Field Number
'ocation: Area (acres): Season: Year: Township: Range: Section: Qtr/Qtr:
90-01-A
Buckskin Mining Company - 2008 Annual Report December, 2008
/
17.00 Spring 1990 T.51 N. R.72 W. 5 NW1/4NW1/4 1979 1989
Info. Source: 2005 Annual Report Initial Disturbance Date: Final Backfill/Grading Date: Notes:
Reclamation History
BACKFILL ACTIONS
Quality Reference: Unsuit. BF Action: Data in 1989 Annual Report, Appendix B Data in 1989 Annual Report, Appendix B
TOPSOIL
Topsoil Date: . Topsoil Depth:
I
1989 Minimum of 24 in., with a 32 in. average; top 6 in. were separately removed and replaced as top 6 in. of the reclaimed surface Direct haul from pit advance
Topsoil Source:
SEEDING
Seed Date: Type: Bed Prep.: Contractor: Equipment: Method: Seed Mix Name: Mix Description: Shrubs: Trees: Shelter Belt Date: Shelter Belt Desc.: Hydroseeded (with fertilizer and mulch) and harrow Hydroseeded Upland Grassland Revegetation (Sideslope & Upland Mixes) (See 1990 Annual Report, Reclamation, Table 4-2) Apr 1990 Initial Spoil: Scarified with ripper. Seedbed: Harrow drag.
)
2125/2009 Page 1 of 4
5OC>-TI
Field Number
Seed Date:
\
90-01-A
Buckskin Mining Company - 2008 Annual Report December, 2008
1990 Initial
'Type: Bed Prep.: Contractor: Equipment: Method: Seed Mix Name: Mix Description: Shrubs: Trees: Shelter Belt Date: Shelter Belt Desc.:
Bare-root shrubs (20 Artemesia cana, 50 A. tridentata, 20 Chrysothamnus nauseosus, 20 Rosa arkansana) were hand planted in this unit around the three large rockpiles
COVER CROP MULCHING
Mulch Date: Mulch Type: Mulch Mix: Mulch Rate: Apr 1990 Hydromulched 30% virgin aspen fibre and 70% cellin fibre, 1 tonlac (top) & 2 tonslac (side slopes); with tackifier, 40 Ibs.lac
MOWING ERTILIZING
Fertilize Date: Fertilize Rate: Fertilizer Type: Apr 1990 100lb/acre 18-46-0
OTHER TREATMENTS VEGETATION MONITORING
Veg. Mon. Date 1990 1991 1992 1996 1999 2000 2003 2003 2004 Vegetation Monitoring Description See 1990 Annual Report, Appendix C See 1991 Annual Report, Reclamation 1991 See 1992 Annual Report, Appendix F See 1996 Annual Report, Appendix E Interim Bond Release Monitoring Jurisdictional wetlands monitoring 1st year Final Bond Release monitoring Jurisdictional wetlands monitoring 2nd year Final Bond Release monitoring
GRAZING
Grazing Date: Nov-Dec 1998 Aug 1999 Apr-May 2000 Jun 2001 Aug 2004 ) 09/19/2005-1 011512005
I
Animal Units: 218 cattle 200 cattle 141 cattle 162 cattle 81 pair 50 cows, 2 bulls, 48 calves 47 pair
60 cowlcalf pairs
Pasture: Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1
Grazing Duration: 45 days 30 days 32 days 45 days 30 days 26 days 34 days 19 days
07/28/06-08/31/06 07/26/07-08/13/07
2125/2009
Page2of4
fp?-Tl
Field Number
OS/26/08-06/17/08 \ 11/29/08-12/11/08
90-01-A
.
~
Buckskin Mining Company - 2008 Annual Report December, 2008
Pasture #1 Pasture #1 22 days 12 days
38 cow/calf pairs 1 bull 101 cows
212512009
Page 3 of4
Field Number
90-01-A
Buckskin Mining Company - 2008 Annual Report December, 2008
Bond Release Information
~ategory:
Verification Status
Verification Rough Backfill: Stream Channel Reconstruction: Backfill Quality: Topsoil Replacement: Sediment Control Release: Postmine Land Uses: Postmine Wildlife Habitat: Revegetation Success: Postmining Shrub Goals: PostmineTree Distribution: Groundwater Restoration: Surface Water Restoration: Postmining Road Corridor: Temporary Structure Removal:
05-22-2001 08-25-1999 08-30-2005 08-30-2005 08-23-2004 08-23-2004 N/A 08-30-2005 08-30-2005 08-30-2005 08-30-2005 10-11-2001 05-17-2000 09-16-2005 09-16-2005 11-02-2005 11-02-2005 N/A 09-16-2005 09-16-2005 09-16-2005 09-16-2005
Submittal Date Approval Date
Document Reference
N/A N/A N/A
Permit 500-T6; Change No.3; TFN 32/382 Permit 500-T5; TFN 36/282 Permit 500-T6; Change No. 28; TFN 41/181 Permit 500-T6; Change No. 28; TFN 41/181 Permit 500-T6; Change No. 31; TFN 4 6/173 Permit 500-T6; Change No. 31; TFN 4 6/173
N/A
Permit 500-T6; Change No. 28; TFN 41/181 Permit 500-T6; Change No. 28; TFN 41/181 Permit 500-T6; Change No. 28; TFN 41/181 Permit 500-T6; Change No. 28; TFN 41/181
Chapter 15 Bond Release Status
dond
Tll~
Date
06-04-2001 10-11-2001 05-17-2000 01-19-2006
LBRUID
Document Reference
2000 Annual Report
~ermit
Area Bond Phase 1 Phase 2 Phase 3
500-T6; Change No.3; TFN 3 2/382
Permit 500-T5; TFN 36/282 9094 Permit 500-T6; Change No. 33; TFN 4 3/242
2125/2009
Page 4 of4
Field Number
')cation: Area (acres): 14.15 Season: Year: Township: Range: Section: Qtr/Qtr:
90-03-A
Buckskin Mining Company - 2008 Annual Report December, 2008
Fall
1990 T.51 N.
R.72 W.
5
NW114NW1 14 1979 1989
Info. Source: 2005 Annual Report Initial Disturbance Date: Final Backfill/Grading Date: Notes:
Reclamation History
BACKFILL ACTIONS
Quality Reference: Unsuit. BF Action: Data in 1989 Annual Report, Appendix B Data in 1989 Annual Report, Appendix B
TOPSOIL
Topsoil Date: Topsoil Depth: Topsoil Source: 1989 & 1990 .Minimum of 24 .in., with a 32 in. average; top 6 in. were separately removed and replaced as top 6 in. of the reclaimed surface Direct haul from pit advance
SEEDING
Seed Date: Type: Bed Prep.: Contractor: Equipment: Method: Seed Mix Name: Mix Description: Shrubs: Trees: Shelter Belt Date: Shelter Belt Desc.: Drill seeded and hydroseeded sagebrush Fall Drill Seeded And Hydroseeded Sagebrush Upland Grassland Revegetation (Terrace, Sides lope, & Hilltop Mixes) (See 1990 Annual Report, Reclamation, Table 4-2) Nov 1990 Initial Spoil: Scarified with ripper. Seedbed: Disced.
2125/2009
Page 1 of4
!5DO-T7
Field Number
Seed Date: Type: Bed Prep.: Contractor: Equipment: Method: Seed Mix Name: Mix Description: Shrubs: Trees: 1997
90-03-A
Buckskin Mining Company - 2008 Annual Report December, 2008
InterSeed
A total of 550 bare-root trees and shrubs (Populus sargentii, Salix amygdaloides, Corn us stolonifera, Artemesia cana, and Shepherdia argentea) were hand planted inside the wetland pond exclosures in the AVF (Units 90-3-A, 95-3, 96-3, and 96-4). In 1999, a total of 282 bare-root trees and shrubs (Populus deltoides, P. tremuloides, Fraxinus pennsylvanica, Picea pungens, Pinus ponderosa, Betula papyrifera, Acer saccharinum, Rhus glabra, Syringa vulgaris, Caragana arborescens, Elaeagnus augustifolis, Malus spp., Prunus americana, P. [nanking], P. virginiana, Salix [golden], and Rosa rugosa) were hand planted inside the wetland pond exclosures in the AVF (Units 90-3-A, 95-3, 96-3, and 96-4).
Shelter Belt Date: Shelter Belt Desc.:
COVER CROP
Date Cover Crop Type: Cover Crop Mix: Cover Crop Rate: 151b.lacre Oats
.iULCHING
Mulch Date: Mulch Type: Mulch Mix: Mulch Rate: Nov 1990 Hydroniulched 100% wood fibre, hydromulched, 1.5 tons/ac; with tackifier, 40 Ibs.lac
MOWING FERTILIZING
Fertilize Date: Fertilize Rate: Fertilizer Type: P205, 75 Ibs.lac & K20, 40 Ibs.lac Nov 1990
OTHER TREATMENTS
Date Description 1997 Wetland ponds excavated and fenced
VEGETATION MONITORING
Veg. Mon. Date 1991 1992 1996 1999 . 2000 .i 2003 2003 Vegetation Monitoring Description See 1991 Annual Report, Reclamation 1991 See 1992 Annual Report, Appendix F See 1996 Annual Report, Appendix E Interim Bond Release Monitoring Jurisdictional wetlands monitoring 1st year Final Bond Releas.e monitoring Jurisdictional wetlands monitoring
2125/2009
Page2of4
.q;o-Tl
Field Number
2004 \\2004
90-03-A
_.. -
- ... - --."
Buckskin Mining Company - 2008 Annual Report December, 2008
2nd year Final Bond Release monitoring Jurisdictional wetlands monitoring
\3RAZING
Grazing Date: Nov-Dec 1998 Aug 1999 Apr-May 2000 Jun 2001 Aug 2004
09/19/2005-10/15/2005
Animal Units: 218 cattle 200 cattle 141 cattle 162 cattle 81 pair 50 cows, 2 bulls, 48 calves 218 Cattle 200 cattle 141 cattle 162 cattle 81 pair 50 cows, 2 bulls, 48 calves 47 pair 60 cowlcalf pairs 38 cowlcalf pairs 1 bull 101 cows
Pasture: Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1 Pasture #1
----~----.---
Grazing Duration: 45 days 30 days 32 days 45 days 30 days 26 days 45 days 30 days 32 days 45 days 30 days 26 days 34 days 19 days 22 days 12 days
Nov-Dec 1998 Aug 1999 Apr-May 2000 Jun 2001 Aug 2004
09/19/2005-10/15/2005 07/28/06-08/31/06 07/26/07-08/13/07 05/26108-06/17/08 11129/08-12111108
)
--------~~~-----------~-
--- -------------------
212512009
Page 3 of4
c.tYJ-Tl
Field NumberĀ·
90-03-A
Buckskin Mining Company - 2008 Annual Report December, 2008
')
..;ategory:
Bond Release Information Verification Status
Verification Rough Backfill: Stream Channel Reconstruction: Backfill Quality: Topsoil Replacement: Sediment Control Release: Postmine Land Uses: Postmine Wildlife Habitat: Revegetation Success: Postmining Shrub Goals: PostmineTree Distribution: Groundwater Restoration: Surface Water Restoration: Postmining Road Corridor: Temporary Structure Removal:
Submittal Date Approval Date
Document Reference
N/A N/A
05-22-2001 08-25-1999 08-30-2005 08-30-2005 08-23-2004 08-23-2004 N/A 08-30-2005 08-30-2005 08-30-2005
10-11-2001 05-17-2000 09-16-2005 09-16-2005 11-02-2005 11-02-2005 N/A 09-16-2005 09-16-2005 09-16-2005
Permit 500-T6; Change No.3; TFN 3 2/382 Permit 500-T5; TFN 3 6/282 Permit 500-T6; Change No. 28; TFN 41/181 Permit 500-T6; Change No. 28; TFN 41/181 Permit 500-T6; Change No. 31; TFN 4 6/173 Permit 500-T6; Change No. 31; TFN 4 6/173 N/A Permit 500-T6; Change No. 28; TFN 41/181 Permit 500-T6; Change No. 28; TFN 41/181 Permit 500-T6; Change No. 28; TFN 41/181
Chapter 15 Bond Release Status
dond Tllpe Area Bond Phase 1 Phase 2 Phase 3 Date
06-04-2001 10-11-2001 05-17-2000 01-19-2006 9094
LBRUID
Document Reference
2000 Annual Report Permit 500-T6; Change No.3; TFN 3 2/382 Permit 500-T5; TFN 3 6/282 Permit 500-T6; Change No. 33; TFN 4 3/242
212512009
Page4of4
..5lO-Tl