The petitioners fail to provide compelling evidence with their petition to
suggest that there has been significant changes since DNR’s 1987 Permitting Decision determining that the restoration and reclamation plans were sufficient (including to restore disturbed fish and wildlife habitats), EPA’s 1990 findings that reclamation was feasible, and the proceedings in Trustees for Alaska v. Gorsuch, in which the Alaska Supreme Court upheld DNR’s decision concerning the feasibility of reclamation. Wetlands of a similar type occur throughout the petition area. While the petitioners cite several passages from the 1990 EIS that discuss wetlands in the area and their functions, this information does not contradict DNR’s earlier findings with respect to reclamation and restoration of wetlands and fish and wildlife habitat. Moreover, even though EPA found that there would be significant wetland impacts during operations in the Chuitna Coal project area, EPA made no finding that reclamation was not technologically feasible.

132. Not only have petitioners’ argument been addressed in previous
decisions, but the petitioners continue to rely on information that they submitted with their 2007 petition and which Commissioner Irwin found either did not provide competent evidence to support their allegations, or which, when inspected more

274 275 276

1987 Permitting Decision at 125, 283, and 383. Gorsuch, 835 P.2d 1239. Id. at 1249.

10/24/11 Page 65 of 109

closely, contradicted petitioners’ allegations. 277 The petitioners did not seek further review of these final findings, and dismissed with prejudice their lawsuit on Commissioner Irwin’s July 16, 2007 decision and corresponding February 14, 2008 decision on reconsideration.278

133. Additionally, the petitioners continue to rely on a 1998 report by Cooper,
et al., Hydrologic Restoration of a Fen in Rocky Mountain National Park, Colorado, USA 279 -- regarding 1990 wetland restoration efforts for fen wetlands systems in the Rocky Mountains, which does not support their allegations. The efforts documented in that paper were devoted to restoring fen systems for lands disturbed by agricultural activities that took place roughly one hundred years ago and relating to activities not likely subject to the regulations and practices used in contemporary agricultural activities, much less contemporary surface coal mining activities.280 These lands are also located in a much more arid environment than the petition lands in the Chuitna watershed. Additionally, at least one conclusion in the report appears to contradict the petitioners’ claim that fen systems cannot be restored: The ditch was blocked in an attempt to restore the hydrologic regime in the central and southern portions of the fen. Water-level data from three years prior to the restoration and four years after restoration show that blocking the ditch successfully restored surface sheet flow, high later summer water levels, and anaerobic soil conditions.281

134. The other reports that the petitioners continue to rely on that were
included with the 2007 Petition deal with studies of restoration efforts for sphagnum moss in Quebec,282 a wetlands restoration project in Hungary in a primarily agricultural and urban development area, 283 as well as a report of modeling approaches for the “prediction of effective water and lands use management aimed at
277 278 279

July 16, 2007 Decision on 2007 Petition at 8-9. For this reason, these arguments are likely barred by res judicata and collateral estoppel.

18 Wetlands 3 (1998), and Exhibit 6 to the current petition, and Exhibit 4 to the 2007 petition. Petition, Exhibit 6 at 336-37. 2010 Petition, Exhibit 6 at 335.

280 281

282 2010 Petition, Exhibit 15, Shantz, et al., Hydrological changes following restoration of the Bois-des-Bel Peatland, Quebec, 1991-2002, 331 Journal of Hydrology 543 (2006).

2010 Petition, Exhibit 9, Middleton, et al., Fen Management and Research Perspectives: An Overview, in Wetlands: Functioning, Biodiversity Conservation, and Restoration 191 (2006).
283

10/24/11 Page 66 of 109

mire conservation and restoration in primarily Western Siberia.284 These studies discuss the difficulties of restoring wetlands but do not provide relevant data and information to support petitioners’ argument in Allegation I that restoring wetlands, particularly fens, is not technologically feasible.

135. Petitioners also continue to rely on another report they assert shows that
fens and bogs cannot be restored, Compensating for Wetland Losses Under the Clean Water Act, 285 but the excerpts from the report do not discuss any restoration measures that might be applicable to further aid analysis of the validity of this assertion, including contemporary coal mining practices and performance standards. The primary purpose of the report is to provide guidance to the U.S. Army Corps of Engineers and EPA in making permitting decisions and to develop mitigation strategies that the agencies can use in their decisions under section 404 of the Clean Water Act. 286 While the report is cited in the petition to support the claim that any proposed fen/bog restoration is not technologically feasible, petitioners’ claims are contradicted by other competent and scientifically sound information discussed in detail below, which demonstrates that, while it may be difficult, it is possible to restore fens.

136. In short, as Commissioner Irwin previously found, none of these reports
deal with disturbances caused by surface coal mines or mining in general, nor do they assess the effectiveness of contemporary coal mining practices and performance standards applicable to both operational and reclamation phases of surface coal mining activities, thus rendering the reports not competent for purposes of review to determine lands unsuitable for surface coal mining operations. Moreover, these reports do not show that reclamation in accordance with ASCMCRA of lands in the petition area disturbed by construction and operation of surface coal mining operations would not be technologically feasible.

137. In addition to the foregoing decisions that have found the hydrological
balance and wetlands can be restored, there is evidence of contemporary techniques
2010 Petition, Exhibit 5, Bleuten, et al., Hydrological Processes, Nutrient Flows and Patterns of Fens and Bogs, Wetlands and Resource Management 190 (2006).
284 285 2010 Petition at 23-24, discussing Exhibit 10, a National Research Council report entitled Compensating For Wetland Losses Under The Clean Water Act, at 2 (2001). 286

33 U.S.C. § 1344.

10/24/11 Page 67 of 109

that can be used to restore wetlands after mining. For example, in its intervention on the petition, PacRim notes other contemporary coal mining practices that are considered to promote reclamation success, including: Modern mining operations are conducted and reclaimed in a manner addressing sequential changes in the hydrologic control infrastructure, which minimizes impacts during mining and shortens the period of hydrologic restoration; Modern mine operations also incorporate material handling plans, which often include segregation of materials according to specific properties and reclamation or hydrologic benefits (i.e., topsoil, alluvium, surface gravels, aquiclude or aquitard materials) and dictate how these materials will be placed into the reclamation areas; and Modern groundwater models, such as MODFLOW developed by the USGS, are able to predict mining impacts to groundwater and instream flows, allowing a mine operator to formulate plans to mitigate potential water table declines and associated stream flow losses during mining, as well as proving a means to mitigate impacts after mining while groundwater elevations naturally recover.287
 
287 288 289

reclaimed after disturbance by mining do exist. Within the Chuitna watershed, Exhibit 2 to PacRim’s January 19, 2011, letter on the petition, shows compelling evidence of wetlands reestablishing after disturbance by mining activities. PacRim also provided recent reports concerning revegetation of disturbed areas in Alaska, including Barclay’s willow and Diamond-leaf willow,288 as well as sedges in wetland areas.289 DNR reviewed these reports, and found them to be competent and scientifically sound data and information documenting successful revegetation efforts that are viable techniques that should be considered for reclamation planning in the coal-mine permitting context.

-- while small scale -- also exist. At the headwaters of Stream 2003, a test pit was dug to a depth of approximately seventeen feet to the top of a coal seam. The area was backfilled and graded with little additional work conducted to encourage vegetation or wetlands regrowth. During recent environmental
PacRim’s January 19, 2011 letter commenting on the 2010 Petition, at 13. Walter, et al. (2005). Nolan and Wright (2007).

   

138. In fact, many examples of where high value wetlands have been

139. Examples of the ability to reclaim areas in the Chuitna watershed

10/24/11 Page 68 of 109

baseline work, including wetlands and vegetation mapping, this area was delineated as undisturbed natural ground. The report on this site stated that “[t]he lake and surrounding area are characterized as a vegetated pond with high value wetlands which contribute to carbon export and food chain support to adjacent streams.” 290

140. Although small in scale, this site is important because it shows that a
functional wetland was established without additional mitigation or maintenance that would be required as part of a reclamation plan under 11 AAC 90.083. This site, along with several other sites disturbed by exploration activities within the Chuitna watershed, were inspected as part of the department’s field work on the petition.

141. With its 2010 Petition, the petitioners included three recent reports that
they commissioned which they assert support their allegation that reclamation is not technologically feasible. These reports are the “Chuitna Coal Mine baseline monitoring and restoration plan review” by Mark Wipfli (2009 Wipfli Report), 291 “Report on Chuitna Coal Project of PacRim Coal” (2009 Palmer Report),292 and a “Report on Chuitna Coal Project Aquatic Studies and Fish and Wildlife Protection Plan” by Lance Trasky (2009 Trasky Report).293 These reports include analyses of the potential impacts from surface coal mining based on a review of draft project and baseline documents that PacRim Coal is developing for its proposed Chuitna Coal Project. As the permitting process for the proposed Chuitna Coal Project has progressed, these draft project and baseline documents have changed considerably in response to comments and concerns raised by state and federal agencies. Consequently, the three reports commissioned by the petitioners have limited applicability in relation to the evolving proposed project.

142. In any event, petitioners’ reports discuss the importance of the existing
food web and hydrologic linkages in understanding the premining ecosystem and they

290 291

HDR Alaska (2008).

Exhibit 19 to the petition. Exhibit 20 is an executive summary of the conclusions presented in Exhibit 19. Exhibit 12 to the petition. Exhibit 13 is a summary of the conclusions presented in Exhibit Exhibit 17 to the petition. Exhibit 18 is a summary of the conclusions presented in Exhibit

292

12.
293

17.

10/24/11 Page 69 of 109

assert that the data is not adequate to support a permitting decision, e.g., “stream restoration presented in the Fish and Wildlife Protection Plan is conceptual and few specifics are provided.”294 The ADF&G agreed with the author that there was not enough information in these reports to address their concerns about reclamation,295 but goes on to state ADF&G could not “conduct a thorough analysis until finalized plans are submitted.”296 The 2009 Wipfli Report states that the reports reviewed contain important biological information but are missing important baseline studies and potential impacts to the Chuitna watershed. From these reports, the petitioners argue that the understanding of streams and riparian areas has changed since the original Diamond Shamrock surface coal mining permit application was reviewed and use this as their basis for requesting designation of the petition area as lands unsuitable for mining.

143.

The 2009 Palmer Report 297 is a review of draft baseline documents for

the proposed Chuitna Coal Mine. The report focuses on the potential impacts the proposed Chuitna Coal Mine would have on streams and the environment both in the project area and downstream, and raises concerns with the baseline studies associated with the Chuitna Coal Project. 298 The petitioners cite the 2009 Palmer Report to support their allegation that the reclamation of streams is not technologically feasible.299 However, in light of stream restoration projects associated with mining projects that are discussed in this decision, the 2009 Palmer Report fails to demonstrate that reclamation, or stream restoration, is not technologically feasible.300 Examples discussed in this decision dealing with stream restoration after both large and small scale mining, including surface coal mining, show where streams

294 295

2009 Trasky Report at 53.

Informal Comments on Three Reports Associated with the Proposed PacRim Chuitna Coal Project, ADF&G (December 2010). Id. at 2. Exhibit 12 and 13 to the petition.

296 297 298

These concerns have also been expressed by state and federal agencies reviewing the project, and staff with the agencies has asked PacRim for additional information and baseline studies, which are currently ongoing. Petition at 28. See Section F, below, relating to Allegation I.

299 300

10/24/11 Page 70 of 109

have been successfully reclaimed, along with the ecological functions of the restored portions of those streams.

144. The 2009 Trasky Report, which is another report cited by petitioners,
stresses the importance of nutrients that support fish populations, e.g., “Nutrients from salmon eggs and carcasses play a major role in the productivity of both freshwater and riparian ecosystems and in perpetuating future salmon runs.” However, the report fails to take into account proposed or mandated mitigation that would require the addition of nutrients such as pollock bone meal, transported salmon carcasses, and salmon carcass analogs. Selected examples of nutrient addition to salmon bearing waters include those from Revillagigedo Island, Southeast Alaska 301 Grilse Creek 302, and Cluxewe River in British Columbia 303, and these examples confirmed an increase in salmonids size and weight, as well as an increase in abundance of other food chain organisms. These examples support the proposition that nutrient addition can be used to mitigate the loss of any marine derived nutrient caused by mining operations and can be continued as mitigation throughout the reclamation period until natural sources can be re-established.

145. The ADF&G also reviewed the petition, including the 2009 reports
prepared by Wipfli, Palmer, and Trasky. ADF&G concluded that “information submitted with, or in response to the petition, is insufficient at this time to determine whether reclamation of anadromous water bodies or riparian areas anywhere within the entire Chuitna River watershed is not technologically feasible.”304 The letter goes on to state that many of the concerns raised by the petitioners with regard to reclaiming anadromous water bodies and their associated riparian areas need to be addressed on a project-specific basis, when performance standards and other requirements are considered. 305 This is a sound conclusion.

301 Restoring Productivity of Salmon-Based Food Webs: Contrasting Effects of Salmon Carcass and Salmon Carcass Analog Additions on Stream-Resident Salmonids, Wipfli and others (2004). 302 303 304 305

Salmon River Nutrient Enrichment for Fish Habitat Restoration (2006). Nutrient Enrichment of Vancouver Island’s Cluxewe River (2007). Alaska Department of Fish and Game Letter dated May 26, 2011, at 2. Id.

10/24/11 Page 71 of 109

146. Where the petitioners’ commissioned reports do discuss reclamation, the
reports either do not apply the appropriate reclamation standards based on the postmining land use authorities, or the conclusions reached in these reports are speculative and not supported by competent and scientifically sound data. It is also important to note that contemporary mining practices have also changed with the advance of new technology and increased understanding of reclamation processes.306 Contemporary mining practices require continuous monitoring and mitigation of reclaimed areas. The petitioners and the authors of the commissioned reports base their arguments on the erroneous assumption that no adverse impacts at all are allowed to fish and wildlife habitat, wetlands, and site hydrology as a result of surface coal mining operations.

147. The petitioners also cite a 2010 report (Mountaintop Mining
Consequences, Palmer, et al.) documenting the impacts of valley fills307 on headwater streams in the Appalachian region. Mine operators create valley fills when they dispose of excess spoil/overburden material on valley floors. This material consists of spoil and overburden that is not used in reclaiming the postmining topography after mining has been completed. This activity is typically associated with “mountain top removal”308 operations in the Appalachian region. In Alaska, there is only one permitted valley fill, located at the Two Bull Ridge Mine near Healy, Alaska. The petitioners cite the valley fill report 309 to raise concerns that it would be impossible to reclaim premining vegetation, especially woody vegetation.

306

Examples of contemporary mining practices include mining and reclamation plans that consider the roles landforms have on the function of reclaimed areas, the use of GPS controlled mining equipment, and extensive monitoring and mitigation plans that allow the mining and reclamation operation to adapt to real world conditions.

307

"Valley fill" is defined as a “fill structure consisting of any material other than organic material that is placed in a valley where side slopes of the existing valley measured at the steepest point are greater than 20 degrees or the average slope of the profile of the valley from the toe of the fill to the top of the fill is greater than 10 degrees.” 11 AAC 90.911(120). “Mountaintop removal” is defined as “surface mining which removes an entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill, by removing substantially all of the overburden off the bench and creating a level plateau or a gently rolling contour, with no highwalls remaining, and capable of supporting postmining land uses approved in accordance with 11 AAC 90.141.” 11 AAC 90.911(64). Petition at 22.

308

309

10/24/11 Page 72 of 109

148. However, the potential circumstance petitioners cite has not been an
issue in Alaska, even in areas where the reclamation effort did not involve a valley fill. For example, based on documentation in both an evaluation report and a recent final bond release for the Gold Run Pass permit, revegetation of wood species was well above the standard required by 11 AAC 90.457. 310

149. At present, there are no planned or anticipated valley fills in the petition
area. Notwithstanding, there is documentation noting successful reclamation of woody vegetation at the Lone Creek Bulk Sample sites in the Chuitna watershed. 311

150. The petitioners assert that the valley fill report provides evidence that
surface coal mining causes permanent damage to streambeds and riparian areas and that there are no examples of large scale reclamation associated with mining.312 However, the valley fill report is narrowly focused on impacts of mountaintop removal and the disposal of valley fill in West Virginia. This information is countered by the information discussed elsewhere in this document, including competent information relevant to the Alaska environment and stream reclamation efforts in Alaska. Moreover, it is noteworthy that the Palmer, et al., valley fill report does not discuss or consider successful stream restoration efforts at surface coal mining operations in other parts of the United States, some of which are documented in this decision.

151. During review of the petition, DNR found reports that recommended
management practices to successfully restore fen/bogs. A 2003 study by the University of Minnesota on fen restoration, Fen Restoration Final Project Report, 313 recommended a number of measures to promote successful fen restoration, including direct haul of soil material to its final location, timing targets for soil removal and placement, methods for transplanting desired vegetation and controlling water levels. Another paper, Covering Bare Ground Suppresses Unwanted Willows and Aids a Fen

310

Revegetation Evaluation of Gold Run Pass July 2006-August 2008 Report for Bond Release (Dot Helm, November 2008); Gold Run Pass Phase III Bond Release (March 3, 2011).

311

Inspection Report Diamond Chuitna Mine Phase 0 (October 1, 2011). This site is also discussed in Exhibit 2 to PacRim’s January 19, 2011 comment letter on the petition, at 9 (blue and red test pits). Petition at 21. Johnson, K. W. and Valppu, S. H. (2003).

312 313

10/24/11 Page 73 of 109

Meadow Restoration in Switzerland, 314 provides recommendations for controlling unwanted vegetation within a restored fen to limit competition and enhance the regrowth of desired vegetative species associated with fens. A study on the restoration of fens, Restoration of Degraded Boreal Peatlands, 315 cited the 1998 study by Cooper, et al., Hydrologic Restoration of a Fen in Rocky Mountain National Park, Colorado, USA, 316 as an example of a successful fen restoration project. The Cooper study is the same study cited by petitioners at pages 22-23 of the petition, and was also submitted with the 2007 petition. While the Cooper study addressed the difficulties the project encountered during and after competition of the project, it described mitigation measures that can be taken to minimize these difficulties and the study describes success at restoring fens.317 The management practices suggested by these reports is already required by 11 AAC 90.313 (Topsoil Storage) and is consistent with contemporary mining practices to direct haul soils to maintain their ecologic viability. Reclamation of wetlands, including type and location, is driven by the approved postmining land use. For any new projects within the Chuitna watershed, any disturbance to or loss of wetlands would have to be approved by DNR under AS 27.21 and by the Army Corps of Engineers under the Clean Water Act section 404 provisions. Ultimately, the decision to restore fens as part of reclamation is significantly tied to the landowner’s proposed postmining land use and consultation with DNR regarding that proposed use.

152. In accordance with AS 27.21.260(c)(1), the evidence in the administrative
record-- particularly in light of the contrary evidence discussed in this decision -- is insufficient to require my determination that, for the petition area’s hydrologic balance, reclamation in accordance with ASCMCRA is not technologically feasible. Moreover, the petitioners’ evidence is insufficient to support the conclusion that surface coal mining operations would irreparably harm the area’s hydrologic balance. Finally, many of the arguments and concerns raised by petitioners will also be addressed again at the permitting stage, based on project specific proposals.

314 315 316 317

Matthias Suter, Christine Prohaska and Dieter Ramseier (2006) Rochefort, Line and Lode, Elve, Ecological Studies, Vol. 188 (2006) 18 Wetlands 3 (1998). 2010 Petition, Exhibit 6 at 344.

10/24/11 Page 74 of 109

C. Petitioners’ allegation that reclamation would not restore groundwater recharge capacity in the petition area.

153. Petitioners claim that any surface mining within the Chuitna watershed
would not restore the recharge capacity, as required by the performance standard in 11 AAC 90.343 (Protection of Groundwater Recharge Capacity). 318 The petitioners assert that this allegation is reviewed under the mandatory designation standard set forth in AS 27.21.260(c)(1). This assertion is mistaken. Allegations regarding aquifer recharge are subject to the discretionary designation standard. Under AS 27.21.260(c)(2)(C), the Commissioner “may designate an area as unsuitable…if the commissioner determines that the operations in the area will affect aquifer recharge areas….” 319 In any event, whether the petitioners’ allegation that surface coal mining operations would not restore recharge capacity is reviewed under the nondiscretionary or discretionary designation standards, the evidence is insufficient to support their allegation.

154. In making this allegation, the petitioners quote selective portions of the
1990 FEIS. 320 A full examination of the 1990 FEIS, however, contradicts petitioners’ allegation: Reclamation of the mine area would at least partly reverse the ground-water impacts from mining. After removal of the surface-water diversion systems, surface water together with incident precipitation would recharge the underlying spoil materials and with time result in the reestablishment of a ground-water regime similar but not identical to the premining condition. 321

155. As stated earlier, one of ASCMCA’s purposes is to minimize adverse
impacts to the hydrologic balance, including the recharge capacity within the mine area, and this is reflected in 11 AAC 90.343. As expressed in the 1990 FEIS, the EPA concluded that the proposed reclamation was essential to minimizing adverse impacts and would facilitate recharge of the “groundwater regime similar but not identical to the premining condition.”322 This finding is again supported by DNR’s 1987 Permitting Decision to issue the permit for the Diamond Shamrock Chuitna Coal

318 319 320 321 322

Petition at 24-25. Emphasis added. Petition at 25. 1990 FEIS at 5-20. Id.

10/24/11 Page 75 of 109

Mine. 323 As required by AS 27.21.180(c)(3), the permitting decision found that there would be no material damage to the project or surrounding areas. 324

156. The petitioners assert that because “groundwater recharge capacity
cannot be achieved within a reasonable timeframe,” 325 the performance standard at 11 AAC 90.343 could not be met. Specification of a reasonable time frame is not set forth in the regulations. Moreover, the absence of a given time frame does not alone warrant an unsuitability determination, when there are a myriad of performance standards and other countervailing competent and scientifically sound data and information identified in this decision that support the conclusion that reclamation is technologically feasible.326

157. Petitioners also question the ability to preserve water quality during coal
mining operations and cite a few studies relating to those concerns. 327 These concerns, however, can be addressed, and potential impacts prevented, by applying the performance standards and requiring adherence to Alaska Water Quality standards.

158. In sum, in accordance with AS 27.21.260(c)(1), for groundwater recharge,
the evidence in the administrative record is insufficient to require my determination that reclamation is not technologically feasible. In accordance with AS 27.21.260(c)(2)(C), the evidence is insufficient to sway me to designate, in my discretion, any part of the petition area as unsuitable for surface coal mining operations due to groundwater recharge issues, because the evidence does not support a conclusion that operations anywhere in the petition area would “affect aquifer recharge areas or other renewable resource land in which the operations could

323 324 325 326

DNR’s 1987 Permitting Decision, at 386. Id. at 39. Petition at 25.

For example, under 11 AAC 90.085(a) and (c)(3), an application for a proposed mining operation would have to describe anticipated impacts to the recharge capacity and include plans for restoring the “approximate recharge capacity in the area” after mining is complete in accordance with 11 AAC 90.343.11 AAC 90.085(c)(3). Under 11 AAC 90.083(a) and (b)(1) and 11 AAC 90.085(c)(3), DNR requires that a reclamation plan include “a detailed timetable for the completion of each major step in the reclamation plan,” and that would include a timetable for restoration of the approximate recharge capacity. Petition at 25.

327

10/24/11 Page 76 of 109

result in a substantial loss or reduction to the long-range productivity of water supply,” in this instance, groundwater recharge. D. Petitioners’ allegation that reclamation would not restore aquatic productivity to premining levels.

159. The petitioners allege that reclamation would not restore aquatic
productivity for fish habitat to premining levels. This allegation cites the importance of the petition area as highly productive fish habitat, and that invertebrates within the petition area are an important food source for fish. 328 This argument is based on an interpretation of 11 AAC 90.327(d)(3).329 11 AAC 90.327(d)(3) provides: (d)When permanent diversions are constructed or stream channels restored after temporary diversions, the operator shall … … (3) establish or restore the stream to a longitudinal profile and cross section, including aquatic habitats that approximate refining stream channel characteristics and which may, using the best technology currently available, be expected to restore aquatic productivity to premining levels.330 This regulation means that any coal mining operation that plans to construct permanent diversions (i.e., rebuild stream channels) is directed to use the “best technology available” as part of the reclamation and mitigation plan that may be expected to restore aquatic productivity to premining level. As with other requirements of ASCMCRA, there is the understanding that mining will have adverse impacts to the environment, 331 including aquatic productivity, and that any adverse impact must be minimized or mitigated. Accordingly, there is no

328

The petitioners assert that this allegation is reviewed under the mandatory designation standard set forth in AS 27.21.260(c)(1). Petitioners are again mistaken. Allegations regarding restoration of aquatic productivity -- or, in other words, to reclaim losses or reduction to productivity that may be sustained as a consequence of surface coal mining -- are subject to the discretionary designation standard. Under AS 27.21.260(c)(2)(C), the commissioner “may designate an area as unsuitable…if the commissioner determines that the operations in the area will affect aquifer recharge areas in which the operations could result in a substantial loss or reduction of long-range productivity of water supply or food or fiber products.” But even if this allegation is reviewed under the nondiscretionary designation standard, the evidence is insufficient to support their allegation. Petition at 25-29. Emphasis added. See discussion at Allegation I, subsection B, above.

329 330 331

10/24/11 Page 77 of 109

requirement, as petitioners argue, that a petition must be granted if there is a showing that mining activity will have an adverse impact on the environment.

160. Petitioners’ interpretation of 11 AAC 90.327(d)(3) also ignores the
emphasized portion of this performance standard -- i.e., petitioners do not consider the application of “best available technology” and how this technology can be used to restore habitat.

161. The petitioners’ argument is misplaced for an additional reason:
other applicable performance standards will operate to protect water quality and hydrology, and seek to minimize adverse impacts on fish and wildlife. 332

162. Petitioners next cite examples of impacts to fish productivity that were
considered in the 1990 FEIS 333 as evidence demonstrating that aquatic productivity could not be restored. The cited examples are comments set forth in Chapter 5 of the 1990 FEIS, dealing with “Environmental Consequences.” A closer reading of Chapter 5 and the cited comments regarding potential impacts to aquatic productivity show the comments themselves were speculation, and not conclusions.334

163. Petitioners also fail to account for the mitigation required by DNR’s 1987
Permitting Decision,335 or how mitigation might be required by other state and federal permits,336 and how that mitigation was addressed in the 1990 FEIS: To mitigate for the unavoidable loss of approximately two miles of anadromous fish habitat in tributaries 200305, 200304, and 20030502 (ADF&G Nos. 247-20-10010-2030 - 3018 and 3012) the applicant shall construct replacement fish habitat. Replacement fish habitat shall consist of the construction and maintenance of at least four one-half acre coho salmon rearing ponds to be located adjacent to coho salmon spawning habitat in tributary 2003. The requirement also insists upon a monitoring plan to address the effectiveness of the mitigation:

332

11 AAC 90.323 (water quality); 11 AAC 90.343, 11 AAC 90.085,11 AAC 90.321 (hydrology); and 11 AAC 90.423 (fish and wildlife). Petition at 27. 1990 FEIS at 5-139. 1987 Permitting Decision at 11. 1990 FEIS at 5-1.

333 334 335 336

10/24/11 Page 78 of 109

Should the monitoring show that the ponds are not providing satisfactory coho salmon rearing habitat, as determined by ADNR in consultation with ADF&G, alternative mitigation may be prescribed as necessary to compensate for the lost fish habitat.337

164. Moreover, information regarding anadromous fish streams has advanced
since the 1990 FEIS, as has the understanding of the technology used to restore fish productivity in disturbed areas. In Alaska, several mitigation measures have been used successfully to restore productivity to impacted streams. Examples include the construction of off-channel rearing pond at the Granite Creek Material Site,338 which is used for coho and Dolly Varden rearing, and the restoration of Resurrection Creek for pink, coho, Chinook, chum and sockeye salmon. 339 Another mitigation measure used successfully was the Alaska Resource & Economic Development Inc.340 (ARED) system on the Moose Creek Restoration project. 341 The ARED system is designed to use existing wild salmon in an impacted stream to enhance fish population. This enhancement is accomplished by improving the survival rate of the salmon in their early life stages. In the Moose Creek project this technique has been used to help reestablish the Chinook and coho salmon populations. Other mitigation that has been used successfully in restoration projects, and discussed elsewhere in this decision, includes the addition of nutrients such as pollock bone meal, transported salmon carcasses, and salmon carcass analogs.

165. In addition, for reasons discussed above, the application of 11 AAC
90.327(d)(3) needs to be on a project-specific basis, using site specific information, including a detailed mining and reclamation plan, not area-wide information using the petition process.

166. In accordance with AS 27.21.260(c)(1), the evidence in the administrative
record is insufficient to require my determination that, for aquatic productivity (specifically fish habitat), reclamation in accordance with statutory and regulatory authorities is not technologically feasible. In accordance with AS 27.21.260(c)(2)(C),
337 338 339

Id. at 6-9 (quoting DNR’s 1987 Permitting Decision at 12). PacRim Coal Intervention Letter Exhibit 2.

Wildfish Habitat Initiative, http://wildfish.montana.edu/Cases/browse_details.asp?ProjectID=61 .
340 341

http://www.ared.net/index.htm .

Wildfish Habitat Initiative, http://wildfish.montana.edu/Cases/browse_details.asp?ProjectID=73 .

10/24/11 Page 79 of 109

the evidence is insufficient to cause me to designate, in my discretion, any part of the petition area as unsuitable for surface coal mining operations because of aquatic productivity, because the evidence does not support a conclusion that operations anywhere in the petition area would “affect aquifer recharge areas or other renewable resource land in which the operations could result in a substantial loss or reduction to the long-range productivity of water supply or food or fiber products.” Stated another way, there is insufficient evidence to support the allegation that there will be a substantial loss or reduction to the long-range productivity of aquatic productivity -including fish habitat, fish, or other food supply -- based on the petition, even assuming that fish habitat is the confirmed postmining land use for the delineated petition area. And, as a practical matter, it must be recognized that concerns regarding a proposed project’s ability to achieve the applicable performance standards with regard to water quality, minimization of damage to fish and wildlife, and design of precise reclamation measures for proposed postmining land uses is dealt with on a site-specific basis during the permitting phase. Such concerns cannot be appropriately addressed in the context of a lands unsuitable petition if petitioners fail to assume -- as they do here -- that contemporary coal mining practices will be followed. E. Petitioners’ allegation that surface coal mining in the petition area cannot be designed and operated to minimize changes in water quality and quantity and hydrology enough to ensure no adverse effects to fish and wildlife habitat.

167. Petitioners appear to assert that the Act mandates that a petition be
granted if there are adverse impacts to fish and wildlife.342 The proposition that no adverse impacts from surface coal mining operations is allowed is not consistent with the legislative expectation under either SMCRA or ASCMCRA. As noted in section B, above, adverse impacts during construction and operation are anticipated. The objective, though, is to minimize and avoid impacts, and to reclaim areas which are impacted.343

342 343

Petition at 29-33.

For example, regarding fish and wildlife, a coal mining operation “shall, to the extent possible using the best technology currently available, minimize disturbances and adverse impacts on fish, wildlife, and related environmental values, and achieve enhancement of such resources where practical.” 11 AAC 90.423(a).

10/24/11 Page 80 of 109

168. In making this allegation, the petitioners misconstrue 11 AAC 90.321(b)
to be a performance standard requiring “avoidance of adverse effects to pre-existing land uses.”344 This is not a correct statement of the regulation, because, as discussed in detail above, the focus is on “postmining land use,” whatever that land use may be determined to be in accordance with applicable authorities and consultation with the landowner.

169. The petitioners and a number of commenters, including the
Center for Science and Public Participation (CSP2), 345 raised concerns that water discharges from coal mining operations -- specifically discharges from the proposed Chuitna Coal Project -- will not meet Alaska Water Quality Standards, even after reclamation. These comments parallel concerns that have been expressed by state and federal agencies in their initial evaluation of preliminary plans submitted by PacRim for the Chuitna Coal project, but these comments were made based on preliminary information relating to a specific project and are too speculative for determining reclamation is not technologically feasible. Moreover, if PacRim’s final proposal cannot comply with performance standards (including compliance with Alaska water quality standards) it will not be permitted. Thus, petitioners -- once again -- fail to assume (as they must) that performance standards will be followed. And, the type of issue that CSP2 raised and addressed in the previous paragraph must be addressed as part of a project-specific review.346

344 345 346

Petition at 33 (emphasis added). CSP2’s January 18, 2011 letter in support of the petition.

The Alaska Department of Environmental Conservation echoed this view in reviewing CSP2’s comments in support of the petition: ….The agencies have not yet been provided all the data and plan information to determine the potential and degree of risk and suitable mitigation methods to address the multitude of issues concerning water quality and subsequent effects on habitat and fisheries. Once these issues have been identified on the basis of complete data and development plans, they will need to be reviewed and deliberated amongst the state and federal agencies for compatibility across the several permits that PacRim will need to obtain. Until such time as the agencies have been provided with complete permit applications with all the supporting data and documentation, it is pre-mature to determine if [CSP2’s] concerns directly apply to the Chuitna Coal Project.

10/24/11 Page 81 of 109

170. Petitioners also cite EPA’s statements in the 1990 FEIS that streamflow
reduction from the Chuitna Coal Project could be as much as 17% in the Chuitna River near Lone Creek during low flow periods, and that there might be a reduction of streamflow of 25% for Lone Creek during low flow periods. 347 However, neither citation presents EPA’s complete statement regarding its analyses and conclusions on these potential reductions. For example, regarding the Chuitna River, EPA stated: As indicated in Table 5-7, minimum flow in the Chuitna River immediately below the mouth of Lone Creek could be reduced by up to 17% during low flow periods in later years of mining. This reduction would represent an extreme worst case situation and would be unlikely during mining because of the addition of return water to the Chuitna drainage from the various mine area drainage systems.348 Regarding Lone Creek, EPA stated: As indicated in Table 5-7, minimum flows could be reduced during low flow periods (late summer and later winter) by up to 25 percent within the portion of Lone Creek east of the mine. As flows increase downstream, impact would be proportionally less. The above calculations of flow reduction assume no transfer of pit drainage to Lone Creek. During the first 10 years of mining, Diamond Alaska plans to release much of its pit drainage into Lone Creek; therefore net flow would actually increase at least temporarily. The up to 25 percent reduction would still occur in the event of pump failure or in the event that pit water freezes and cannot be pumped. 349

171. As stated throughout this decision, a petitioner must assume that any
mine that might be permitted in the petition area will follow contemporary mining practices and that the applicable regulatory standards established by ASCMCRA, including compliance with Alaska Water Quality Standards, will be imposed and adhered to. Neither DEC, which regulates wastewater, nor DNR, which issues coal operating permits, will issue authorizations that would allow discharges to exceed Alaska’s applicable statutory and regulatory requirements for water quality and quantity. The same is true for ADF&G, which will only issue Title 16 Habitat Permits if a mining proposal can show that statutory and regulatory requirements will be met.

DEC’s May 26, 2011 analysis and response to CSP2’s January 18, 2011 comment letter.
347 348 349

2010 Petition at 31. 1990 FEIS at 5-30. Id.

10/24/11 Page 82 of 109

172. In accordance with AS 27.21.260(c)(1), the evidence in the record is
insufficient to require my determination that -- for water quality, quantity, and hydrology that may provide fish and wildlife habitat within the petition area -reclamation in accordance with ASCMCRA is not technologically feasible. Moreover, the evidence is insufficient to support the petitioners’ allegation that surface coal mining operations would irrevocably alter the hydrology and aquatic productivity of the petition area, or the Chuitna watershed. F. Examples of Successful Stream and Wetlands Reclamation Projects

173. In addition to the information submitted by the petitioners, I am required
to review relevant, competent and scientifically sound data and information in making a determination on a petition alleging that reclamation is not technologically feasible.350 I have reviewed stream and wetland restoration and reclamation projects in Alaska and other parts of North America. Many of the examples reviewed include areas disturbed by mining, including surface coal mining.

174. The Valdez Creek Mine, located south of the Alaska Range, is an example
of mining-related successful stream reclamation. The mine operated as one of the largest gold producers in Alaska from 1984 to 1996 by the Valdez Creek Mining Company -- a consortium of Camindex Mines Ltd., Cambior Inc., and Barrick Resources Ltd.351 The stream hosts populations of grayling and trout, 352 and during some period of the operations, fish were transported around the mine site during the spawning period. The work was done under contract from Cambior to Potterville Specialty Services and North Alaska Fisheries Services for several days each week for a period of about a month and a half in the spring. 353 While there are no anadromous fish that are supported in the river, it is an important example of stream reclamation

350 351

AS 27.21.260(a)(2).

Reger, R.D. and Bundtzen, 1990, Multiple glaciations and gold-placer formation, Valdez Creek valley, western Clearwater Mountains, Alaska: DGGS Prof. Paper 107, at 1-2; 30p.

EPA, 1992, Site visit report: Valdez Creek mine Cambior Alaska Incorporated, at 3-8; 46p.; website, http://www.epa.gov/osw/nonhaz/industrial/special/mining/techdocs/placer/placer3.pdf .
352

EPA, 1992, Site visit report: Valdez Creek mine Cambior Alaska Incorporated, at 3-37; 46p.; website, http://www.epa.gov/osw/nonhaz/industrial/special/mining/techdocs/placer/placer3.pdf .
353

10/24/11 Page 83 of 109

after substantial disturbance to the hydrologic balance by a relatively deep surface mining operation. The postmining stream on this site was constructed on reclaimed mine spoils that were replaced after mining in the same general configuration as the premining stratigraphy, including substantial thicknesses of glacialfluvial material overlying Tertiary fluvial deposits and deeply incised paleochannels. 354 This work resulted in the 1995 Governor’s Award for Reclamation, presented to Cambior Alaska, Inc.355 The selective handling of the spoil material is very similar to spoil handling plan for the Diamond Shamrock permit application.356

175. Nome Creek, located in the White Mountains in Interior Alaska, is
another example of successful postmining stream reclamation. The creek was mined from 1900 357 up to the 1980s358 by sluicing, and a gold dredge operated on a large scale in the 1920s and 1930s; an area is still set aside for recreational gold mining.359 Approximately seven to eight miles of the stream and riparian areas were destroyed as part of the historic mining operations. In the late 1980s, the Department of Interior’s Bureau of Land Management (BLM) initiated a water resource monitoring and inventory on Nome Creek and reclamation efforts were started in earnest by 1991. As of 2006, six miles of stream, riparian areas, and 300 acres of floodplain restoration had been completed.360 This stream historically had a resident Arctic grayling population. Monitoring has shown grayling present in lower and upper Nome

Reger, R.D. and Bundtzen, 1990, Multiple glaciations and gold-placer formation, Valdez Creek valley, western Clearwater Mountains, Alaska: DGGS Prof. Paper 107, at 6; 30p.
354 355

DNR, 1997, Mining reclamation in Alaska: State of Alaska, Department of Natural Resources, Division of Mining and Water Management, November 1997, 37p. DNR 1987 Permitting Decision at 402; 404p.

356 357

McGown, Sarah, 2011, History of gold mining on Nome Creek: BLM Alaska website http://www.blm.gov/ak/st/en/prog/nlcs/white_mtns/summer_recreation/nome_creek_minin g.html (updated 1-15-11). Fleming, D,F., and McSweeny, Ingrid, 2001, Stock assessment of arctic grayling in Beaver and Nome Creeks: Alaska Department of Fish and Game, Division of Sport Fish, Fisher Data Serier 01-28, at 1; 38 p.

358

359

BLM, 2001, Gold Panning at Nome Creek: BLM Alaska website, http://www.blm.gov/ak/st/en/prog/nlcs/white_mtns/summer_recreation/gold_panning.html
360

Kostohrys, Jon, 2007, Water resources and riparian reclamation of Nome Creek, White Mountains National Recreation Area, Alaska: Bureau of Land Management, Alaska Open File Report 113, 47p.

10/24/11 Page 84 of 109

Creek.361 This restoration effort has been a national showcase for riparian reclamation projects,362 and BLM hopes that techniques developed at Nome Creek will be useful in other placer mine reclamation efforts. 363

176. Another pertinent example of stream reclamation related to coal mining
is that of Moose Creek, in the Wishbone Hill area near Palmer and Sutton, Alaska. Prior to disturbance, the creek supported sockeye, coho, Chinook, pink, and chum salmon.364 From 1916 through 1983, sporadic coal mining occurred along Moose Creek. Early underground mining, followed by adjoining strip mining operations, severely altered more than seven miles of Moose Creek.365 In 1923, a railroad spur was constructed up Moose Creek, from the railroad junction at the creek’s mouth to the foothills. 366 When the rail line was upgraded to a standard-gauge rail, Moose Creek was re-routed, straightened and channelized, separating it from its floodplain, creating artificial waterfalls, and impacting more than seven miles of creek.367 Such stream alterations resulted in degraded fish rearing and spawning habitat on the creek, as well as degraded adjacent wildlife riparian habitat for species such as bears and eagles. The stream alterations resulted in three distinct waterfalls, which prevented salmon from accessing over five miles of stream and wetland complex. The goal of the Moose Creek Fish Passage Restoration Project was to restore wild salmon spawning habitat and runs to the upper Moose Creek watershed and improve the quality and quantity of aquatic and riparian habitat available to fish and

361 362

Flemming and McSweeny (2001).

Kostohrys, Jon and Koss, Lee, 2006, Nome Creek restoration of place[r] mined gravels [abs]: Alaska Section of the American Water Resources Association 2006 Annual Meeting, Proceedings Abstracts. Kostohrys, 2007.

363 364

Matanuska-Susitna Borough, 2011, Moose Creek Soapstone Community Council comprehensive draft plan May 16, 2011: Matanuska-Susitna Borough, at 13; 80p.

Moose Creek Fish Passage Restoration Project, 2007, Wildfish Habitat Initiative (USFWS and Montana Watershed Council): website updated 2/16/2007, http://wildfish.montana.edu/Cases/browse_details.asp?ProjectID=73 .
365

Moose Creek Restoration Project, 2011, Chickaloon Village Traditional Council website: website, http://www.chickaloon.org/index.php?option=com_content&view=article&id=145&Itemid=160.
366 367

U.S. Fish and Wildlife Service, 2005, Environmental assessment, Moose Creek fish passage project: Anchorage USFWS Office, Anchorage, AK, prepared for the Chickaloon Village Traditional Tribal Council.

10/24/11 Page 85 of 109

wildlife species.368 The work was a cooperative effort by the Chickaloon Village Environmental Protection Program, the U.S. Fish and Wildlife Service, NOAA, the University of Alaska at Anchorage’s Environment and Natural Resources Institute, the EPA, and others, receiving a Five-Star Restoration Grant in 2004. 369 Work was done in two phases -- Phase I in 2005, and Phase II in 2006. In late July 2005, after Phase I restoration construction was complete, over 200 adult Chinook salmon were observed above the previously impassable waterfall barrier. Chinook salmon were spawning in the newly created restoration channel. In late September and early October 2005, several adult coho salmon were seen migrating through the restoration project toward upstream spawning habitats. In early September, after Phase II restoration was complete, coho salmon were observed above the previously impassable barrier.370 It is reported that “within days of project completion, Chinook salmon were observed spawning within the new channel, and were also seen as far as four miles upstream of the old waterfall site.” 371 Phase II was completed in July 2006, relocating portions of the stream to its original location and bypassing three partial-barriers to fish passage. The stream restoration work largely survived a major flood later in the late summer of 2006, and the stream allows continuous fish passage. 372

177. Resurrection Creek, home to Alaska’s first gold rush in 1896, is another
relevant stream restoration project. Hydraulic and power shovel mining within the watershed reduced the quality and quantity of fish and wildlife habitat within the watershed. The most severe impacts from mining were located in the lower 6.2 miles

Roach, Chris, 2004, Summary – Moose Creek conceptual reclamation plan [abs.]: Alaska Section of the American Water Resources Association 2004 Annual Meeting, Proceedings Abstracts; Moose Creek Fish Passage Restoration Project, 2007, Wildfish Habitat Initiative (USFWS and Montana Watershed Council): website updated 2/16/2007, http://wildfish.montana.edu/Cases/browse_details.asp?ProjectID=73 .
368

EPA, 2010, Five-Star Restoration Program: EPA website updated 3-5-2010, http://www.epa.gov/owow/wetlands/restore/5star/ .
369

Moose Creek Fish Passage Restoration Project, 2007, Wildfish Habitat Initiative (USFWS and Montana Watershed Council): website updated 2/16/2007, http://wildfish.montana.edu/Cases/browse_details.asp?ProjectID=73 .
370

Cooperative Conservation, 2011, Moose Creek fish passage restoration project: website, http://www.cooperativeconservationamerica.org/viewproject.asp?pid=712 .
371

Moose Creek Restoration Project, 2011, Chickaloon Village Traditional Council website: http://www.chickaloon.org/index.php?option=com_content&view=article&id=145&Itemid=160.
372

10/24/11 Page 86 of 109

of river. The lower reaches within this area were identified as critical spawning and rearing habitat for coho, chum, pink and Chinook salmon. Placer tailings piles up to 25 feet high confined and straightened the stream 373 and covered 54% of the floodplain.374 Investigations began in 2002 by the U.S. Forest Service Wind River Restoration Team from Carson, Washington, that assisted the Chugach National Forest by surveying and analyzing stream channel conditions and developing a stream channel restoration strategy, rehabilitation alternatives, and recommendations. 375 Restoration design and implementation templates for Resurrection Creek included channel geometry equations, stream flow patterns, and relic and disturbed analog reaches for reference reaches of stream. Restoration actions included mechanically manipulating mine tailings to recover floodplain width and elevations; reconstructing meander pattern, channel profile, pools and spawning habitat; developing multiple relief channels and off-channel ponds within the floodplain; extracting beetle killed spruce trees in high risk fire hazard areas to utilize as a source of in-stream and terrestrial woody material; augmenting soils in reclaimed riparian areas to provide soil/landform and drainage conditions which can support native plant communities; thinning existing overstocked riparian sapling spruce and cottonwood stands; allowing natural revegetation where seed source and site conditions were favorable; and using native plant species in revegetation projects when natural revegetation conditions were not favorable.376 The U.S. Forest Service produced a draft of the EIS in April 2004, completed the FEIS in November 2004, and in 2005 had finished channel, side channel, logjam, and floodplain reconstruction for most of the lower 0.7 miles of the project. These newly created channel segments were quickly utilized by spawning salmon almost
373

Wild Fish Initiative, 2007, Resurrection Creek: (USFWS and Montana Watershed Council) website, http://wildfish.montana.edu/Cases/browse_details.asp?ProjectID=61.

374

Bair, Brian, Blanchet, Dave, and Olegario, Anthony, 2003, Planning a resurrection: Resurrection Creek, Alaska: Streamline -- Watershed Management Bulletin a publication of FORREX, the Forest Research Extension Partnership, vol.7, no. 2, at 1; 4p.

375

Bair, Brian, Powers, Paul, and Olegario, Anthony, 2002, Resurrection Creek stream channel and riparian restoration analysis, river kilometer 8.0-9.3: U.S. Forest Service Wind River Watershed Restoration Team, October 1, 2002, at 4; 61p. Wild Fish Initiative, 2007, Resurrection Creek: (USFWS and Montana Watershed Council) website, http://wildfish.montana.edu/Cases/browse_details.asp?ProjectID=61 .

376

10/24/11 Page 87 of 109

immediately following construction.377 With channel restoration nearly complete for about 75 percent of the length of the one-mile project reach, many of the morphologic objectives of the project have been accomplished or nearly accomplished in the reach restored in 2005. Spawning gravel at the pool tails was increased substantially from pre-project conditions. Although the majority of the fish were pink salmon, all five species of Pacific salmon have been observed in the restored reach (pink, coho, Chinook, chum and sockeye). 378 The U.S. Forest Service is now nearly complete with planning for Phase II of the project that would reclaim an additional two miles of the creek below the Phase I work.379

178. Outside of Alaska, there have been many examples of reclaiming fishbearing streams, including salmon streams, after mining activity. Clear Creek near Shasta, California is an example where historic hydraulic and dredge mining, as well as recent gravel mining, significantly disturbed the flood plain and stream including the complete removal of all of the riparian and upland vegetation. Mining left a complex of large pits and ponds along the lower reaches that became isolated when water levels dropped stranding adult and juvenile salmon and steelhead.380 Gravel mining in the 1950s through the 1980s completely disrupted channel form and confinement, interrupting fish migration.381 Historically, Clear Creek supported populations of Chinook salmon that were adversely affected by these activities. The U.S. Fish and Wildlife Service has monitored the occurrence of juvenile salmonids

377

U.S. Forest Service, 2006, Resurrection Creek stream channel and riparian restoration project: USFS Alaska Region Briefing Paper, April 2006, at 2, 4p.; U.S. Forest Service, 2004, DEIS, Resurrection Creek stream and riparian restoration project, Seward ranger district, Chugach National Forest: USDA Forest Service, April 2004, R10-MB-505, 201p.

Wild Fish Initiative, 2007, Resurrection Creek: (USFWS and Montana Watershed Council) website, http://wildfish.montana.edu/Cases/browse_details.asp?ProjectID=61 .
378 379 380

USFS DEIS Resurrection Creek Phase II Stream Riparian Restoration (8-04-10).

Wild Fish Habitat Initiative, 2006, Clear Creek Photo Gallery: website updated 6-20-2006, http://wildfish.montana.edu/cases/gallery1.asp?ProjectID=74 .
381

Tompkins MR, Kondolf GM (2003) Integrating geomorphic process approach in riparian and stream restoration: past experience and future opportunities. In: Faber PM (ed) California riparian systems: processes and floodplain management, ecology and restoration. Proceedings of the Riparian Habitat and Floodplains Conference (Sacramento, 2001), Sacramento, California, at 234; 230–238.

10/24/11 Page 88 of 109

since 1998 when restoration began.382 Recent restoration activities of the stream and riparian areas have led to a fivefold increase in Chinook spawning escapements over the disturbed configuration.383 Restoration activities are ongoing.384

179. Near Butte Montana, stream restoration efforts of portions of Silver Bow
Creek, as part of a Superfund cleanup of mining tailings that began in 1999, have returned trout to portions of reclaimed streams that have been barren of trout for generations.385 By 2005, slimy sculpin and long-nosed suckers returned to the creek,386 and by 2007, trout were found in Silver Bow Creek. In 2010, an 18.5 inch cutthroat trout was caught by a young sports fisherman and mink, which prey on fish, were observed along the creek.387 This project included the removal of nearly a century’s worth of mine tailings and the complete reconstruction of 10 miles of trout streams and their associated riparian areas. As part of the project’s achievements for this restoration project, the Montana Department of Environmental Quality cites improved ground and surface water quality, and reconstructed stream channels that are functioning and providing increased habitat diversity and an increase in biological diversity especially in aquatic species susceptible to metals leaching from spoils.388

180. Several stream restoration projects associated with large coal mines have
been completed in Illinois. Consol Energy’s Burning Star 4 mine reclaimed eight miles

382

Earley, J.T., Colby, D.J., and Brown, M.R., 2010, Juvenile salmonid monitoring in Clear Creek, California, from October 2008 through September 2009: USFWS, Red Bluff Fish and Wildlife Office, California (September 2010), at 1; 53p.

383 WildFish Habitat Initiative, http://wildfish.montana.edu/Cases/browse_details.asp?ProjectID=74 .

Destaso, J. and Brown, M.R., 2011, Clear Creek Restoration Program Annual Work Plan for Fiscal Year 2011: CVPIA program document, website: http://www.usbr.gov/mp/cvpia/docs_reports/awp/2011/3406(b)(12)%20Clear% 20Creek_AWP _FY2011.pdf
384

Montana Department of Environmental Quality, 2009, Silver Bow Creek update, winter 2009: Montana DEQ website, http://www.cfwep.org/cfinfo/agency_updates/SBC-030209.pdf .
385 386

Tracy, Jim, 2005, Greenway district wins environmental award, poisoned Silver Bow Creek showing signs of life: Anaconda Leader, April 18, 2005.

Montana Department of Environmental Quality, 2008, Trout make splash in Silver Bow Creek for second straight year, Montana DEQ press release (Oct. 7, 2008).
387

Montana Department of Environmental Quality, 2009, Silver Bow Creek update, winter 2009: Montana DEQ website, http://www.cfwep.org/cfinfo/agency_updates/SBC-030209.pdf .
388

10/24/11 Page 89 of 109

of stream, including associated riparian areas, that had been impacted by dragline placed mine spoil. This project has been recognized by OSM for its outstanding reclamation efforts and has received a national award for its innovative reclamation practices.389 The Pipestone Creek Restoration Project is another project in Illinois that restored 4.6 miles of Pipestone Creek on reclaimed mine spoils. This project noted that aquatic species returned to the restored portions on the creek in a short period after work was complete. The restored creek along with the conservation easement has been added to Pyramid State Park. 390

181. While some of the above examples involved reclamation projects that
commenced long after an area was subject to some form of mining and had been abandoned, the projects nonetheless reflect that reclamation is technologically feasible. Successful reclamation for surface coal mining operations, not only within the petition area but other areas of the state, will be even more likely for present-day reclamation where statutory and regulatory authorities require detailed planning, multi-agency State and federal regulatory review, and reclamation efforts to be actively pursued before, during, and after coal mining ceases.

182. Since the 1987 Permitting Decision on the Diamond Shamrock Chuitna
Coal Project, regulatory authorities nationwide have recognized that reclamation of coal mine sites could be even better. Both state and federal regulatory authorities and the mining industry have combined resources to institute geomorphic reclamation techniques such as those pioneered by Horst Schor and documented in his book “Landforming: An Environmental Approach to Hillside Development, Mine Reclamation and Watershed Restoration” (Schor and Gray, 2007), as well as the works of Dave Rosgen391 on stream restoration. These techniques are currently being applied to large surface coal mining operations throughout the United States.

183. This use of advanced reclamation strategies recognizes the need for both
pre-development baseline studies of the streams and riparian areas proposed to be disturbed, and a detailed life of project monitoring and reclamation plan that are
389 390 391

2011 OSM National Stream Design Workshop, Field Tour Descriptions. PacRim Coal Intervention Letter Exhibit 3.

Rosgen, Dave, & Silvey, Hilton Lee; Watershed Assessment of River Stability and Sediment Supply, at 589, 2006 and Rosgen, Dave, & Silvey, Hilton Lee; Applied River Morphology, Second Edition© 1996 184 pages.

10/24/11 Page 90 of 109

designed to achieve reclamation in real world conditions. The EPA, in its recognition of river corridor and wetlands restoration, stresses the importance of planning and proper management: “When properly planned, executed and managed, restoration works; its success can be attributed to the hard work and dedication of practitioners, scientists and others….”392 This progression to more advanced reclamation techniques in Alaska can be seen in the submittal by PacRim Coal of their “Draft Chuitna Coal Project Preliminary Design Report.” This report outlines the proposed designs for streams to be reclaimed at the proposed Chuitna Coal Project.

184. Unless a specific finding is made, the existing performance standard
found at 11 AAC 90.353 imposes a 100-foot, “no-mining” buffer on all perennial or intermittent streams, including streams located within the Chuitna watershed. The buffer may only be waived if the Commissioner specifically finds that any surface coal mining operation, including all support facilities, will have no adverse impacts on water quality and quantity and that any adverse effect on fish and wildlife will be minimized. To make this finding, the Commissioner must have detailed baseline data and a complete operation and reclamation plan for any proposed project within the Chuitna watershed.

185. As discussed several times above, it must be recognized that concerns
regarding a proposed project’s ability to achieve the applicable performance standards with regard to water quality, minimization of damage to fish and wildlife, and design precise reclamation measures for proposed postmining land uses is dealt with on a site-specific basis during the permitting phase. Such concerns cannot be appropriately addressed in the context of a lands unsuitable petition if petitioners fail to assume -- as they do here – that contemporary coal mining practices will be followed.

186. While Congress intended the petition process “to be applied on an area
basis, rather than a site-by-site determination, which presents issues more

392

http://www.epa.gov/owow/wetlands/restore/benefits.html

.

10/24/11 Page 91 of 109

appropriately addressed in the permit application process,”393 the petition process nonetheless contemplates that sufficient evidence to establish their allegations throughout the petition area. In this regard, there is insufficient evidence to support the claim that reclamation throughout the delineated petition area is not technologically feasible.

187. Congress emphasized that the petition process “does not require the
designation of areas as unsuitable for surface mining other than where it is demonstrated that reclamation of an area is not physically or economically feasible under the standards of the act.” 394 Based on all of the above -- in particular the prior state and federal permitting decisions and the many examples of successful reclamation -- and pursuant to the requirements of ASCMCRA, there is insufficient evidence in the administrative record for me to determine that reclamation of streambeds and riparian areas in the petition area is not technologically feasible. 395 Petitioners’ Allegation II: Surface coal mining operations will affect fragile land and could result in significant damage to important cultural, scientific, and aesthetic values and natural systems

188. Petitioners also allege that, pursuant to AS 27.21.260(c)(2)(B), the
petition area should be deemed unsuitable for surface coal mining operations on the basis that “such operations will affect fragile land and could result in significant damage to important cultural, scientific, and aesthetic values and natural systems.” In connection with this allegation, petitioners assert the following: The watershed contains fragile land within the meaning of the ASCMCRA regulations; Surface coal mining within the watershed would result in significant damage to important cultural, scientific, and aesthetic values and natural systems;
   
393 394 395

House Committee Report No. 95-218 (1977), at 630.

U.S. Code Cong. & Admin. News 1977, p.630, and quoted by the Fifth Circuit in Prager, 793 F.2d at 732-34 (holding that the Secretary of the Interior had thoroughly considered the petitioner’s allegation that reclamation would not be technologically or economically feasible, and the record supported the secretary’s decision that there was insufficient evidence to support the allegation). AS 27.21.260(c)(1).

10/24/11 Page 92 of 109

Significant harm will result to subsistence, commercial and sport fishing, complex and poorly understood hydrologic systems, the Cook Inlet beluga whale population, and aesthetic values.396

189. Under AS 27.21.260(c)(2)(B), the Commissioner “may designate an area
as unsuitable for all or certain” coal mining activities “if the commissioner determines that operations in the area will…affect fragile or historic land in which the operations could result in significant damage to important historic, cultural, scientific, and aesthetic values and natural systems.” This provision is considered discretionary, that is, the Commissioner may designate lands unsuitable at his or her discretion, but is not required to do so.

190. At the outset, the petitioners’ Allegation II is verbatim to the Allegation II
that they raised in the 2007 petition.397 As with the 2007 Petition, the current petition contains only general assertions. With the exception of one new document, 398 the petitioners do not submit any new evidence to support this allegation since it was originally made in the 2007 Petition.399

191. Former Commissioner Irwin rejected this same allegation in the 2007
Petition, stating the following: It has been recognized that many of the lands within the petitioned area may hold some of the values that petitioners list. The petition also describes how many of those listed on the petition use the area and benefit from its resources. However, petitioners have provided no evidence to support allegations that surface coal mining operations -- if carried out in accordance with applicable, contemporary standards and regulations -- would result in significant damage to these values and natural systems, rendering the assertions speculative. Petitioners also fail to describe how the allegations are specific to petitioners’ interests, that is, it does not describe the specific coal mining activities that would occur and on which lands within the petitioned area that would adversely affect the petitioners’ interest. This correlation must be described in the petition to support the allegations. In addition, specific existing federal statutes address many of these issues, such as laws
396 397 398

Petition at 33-45. See Allegation II of 2007 Petition, at 25-36.

MacDonald, Glen M., et al., Rapid Early Development of Circumarctic Peatlands and Atmosphere CH4 and CO2 Variations, 312 Science 285 (2006). For this reason, petitioners’ arguments are likely barred by res judicata and collateral estoppel.

399

 

10/24/11 Page 93 of 109

governing protection of cultural resources and protection of marine mammals, and any authorized coal development must comply with these laws.400 Commissioner Irwin also noted that the petitioners alleged “harms from potential coal storage and transport activities at Ladd Landing, but the petitioned area does not include Ladd Landing, and the petition likewise fails to assume that contemporary mining standards and regulations would apply to activities at the site.” 401 Commissioner Irwin informed petitioners that they could submit a new petition providing evidence supporting their allegation, and that it would be considered.402

192. I concur with Commissioner Irwin’s earlier findings, and also find, as
discussed below, that the petition fails to provide any new information to support an unsuitability designation.

A. Fragile Lands 193. The petitioners’ list of fragile lands for purposes of Allegation II includes
streams and riparian areas, wetlands, and lands which support subsistence and commercial uses, as well as aesthetic values, and they consider these to meet the definition of “fragile lands.” 403 Fragile lands are particular areas that could be damaged or destroyed by coal mining and reclamation. 404 Under 11 AAC 90.911(40), “fragile lands” means: …geographic areas containing natural, ecologic, scientific, or aesthetic resources that could be damaged or destroyed by surface coal mining and reclamation operations. Examples of fragile land includes, but is not limited to, uncommon geologic features, National Natural Landmark sites, groundwater recharge areas, valuable habitats for fish and wildlife, critical habitats for endangered species of animals and plants, critical wetlands, environmental corridors containing concentrations of ecologic and aesthetic features, areas of recreational value due to high environmental quality, buffer zones around areas where surface coal mining is prohibited; and important, unique, or highly productive soils or mineral resources.
400 401 402 403 404

July 16, 2007 Decision on 2007 Petition at 10. Id. Id. Petition at 34. See 11 AAC 90.911(40) and 30 C.F.R. 762.5.

10/24/11 Page 94 of 109

194. In reviewing this allegation, DNR has also relied on OSM’s clarification in
the COALEX Report of the term “fragile land.” OSM stated that the definition “is meant to provide guidance on what general types of resources can be considered fragile lands, not a list of areas which can or should automatically be designated suitable.” 405

195. OSM has stated in the COALEX Report that “[a]n interruption of certain
activities or a diminution of particular values during mining is not sufficient to classify the land as fragile if the activities or values can be restored.” 406 Thus, even though there is a potential for surface coal mining to affect the lands and values that petitioners reference, those factors alone do not justify an automatic finding that lands are “fragile” because petitioners need to show with specificity that after mining and reclamation the geographic area has been destroyed or damaged by the mining operations.

196. Moreover, even if the evidence demonstrates that fragile lands would be
destroyed or damaged such a finding would not dictate that lands should be designated unsuitable for surface coal mining operations because when reviewing the petition, I must consider competent and scientifically sound data and information, as well as an array of statutory and regulatory factors. For example, I must strike a balance between protection of the environment and the need for coal as an essential source of energy, recognize that responsible extraction of coal is an essential and beneficial economic activity, take into account how contemporary coal mining practices (including performance standards) will minimize or avoid damage to an area, and consider the positions expressed about coal mining in this area in area plans and by the landowners.

197.

Based on the area plans cited and described earlier in this decision,

coal development in the Chuitna watershed has long been recognized as an important goal for and appropriate use of the area’s lands. As described earlier under Allegation I, there is substantial evidence supporting that reclamation of the petition lands is technologically feasible. With the goals of these area plans in mind, and in light of OSM’s guidance above regarding fragile lands, I find that -- assuming contemporary
405 406

COALEX State Inquiry Report – 156 (emphasis added).

Id. (emphasis added). The OSM COALEX Report – 156 provides additional guidance for making a decision under AS 27.21.260(c)(2)(B).

10/24/11 Page 95 of 109

coal mining practices are followed -- the petition and the administrative record do not present any evidence that lands within the petition area are fragile or that impacts in the petition area and associated values that petitioners claim for the area, would be significantly damaged.

B. Aesthetic Values 198. The petitioners raise concerns about potential impacts to aesthetic
values from surface coal mining operations in the petition area. Activities that already affect the aesthetic values in the petition area and the greater Chuitna watershed include oil and gas exploration and development, exploration activities for coal, and commercial flight-seeing and guide services. Moreover, for much of the watershed, the land is privately owned, and petitioners’ ability to gain access without authorization is questionable. Also, the visibility or noise associated with any specific project that might be permitted would depend on the viewshed in which the project is located (e.g., the project operation may be inaccessible or the landscape situation may obstruct visibility of the activity), as well as the conditions placed on operations to minimize and avoid audio and visual impacts.

199. Because of the nature of surface coal mining operations, impacts to
aesthetic values are anticipated. The 2000 Kenai Area Plan, Kenai Borough Plan, and various owners of large parcels of land in the watershed have all expressed their intent to propose coal development projects. While some impacts may be visible in localized areas where actual mining activities occur, because reclamation is conducted concurrent with mining on a rolling basis, and because reclamation must be completed before site closure is approved, impacts to aesthetic values will be substantially minimized. Impacts from noise, light pollution, or vehicle traffic associated with mining operations can also be mitigated as part of the mine plan or by stipulations during the permitting process. For instance, DNR previously dealt with noise and light issues with respect to development of the True North/Fort Knox mine near Fairbanks. Under ASCMCRA, the same or similar mitigation measures, as appropriate, can be accomplished through technical amendments pursuant to 11 AAC 90.127(2) and during the mine permitting process itself. Thus, potential impacts from surface coal mining operations in the petition area, if they occur, can likely be

10/24/11 Page 96 of 109

minimized and avoided, or are unlikely to cause significant impacts to aesthetic values to warrant an unsuitability designation. 407

C. Beluga Whales 200. The petitioners raise concerns that Cook Inlet beluga whales may be
adversely impacted by surface coal mining in the petition area. On October 22, 2008, NMFS listed the Cook Inlet stock of beluga whales as endangered under the ESA. 408 This stock of beluga whale had also previously been listed by NMFS as depleted under the MMPA. Following the ESA listing, 409 NMFS delineated critical habitat within Cook Inlet for the beluga whale, and this habitat is adjacent to the petition area. 410

201. There is no evidence in the administrative record that coal mining
activities within the petition area, properly regulated in accordance with applicable performance standards (including those relating to protection of water quality), would have any down-stream significant, much less measureable, impact on beluga whales and their designated critical habitat. Outside the petition area and in the marine waters of Cook Inlet, impacts to belugas associated with surface coal mining operations involving shore-side bulk freighting activities would also likely be minimal, but would, in any event, be pointedly addressed on a project-specific basis in a multiagency State and federal review, including consideration of potential impacts pursuant to NEPA, as well as federal review under the MMPA 411 and ESA 412. For example, 11 AAC 90.423, dealing with protection of fish and wildlife, requires that any proposed project within the watershed that might pose a threat to threatened or endangered species and their critical habit would require consultation with State and federal fish and wildlife agencies to determine whether a specifically proposed project may proceed.

407

AS 27.260(c)(2)(B).

408 More information is provided at the following link: http://www.nmfs.noaa.gov/pr/species/mammals/cetaceans/belugawhale.htm 409

The State of Alaska has filed a court action challenging this listing. State of Alaska v. Lubchenco, Case No. 10-0927 (D.C. D. 2010). Id. 16 U.S.C. § 1361, et seq. 16 U.S.C. § 1531, et seq.

410 411 412

10/24/11 Page 97 of 109

202. Regarding the significant adverse impacts that petitioners allege for both
fish and beluga whales, petitioners fail to assume that contemporary coal mining practices, including performance standards, will apply. Within a project area, impacts would have to be minimized using the best available technology, 413 in addition to acquiring Title 16 Habitat Permits from ADF&G that require mitigation of lost fish productivity due to mining in streams and riparian areas.414 These permitting requirements would also address the petitioners’ concerns raised about potential impacts to subsistence, commercial and sport fisheries. If a proposed project could not comply with these performance standards and others that will be required by state and federal regulatory authorities, then the project would not be permitted.

D. Natural Systems -- Global Warming/Greenhouse Gases 203.
Petitioners contend that coal extracted from the Chuitna watershed, not

just from within the confines of the requested petition area, would result in adverse effects to “another natural system -- the climate.” 415 Petitioners claim that extraction activities in peatland in the watershed will release trapped methane gas. The petitioners also assert that the burning of coal by customers of coal extracted from the greater Chuitna watershed would also add CO2 into the atmosphere, furthering global warming.

204.

Petitioners appear to expect that because coal extraction and burning

relating to coal extracted from the petition area may contribute to greenhouse gases, this potential contribution warrants designation of the area as unsuitable for coal mining activities. Followed to its logical conclusion this argument would dictate that all coal fields in the United States would need to be designated as unsuitable. Clearly, this was not what the U.S. Congress or Alaska Legislature had in mind. Indeed, the U.S. Congress and the Alaska Legislature expressed that there needs to be a balancing between coal use and environmental protection, especially when coal is recognized by both legislative bodies as an essential source of energy.416

413 414 415 416

See Section D of this decision on Allegation I. ADF&G’s May 26, 2011 letter at 2. Petition at 44. 30 U.S.C. § 1202(f); AS 27.21.010(b)(7).

10/24/11 Page 98 of 109

205. Consideration of these issues are subject to my discretionary review.417 I
do not find that petitioners’ arguments justify a lands unsuitable designation. Methane and CO2 that might be released during mining and the burning of coal (wherever that might occur) are just a few of many contributors to greenhouse gasses generated by human activity. Naturally occurring conditions also contribute to greenhouse gases. The contribution to greenhouse gases of coal extracted from the petition area would be minimal -- even when aggregated with greenhouse gases on a global basis -- and do not lead me to the conclusion that these would result in significant harm to natural systems.

206. For example, compared to the total production of coal in the United
States, the one currently proposed project in the watershed (PacRim’s proposed Chuitna Coal project) would, at maximum production, produce roughly one percent of the U.S. coal supply per year, and less than 0.2 percent of the world’s annual production. 418 A rough calculation shows that this would correspond to approximately 0.04 percent of the world’s greenhouse gas emissions. Moreover, the coal found in the Chuitna watershed is low sulfur, one of the cleaner burning fuels that could be burned to support basic power needs, in particular electricity.

207. While greenhouse gasses and their link to climate change is an important
issue to both the State and the nation, addressing broad policy concerns regarding coal as a fuel source and global warming are outside the scope of the lands unsuitable petition process, and are handled at the national government level and through international agreements. 419

417 418

AS 27.21.260(c)(2)(B).

Coal Statistics – World Coal Association website, http://www.worldcoal.org/resources/coal-statistics .
419

The impact of climate change to arctic and subarctic regions is an important issue to the State of Alaska. Former Governor Sarah Palin, by Administrative order number 238, established the Alaska Climate Change Sub-Cabinet to advise the Office of the Governor on the implementation of Alaska’s climate change strategy. Members of the sub-cabinet include the commissioners of the Departments of Environmental Conservation, Natural Resources, Fish and Game, Transportation, and Community and Economic Development, as well as the Vice Chancellor of Research for the University of Alaska Fairbanks. The purpose of this group is to develop strategies to mitigate the impacts of climate change while protecting Alaska’s economic growth. This Sub-cabinet is developing recommendations for Alaska communities that will be impacted as a result of climate change.

10/24/11 Page 99 of 109

208. Based on the above and the administrative record, I decline to use my
discretionary authority under AS 27.21.260(c)(2)(B) to designate any of the petition area as unsuitable for surface coal mining operations. Petitioners’ Allegation III: Surface coal mining operations will affect renewable resource lands in which the operations could result in a substantial loss or reduction of long-range productivity of water supply or food or fiber products

209. Petitioners further assert that, under AS 27.21.260(c)(2)(C), the petition
area should be deemed unsuitable for mining because surface coal mining operations “will affect renewable resource lands in which the operations could result in a substantial loss or reduction of long-range productivity of water supply or food or fiber products.”420 Petitioners allege that mining could impact productivity in the Chuitna watershed. Petitioners cite the potential for impacts to aquifer recharge and for increased sedimentation, which they say would harm salmon productivity, which they say in turn will harm subsistence, commercial, and sports fishing. They also claim that activities in the petition area will result in a substantial loss or reduction to moose populations in the area.421 Finally, while citing no information to support the allegation, petitioners refer back to information they discuss in Allegations I and II of the petition.

210. Under AS 27.21.260(c)(2)(D), the Commissioner “may designate an area
as unsuitable for all or certain” coal mining activities “if the commissioner determines that operations in the area will . . . affect aquifer recharge areas or other renewable resource land in which the operations could result in a substantial loss or reduction of long-range productivity of water supply or food or fiber products.”422 This provision is considered discretionary, that is, the Commissioner may designate lands unsuitable in his or her discretion, but is not required to do so.

211. The petitioners’ Allegation III is verbatim to the Allegation III that they
raised in the 2007 Petition. 423 As with the 2007 Petition, the current petition contains only general assertions, and petitioners fail to provide evidence to support this
Petition at 45-46. Id. Emphasis added. See Allegation III of 2007 Petition, at 36-37.

420 421 422 423

10/24/11 Page 100 of 109

allegation. Nor do petitioners submit any new evidence to support this allegation since the 2007 Petition.

212. Former Commissioner Irwin rejected this same allegation in the 2007
petition, stating the following: Petitioners fail to allege how lands throughout the petitioned area, in connection with any type of surface coal mining activity would suffer substantial loss or reduction of long-range productivity of aquifers and their recharge areas, or for food or timber products, including salmon and moose that petitioners specifically name. While they mention pumping operations and potential deposition of sedimentation relating to coal operations, these statements, of themselves, do not constitute significant facts to frame the allegation. Nor do the petitioners present any evidence to suggest that current surface coal mining practices, properly regulated, will not guard against the alleged harms. 424

213. As with the first two allegations in the petition, petitioners fail with
respect to Allegation III to assume that contemporary coal mining practices will be followed, including performance standards. While it would be reasonable to expect that surface coal mining operations would have some adverse impact on the aquifer within the actual mining area, there is insufficient evidence to demonstrate a substantial loss or reduction of productivity to the water supply, or food or fiber products. To the extent there might be an effect, there are performance standards created to minimize any effect. Under 11 AAC 90.329, an operator must (among other things) use the best technology currently available to minimize and avoid, for example, additional contributions of sediment to stream flow or to runoff outside the permit area. Likewise, under 11 AAC 90.423, an operator must (among other things) use best technology currently available to minimize disturbances and adverse impacts to, for example, fish and moose. Estimation of more specific impacts to aquatic productivity would also be addressed on a project-specific basis. Within a project area, impacts would also be addressed through a Title 16 habitat permit issued by ADF&G, which likewise would contain requirements to mitigate impacts to fish productivity due to mining in streams and riparian areas.425

424 July 16, 2007 Decision on 2007 Petition, at 10-11. Because this issue has been adjudicated and the matter was dismissed with prejudice by the Superior Court, this claim is likely barred by res judicata and collateral estoppel. 425

ADF&G May 26, 2011 letter at 2.

10/24/11 Page 101 of 109

214. Based on the above and the administrative record, I decline to use my
discretionary authority under AS 27.21.260(c)(2)(C) to designate any of the petition area as lands unsuitable for surface coal mining operations. Petitioners’ Allegation IV: Surface coal mining operations will affect areas of unstable geology and other natural hazards in which the operations could substantially endanger life and property

215. Petitioners allege that, pursuant to AS 27.21.260(c)(2)(D), the petition
area should be deemed unsuitable for surface coal mining operations on the basis that those operations will affect areas of unstable geology and other natural hazards which could substantially endanger life and property. 426

216. Under AS 27.21.260(c)(2)(D), the Commissioner “may designate an area
as unsuitable for all or certain” coal mining activities “if the commissioner determines that operations in the area will…affect areas subject to frequent flooding and areas of unstable geology, or other natural hazard land in which the operations could substantially endanger life and property.” This provision is considered discretionary, that is, the Commissioner may designate lands unsuitable in his or her discretion, but is not required to do so.

217. Petitioners’ Allegation IV is verbatim to the Allegation IV that they raised
in the 2007 Petition.427 As with the 2007 Petition, the current petition contains only general assertions, and petitioners fail to provide evidence to support this allegation. Nor do petitioners submit any new evidence to support this allegation since the 2007 Petition. A. Earthquakes

218. Like Commissioner Irwin, I find that many of the conditions petitioners
describe, e.g., earthquakes, high winds, landslides, and severe winter ice conditions428 occur in areas where surface coal mining activities have long been carried out under regulation without substantially endangering life and property. For example, the Usibelli Coal Mine near Healy, Alaska is located within the area impacted by the magnitude 7.9 earthquake on the Denali Fault in November 2002. Little or no damage
426 427 428

2010 Petition at 46-48. See Allegation IV of 2007 Petition, at 37-39. 2010 Petition at 46-48.

10/24/11 Page 102 of 109

was sustained within active or reclaimed surface coal mining areas. Only minor slump features, occurring within both disturbed and undisturbed areas, were noted. Petitioners fail to provide supporting evidence that the situation would be any different for any of the streambeds or riparian areas they delineate in the current petition.

219. The petitioners maintain that seismic hazards in the Chuitna watershed
are extreme and would cause an increased ground failure hazard if the ground were disturbed by mining activities.429 There are two strike slip faults that occur in the petition area -- the Bruin Bay Fault and the Castle Mountain Fault. According to the Division of Geological and Geophysical Surveys, these two faults have not shown signs of movement within the Holocene period (approximately the last 11,000 years) and therefore would not be characterized as “active.” 430 In addition to their lack of recent movement, and due to the geology and character of the faults, they would be unlikely to generate a seismic event on the scale of the 9.2 magnitude Good Friday earthquake in 1964. Seismic Risk Zone 4 includes virtually all of the Southcentral Alaska region, including the Chuitna watershed. The region contains roads, pipelines, railroads, oil and gas platforms, power plants, oil and gas refineries, and buildings up to 20 stories in height, all designed to withstand seismic events in this risk zone.

220. There is no evidence in the administrative record to support the
allegation that surface coal mining operations, if properly regulated, would nonetheless adversely affect renewable resource lands in an earthquake event. B. Volcanic Hazards

221. With respect to any volcanic hazards, the petitioners claim there are four
volcanoes on the west side of Cook Inlet that create a volcanic risk. 431 These volcanoes include: Augustine, Iliamna, Redoubt, and Mount Spurr. Direct impacts from volcanic hazards with the Chuitna watershed would most likely be associated with Mount Spurr, the closest volcano.

429 430

Petition at 47.

DGGS, DNR Large Mine Coordinator Tom Crafford and DGGS Deputy Director Rob Cornbellick, July 12, 2007. Petition at 47.

431

10/24/11 Page 103 of 109

222. A Preliminary Volcano-Hazard Assessment for Mount Spurr Volcano432
indicates that within the Chuitna watershed there exist minimal volcanic hazards associated with an eruption. Only a small area of the southwestern edge of the watershed is within the zone of debris avalanche hazards. Volcanic ash hazards depend on the prevailing wind at the time of an eruption. They are predominantly a threat to aircraft operations and only apply to a much lesser extent to ground-based operations. Within the Chuitna watershed, a volcanic ash fall from Mount Spurr might necessitate a suspension of ground-based mining operations, but would be unlikely to constitute a significant danger to health or property, at least no more so than falling ash in the nearby communities of Tyonek or Beluga. Assuming that contemporary coal mining practices will be adhered to, the presence of mining activities in the petition area would not exacerbate an air quality situation that might result in combination with a volcanic eruption and there is no evidence in the record to support such a conclusion. C. Winter Ice & High Wind Conditions

223. The petitioners raise concerns that winter ice conditions along with
strong currents in Cook Inlet could substantially endanger life or property, either directly, or as a result of spills of fuel or coal, connected with a coal shore-side marine freight facility that may be permitted and built for transferring coal to transport ships.433 This allegation describes potential circumstances that would occur outside the petition area.

224. This allegation does not address why surface coal mining operations
within the petition area itself is a hazard. The currently proposed Chuitna Coal Project proposes a freight transport facility located outside the delineated petition area.434 Thus, the allegation contains matters outside the scope of this decision.

225. Even if the petitioners had delineated a coal-bearing area that would
encompass shore facilities, I would not find support for the allegation. Marine

432

Preliminary Volcano-Hazard Assessment for Mount Spurr Volcano, Alaska, Open –File report 01-482, 2002. Petition at 47.

433 434

Applicant’s Proposed Project; April 2011, http://www.chuitnaseis.com/documents/Current-Project-Description.pdf , at 8.

10/24/11 Page 104 of 109

shipping activities in Cook Inlet occur year-round for several ports in the Inlet, involving the transport of a variety of products (both raw resources and finished consumer products). Ice conditions/floes are issues that are commonly encountered and are successfully addressed by marine traffic in Cook Inlet during winter months. To assist with navigation and docking during ice conditions, the U.S. Coast Guard has developed operating procedures for different portions of Cook Inlet. 435 These operating procedures are designed to set minimum transit and docking requirements to lessen the chance of shipping accidents. In addition, a port operator and the U.S. Coast Guard have the option of shutting down operations if they feel conditions warrant, as noted in the February 1999 closure of the Port of Nikiski due to heavy ice conditions. 436 I find that reasonable and appropriate conditions could be imposed on any coal mining operations to minimize and avoid this particular concern, and that the allegation does not warrant designating an area that is, in the first instance, outside the petitioners’ delineated petition area.

226. In the effort to support their allegation regarding high wind conditions,
petitioners state that "[r]ecent events in Seward, Alaska" that involved high wind conditions, dry weather and fugitive coal dust emissions from coal stockpiled and handled at a vessel transport facility resulted in issuance of a citation by the Alaska Department of Environmental Conservation against the Alaska Railroad "for failing to control the fugitive emissions and for allowing pollution that is harmful to health and property.” 437 This allegation is verbatim to that raised in the 2007 Petition. I concur with former Commissioner Irwin’s 2007 finding and conclusion 438 that the referenced event simply does not support petitioners’ allegation, inasmuch as the violation occurred as a consequence of the Alaska Railroad’s failure to follow/comply with existing air quality standards and requirements.

435

2008 Operating Procedures for Ice Conditions in Cook Inlet, U.S. Coast Guard (December 2008).

436

Heavy ice in Cook Inlet halts marine traffic, posted by the Associated Press, Tuesday, February 09, 1999. Petition at 48. July 16, 2007 Decision on 2007 Petition, at 12.

437 438

10/24/11 Page 105 of 109

227. Based on the above and the administrative record, I decline to use my
discretionary authority under AS 27.21.260(c)(2)(D) to designate any of the petition area as lands unsuitable for surface coal mining operations. Petitioners’ Allegation V: Lands Exempt from Designation under AS 27.21.260; Streambeds and Associated Riparian Areas Within Logical Mining Unit 1

228. Petitioners requested that streambeds and associated riparian areas that
exist in the Chuitna watershed, including those that may traverse LMU-1, be included in my deliberations on the January 21, 2010, petition. PacRim asserts that lands delineated by the petition that may lie with LMU-1 are exempt from petition review.

229. As part of the settlement relating to a judicial proceeding involving an
Alaska Civil Rule 601 administrative appeal of former Commissioner Irwin’s decision on the 2007 petition, DNR agreed that lands within LMU-1 would not be held exempt - based on the 1980s Diamond Shamrock coal permitting process -- from a future petition proceeding. 439 Thus, the petition lands contained within LMU-1, along with the greater petition area that meanders throughout the Chuitna watershed, have been considered in rendering this decision. Statutory and Constitutional Obligations to Facilitate Responsible Development of Coal Resources

230. Other statutory and constitutional factors play a part in my
determinations on this petition. As previously explained with the 2010 Petition, the petitioners have refined the area for which they seek an unsuitability designation, compared to what they sought under the 2007 Petition. Given the meandering nature and length of the petition area throughout the larger Chuitna watershed designation of the petition area, or any portion thereof, would have a significant fragmenting impact on the coal resources throughout the watershed and would affect a potential operator’s ability to economically and efficiently access and extract the coal resource. In short, a designation would affect the feasibility of project-specific coal mining and deter coal resource development. Because of this, granting the requested designation would likely result in a de facto designation of the entire watershed as unsuitable for

439 No other aspect of Commissioner Irwin’s decision on the 2007 petition was changed or withdrawn, and the associated Rule 601 administrative appeal was dismissed with prejudice.

10/24/11 Page 106 of 109

coal mining. Such a result would undercut my ability to carry out other important ASCMCRA objectives, including: assuring “that the coal supply essential to the nation’s energy requirements and to its economic and social well-being is provided and to strike a balance between protection of the environment and other uses of the land and the need for coal as an essential source of energy;” 440 and assuring “that reclamation of land on which surface coal mining takes place is accomplished as contemporaneously as practicable with the surface coal mining, recognizing that the responsible extraction of coal by responsible mining operators is an essential and beneficial economic activity.” 441
   
440 441

231. As DNR Commissioner, I also have responsibilities under the Alaska
Constitution and AS 44.37.025(a) to encourage and allow responsible resource development.

232. While these obligations and the manner in which they are carried out
greatly depend on the context and facts in which resource development questions -such as this petition -- are raised, these obligations are nonetheless important factors in my decision. Notably, as set out in detail at the outset of this document, I recognize that the majority of landowners in the Chuitna watershed were motivated in great part to select their lands because of the presence of significant coal resources and the financial prosperity, employment opportunities, and enhanced social well-being that development of those lands would bring, not just to private industry, but to Native corporation shareholders and Mental Health Trust beneficiaries, as well as local residents and the public at large. Thus, to the extent that any landowner or lessee in the area may propose a surface coal mining project capable of demonstrating compliance with applicable state, federal, and local requirements, and that such operations therefore can be responsibly conducted, then such operations would further these important statutory and constitutional directives.

AS 27.21.010(b)(7). AS 27.21.010(b)(5).

10/24/11 Page 107 of 109

DECISION

233. The information contained in the administrative record, including that
provided with the petition, is insufficient to support Allegation I.

234. Regarding Allegation II there is insufficient evidence to support this
allegation or that the petition area constitutes “fragile lands.” I therefore decline to use my discretionary authority under AS 27.21.260(c)(2)(B) to designate any of the petition area as fragile lands or as lands unsuitable for surface coal mining operations.

235. Regarding Allegation III there is insufficient evidence to support this
allegation. I therefore decline to use my discretionary authority under AS 27.21.260(c)(2)(C) to designate any of the petition area as lands unsuitable for surface coal mining operations.

236. Regarding Allegation IV, there is insufficient evidence to support this
allegations. I therefore decline to use my discretionary authority under AS 27.21.260(c)(2)(D) to designate any of the petition area as lands unsuitable for surface coal mining operations.

237. Regarding Allegation V, all of the streambeds and riparian areas
delineated by the petition were included in my review of the petition, including those which meander through the Chuitna Coal Project LMU-1 area.

238. Commissioner Irwin agreed that lands within LMU-1 would not be held
exempt under AS 27.21.260(g) from petition review based on the Diamond Shamrock coal permitting process. Commissioner Irwin did not, however, otherwise withdraw or change any aspect of his decision on the 2007 Petition, and the petitioners’ associated Rule 601 administrative appeal on the 2007 Petition decision was dismissed with prejudice by the Superior Court. A dismissal with prejudice, including a stipulation to dismiss with prejudice, “is treated as a dismissal on the merits and is, therefore, a final judgment on the merits … operating as res judicata.” Smith v. CSK Auto, Inc., 132 P.3d 818, 820 (Alaska 2006). Res judicata (claim preclusion) and collateral estoppel (issue preclusion) “bind the parties and their privies to factual findings, as well as legal conclusions, that have been the subject of prior litigation,” and “administrative agency decisions can have preclusive effect on later court proceedings, so that if a party participates in an administrative adjudication, … the adjudication

10/24/11 Page 108 of 109

may foreclose the possibility of a later lawsuit on the same factual issues.” Alaska Public Interest Group v. State, 167 P.3d 27, 44 (Alaska 2007). The Alaska Supreme Court has also stated that (1) “‘principles of finality may be applied to the decisions of administrative agencies if, after case-specific review, a court finds that the administrative decision resulted from a procedure that seems an adequate substitute for judicial procedure and that it would be fair to accord preclusive effect to the administrative decision’” and that (2) the collateral estoppel doctrine “may be applied to an administrative decision if the decision is one ‘rendered pursuant to an exercise of primary jurisdiction.’” Harrod v. State, Dep’t of Revenue, 255 P.3d 991, 1000 (Alaska 2011) (citations omitted). In rendering my decision on the 2010 petition, I expressly preserve, and in no way hold contrary to, the final findings of Commissioner Irwin on the evidence and allegations that petitioners asserted in the 2007 petition and which petitioners now reassert nearly verbatim in the 2010 Petition. I also expressly preserve the defenses of res judicata and collateral estoppel for Commissioner’s Irwin’s final findings for purposes of any future litigation that may be brought on the 2010 Petition.

239. Any remaining allegations raised by petitioners that have not been
specifically addressed by this decision are rejected.

240. While there is insufficient evidence to support any of the allegations,
some of the petitioners’ allegations raise reasonable concerns regarding whether water quality, wetlands, the hydrologic balance of the larger Chuitna watershed, fish and wildlife habitat, and other resources can be adequately protected if surface coal mining occurs within the petition area. These concerns are, however, more effectively and appropriately addressed in the application of regulatory requirements, including the performance standards that are incorporated in ASCMCRA mine permits, if a proposed mine is ultimately approved anywhere within the Chuitna watershed. Moreover, the potential impacts from any proposed coal mining project will be addressed through multi-agency State and federal review, including under NEPA.

241. It is important to note that this decision to not designate the petition
area as unsuitable for all or certain types of coal mining activities does not mean that surface coal mining will automatically be approved in this area. This decision simply denies petitioners’ request to preemptively shutdown the Chuitna watershed from the

Beluga

Tyonek

et Inl k oo C

Kenai

Figure 1: Location map showing locations of Anchorage, Kenai, Tyonek and Beluga in relation to the Chuitna River Watershed.

¯

0

2

4

8

17 20

16

15

14

13

18

17

16

15

14

13

18

17

16

15

14

13

Land Estate and Mineral Esta
21 22 23 24 19 20 21 22 23 24 19 20 21 22 19 20

18

17

State of Alaska (Surface and Su 23 24

Mental Health Land (Surface an
29 28 27 26 25 30 29 28 27 26 25 30 29 28 27 30 29

Tyonek Native Corporation (Su 26 25

Cook Inlet Regional Inc. (Surfac
32 33 34 35 36 31 32 33 34 35 36 31 32 33 34 31 32

Kenai Peninsula Borough (Sur 35 36 Private

5

4

3

2

1

6

5

4

3

2

1

6

5

4

3

2

1

6

5

8

9

10

11

12

7

8

9

10

11

12

7

8

9

10

11

12

7

8

17

16

15

14

13

18

17

16

15

14

13

18

17

16

15

14

13

18

17

20

21

22

23

24

19

20

21

22

23

24

19

20

21

22

23

24

19

20

29

28

27

26

25

30

29

28

27

26

25

30

29

28

27

26

25

30

29

32

33

34

35

36

31

32

33

34

35

36

31

32

33

34

35

36

31

32

6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1 6

5

8

9

10

11

12

7

8

9

10

11

12

7

8

9

10

11

12

7

8

17

16

15

14

13

18

17

16

15

14

13

18

17

16

15

14

13

18

17

20

21

22

23

24

19

20

21

22

23

24

19

20

21

22

23

24

19

20

29

28

27

26

25

30

29

28

27

26

25

30

29

28

27

26

25

30

29

32

33

34

35

36

31

32

33

34

35

36

31

32

33

34

35

36

31

32

5

4

3

Figure 2 Land and Mineral Estate Ownership 8 9 10 11 12 7 8 9 Chuitna River Watershed
17 16 15 14 13 18 17

2

1

6

5

4

16

¯
10 15

3

2

1

6

5

4

0 0.5 1
11 14 12 13

2
7 18

3
8 17

Miles 4
9 16

3

2

1

6

5

10 15

11 14

12 13

7

8

17

16

15

14

13

18

17

16

15

14

13

18

17

16

15

14

13

18

20

21

22

Legend
23 24 19 20 21 22 23 24 19 20 21 22 23 24 19 20 26 25 30 29 28 27

17

An

29

28

27

26

25

30

29

28

27

26

NH
25 30 29

Ch
32 33 34 35 36 31 32 33 34 35 36 31 32 33 34 35 36 31 32

5

4

3

2

1

6

5

4

3

2

1

6

* Data sou Anadrom
5 4 3 2 1 6 5

8

9

10

11

12

7

8

9

10

11

12

7

8

9

10

11

12

7

8

17

16

15

14

13

18

17

16

15

14

13

18

17

16

15

14

13

18

17

20

21

22

23

24

19

20

21

22

23

24

19

20

21

22

23

24

19

20

29

28

27

26

25

30

29

28

27

26

25

30

29

28

27

26

25

30

29

32

33

34

35

36

31

32

33

34

35

36

31

32

33

34

35

36

31

32

6

5

4

3

2

1

6

5

4

3

2

1

6

5

4

3

2

1

6

5

7

8

9

10

11

12

7

8

9

10

11

12

7

8

9

10

11

12

7

8

18

17

16

15

14

13

18

17

16

15

14

13

18

17

16

15

14

13

18

17

19

20

21

22

23

24

19

20

21

22

23

24

19

20

21

22

23

24

19

20

30 29

28

27

26

25

30

29

28

27

26

25

30

29

28

27

26

25

30

Figure 3: Displayed in red are the streams and riparian areas 31 32 33 34 35 36 31 reuested to be designated as unsuitable for mining as part 36 the31 of 32 33 34 35 January 2010 lands unsuitable petition. Due to scale, the map 6 does not display the associated riparian areas that petitioners also 5 4 3 2 1 6 5 4 3 request designated as unsuitable. The riparian areas 2are a 1 150' 6 -wide buffer on the main stem of the Chuit River and a 100’-wide 8 9 10 11 12 7 8 10 11 buffer on its tributaries that run along the9 anadromous fish 12 7 streams, measurement taken from ordinary high water mark. 17 16 15 14 13 18 17 16 15
14 13 18

29

32

33

34

35

36

31

32

¯
5 8 17

4

3

2

1

6

5

0 0.5 1
9 16 10 15

2
11 14

3
12 13

Miles 4
7 18 8 17

17

16

15

14

13

18

17

16

15

14

13

18

17

16

15

14

13

18

17 Legend

20

21

22

23

24

19

20

21

22

23

24

19

20

21

22

23

24

19

20 LM

29

28

27

26

25

30

29

28

An
27 26 25 30 29 28 27 26 25 30 29

Ch

32

33

34

35

36

31

32

33

34

35

36

31

32

33

34

35

36

31

32

NH

5

4

3

2

1

6

5

4

3

2

1

6

5

4

3

2

1

6

* Data sou 5 Anadrom
8

8

9

10

11

12

7

8

9

10

11

12

7

8

9

10

11

12

7

17

16

15

14

13

18

17

16

15

14

13

18

17

16

15

14

13

18

17

20

21

22

23

24

19

20

21

22

23

24

19

20

21

22

23

24

19

20

29

28

27

26

25

30

29

28

27

26

25

30

29

28

27

26

25

30

29

32

33

34

35

36

31

32

33

34

35

36

31

32

33

34

35

36

31

32

6

5

4

3

2

1

6

5

4

3

2

1

6

5

4

3

2

1

6

5

7

8

9

10

11

12

7

8

9

10

11

12

7

8

9

10

11

12

7

8

18

17

16

15

14

13

18

17

16

15

14

13

18

17

16

15

14

13

18

17

19

20

21

22

23

24

19

20

21

22

23

24

19

20

21

22

23

24

19

20

30 29

27 26 25 30 29 28 26 Figure 4: Chuitna Coal Project's Logical Mining27 Unit 1 (LMU-1) 30 25 overlain on the streams and riparian areas (shown in red) requested 31 32 33 34 to be designated as unsuitable for mining as part of the January 35 36 31 32 33 34 35 36 31 2010 lands unsuitable petition. Due to scale, the map does not 6 display4 the associated riparian areas that petitioners also request 5 3 2 1 6 5 4 3 2 1 designated as unsuitable. The riparian areas are a 150' -wide 6 buffer on the main stem of the Chuitna River and a 100’-wide 8 10 11 12 8 buffers9 on its tributaries that 7 run along the anadromous fish 9 10 11 12 7 streams, measurement taken from ordinary high water mark. 17 16 15 14 13 18 17 16 15 14 13 18

28

29

28

27

26

25

30

29

32

33

34

35

36

31

32

5

8

17

¯

4

3

2

1

6

5

0 0.5 10 1 9
16 15

11 14

2

12 13

3

7

Miles 4
8 17

18